New Manufacture of the SPS-49 Reflectors
Solicitation number
N0016424RWP12
Issued by

About this file

This solicitation is for the new manufacture of SPS-49 reflectors. The Navy seeks to award a contract to produce SPS-49 reflectors in accordance with provided drawings and specifications, as well as perform first article testing and deliver data items. The contractor must furnish all required labor, materials, equipment, and facilities. The performance period is five years from award with a minimum of one reflector required initially and pricing provided for yearly quantities thereafter. Proposals are due by 07 February 2024 with award anticipated shortly after. Delivery locations and terms are also defined.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 07 Feb 2024

X

A X B X C X D

EX

X

G F 61 - 76

77 - 88 X H 89 - 94 cheryl.a.biel.civ@us.navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A7 1 94

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00164 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and see Section L conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

CHERYL A BIEL (812) 854-8530

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

5 - 18 19 - 20

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

21 - 23 24 - 25

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 26 - 35 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 36 - 38 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

39 - 59

PART II - CONTRACT CLAUSES

NAVAL SURFACE WARFARE CENTER CRANE DIV

C. BIEL (812-854-8530)

BLDG 3373

300 HWY 361

CRANE IN 47421-5002

812-854-8530

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

08 Jan 2024

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0016424RWP12

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QTY U/I UNIT PRICE AMOUNT

0001 FIRST ARTICLE, SPS-49 New

Manufacture

1 Each

First article for the SPS-49 Reflector new manufacture ordered IAW the SOW, all applicable drawings, and CDRLs. USN or FMS units.

**See pricing matrix below NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

PSC: 5840

FOB: Destination

FFP

CLIN 0001 PRICE MATRIX

Quantity Year 1 (each)

0002 SPS-49 New Manufacture

Each

SPS-49 Reflector new manufacture ordered IAW the SOW, all applicable drawings, and CDRLs. USN or FMS units.

**See pricing matrix below NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

CLIN 0002 PRICE MATRIX

Quantity YEAR 1 (each) YEAR 2 (each) YEAR 3 (each) YEAR 4 (each) YEAR 5 (each)

2-3 4+

0003 Data

1 Lot

Technical Data Requirements for CLINs 0001-0002 IAW the contract CDRLs, A001-A005 provided in Section J, all applicable DIDs, and the SOW. The price/costs for all data generated by the contractor directly or indirectly in its performance of this effort is included in the price/costs paid by the Government under CLINs 0001 through 0002.

0004 Contract Ceiling

Each

The purpose of this CLIN is to establish the contract ceiling. no orders will be placed using this CLIN.

IDC CONSTRAINTS

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00

TBD

Section C - Descriptions and Specifications

STATEMENT OF WORK (SOW)

STATEMENT OF WORK FOR

NEW MANUFACTURING OF THE SPS-49 REFLECTOR

July 25, 2023

1. INTRODUCTION AND SCOPE

SCOPE: This SOW defines manufacturing, first article requirements and test requirements for the SPS-49 Reflector as manufactured per drawing number 912164.

2. APPLICABLE DOCUMENTS

The following documents, or the revision, or issue in effect at the date of the order or as otherwise specified by the delivery order (DO), forms a part of this SOW to the extent described herein. The exact revision of documents is not cited in the text of the SOW for convenience of reference.

2.1. Drawings

912164 Reflector, Antenna Rev AN 914411 Slat Coordinates, Antenna Reflector, Rev C 80972501 SPS-49 Reflector End Cap, Rev A 80972601 SPS-49 Splice, Rev – 80986201 SPS-49 Clip, Rev B

NSWC Crane Documents

89 WIS 10 8485 SPS-49 Reflector Laser Tracker Procedure, Rev B 89 TPA 09 8469 SPS-49 Reflector Range Test Procedure, Rev A 89 TRP 12 9240 Physical Repair Procedure, Rev B 89 WIS 10 0109 Quality Assurance Work Instruction, Rev D 89 TRP 09 8471 Rec E Reflector OH and Repair Pocedure

Commercial Documents

ISO 9001:2015 Quality Management System

3. REQUIREMENTS

3.1 General Requirements

3.1.1. As ordered via a delivery order (DO), the contractor shall manufacture and deliver

AN/SPS-49 reflectors.

3.1.2. The contractor shall provide labor, materials, equipment, and facilities as defined by the

DO and this SOW.

3.1.3. The contractor shall submit Progress Status and Management Reports. (CDRL A001)

3.2. Logistics/Configuration Management (CM) Requirements

3.2.1. The contractor shall be responsible for ensuring each end item delivered to the Government conforms to the approved product drawings.

3.2.2 If an obsolescence issue occurs, the Contractor shall notify the Government of this condition upon identification. Contractor assumes responsibility for identification, notification, and recommended resolution of obsolescence issues to the Government. The Contractor shall immediately define the shortage by providing the Government with the component manufacturer part number (OEM), affected end item part number, affected end item nomenclature, and components per end item. If an alternate part is identified, the Contractor shall provide the alternate manufacturer part number (OEM) and a technical report with data proving the alternate part is equivalent (A002, Technical Report).

3.3 General Requirements, Manufacture and Test in Accordance with drawing

3.3.1 The contractor shall furnish all equipment, parts, and labor necessary to manufacture

SPS-49 Reflector assets.

3.3.2 All Newly manufactured Reflectors shall be delivered to the Government per FOB

Destination to NSWC Crane, Building 3168.

3.3.3 All assets to be delivered to the Government, the contractor shall perform marking for shipment and storage processes using MIL-STD-129P.

3.3.4 All assets to be delivered to the Government, the contractor shall apply equipment markings and identification processes using MIL-STD-130N.

3.3.5 All assets shall be packaged IAW MIL-STD-2073-1E Method 54 and cover all external electrical ports with plastic protective caps.

3.3.6 The contractor shall maintain a configuration control program that meets the requirements of EIA-649-1 Configuration Management Requirement for Defense contracts.

3.3.7 The contractor shall manufacture AN/SPS-49 Reflectors in accordance with drawing numbers 912164 and 914411.

3.3.8 The max allowable thickness of the slat material is 0.028 inches per drawing 912164.

3.3.9 The contractor shall test manufactured AN/SPS-49 Reflectors to show compliance to the specifications laid out in document 912164. The contractor shall include test/inspection reports with each delivered reflector. (CDRL A004, Test Inspection Report, Production

Test Report) Modified versions of Form III and Form V found in document number 89 TRP 09 8471 will be provided to the contractor.

3.4 First Article

3.4.1 Reflectors shall meet the dimensional requirements of drawing 912164.

3.4.1.1 Verification method: Analysis by FARO Laser Tracker. This verification verifies 74 dimensions across the reflector at the pylons.

3.4.2 Reflector welds shall be inspected per drawing 912164, note 18.8.

3.4.2.1 Verification method: Inspection of weld integrity by dye penetrant inspection.

3.4.3 Back frame shall meet the dimensional requirements of drawing 912164.

3.4.3.1 Verification method: Analysis by FARO Laser tracker. This verification verifies dimensions from the back frame per drawing 912164.

3.4.4 Slat positions shall meet dimensional requirements of drawing 912164.

3.4.4.1 Verification method: Analysis by using the FARO Laser tracker per document number 89 WIS 10 8485. This verification measures 420 points at each mounting bracket for each slat across the reflector.

3.4.5 Reflector shall pass a paint peel inspection.

3.4.5.1 Verification method: Paint adhesion test by following ASTM 3359 test by crosshatch tape pull test.

3.4.6 The reflector shall meet antenna performance specification as outlined in 89 TPA 09

8469.

3.4.6.1 Verification method: Test by following the Far Field Procedure as outlined in document number 89 TPA 09 8469.

3.4.7 The contractor shall resolve any issues found with the First Article products (data and hardware). First Article test data and hardware shall meet the requirements of all drawings/documents is section 2.1.

3.4.8 The contractor shall conduct a First Article Test closeout meeting showing successful completion of all first article requirements. The contractor shall be responsible for testing as indicated in Section 3.4 and delivery of First Article Test data sheets (CDRL A003, Test/Inspection Report, First Article Test Report). The contractor shall be responsible for any mechanical defects found at Government test/inspection points such as correction of any painting and/or physical discrepancies. CDRL A003, Test/Inspection Report, First Article Test Report. First Article testing may be waived for manufacturers of the SPS-49 Reflectors within the past 5 years. The contractor shall produce the first article in the same facility that will be used for production.

3.5 Production Unit Testing

3.5.1 Reflectors shall meet the dimensional requirements of drawing 912164.

3.5.1.1 Verification method: Analysis by FARO Laser Tracker. This verification verifies 74

3.5.2 Reflector welds shall be inspected per 912164, note 18.8.

3.5.2.1 Verification method: Inspection of weld integrity by dye penetrant inspection.

3.5.3 Back frame shall meet the dimensional requirements of drawing 912164.

3.5.3.1 Verification method: Analysis by FARO Laser tracker. This verification verifies 74

3.5.4 Slat positions shall meet dimensional requirements of 912164.

3.5.4.1 Verification method: Analysis by using the FARO Laser tracker per document number 89 WIS 10 8485. This verification measures 420 points at each mounting bracket for each slat across the reflector.

3.5.5 Reflector shall pass a paint peel inspection.

3.4.5.1 Verification method: Paint adhesion test by following ASTM 3359 test by crosshatch tape pull test.

3.6 QA Inspection

3.5.6.1 HOLD reflector for Government Quality Assurance (QA) Inspector. QA Inspector shall use Form V found in 89 TRP 09 8471 to complete the inspection of the reflector. No reflector will be shipped without first being inspected by a qualified QA Inspector per document number

89 WIS 10 0109.

3.6.1 The reflector shall meet antenna performance specification as outlined in 89 WIS 10 8485.

3.5.7.1 Verification method: Test by following the Far Field Procedure as outlined in document number 89 TPA 09 8469.

3.7 Installation Kit

3.7.1 An Installation Kit consisting of the parts outlined in Table 1 shall be provided by the contractor and installed in the shipping skid with each newly manufactured reflector.

TABLE 1. Installation Part Kit

Description P/N Cage Code Qty Screw, Cap, Hex Head, ¾-16 X 4 ¼"

MS90727-196 80205 2

Lock Washer, ¾” MS35338-51 80205 2 Flat washer, ¾” MS51412-13 80205 2

Screw, Cap, hex head, 5/8-11 x 3”

MS90728-168 80205 4

Lock washer, 5/8, .166” Thick

MS35338-50 80205 4

4. GOVERNMENT FURNISHED ITEMS

4.1 Government Furnished Information (GFI) - The Government will provide the drawings/information shown in section 2 which is not commercially available.

4.2 Government Furnished Equipment (GFE) – The Government will provide shipping skids at each DO. The contractor shall take action for disposition of the GFE, as directed by the Government, at the conclusion of the contract. (CDRL A005, Government Property (GP) Inventory Report).

4.3 Government Furnished Material (GFM) – No GFM will be provided.

5. DATA DELIVERABLES

5.1.1 The following data deliverables shall be completed and submitted in accordance with the requirements listed in the Contractor Data Requirements Lists (CDRL).

CDRL: A001

DID Number: DI-MGMT-81928 DID Title: Contractor's Progress, Status, and Management Report SOW Paragraph: 3.1.3

CDRL: A002

DID Number: DI-NDTI-80809B DID Title: Technical Report- Study/Services Subtitle: Engineering Change Proposal SOW Paragraph: 3.2.2

CDRL: A003

DID Number: DI-NDTI-80809B DID Title: Test/Inspection Report Subtitle: First Article Test Report SOW Paragraph: 3.2.4

CDRL: A004

DID Number: DI-NDTI-80809B DID Title: Test/Inspection Report Subtitle: Test Report SOW Paragraph: 3.3.8

CDRL: A005

DID Number: DI-MGMT-80441D DID Title: Government Property (GP) Inventory Report SOW Paragraph: 4.2

6. SPECIAL CONDITIONS

6.1 Security - Work performed under this contract is not expected to be classified. If classified documents or products are required, a security clearance at the appropriate level shall be required to handle classified documentation and gain access to U.S. Navy ships and/or Government facilities.

6.2 Place of Performance - The majority of work under this contract shall be performed at the prime contractor’s facility and/or subcontractor facilities. Work must be performed in accordance with this SOW and consistent with the terms and conditions of the contract.

6.3 Inspections - The Government reserves the right to perform in-process inspections at the contractor’s facility. The Government will inspect all work before acceptance, according to defined specifications as outlined in this SOW. Workmanship defects and/or transportation damage found upon delivery to the Government shall not be accepted and shall be redone/reworked by the contractor at no additional cost to the Government.

6.4 Quality – The contractor shall have a quality program that is ISO 9001-2015 compliant or meets the following requirements: monitor and control critical processes; continuously improve processes; establish mechanisms for performance feedback; and maintain an effective root cause analysis and corrective action system.

6.4.1 Counterfeit Parts and Materiel. Counterfeit materiel is a serious threat to the safety and operational effectiveness of DoD systems. The Contractor (and Subcontractors at all tiers) shall implement a risk mitigation process when obtaining critically or high risk materiel in accordance with paragraphs (6.4.1.1 and 6.4.1.2) below:

6.4.1.1 If the materiel is currently in production or currently available, the material shall be obtained only from authorized sources. Authorized sources are the original manufacturer, a source with the express written authority of the original manufacturer or current design activity, or and authorized aftermarket manufacturer.

6.4.1.2 If the materiel is not in production or currently available from authorized sources, the materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria.

Counterfeit avoidance criteria can be found in the following Industry Standards – SAE AS5553A; SAE AS5452; SAE AS6081; SAE ARP617; SAE AS6174; and SAE AS6301.

6.4.2 The Contractor shall report instances of counterfeit and suspect counterfeit materiel to the Contracting Officer and the Government Industry Data Exchange Program (GIDEP) as soon as the Contractor becomes aware of the issue.

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-209-H002 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (OCT 2018)

(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.

The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "First Article Approval--Government Testing" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements.

(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.

C-209-H003 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (OCT 2018)

If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):

(Offeror to fill in contract number(s), as applicable. See Section M)

(End of Text)

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

None

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No.

N0016424RWP12.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.

Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph

(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-242-H002 POST AWARD MEETING (NAVSEA) (OCT 2018)

(a) A post-award meeting with the successful offeror will be conducted within [ 10 ] days after award of the contract if found applicable. The meeting will be held at the address below:

Location/Address: The specifics of this meeting, if determined necessary, will be determined at time of award.

(b) The contractor will be given [ 5 ] working days notice prior to the date of the meeting by the Contracting Officer.

(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the [contract / task order].

(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out.

Specific topics shall be mutually agreed to prior to the meeting.

C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE I

(NAVSEA) (MAY 2019)

(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.

(b) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:

(1) The Contracting Officer may at any time by written order:

(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or

(ii) add items of data or information to the attachment identified in Section J; or

(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.

(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.

(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government

Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:

(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or

(2) By submitting a request to the

Department of Defense Single Stock Point (DoDSSP) Building 4, Section D

700 Robbins Avenue Philadelphia, Pennsylvania 19111-5094 Telephone (215) 697-6396 Facsimile (215) 697-9398.

Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.

D-247-H001 ADDITIONAL MARKING REQUIREMENTS FOR FMS ITEMS (NAVSEA) (OCT 2018)

(a) The following identifying marks shall appear on the outside of each box, parcel and/or crate and all shipping papers included in each shipment:

NAVY

FMS CASE TBD at the Delivery Order level REQUISITION NO. TBD at the Delivery Order level ITEM DESCRIPTION TBD at the Delivery Order level

If a consolidated shipment of several items in one container is forwarded, add to the above information

"CONSOLIDATED SHIPMENT, CONTAINS ____ ITEMS".

(b) The inscription "UNITED STATES OF AMERICA" shall be affixed in a suitable size indelible stencil, label or printed form on all external shipping containers or the exterior surface of uncrated items.

(c) All invoices, correspondence, reports and other documents shall be identified with the appropriate FMS case designator, requisition number(s), and item description(s).

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020)

Item(s) CLINs 0001-0002 The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001-2015

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph

(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)

The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)

(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.

(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(d) The certificate shall read as follows:

I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this document.

Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 6 months after date of order (ADO) 1 Naval Surface Warfare Center

CRANE DIV

M/F: Sam Chapin (3168) BLDG 41 SE Central Receiving

300 HWY 361

CRANE IN 47522-5001

N00164

0002 2 months ADO (SAME AS PREVIOUS LOCATION)

0003 IAW CDRL 1 N/A

DELIVERY INFORMATIONFOB:

Destination

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

See Section F

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

Within Days

After Date

Item No. Quantity of Contract

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

F-242-H001 CONTRACTOR NOTICE REGARDING LATE DELIVERY (NAVSEA) (OCT 2018)

In the event the contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the contractor shall immediately notify, in writing, the Contracting Officer and the cognizant Contract Administration Services Office, if assigned. The notice shall give the pertinent details; however, such notice shall not constitute a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.

Section G - Contract Administration Data

252.204-7006 BILLING INSTRUCTIONS—COST VOUCHERS (MAY 2023)

When submitting a request for payment using a cost voucher, the Contractor shall--

(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and

(b) Separately identify a payment amount for each contract line item included in the payment request.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

COMBO Inspection/Acceptance: Destination/Destination

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD

Issue By DoDAAC TBD

Admin DoDAAC** TBD

Inspect By DoDAAC TBD

Ship To Code TBD

Ship From Code TBD

Mark For Code TBD

Service Approver (DoDAAC) TBD

Service Acceptor (DoDAAC) TBD

Accept at Other DoDAAC TBD

LPO DoDAAC TBD

DCAA Auditor DoDAAC TBD

Other DoDAAC(s) TBD

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.