25-0038_Cost_proposal.xls
XLS spreadsheet 31 KB Posted
- Attached to
- Long Valley inspection Booth; 25-0038
- Solicitation number
- 0000035679
- Issued by
- Plumas County, California
About this file
This is a cost proposal spreadsheet for Invitation for Bid (IFB) 24-0148, which appears to be a blank template for a construction or infrastructure project. The document includes sections for labor classifications, materials, and miscellaneous costs, with all current entries showing $0.00 across concrete work, booth installation, bollard installation, and electrical work. The spreadsheet is structured to capture detailed cost breakdown, including labor hours, rates, material quantities, unit costs, and additional expenses like equipment rental and mobilization.
The cost proposal template indicates that tax on materials must be included in the unit cost, suggesting a comprehensive pricing approach. While the current document is empty, it is designed to allow a bidder to provide a complete financial proposal with granular cost details across different project components. The blank nature of the document suggests this is a standard form provided to potential contractors to submit their precise cost estimates for the specific project referenced in IFB 24-0148.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-0038_IFB.pdf | ||
| 25-0038_Attachment_1,_LABOR_CODE_CERTIFICATIONS.pdf | ||
| 25-0038_Attachment_2,_Noncollusion_Affidavit.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Cost Proposal Sheet | |||
| IFB 24-0148 | |||
| Labor: | |||
| Classification | Hours | Rate | Total |
| Concrete Work | $0.00 | ||
| Booth installation | $0.00 | ||
| Bollard Installation | $0.00 | ||
| Electrical Work | $0.00 | ||
| $0.00 | |||
| $0.00 | |||
| Total Labor: | $0.00 | ||
| Materials*: | |||
| Description | Quantity | Unit Cost | Total |
| Inspection Booth | $0.00 | ||
| Bollards | $0.00 | ||
| Concrete | $0.00 | ||
| $0.00 | |||
| $0.00 | |||
| $0.00 | |||
| Total Materials: | $0.00 | ||
| Other/Miscellaneous: | |||
| Description | Quantity | Unit Cost | |
| equipment rental costs | $0.00 | ||
| mobilization | $0.00 | ||
| $0.00 | |||
| $0.00 | |||
| Total Other/Miscellaneous: | $0.00 | ||
| GRAND TOTAL: | $0.00 | ||
| * Tax on materials must be included in unit cost |