25_004 SCADA Integrators RFP.pdf

PDF 6 MB Posted

Attached to
25-004 SCADA Integration
Solicitation number
PE-77111-NONST-2025-000000017
Issued by
Jasper County, Georgia

About this file

This document is a Request for Proposals (RFP) issued by the City of Commerce, Georgia for SCADA Integration for their Wastewater Treatment System. The RFP seeks proposals from vendors for the design and implementation of a new SCADA system at the Northside Wastewater Pollution Control Plant (WPCP) and the new Grove Creek WPCP. The scope of work includes provision and installation of local control panels, remote I/O equipment, SCADA servers and programs, operator interface terminals, and integration of instrumentation. Vendors must register with the project engineer, submit proposals by December 16, 2024, and may be asked to provide site visits and presentations prior to selection. The City intends to select a vendor to provide these services.

The RFP outlines specific submittal requirements, including details on company history, experience, maintenance programs, power and site requirements, and equipment specifications. Pricing information is required, including hourly rates, a 20-year O&M cost estimate, and the capital cost for the SCADA system. The proposals will be evaluated based on criteria such as lead time, established presence, experience, design, operations, maintenance, and cost. The City reserves the right to change the selection process as needed based on the proposals received.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals For SCADA Integration for Commerce, GA Wastewater Treatment System

Prepared for:

City of Commerce 27 Sycamore Street Commerce, GA 30529

Prepared By:

GOODWYN MILLS CAWOOD, LLC

6120 Powers Ferry Road NW, Suite 200 Atlanta, GA 30339

COMMERCE OCTOBER 2024

SCADA INTEGRATOR Page 2 of 9

1 INTRODUCTION

The purpose of this request for proposals (RFP) is to solicit proposals from Vendors for SCADA Integration for the city of Commerce’s Wastewater Treatment System. It is the intent of Commerce to select a vendor that will be used in the design and implementation of SCADA within its system.

It is Commerce’s intent to have proposals representative of similar scope, supply, and configuration between suppliers based on performance requirements so that the proposals can be evaluated on an equal and fair basis with like-for-like comparison where possible. The proposals will be evaluated using criteria listed in Section 3. Commerce may request site visits and/or presentations from a short-list of Vendors prior to making a selection.

Background Commerce’s wastewater treatment system is primarily comprised of an existing Water Pollution Control Plant (WPCP), the Northside WPCP, water towers and pump stations to efficiently serve the surrounding area. An additional WPCP has been designed to better support the Northside WPCP, and is to begin construction soon.

Northside WPCP:

The Northside WPCP is an existing 2.1 million gallon per day (MGD) maximum monthly average daily flow (MMADF) facility in Commerce, GA. The Plant serves approximately 7,800 acres of property in Jackson County, Georgia and treats domestic, commercial and industrial wastewater.

The facility consists of coarse screening, influent flow measurement and recording, grit removal, aeration basins, filtration, chlorination and dechlorination. The original plant was constructed in 1974, and was upgraded in 1986 to treat 1.05 MGD of flow and was again upgraded in 2003 to treat its present 2.1 MGD permitted flow. A PFD of Northside WPCP site plant, adjacent lift station and P&I Diagram following their 2003 upgrade is attached in Appendix A.

The current SCADA system installed at the Northside WPCP is the General Electric Intellution iFIX

3.5 SCADA system. Computer displays present graphic illustrations of each system with equipment run status, process flow readings, chemical flow readings, chemical tank levels, alarms, alarm report history, reports and trending information.

Grove Creek WPCP:

SCADA INTEGRATOR Page 3 of 9

Commerce recently has requested the design of a new wastewater treatment facility to provide support to the Northside WPCP. This plant, the Grove Creek WPCP, is designed as a 2.0 MGD greenfield facility. The plant will feature an Orbal oxidation ditch, tertiary cloth disc filters, and a UV system. A PFD of the site plan for the proposed facility is attached in Appendix B. The location of the Beck Road lift station is also shown.

Submittal Registration Proposers must register via email with the Engineer, Goodwyn Mills Cawood, to ensure that all addenda are received. Proposals by unregistered suppliers will not be considered. Send contact information to Charles Welch at Charles.Welch@gmcnetwork.com with the subject line, “Commerce SCADA Integrator Proposal”. The email shall in its body provide the following information:

1. Contact Name

2. Phone (Office/Cell)

3. E-mail Address

4. Physical Address

5. SCADA Integrator Manufacturer

Questions All questions should be addressed in writing to Charles Welch at Charles.Welch@gmcnetwork.com. PLEASE DO NOT CALL such that questions may be properly managed and all suppliers provided the same information. The engineer will issue addenda as deemed necessary and appropriate. Questions shall be submitted no later than the following:

November 15, 2024 at 5:00 P.M. E.S.T.

Companies that wish to schedule an on-site review of the existing Northside WPCP may do so by contacting Charles Welch at Charles.Welch@gmcnetwork.com or by calling 404-626-3893.

Preparation of Proposal Each Proposal shall be assembled in one PDF document with a Title Page, Table of Contents, and Section Dividers. The submittal information shall be presented in the order requested under Section 5, Proposal Information.

In the case of Vendors who choose to furnish “confidential information”, this information shall be clearly identified as the confidential portion of the Vendor’s Proposal and shall be assembled in the same manner as described above.

mailto:charles.welch@gmcnetworkj.com

SCADA INTEGRATOR Page 4 of 9

Delivery of Proposal The Proposal shall be emailed to Charles Welch at Charles.Welch@gmcnetwork.com. If the PDF is too large, GMC can provide an FTP site or OneDrive folder where the Vendor can upload the document.

The Proposal must be received by: 12:01 P.M. E.S.T. on December 16, 2024.

2 Project Description General description of the work at each facility is detailed below. It is the request of Commerce that the new SCADA system at both plants allows operators control of either facility and also the control of the Beck Road Pump Station.

Northside WPCP:

1. Provision and installation of all Local Control Panels (LCPs). Replace all existing LCPs with the latest technology.

2. Replacement of Remote Input Output (RIO) cabinets and equipment as required to operate the new system.

3. Rehabilitation and/or upgrading of existing SCADA server/panel.

4. New SCADA program.

5. New Operator Interface Terminal (OIT) computers and equipment.

6. Replacement, calibration, and commissioning of necessary instruments.

7. Complete programming for SCADA and LCPS.

Grove Creek WPCP:

The project description for Grove Creek WPCP includes the Beck Road Pump Station adjacent to the plant.

1. Provision and installation of all LCPS and integration with Factory Control Panels (FCPs).

2. Provision and installation of primary and backup SCADA program and server/panel, OITs, communication equipment including ModBUS CAT6 managed network switches, radios, and milt-mode Fiber Optic (FO) converters.

3. Provision, calibration, and commissioning of all integrator supplied instrumentation.

4. Complete programming for SCADA, LCPS, ad VFDS not factory programmed.

Note: Any supplier who submits in its Proposal to Commerce any information that is determined by Commerce or its engineer, Goodwyn Mills Cawood, to be substantially inaccurate, misleading, exaggerated, or incorrect may be disqualified from consideration.

SCADA INTEGRATOR Page 5 of 9

3 SELECTION PROCESS

CATEGORIES

Commerce and its consultants reserve the right to change, suspend, or rescind the Proposal rating and/or sole source selection based on subsequently ascertained information.

The offers will be evaluated according to the five categories below:

• Lead Time – 20%

• Established Presence – 20%

• Experience/Installations – 20%

• Design, Operation, and Maintenance – 20%

• Cost – 20%

4 REQUIRED SUBMITTAL INFORMATION FOR SUPPLIERS

GENERAL

• Provide an acknowledgment of all addenda.

• Provide the following information:

o Sales Representative company name (if applicable), project contact, address, phone number, web address and email o Manufacturer company name, project contact, address, phone number, web address and email

LEAD TIME

• Length of time between approval of shop drawings/submittal and delivery to the job site.

It is anticipated that shop drawings/submittal will be approved prior to project bid.

ESTABLISHED PRESENCE

Please state the following:

• A brief company (manufacturer) history

• Duration that the Vendor has been in business

• Provide an organizational chart with the team that will be assigned to this project

• Location and qualifications of nearest qualified service representative

• Overview of maintenance and troubleshooting program

EXPERIENCE/INSTALLATIONS

• State the number of total installations the manufacturer has in operation in North America.

SCADA INTEGRATOR Page 6 of 9

• State the number of installations the manufacturer has in Georgia.

• List installations completed within the past ten (10) years.

o All projects submitted shall be separated projects o All the projects must have been completed by the Vendor submitting a Proposal for this project.

• For two (2) projects, include the following additional information.

o Owner’s representative who has personal knowledge of the manufacturer’s performance during the referenced project. More than one person may be listed, but all must have knowledge of the project. DO NOT list principals or individuals who cannot answer specific questions about the equipment.

o Cost of manufacturer’s portion of the project

PERFORMANCE AND SITE REQUIREMENTS

• State what power requirements are needed to run the SCADA system and all associated equipment provided by the Vendor (i.e., phase, kW, etc.)

• State any additional set up and/or site requirements

COST

• Provide the hourly rates for the installation and setup the vendor will perform.

• Provide an estimated schedule of O&M costs for the next 20 years that would include the following at a minimum:

o Annual maintenance and repairs o Any replacement costs for equipment o Annual power usage (assume $0.12/kwh) o Call out costs

• Provide the capital cost for all equipment necessary for the SCADA system.

DESIGN

• Please provide a technical specification specific for your equipment.

• Please provide cut sheets or any other brochures and technical information that would be helpful in evaluating your equipment.

• Provide equipment layout drawings with dimensions and component sizing drawn to scale for the proposed project. Provide a process and instrumentation diagram as well as electrical drawings (panels, one line, etc.).

• Provide written description of routine maintenance requirements and expected frequency. This shall match the cost estimate.

• Provide standard manufacturer equipment used by Vendor for major components, and clearly state the proposed manufacturer for all major equipment.

SCADA INTEGRATOR Page 7 of 9

• Provide Vendor scope of supply.

• Clearly list all required materials not provided by the Vendor that are needed for successful installation, such as anchor bolts, supports, etc. This should not include items specifically listed as not required to be provided by the Vendor in Section 2.

• Vendors should contact the engineer in writing as described in Section 1 should they find that requirements of the RFP contribute considerable cost, yet questionable benefit.

Further, cost saving or value engineering suggestions are recommended in the proposals.

SCADA INTEGRATOR Page 8 of 9

APPENDIX A – See attached

Page 1 Northside Site Plan Page 2 Process & Instrumentation Diagram Page 3 Process & Instrumentation Diagram Page 4 Process & Instrumentation Diagram Page 5 Process & Instrumentation Diagram

BFP - BACKFLOW PREVENTER

RAS - RETURN ACTIVATED SLUDGE

RW - REUSE WATER

UV - ULTRAVIOLET

W - POTABLE WATER

WAS - WASTE ACTIVATED SLUDGE

YD - YARD HYDRANT

C - CHEMICAL FEED LINE

SS - SANITARY SEWER

PP - POWER POLE

LP - LIGHT POLE

AutoCAD SHX Text

U.V. CHAMBER

AutoCAD SHX Text

YD

AutoCAD SHX Text

8" DIP AIR

AutoCAD SHX Text

4" DIP

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

4" DIP

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

NO. 2

AutoCAD SHX Text

CLARIFIER

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

NO. 1

AutoCAD SHX Text

CLARIFIER

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

NO. 3

AutoCAD SHX Text

CLARIFIER

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

EXIST. CONCRETE

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

NO. 1

AutoCAD SHX Text

DIGESTER

AutoCAD SHX Text

DIGESTER

AutoCAD SHX Text

NO. 2

AutoCAD SHX Text

CLARIFIER

AutoCAD SHX Text Existing

AutoCAD SHX Text Edge of

AutoCAD SHX Text Pavement

AutoCAD SHX Text

BASIN NO. 3

AutoCAD SHX Text

INFLOW EQUALIZATION

AutoCAD SHX Text

NEW

AutoCAD SHX Text

BASIN NO. 2

AutoCAD SHX Text

INFLOW EQUALIZATION

AutoCAD SHX Text

NEW

AutoCAD SHX Text

INFLOW EQUALIZATION

AutoCAD SHX Text

NEW

AutoCAD SHX Text

CHEMICAL STORAGE TANK

AutoCAD SHX Text

CHEMICAL FEED SHED

AutoCAD SHX Text

LAB. BUILDING

AutoCAD SHX Text

ADMINISTRATION/

AutoCAD SHX Text

POST AERATION AND PARSHALL FLUME

AutoCAD SHX Text

OXIDATION

AutoCAD SHX Text

DITCH

AutoCAD SHX Text

EXIST. FENCE TO REMAIN

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

8" TO BELT PRESS

AutoCAD SHX Text

16" RAS/WAS

AutoCAD SHX Text 20"

AutoCAD SHX Text 20"

AutoCAD SHX Text 20"

AutoCAD SHX Text 20"

AutoCAD SHX Text 20"

AutoCAD SHX Text 18"

AutoCAD SHX Text 18"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6" W.A.S. F.M.

AutoCAD SHX Text 8"

AutoCAD SHX Text

8" TO BELT PRESS

AutoCAD SHX Text

12" DRAIN

AutoCAD SHX Text F.F. 723.28

AutoCAD SHX Text

NO.1

AutoCAD SHX Text

CLARIFIER

AutoCAD SHX Text

NO.2

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

PROPOSED FENCE

AutoCAD SHX Text

SEPTAGE RECEIVING DI TOP=712.55

AutoCAD SHX Text 4"

AutoCAD SHX Text

25' DOUBLE GATE SEE SHEET C-28 FOR DETAILS

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

DITCH

AutoCAD SHX Text

OXIDATION

AutoCAD SHX Text

DEWATERING/MAINTENANCE

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4" F.M.

AutoCAD SHX Text 4"

AutoCAD SHX Text 12" F.M.

AutoCAD SHX Text

6" DECANT

AutoCAD SHX Text 8"

AutoCAD SHX Text 12" F.M.

AutoCAD SHX Text

CONC. STEPS

AutoCAD SHX Text 8"

AutoCAD SHX Text 12" F.M.

AutoCAD SHX Text 12" F.M.

AutoCAD SHX Text 1" C

AutoCAD SHX Text 12"

AutoCAD SHX Text 1" C

AutoCAD SHX Text 16"

AutoCAD SHX Text 6"

AutoCAD SHX Text 8"

AutoCAD SHX Text 1" C

AutoCAD SHX Text 8"

AutoCAD SHX Text 20"

AutoCAD SHX Text 8" W

AutoCAD SHX Text

2" PW

AutoCAD SHX Text 6"

AutoCAD SHX Text

1 1/2" RW

AutoCAD SHX Text 20"

AutoCAD SHX Text

2" RW

AutoCAD SHX Text 12" F.M.

AutoCAD SHX Text 8"

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

NEW BACK FLOW PREVENTER VAULT

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

VALVE VAULT #3

AutoCAD SHX Text

VALVE VAULT #5

AutoCAD SHX Text

VALVE VAULT #4

AutoCAD SHX Text 16"

AutoCAD SHX Text 24"

AutoCAD SHX Text 24"

AutoCAD SHX Text

BASIN NO. 1

AutoCAD SHX Text

INFLOW EQUALIZATION

AutoCAD SHX Text

NEW

AutoCAD SHX Text F.F. = 721.38

AutoCAD SHX Text

FF.=721.38

AutoCAD SHX Text

CONNECT PROPOSED FENCE TO EXISTING FENCE

AutoCAD SHX Text F.F. 715.38

AutoCAD SHX Text

CHEMICAL STORAGE TANK

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text

20" EFF.

AutoCAD SHX Text

12" DRAIN

AutoCAD SHX Text

12" DRAIN

AutoCAD SHX Text

SEPTAGE/DRAIN PUMP STATION TOP = 713.64

AutoCAD SHX Text 1" C

AutoCAD SHX Text

4"RW

AutoCAD SHX Text

4"RW

AutoCAD SHX Text 1"W

AutoCAD SHX Text

RW

AutoCAD SHX Text 6"

AutoCAD SHX Text W

AutoCAD SHX Text

4"RW

AutoCAD SHX Text

2"RW

AutoCAD SHX Text

2"RW

AutoCAD SHX Text 6"

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text 6"

AutoCAD SHX Text 6" W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text 6"

AutoCAD SHX Text W

AutoCAD SHX Text 6"

AutoCAD SHX Text

RW

AutoCAD SHX Text

4"RW

AutoCAD SHX Text

2"RW

AutoCAD SHX Text

2"RW

AutoCAD SHX Text

1.5"RW

AutoCAD SHX Text

LP

AutoCAD SHX Text

LP

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

PROPOSED PARKING

AutoCAD SHX Text

EXISTING FENCE TO REMAIN

AutoCAD SHX Text

CONNECT PROPOSED FENCE TO EXISTING FENCE

AutoCAD SHX Text

PROPOSED PARKING

AutoCAD SHX Text

EQ. PUMP STATION

AutoCAD SHX Text

24' OPENING ELECTRIC OPERATED FRONT GATE SEE SHEET C-28 FOR DETAILS

AutoCAD SHX Text

PLANT SIGN

AutoCAD SHX Text

4" PLUG VALVES (2)

AutoCAD SHX Text 1"W

AutoCAD SHX Text

GENERATOR PAD

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

BLOWER

AutoCAD SHX Text F.F.=717.54

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

BLOWER

AutoCAD SHX Text

FREE STANDING FUEL TANK; DIKE

AutoCAD SHX Text

UTILITY SERVICE PAD

AutoCAD SHX Text

FUEL TANK PAD

AutoCAD SHX Text

TERTIARY FILTERS

AutoCAD SHX Text

12' WIDE DOUBLE GATE

AutoCAD SHX Text

RW

AutoCAD SHX Text 8"

AutoCAD SHX Text P.V.

AutoCAD SHX Text 8" G.V.

AutoCAD SHX Text

BYPASS

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

STEP

AutoCAD SHX Text

STEP

AutoCAD SHX Text

BASIN NO. 1

AutoCAD SHX Text

(2) 4" PLUG VALVES

AutoCAD SHX Text

RAS/WAS WET WELL & PUMP STATION

AutoCAD SHX Text

12' WIDE DOUBLE GATE

AutoCAD SHX Text

4" HIGH, 2' WIDE ASPHALT HUMP TOP = 713.38

AutoCAD SHX Text

NEW LOCATION OF CATCH BASIN

AutoCAD SHX Text

NOTE: MH J-1 WAS MOVED 15' NORTH OF LOCATION SHOWN

AutoCAD SHX Text 20" P.V.

AutoCAD SHX Text 20" P.V.

AutoCAD SHX Text

HEADWORKS

AutoCAD SHX Text

PROPOSED UNDERGORUND POWER

AutoCAD SHX Text

PROPOSED OVERHEAD POWER

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text

PP

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text

UG

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

INIT.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION DESCRIPTION

AutoCAD SHX Text PROJECT No.

AutoCAD SHX Text

DRAWING FILE:

AutoCAD SHX Text

SURVEYED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWING INFORMATION

AutoCAD SHX Text SHEET No.

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text W

AutoCAD SHX Text L

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text B

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

SMYRNA, GEORGIA 30080

AutoCAD SHX Text

FAX (770) 955-1064

AutoCAD SHX Text

2430 HERODIAN WAY, SUITE 101

AutoCAD SHX Text

(770) 952-2481

AutoCAD SHX Text Stevenson Palmer

AutoCAD SHX Text

SAVANNAH

AutoCAD SHX Text

ALBANY

AutoCAD SHX Text

SMYRNA

AutoCAD SHX Text

AUGUSTA

AutoCAD SHX Text I N C O R P O R A T E D

AutoCAD SHX Text

AutoCAD SHX Text Engineering

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text S219-00-35

AutoCAD SHX Text C1-C7,10,13,14,17,22-27

AutoCAD SHX Text

DHH/WBK

AutoCAD SHX Text

MRT

AutoCAD SHX Text

CRD/RCG

AutoCAD SHX Text

CRD

AutoCAD SHX Text

WDW

AutoCAD SHX Text

OCT. 2002

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

PROPOSED SITE PLAN

AutoCAD SHX Text

NORTHSIDE WWTP EXPANSION

AutoCAD SHX Text

CITY OF COMMERCE, GEORGIA

AutoCAD SHX Text C-3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BEFORE ANY EXCAVATION WORK BEGINS OR ANY WORK BEGINS

AutoCAD SHX Text

WITHIN TEN(10') FT. OF OVERHEAD POWER LINES OF 750 VOLTS OR

AutoCAD SHX Text

MORE, NOTIFICATION MUST BE MADE TO THE UTILITIES PROTECTION

AutoCAD SHX Text

CENTER, INC. IT'S THE LAW.

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text

IT'S THE LAW

AutoCAD SHX Text

OUT-OF-STATE: CALL COLLECT (404)325-5000

AutoCAD SHX Text

THREE WORKING DAYS BEFORE YOU DIG

AutoCAD SHX Text

CALL FREE THROUGHOUT GEORGIA

AutoCAD SHX Text 1-800-282-7411

AutoCAD SHX Text

(623-4344 METRO ATLANTA)

AutoCAD SHX Text

UTILITIES PROTECTION CENTER, INC.

AutoCAD SHX Text

OF GEORGIA

AutoCAD SHX Text d

AutoCAD SHX Text a

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text h

AutoCAD SHX Text e

AutoCAD SHX Text v

AutoCAD SHX Text d

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text g

AutoCAD SHX Text r

AutoCAD SHX Text n

AutoCAD SHX Text u

AutoCAD SHX Text u

AutoCAD SHX Text n

AutoCAD SHX Text d

AutoCAD SHX Text NOTES: THIS SHEET REPRESENTS COMPLETION OF NEW COMPONENTS, PIPING, PAVING, ETC.. REFER TO PERTINENT SHEET FOR VARIOUS DISCIPLINES OF WORK.

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text D.

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text H

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text I

AutoCAD SHX Text No. 15734

AutoCAD SHX Text W

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text

FENCING

AutoCAD SHX Text

EXISTING SEWER MANHOLE

AutoCAD SHX Text

EXISTING GAS LINE

AutoCAD SHX Text

EXISTING WATER LINE

AutoCAD SHX Text

PP

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

%%U LEGEND

AutoCAD SHX Text

EXISTING STORM DRAIN

AutoCAD SHX Text

EXISTING 10' CONTOUR

AutoCAD SHX Text

EXISTING 2' CONTOUR

AutoCAD SHX Text

PROPOSED REUSE WATER

AutoCAD SHX Text

PROPOSED WATER LINE

AutoCAD SHX Text

HEADWALL

AutoCAD SHX Text

DROP INLET

AutoCAD SHX Text

PROCESS MANHOLE

AutoCAD SHX Text

PROPOSED STORM DRAIN

AutoCAD SHX Text

PROPOSED 10' CONTOUR

AutoCAD SHX Text

PROPOSED 2' CONTOUR

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text

WM

AutoCAD SHX Text

EXISTING WATER METER

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

PROPOSED FIRE HYDRANT

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

IRRIGATION VALVE

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

AutoCAD SHX Text 8-05-03

AutoCAD SHX Text

MRT

AutoCAD SHX Text

ADDENDUM #3, ITEM 57

AutoCAD SHX Text

AutoCAD SHX Text

AS BUILT

AutoCAD SHX Text

BY CONTRACTORS INFORMATION ONLY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AS-BUILT

AutoCAD SHX Text

DRS

AutoCAD SHX Text 1-09-07

AutoCAD SHX Text

AutoCAD SHX Text cwelch Text Box

APPENDIX A

cwelch Text Box

SCADA INTEGRATOR Page 9 of 9

APPENDIX B – See attached

Page 1 Grove Creek WPCP Site Plan

PL

PL N64°37'18"W 449.77'

S4 9°

'5

0" W

3.

PL PL PL

PL

PL

PL

PL

PL

PL

PL

PLPLPLPLPLPLPLPLPLPLPL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

OH

P

OH

P

O

HP

O

HP

O

HP

O

HP

O

HP

MAG.

METERMAG.

METER

UP

UP

LEGEND

PROPERTY LINE PL

PERIMETER FENCE

RETENTION POND

ASPHALT ROAD

ROAD CENTERLINE

OFFSITE PROPERTY PL

FENCE

TREELINE

OVERHEAD ELECTRIC

RIGHT OF WAY

WATERBODY

STREAM CENTERLINE

EASEMENT

EXISTING ROAD

C -2

C

IV

IL

S

IT

E

PL

A

N

SI

TE

L A

YO

U

T

This drawing is and shall remain the property of Goodwyn, Mills and Cawood, Inc. (GMC) and Goodwyn Mills Cawood LLC (GMC). Unauthorized use of any kind including use on other projects is prohibited. In the event that a conflict arises between the sealed drawings and the electronic files, the sealed drawings will govern.

C om m er ce

.0 M

G D

G ro ve

C re ek W

PC

P

C om m er ce , G

A

G M

C P

R O

J.

C

AT

L2

N O

T

- R

EL

EA

SE

D

F O

R C

O N

ST

R

U C

TI

O

N

CERT I F I C

ATE

O F

A U

TH

OR

IZ

ATION

STATE

O

F G

EO

RG

IA

D R

AW

IN

G S:

.3

0.

D

R

AW

IN

G

S:

.2 9.

NOTES:

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING

AND PROTECTING ALL SERVICE AND UTILITY LINES ON THE

SITE AND WITHIN THE PROJECT CORRIDOR PRIOR TO

BEGINNING EXCAVATION. UTILITIES LOCATED WITHIN THE

FOOTPRINT OF THE PROPOSED UTILITY SHALL BE RELOCATED

AS REQUIRED AND THE COST OF RELOCATION SHALL BE PART

OF THE CONTRACT.

2. ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS SHALL

BE PROTECTED BY A TEMPORARY CONSTRUCTION

ENTRANCE TO PREVENT TRACKING OF MUD ONTO PUBLIC

RIGHT-OF-WAYS.

3. GRADE AREAS ADJACENT TO STRUCTURE LINES TO DRAIN

AWAY FROM STRUCTURES TO PREVENT PONDING.

4. WHEN FINISHED GRADING MEETS OR ABUTS CURBS, WALKS

OR PAVEMENT, UPHILL GRADES SHALL BE SLIGHTLY HIGHER

THAN PAVEMENT TO PERMIT PROPER DRAINAGE.

5. FIELD ADJUSTMENTS IN GRADE MUST BE APPROVED BY THE

ENGINEER.

6. NO FILL MATERIAL IS TO BE STORED ON CONCRETE, ASPHALT

OR PERVIOUS ROADS WITHIN SITE.

7. CONTRACTOR SHALL REFERENCE SPECIFICATIONS FOR

CLEARING, GRUBBING, AND STOCK PILING SOIL.

EROSION CONTROL NOTE:

1. SEE ALSO CIVIL DRAWINGS FOR EROSION CONTROL PLANS.

SCALE:C-201

1 SITE PLAN

1" = 100'

PROPERTY LINE

(41.87 ACRES)

KEY NOTES:

1. 24' WIDE ACCESS ROAD

2. ADMINISTRATION AND LAB BUILDING

3. CLARIFIER

4. ORBAL AERATION BASIN

5. EQUALIZATION BASIN

6. HEADWORKS

7. SEPTIC RECEIVING

8. DEWATERING BUILDING

9. DIGESTER

10. BLOWER BUILDING

11. ELECTRICAL ROOM

12. GENERATOR

13. CHEMICAL TANK FARM

14. TERTIARY FILTER

15. ULTRAVIOLET DISINFECTION

16. PARSHALL FLUME

17. PERIMETER SWALE

18. PERIMETER FENCING

19. RETENTION POND

20. EMERGENCY SPILLWAY

4 4

9 9 cwelch Text Box cwelch Text Box

APPENDIX B

SCADA Integrators RFP.pdf
1 INTRODUCTION
Background
Submittal Registration
Questions
Preparation of Proposal
Delivery of Proposal
2 Project Description
3 SELECTION PROCESS
CATEGORIES
4 REQUIRED SUBMITTAL INFORMATION FOR SUPPLIERS
GENERAL
LEAD TIME
ESTABLISHED PRESENCE
EXPERIENCE/INSTALLATIONS
PERFORMANCE AND SITE REQUIREMENTS
COST
DESIGN
Binder1.pdf
Commerce Northside WPCP Site Plan
Sheets and Views
C-3
Northside P&I Diagram
I-1
I2
I3
I4
Commerce Grove Creek WPCP Site Plan
Sheets and Views
C-201

File details come from the government source that posted it. Updated .