24Z5AT1 Repair_Repaint Water Tower SOW_Drawing Approval Packet.pdf

PDF 5 MB Posted

Attached to
15B51524Q00000012 - Repair and Repaint Water Tower - Project 24Z5AT1
Solicitation number
15B51524Q00000012
Issued by

About this file

This package includes a statement of work, drawings, and photos outlining requirements for a federal contract to repair and repaint an elevated water tower at the Federal Correctional Institution in Texarkana, Texas. The scope of work involves pressure washing, sandblasting, and recoating the 150,000 gallon water tower to remedy pitting and restore the surface. The contractor must be experienced in water tank work and will be responsible for all labor, materials, tools, permits, insurance, and equipment to complete the project. The statement of work specifies responsibilities of the contractor and agency, safety requirements, security protocols for working onsite, and provides reference drawings and photos of the water tower and project area. The solicitation number and opportunity details match the requirements in the statement of work for this repair and repainting project at the Texarkana correctional facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FCI Texarkana Statement of Work / Drawing

Approval

Project 24Z5AT1 - Repair/Repaint Water Tower

Sensitive But Unclassified

U.S. Department of Justice

Federal Bureau of Prisons

South Central Regional Office Grand Prairie, Texas 75051

February 6, 2024

MEMORANDUM FOR KEVIN WALKER, FACILITY MANAGER

FEDERAL CORRECTINAL INSTITUTION TEXARKANA

FROM:

SUBJECT:

Gregory Floyd Facilities Administrator

Approval of Statement of Work and Drawings, “Repair/Repaint Water Tower” FCI Texarkana project 24Z5AT1

We have reviewed and approved the statement of work Pages 1 through 4 and drawings A-1, A-2, & A-3 that was received for the above referenced project.

If you have any questions please call.

Approved 2/6/2024 SCRO

STATEMENT OF WORK

REPAINT ELEVATED WATER TOWER PROJECT 24Z5AT1

FCI TEXARKANA

I. SPECIFICATIONS

A. Scope Of Work

The Federal Bureau of Prisons (FBOP), Federal Corrections Institution (FCI) Texarkana intends to award to a responsible entity for the provision of repainting the elevated water tower at FCI Texarkana, located at 4001 Leopard Drive, Texarkana, Tx 75501.

Awarded contractor will be required to provide all labor, materials, tools, permits, insurance and equipment, necessary to repair all pitting, sandblasting, and recoating of the current surface on an (elevated) 150,000 gallon water tower.

B. Operation Specifications

1. Awarded Contractor shall be a reputable Tower or Tank Service Provider with proven experience in domestic water tanks. All assigned Contractor. The Contractor shall provide the Institution’s Contracting Officer and his Representative (COR) with such proof.

2. Service will comply with all Local, State, and Federal codes and safety requirements as well.

3. Labor includes pressure washing the exterior of the tank and support structure using an anti-fungal biodegradable solution. Cleaning of the surface by hand where necessary. Then applying a one spot prime coat of metal primer and one complete finish coat of acrylic.

4. Contractor shall perform job site clean-up and removal of all excess materials, debris, and old equipment associated with the project. Removal and disposal of all debris must be completed in accordance with all applicable Federal, State, and Local laws pertaining to such work.

C. FCI Texarkana Responsibilities

1. FCI Texarkana shall ensure all energy sources needing to be secured to prevent personal injury and/or property damage will be locked-out and tagged-out with the appropriate safety measures. All system isolations and lock-out/tag-out measures to be implemented, and/or removed, will require written verification by the Contractor, COR, and the Safety Manager prior to doing so.

2. FCI Texarkana shall provide the necessary escorting staff members to the Contractor and their assigned Field Technicians carrying out the prescribed work and will allow access to project related institution areas as needed.

3. The Institution Safety Manager shall randomly monitor the project. If at any time the Safety Manager witnesses, or become privy to a deemed “unsafe work practice” being carried out by one or more of the contractor’s assigned field technicians working on site, the contractor will be required to stop work and make the necessary work practice corrections to comply with all OSHA and/or Institution advised safety requirements. Failure to do so may result in work stoppage and other administrative measures.

D. Contractor’s Responsibilities

1. The Contractor shall comply with all applicable Federal, State, and Local laws for the safe transportation, storage, use, documentation, and disposal of all chemicals that may be used on the job. Likewise, all used chemicals, chemically hazardous debris (to include used rags), must be safely collected in approved receptacles and removed by the Contractor in accordance with the aforementioned regulatory entities.

2. All work shall be inspected by the COR and Contacting Officer for quality and meet the terms of this Statement of Work as specified prior to final acceptance and closure of the project.

E. Reference Documents

Attached reference drawings/specifications are provided for work requirements and the Contractor’s benefit.

Actual equipment installation and existing conditions may vary.

ATTACHMENT A-1 Location Plan ATTACHMENT A-2 Tower Elevation and Loads ATTACHMENT A-3 Project Photos

II. CONTRACTOR SECURITY/WORKING REGULATIONS

A. Working Hours

1. The schedule for these services will be five (5) days a week, Monday through Friday, with the exception of Federal holidays. The schedule will continue weekly until the installation is completed, not to exceed thirty (30) calendar days from Notice to Proceed (NTP). The rear gate will open at 8:00 A.M. and close at 2:30 P.M.

Requests to extend hours or change workdays must be submitted in writing by the Contractor to the Contracting Officer (CO) for approval at least forty-eight (36) hours in advance.

B. Delivery of Materials

1. All construction materials/equipment required for work on this project is required to be processed by the Contractor and coordinated with the COR for temporary storage.

2. Construction related deliveries which are directly shipped to the institution can be received between the hours of 8:O0 AM - 2:30 PM, Monday - Friday, excluding federal holidays. At no point will a Bureau of Prisons (BOP) staff member receive or sign for a delivery if the contractor, or his representative, is not present to verify and accept the delivery.

3. Under no circumstances will FCI Texarkana staff be responsible for the acceptance of any Contractor deliveries.

4. The Contractor shall be responsible to provide for its own means of loading and unloading Contractor material and equipment.

5. The Contractor will not be permitted to impede or block driveways for any extended period that would hinder the normal operations of the institution.

C. Storage of Equipment/Tools

1. If required, all equipment/tools shall be stored in a designated area mutually agreed upon between the COR and the Contractor. If required, the Contractor shall provide a securable, single point access storage container, such as a Job or Gang Box that will be left in the agreed upon storage area for the duration of the project. Size of the storage container will be determined by the Contractor and the COR. The container will be secured using a two padlock protocol with one padlock being provided by the institution lock shop and the other provided by the contractor. For institution security purposes, the contractor shall provide the institution lock shop with one key copy for every contractor padlock being used. If necessary, a contractor provided heavy duty chain may be used to facilitate the locking requirement. All equipment/tools stored within the container will be maintained in a safe an orderly fashion. All contractor padlock key copies will be returned to the contractor upon 100% proven tool accountability by the institution and removal of assigned storage containers from the property.

2. The Contractor shall be responsible for loading and unloading contractor materials and equipment. At no time shall Contractor materials or equipment being staged in a fashion that would block, impede or otherwise hinder the typical operations of the institution.

3. All Contractor ladders that may be needed for the job shall be stored and secured in the immediate work site area. Such ladders will be secured to an agreed upon stationary fixture with a chain and padlock application following the same contractor storage container lock protocol with one padlock provide by the contractor and one provided by the institution’s lock shop.

4. The Contractor shall be required to adhere to the institution’s tool inventory program as it pertains to their tools and equipment entering and exiting the institution. If a contactor owned storage container is to be used for tools, materials, and equipment for the duration of the project, the Contractor will be required to use an institution approved “Daily Inventory Check Sheet” for all items maintained in the container. The process for container tool accountability will require a FCI Facilities Staff member, along with an overseeing Institution Shift Custody Lieutenant, to be present. The container will be inventoried and verified by the Contractor, the Facility Staff Member, and the Shift Lieutenant at the end of every work shift prior to locking the container shut.

D. Security Clearance/Contractor Badges

1. The Contractor shall provide the COR with the necessary security clearance information on all Contractor Field Technicians assigned to work on the project. In the event a Field Technician does not clear the Institution’s security screening process the contractor may, if necessary, submit another Field Technician candidate. By law, the BOP cannot, and will not, release any information regarding the reason as to why a Contractor employee was not able to clear the institution’s security screening process.

2. All security clearance documentation shall be reviewed and institution approved five (5) working days prior to contractor institution access. Approved security clearances will be in effect for the duration of the project.

3. Contractors assigned to the project will access and depart the institution grounds via the main entrance or when necessary the lower property perimeter road gate.

E. Safety and Personal Protective Equipment

1. The Contractor shall comply with all applicable Federal, State, and Local safety standards providing their field technicians with all necessary safety equipment to include, proper personal protective equipment, Lock-Out / Tag-Out equipment, and any “job-site specific” safety equipment deemed necessary to safely complete the project described in this Statement of Work.

2. All contractor employees shall have, and wear required personal protective equipment prescribed by industry standards at all times while on the job site. It is the responsibility of the contractor to provide such equipment.

F. Other Considerations

1. Contractor technicians will NOT be allowed to bring cell phones, cameras or two way pagers into the Institution. Use of such devices however, may be used on institution exterior grounds. FCI Texarkana Reserves the right to restrict their use at any time if deemed a security threat or risk.

2. The Facilities Department at FCI Texarkana maintains a digital camera that will be utilized by FCI Facility Staff to document the project work. The Contractor may request copies of the digital photos for their record keeping.

3. All deviations from this Statement of Work must be approved in writing by the Contracting Officer and COR.

4. In the event of an institution emergency the contractor may be instructed to secure from all work, secure all tools, equipment, and materials, and if necessary escorted off institution grounds. Work will be suspended until the institution emergency passes.

G. Utilities

1. FCI Texarkana will provide electrical power for all tools required for the project and restroom facilities.

END STATEMENT OF WORK

N

63 58

232221

16 17

North 33° 22' 34.5" West 94° 5' 22.8"

COORDINATES

46 - STAFF HOUSING

52 - TRAILER STAGING AREA

49 - UNICOR STORAGE

55 - TOWER 1

54 - GARDEN

50 - SALVAGE YARD

48 - V.T. SHOPS

47 - V.T. CLASSROOM

53 - FARM IMPLEMENT SHED

51 - UNICOR CARDBOARD STO.

45 - FEDERAL PRISON CAMP

61 - LANDSCAPE OFFICE

64 - F/S FREEZERS

63 - GREENHOUSES

59 - TOWER 5

58 - TOWER 4

57 - TOWER 3

65 - WEIGHT AREA

62 - MEDICAL/COMMISSARY

60 - K-UNIT / ABOVE FOOD SERV.

66 - DRUG TREATMENT BLDG.

56 - TOWER 2

24 - POWERHOUSE

23 - RECREATION FIELD

33 - ELEVATED WATER TANK

31 - CONSTRUCTION 1 OFFICE

27 - FUEL STORAGE TANKS

26 - GAS MANIFOLD SHELTER

32 - RADIO TOWER

29 - GREENHOUSE

25 - OUTSIDE PLUMBING SHOP

1 - ADMINISTRATION BLDG.

2 - COURT YARD

6 - WEST UNIT

5 - LAUNDRY

4 - STOREROOM

10 - UNICOR

8 - REAR GATE

9 - REAR GATE OFFICE

7 - SOUTHWEST UNIT

11 - COMMISSARY

3 - FOOD SERVICE

42 - FIREARMS CLASSROOM

41 - TRAINING BUILDING

40 - COMMAND CENTER

36 - UNICOR WAREHOUSE

39 - H.R.M. OFFICE

38 - MAIL ROOM

37 - ARMORY

35 - GARAGE

43 - FIRING RANGE

44 - PARKING AREA

16 - HOSPITAL

14 - EAST UNIT

20 - CHAPEL

19 - MECHANICAL SERVICES

18 - V.T. WELDING SHOP

17 - EDUCATION COMPLEX

15 - MODULAR UNIT

13 - CENTRAL UNIT

21 - GYMNASIUM

22 - RECREATION YARD OFFICE

12 - METAL DETECTOR BLDG. 34 - GROUND WATER TANK

30 - FOOD SERVICE WAREHOUSE

GRAPHIC SCALE IN FEET

FCI TEXARKANA

INSTITUTION SITE PLAN

E

O

B U

NEW MEXICO

R

A

E D

L

TEXAS LA

OKLAHOMA

O

ER UA

ARKANSAS

PR

IS

F

M

F

TR

AP

D E

FTNE O

UJ S

C T I E

N

AREA OF PROPOSED WORK

FCI / FPC TEXARKANA

4001 LEOPARD DRIVE

TEXARKANA, TEXAS 75501

SCRO

SCRO

SOUTH CENTRAL REGION

BUILDING INDEX

FCI TEXARKANA

67 - RECYCLE STORAGE BLDG.

68 - FCI CREDIT UNION

28 - LANDSCAPE SHOP

REVISIONS

ACAD Number:

Sheet number:

of: 3

Date Drawn:

02/05/2024

Checked By:

D. Osborn

Drawn By:

H. McMillan

M.W.O. Number:

UREAU OF

L

TR

E

AP

D

D F E

ERA

OFTN

R

I

TI

EM JUS

B P

CE

O N S

S

H. McMillan, Engineering Tech

PREPARED BY

Fe de ra l C or re ct io na l I ns tit ut io n

- T ex ar ka na

Fe de ra l C or re ct io na l I ns tit ut io n R

EC

O

R D

D R

A W

IN

G

S

DRAWING TITLE

ELEVATED

WATER

TOWER

N/A

B&F PROJECT NUMBER:

24Z5AT1

A-1

LOCATION PLAN

SCALE: USE GRAPHIC SCALE

ReplaceCAMPWalkways.DWG

Approved 2/6/2024 SCRO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Federal Bureau of Prisons

AutoCAD SHX Text United States Department of Justice

AutoCAD SHX Text 4001 Leopard Drive

AutoCAD SHX Text Texarkana, TX 75501

150,000 GAL. SEMISPHERICAL ELEVATED WATER TANK

AT FEDERAL CORRECTIONAL INSTITUTION, TEXARKANA, TEXAS

ALTITUDE: 197' 4 14"

REVISIONS

ACAD Number:

Sheet number:

of: 3

Date Drawn:

02/05/2024

Checked By:

Drawn By:

H. McMillan

M.W.O. Number:

B&F PROJECT NUMBER:

UREAU OF

L

TR

E

AP

D

D F E

ERA

OFTN

R

I

TI

EM JUS

B P

CE

O N S

S

H. McMillan, Engineering Tech

PREPARED BY

Fe de ra l C or re ct io na l I ns tit ut io n

- T ex ar ka na

Fe de ra l C or re ct io na l I ns tit ut io n R

EC

O

R D

D R

A W

IN

G

S

DRAWING TITLE

ELEVATED

WATER

TOWER

N/A

24Z5AT1

Approved 2/6/2024 SCRO

D. Osborn

AutoCAD SHX Text Federal Bureau of Prisons

AutoCAD SHX Text United States Department of Justice

AutoCAD SHX Text 4001 Leopard Dr

AutoCAD SHX Text Texarkana, TX 75501

ChangeofUseWarehouse.DWG

REVISIONS

ACAD Number:

Sheet number:

of: 3

Date Drawn:

02/05/2024

Checked By:

Drawn By:

H. McMillan

M.W.O. Number:

B&F PROJECT NUMBER:

UREAU OF

L

TR

E

AP

D

D F E

ERA

OFTN

R

I

TI

EM JUS

B P

CE

O N S

S

H. McMillan, Engineering Tech

PREPARED BY

Fe de ra l C or re ct io na l I ns tit ut io n

- T ex ar ka na

Fe de ra l C or re ct io na l I ns tit ut io n R

EC

O

R D

D R

A W

IN

G

S

DRAWING TITLE

ELEVATED

WATER

TOWER

N/A

24Z5AT1

Approved 2/6/2024 SCRO

D. Osborn

AutoCAD SHX Text Federal Bureau of Prisons

AutoCAD SHX Text United States Department of Justice

AutoCAD SHX Text 4001 Leopard Dr

AutoCAD SHX Text Texarkana, TX 75501

ChangeofUseWarehouse.DWG

A-1 Location Plan 24Z5AT1.pdf
Sheets and Views
Water Tower Region Sub-A-1_LOCATION PLAN
A-2 Tower Elevation and Loads.pdf
Sheets and Views
Water Tower Region Sub-A2_ TOWER ELEVATION AND LOADS
A-3 Project Photos.pdf
Sheets and Views
Water Tower Region Sub-A_3 PROJECT PHOTOS

File details come from the government source that posted it. Updated .