24R4009 RFP.pdf
PDF 298 KB Posted
- Attached to
- 55-day Tanker Time Charter Federal contract opportunity
- Solicitation number
- N3220524R4009
About this file
This document is a request for proposals for a 55-day tanker time charter issued by the Department of the Navy Military Sealift Command. The solicitation requests proposals for a clean, double-hull tanker capable of carrying a minimum of 235,000 barrels of clean product within vessel's natural segregation in designated cargo tanks. The vessel must meet specified particulars including maximum length, draft, manifold height, and speed. The solicitation provides the charter period from November 28 to December 29, 2023, with a canceling date of November 29. Offerors must comply with terms and conditions including reporting requirements and submit pricing for the charter period and fuel. Proposals are due by November 7, 2023. The document includes attachments relating to fuel consumption, instructions to offerors, evaluation criteria, and flow down of FAR clauses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TANKTIME PART X FAR 52.212-1.pdf | ||
| 24R4009 FUEL CONSUMPTION.xlsx | XLSX spreadsheet | |
| FAR 52.209-5.pdf | ||
| TANKTIME PART II FAR 52.212-4.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27 October 2023
This is the Military Sealift Command Norfolk, Strategic Sealift Program Support Office
SOURCES SOUGHT NOTICES, RFP’S, AMENDMENTS AND CONTRACT AWARDS
WILL BE POSTED TO THE SAM.GOV WEBSITE (ONLY) UNTIL FURTHER
NOTICE.
HTTPS://SAM.GOV
PROFORMA DOCUMENTS WILL BE MADE AVAILABLE UPON REQUEST.
Subj: RFP N3220524R4009
Ref: (a) SF 1449
(b) MSC TANKTIME 2022 (09-22)
This acquisition is being conducted under FAR 13.5 Simplified Procedures for Certain Commercial Products and Commercial Services. Only FAR Part 13 procedures will be used to solicit and evaluate proposals submitted by owners/offerors. Per FAR 52.216-1, the Government contemplates award of a firm-fixed-price contract resulting from this solicitation.
MSC Strategic Sealift Program Support Office, N103A, requests proposals for vessel(s) capable of meeting the transportation requirements described below. The paragraph numbers below apply to the box layout of references (a) and (b), which are incorporated herein by reference (available on the MSC web site at https://www.msc.usff.navy.mil, under “Business “Opportunities”, select “Contracts”, then “Proforma”, or upon request), and shall be the charter form of any contract resulting from this solicitation. By submission of a proposal, the Owner/Offeror confirms agreement with all terms and conditions of this solicitation and the charter form, unless otherwise identified therein.
Notes:
1. EACH OWNER/OFFEROR SHALL SUBMIT ONLY ONE VESSEL.
SUBSTITUTIONS FOR VESSELS WILL BE ALLOWED UP UNTIL SUBMISSION OF
FINAL PROPOSALS IF COMMUNICATIONS ARE HELD AND FINAL PROPOSALS
ARE REQUESTED (SEE TANKTIME PART X(g)).
2. DUE TO INCREASED E-MAIL SECURITY, IT MAY TAKE LONGER FOR E-
MAILS TO BE RECEIVED IN THE APPROPRIATE IN-BOX, ESPECIALLY WHEN
AN E-MAIL IS HOSTED IN A FOREIGN COUNTRY; SOME E-MAILS ARE
DELAYED IN EXCESS OF HOURS. OWNERS/OFFERORS ARE ENCOURAGED TO
SUBMIT OFFERS AS SOON AS POSSIBLE. NO JPEG FILES.
https://sam.gov/ https://www.msc.usff.navy.mil/
A. STANDARD FORM 1449 BOXES
I. Standard Form 1449 Boxes
2. Contract No.: Will be provided upon award
5. Solicitation No.: N3220524R4009
6. Solicitation Issue Date: 27 October 2023
7. For Solicitation Information and Submittal of Proposals/Offers: Email Michelle James at michelle.d.james7.civ@us.navy.mil; 757-443-3870
8. Offer Due Date: Tuesday, 07 November 2023, at 1000 Eastern Time
9. Issued by: Military Sealift Command Norfolk, 471 East C Street, Bldg. SP 64, Naval Station Norfolk, Norfolk, VA 23511-2419 (Code: N32205)
10. This Acquisition is: Unrestricted; NAICS Code: 483111
14. Method of Solicitation: RFP 18a. Payment will be made by: ERP DFAS-CL (Pay DoDAAC N50082) or DFAS-One Pay (Pay DoDAAC N68732). Submit electronic invoices IAW Part VIII(6) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions.
18b. Submit invoices to: See Part VIII(7) MSC Specific Wide Area Work Flow (WAWF) Instructions.
27a. Solicitation incorporates by full text FAR 52.212-1, 52.212-3 Alt I, 52.212-4 and 52.212-5, tailored as indicated and appropriate.
PART I - TANKTIME BOXES:
1. VESSEL(S) REQUIRED:
One, clean, approved, U.S. or foreign-flagged, double-hull tanker, with an Inert Gas System (IGS) and Segregated Ballast Tanks (SBT) that is capable of carrying a minimum of 235,000 bbls of clean product (intentions JP5, JA1, and/or F76) within vessel’s natural segregation in designated cargo tanks with double valve isolation and with the following minimum particulars:
a) There is a classified requirement in this solicitation.
1. Owners/Offerors or their representative, with appropriate security clearances in place, must submit to the Contracting Officer a request to review the classified requirement within one business day of the issuance of this solicitation and then must make the necessary arrangements at their expense to view the classified requirement at the appointed place and time provided, which must be prior to the solicitation response date and time. The opportunity to review the classified requirement will be lost if the Contracting Officer does not receive a request on time or if the Owner/Offeror misses the appointment. There is no requirement to review the classified requirement prior to submitting an offer. Not reviewing the requirement prior to submitting an offer will not in and of itself render an offer ineligible for award.
2. Offers will be considered against this requirement before any other evaluation. An offer found not acceptable with this requirement will not be mailto:michelle.d.james7.civ@us.navy.mil further evaluated. Owners/Offerors will be notified if their offers were excluded because of this requirement.
b) Health and Safety Requirements:
1. Owner/Offeror shall provide the MSC Area Commander with any report required under U.S. Coast Guard Marine Safety Information Bulletin 02-20 (Change 7) (requiring hazardous conditions be reported), prior to entering the port.
2. Owner/Offeror shall provide in its proposal its company’s health and safety plans for its crew, related to the novel coronavirus for this mission. The plan will become part of the contract.
3. Owner/Offeror is advised that due to the time-sensitive and critical nature of the mission, including environmental factors, the Excusable Delay provision shall not apply if delay was caused by a breach of Owner’s Health and Safety Plan cited above, or was otherwise reasonably preventable by following U.S. Coast Guard or Center for Disease Control COVID-19 guidelines in publication at the time of breach.
4. Owner/Offeror agrees that crew and other embarked personnel may be ordered by the charterer to stay aboard the vessel during port visits under this charter as deemed necessary by the charterer or local government authorities. Further, the Owner/Offeror agrees that the charterer may limit access to the vessel by any shore-side personnel upon the vessel’s port calls during this charter.
c) Vessel must be a party to the Ship Inspection Report (SIRE) System, and Owner/Offeror must provide a copy of a Q-88 with a date no earlier than 60 days prior to offer submission.
d) Vessel’s Age – see TANKTIME 2022 (09-22) Part II (o) (7) Age of Vessel.
e) Vessel’s Q-88 must detail current acceptances and dates of inspection. There shall be at least one SIRE inspection not more than six months prior to the commencement of laydays under this charter; Owner/Offeror shall confirm that such inspections were satisfactory.
f) Vessel shall have a SBT.
g) Vessel shall have an IGS.
h) Vessel shall not exceed a maximum LOA of 205 meters.
i) Vessel shall not exceed a maximum DWT 45,000 MT. (Re-measuring DWT is allowed at owner’s expense. Re-measurement must be completed before tendering NOR. Upon tendering NOR the most current Q-88 must reflect the new DWT)
j) Vessel shall not exceed a maximum manifold height above waterline of 15.60 meters while in ballast.
k) Vessel shall be capable of maintaining a minimum Speed of Advance (SOA) of 13 knots in moderate weather (Force 5) while laden.
l) Owner/Offeror must provide a vessel stowage plan demonstrating the vessel’s ability to load a minimum of 235,000 bbls F76 while not exceeding a laden draft of 10.70 meters.
m) Owner/Offeror must provide a vessel stowage plan demonstrating the vessel’s ability to load a minimum 235,000 bbls JP5 while not exceeding a laden draft of 10.70 meters.
n) Owner/Offeror must provide a copy of vessel’s current Class Society issued Safety Management Certificate (SMC).
o) Owner/Offeror must provide a copy of vessel’s current Flag State issued International Ship Security Certificate (ISSC).
p) For U.S. flagged vessels, the Owner/Offeror must provide a copy of vessel’s current USCG Certificate of Inspection (COI). For foreign flagged vessels, the Owner/Offeror must provide a copy of vessel’s current USCG Certificate of Compliance (COC) (if issued), or the Flag State equivalent. A Flag State equivalent shall include information on any deficiencies discovered by the Flag State during the most recent inspection of the vessel, and remedies taken; the minimum manning requirements (e.g., Safe Manning Document); the safety equipment and appliances required on board; the total number of persons allowed to be on board the vessel; and the names of the owners and operators of the vessel. The COI, COC, or Flag State equivalent documents submitted by the Owner/Offeror shall be current and not expire throughout the duration of the charter.
q) Owner/Offeror must provide vessel itinerary from offer submission to intended arrival at load port.
r) The proposed vessel’s cargo tanks that are nominated by the Owner/Offeror to load the intended cargo must be compatible with the intended cargo. This compatibility will be assessed using the DLA-Energy Minimum Requirements for Preparation of Cargo Tanks Table 09-30-2021, hereby incorporated into the RFP and available upon request. The assessment for compatibility will be conducted based on the Certificates of Quality for the vessel’s last three cargoes.
s) Owner/Offeror must confirm upon arrival at the load port, the vessel shall be in a clean, gas-free condition and ready for internal tank inspection of the cargo tanks, which will be used to carry this product. These tanks and all additional cargo tanks, ballast tanks, slop tanks and/or void spaces adjacent to these tanks shall be clean and certified as gas free by a Certified Marine Chemist for the tank inspection prior to the ship being allowed to load the Government’s cargo. The Owner/Offeror shall provide at their expense a Certified Marine Chemist to certify the ship’s tanks are safe for entry for the internal tank inspection by the Government and/or Charterer representative. The Certified Marine
Chemist must enter all the ship’s cargo tanks in advance of the Quality Assurance Representative (QAR) and perform a full four-corner entry inspection. Certified Marine Chemist’s inspection must include all tank pockets identified by the QAR to the satisfaction of the QAR. If a prior (last, 2nd to last, or 3rd to last) cargo contained a percentage of benzene, the Owner’s/Offeror’ s Certified Marine Chemist must arrive to the vessel equipped with benzene detection tubes to measure toxicity for benzene content.
Acceptable benzene levels are as follows: (1) The maximum time-weighted average (TWA) exposure limit is 1 part of benzene vapor per million parts of air (1 ppm) average for an 8-hour workday; and (2) the maximum short-term exposure limit (STEL) is 5 ppm for any 15-minute period. Gasoline tanks, after cleaning should be ventilated with forced air or acceptable means for as long as possible to ensure levels are reduced enough to allow entry. All safe for entry / toxicity / flammability assessments shall be performed in the presence of the inspecting QAR. Owner/Offeror shall provide time needed to re-inert after inspection.
t) Owner/Offeror must provide, if vessel cargo tanks have heating coils, coil type or composition (such as stainless steel, copper, etc.). If vessel cargo tanks have heating coils, Owner/Offeror must provide the date heating coils were last pressure tested and the results of the test (passed or failed). To be eligible for award, the result of the last pressure test must be “pass” and the date of the last pressure test cannot exceed 12 months for the duration of this charter. Vessels that have cargo tanks with coils that are incompatible with the cargo to be carried will be rejected.
u) If vessel cargo tanks are internally coated, Owner/Offeror shall provide the coating type
(epoxy, inorganic zinc, etc.). Coal tar coating is not acceptable. If tanks are not coated then state “none”. Coatings that are incompatible with the fuel to be carried will be rejected.
v) Owner/Offeror shall provide copies of Certificates of Quality for last three cargoes.
These Certificates must contain all test data required by specification for the products that were previously loaded (last three). Vessel Certificates of Quality from vessel post-load samples are preferred, but if unavailable shore tank Certificates of Quality representing quality of product loaded are acceptable. They shall be submitted for each shore tank as well as the vessel tanks after loading (composite sample). Results of “typical” are not acceptable. Additionally, the following are required for the specific products mentioned:
1. Naphtha / Condensates: Mercaptan Sulphur, reported in “parts per million” (ppm) or
“mass percent”, or Doctor Test (ASTMD 4952). Otherwise, Certificates of Quality must contain the test data required by the specification for the products which were loaded.
2. Gasoline (Motor or Aviation): It must be stated whether the previous product was
“leaded” or “unleaded”. This is needed to determine cargo tank “safe entry” testing requirements.
3. Fatty Acid Methyl Esters (FAME): The provisions of DLA-E “Minimum
Requirements for Preparation of Cargo Tanks Table 09-30-2021,” Note 5 apply.
When any of the last three non-DLA-E cargoes have consisted of diesel or heating oil products, FAME test (EN 14078 and ASTM D7371) results shall be provided for each applicable cargo; examples of diesel or heating oil products include, but are not limited to, ULSD, DF1, DF2, DS1, DS2, DSS, DSW, MGO, Gasoil, FS1, FS2, FS4, FS5, FS6, and IFO. In scenarios where FAME testing is not available for non-DLA- E cargoes, the applicable cargo shall be deemed to have contained FAME greater than 5 vol % and evaluation will be conducted under the Minimum Requirements for Preparation of Cargo Tanks Table 09-30-2021 under procedures for biodiesel blends greater than B5.
w) Owner/Offeror shall confirm vessel is able to take upper, middle, lower, bottom, and all-level samples of the cargo (to include OBQ & ROB) without contaminating them from the sampling location. If unable to do so or if the sampling location is contaminated or suspected to be contaminated, the Owner/Offeror agrees that the Charterer will require open sampling on a tank-by-tank basis, consistent with safety and local terminal regulations.
x) Owner/Offeror agrees where cargo is carried after contract award and prior to delivery to provide cargo type/description prior to loading, and applicable Certificates of Quality (to include all test data required in the initial RFP) for review within 48 hours after loading said cargo. Test shall be on a sample taken from the ship versus a representative sample from a shore facility. Any rejection of the Certificates of Quality by the Government shall result in the Government cancelling this contract at no cost to the Government. This compatibility will be assessed using the DLA-E Minimum Requirements for Preparation of Cargo Tanks Table 09-30-2021, hereby incorporated into the RFP and available upon request.
y) Owner/Offeror agrees vessel must meet all MSC requirements for reporting. Vessel shall provide position/status reports in-port and at-sea every six hours daily at 0000, 0600, 1200, and 1800 hours GMT (Zulu) and 72/48/24/12 hr pre-arrival notifications for all ports to the appropriate Area Command and COMSC HQ Tankers. Reports shall be sent to the following email addresses:
1. CTF63-MSCEURAF-N3-CARGO@US.NAVY.MIL
2. WILLIE.F.JONES12.CIV@US.NAVY.MIL
3. M-BA-MSCCENT-OPS@ME.NAVY.MIL
4. SEALOGCENT.OWO@ME.NAVY.MIL
5. DLA_TANKER_POSITION_REPORT@DLA.MIL
6. MSC_BWC@US.NAVY.MIL
7. COMSC.TANKERS@NAVY.MIL
8. MSCHQ_TANKERS_NRFK@US.NAVY.MIL
z) Vessel will be required submit a Monthly Voyage Abstract form on a monthly basis and emailed to COMSC.TANKERS@NAVY.MIL no later than the first day of the month following the month of performance. For time charters that complete prior to the end of the month, the report must be received no later than two calendar days after completion of charter (off-hire). Entries must start with the date the ship presents NOR and is accepted on hire. All columns must be completed as noted. Pull down menus for mailto:COMSC.TANKERS@NAVY.MIL columns C, X and Y are the only comments to be used. Built in macros/formulas are not to be altered.
aa) Confirm that Owner/Offeror agrees to all other terms and conditions as per TANKTIME
2020 (09-22)). Counters to TANKTIME 2022 (09-22) are not acceptable until written confirmation is provided by the charter.
2. PLACE/RANGE OF DELIVERY:
Mediterranean, Range and Port in Charterer’s Option (Intentions St. Theodore, Greece)
3. PLACE/RANGE OF REDELIVERY:
Mediterranean, Range and Port in Charterer’s Option (Intentions Rota, Spain)
4. CHARTER PERIOD:
55 days
5. LAYDAYS:
Commencing: 28 November 2023 Canceling: 29 November 2023
6. TERMS / CONDITIONS / ATTACHMENTS ADDED, DELETED OR MODIFIED:
REPLACE IN ITS ENTIRETY PART II to read as follows: PART II. FAR 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services (DEC 2022) (tailored pursuant to FAR 12.302 (a)) (See PART IX. ATTACHMENTS, Attachment (g))
REPLACE PART VI WITH THE FOLLOWING:
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (SEP 2023)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115- 232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar
2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
XX (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C.
3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment
Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
XX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun
2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5) [Reserved].
XX (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts
(Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
XX (8) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).
XX (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101 note).
XX (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters
(Oct 2018) (41 U.S.C. 2313).
__ (11) [Reserved].
__ (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C.
657a).
__ (13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns
(Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (14) [Reserved]
__ (15) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-6.
__ (16) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-7.
__ (17) 52.219-8, Utilization of Small Business Concerns (Sep 2023) (15 U.S.C. 637(d)(2) and
(3)).
__ (18) (i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III (Jun 2020) of 52.219-9.
__ (v) Alternate IV (Sep 2023) of 52.219-9.
__ (19) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
__ (ii) Alternate I (Mar 2020) of 52.219-13.
__ (20) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 637s).
__ (21) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C.
637(d)(4)(F)(i)).
__ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Oct
2022) (15 U.S.C. 657f).
__ (23) (i) 52.219-28, Post Award Small Business Program Rerepresentation (Sep 2023)(15
U.S.C. 632(a)(2)).
__ (ii) Alternate I (Mar 2020) of 52.219-28.
__ (24) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically
Disadvantaged Women-Owned Small Business Concerns (Oct 2022) ( 15 U.S.C.
637(m)).
__ (25) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small
Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) ( 15 U.S.C. 637(m)).
__ (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15
U.S.C. 644(r)).
__ (27) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15U.S.C. 637(a)(17)).
__ (28) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
__ (29) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Dec 2022)
(E.O.13126).
XX (30) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
XX (31) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
__ (ii) Alternate I (Feb 1999) of 52.222-26.
__ (32) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
__ (ii) Alternate I (Jul 2014) of 52.222-35.
__ (33) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C.
793).
__ (ii) Alternate I (Jul 2014) of 52.222-36.
__ (34) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
__ (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
XX (36) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O. 13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ (37) 52.222-54, Employment Eligibility Verification (May 2022) (Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
__ (38) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated
Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 ( 42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (39) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (Jun 2016) (E.O. 13693).
__ (40) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and
Air Conditioners (Jun 2016) (E.O. 13693).
__ (41) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014)
(E.O.s 13423 and 13514).
__ (ii) Alternate I (Oct 2015) of 52.223-13.
__ (42) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun2014) of 52.223-14.
__ (43) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) ( 42 U.S.C.
8259b).
__ (44) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct
2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-16.
XX (45) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O. 13513).
__ (46) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).
__ (47) 52.223-21, Foams (Jun2016) (E.O. 13693).
__ (48) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).
__ (ii) Alternate I (Jan 2017) of 52.224-3.
__ (49) (i) 52.225-1, Buy American-Supplies (Oct 2022) ( 41 U.S.C. chapter 83).
__ (ii) Alternate I (Oct 2022) of 52.225-1.
__ (50) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (Dec 2022) ( 19
U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I [Reserved].
__ (iii) Alternate II (Dec 2022) of 52.225-3.
__ (iv) Alternate III (Jan 2021) of 52.225-3.
__ (v) Alternate IV (Oct 2022) of 52.225-3.
__ (51) 52.225-5, Trade Agreements (Dec 2022) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
XX (52) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (53) 52.225-26, Contractors Performing Private Security Functions Outside the United States
(Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
__ (54) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C.
5150).
__ (55) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area
(Nov2007) (42 U.S.C. 5150).
XX (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).
__ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial
Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services
(Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
XX (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management
(Oct2018) (31 U.S.C. 3332).
__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award
Management (Jul 2013) ( 31 U.S.C. 3332).
__ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (63) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).
XX (64) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov
2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).
XX (ii) Alternate I (Apr 2003) of 52.247-64.
__ (iii) Alternate II (Nov 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
__ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).
__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) ( 29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (May 2014) (29U.S.C.206 and 41 U.S.C. chapter 67).
__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to
Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to
Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
__ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan
2022).
__ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42
U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the
Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L.
115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of
Division R of Pub. L. 117-328).
(vi) 52.219-8, Utilization of Small Business Concerns (Sep 2023) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(viii) 52.222-26, Equal Opportunity (Sep 2015) (E.O.11246).
(ix) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
(x) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
(xi) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec
2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xiii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(xiv) (A) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and
E.O 13627).
(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to
Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ( 41 U.S.C. chapter 67).
(xvi) 52.222-53, Exemption from Application of the Service Contract Labor Standards to
Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(xvii) 52.222-54, Employment Eligibility Verification (May 2022) (E.O. 12989).
(xviii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan
2022).
(xix) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
(xx) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
(B) Alternate I (Jan 2017) of 52.224-3.
(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United States
(Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
(xxii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42
U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxiii) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)
(31 U.S.C. 3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph
(c) of 52.232-40.
(xxiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021)
(46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph
(d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause) http://www.acquisition.gov/far/current/html/52_212_213.html
PART VIII ADDITIONAL FAR AND DFARS CLAUSES; Amend/Add the following:
ADD: (c)(10) FAR 52.209-5 Certification Regarding Responsibility Matters (AUG 2020) -
CHECKED.
VIII(c)(6) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions; amend to read as follows:
VIII(c)(6) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
http://www.acquisition.gov/far/current/html/52_212_213.html
“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award
Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF
Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Not Applicable (Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the
Invoice 2 in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
2-in-1 Invoice (Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
https://www.acquisition.gov/dfars/252.232-7003-electronic-submission-payment-requests-and-receiving-reports.#DFARS_252.232-7003 https://www.acquisition.gov/dfars/252.232-7003-electronic-submission-payment-requests-and-receiving-reports.#DFARS_252.232-7003
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data
Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
A. Routing Data Table for U.S. Banks / U.S. Currency:
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N50082 Issue By DoDAAC Leave Blank Admin DoDAAC N62387 Inspect By DoDAAC N62387 Ship To Code N62387 Ship From Code Leave Blank Mark For Code Leave Blank Service Approver (DoDAAC) N62387 Service Acceptor (DoDAAC) N62387 Accept at Other DoDAAC Leave Blank LPO DoDAAC N62387 DCAA Auditor DoDAAC Leave Blank Other DoDAAC(s) Leave Blank
B. Routing Data Table for Foreign Banks / Foreign Currency:
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N68732 Issue By DoDAAC Leave Blank Admin DoDAAC N62387 Inspect By DoDAAC N62387 Ship To Code N62387 Ship From Code Leave Blank Mark For Code Leave Blank Service Approver (DoDAAC) N62387 Service Acceptor (DoDAAC) N62387
Accept at Other DoDAAC Leave Blank LPO DoDAAC N62387 DCAA Auditor DoDAAC Leave Blank Other DoDAAC(s) Leave Blank
PART IX. ATTACHMENTS – TANKER TIME CHARTER; Add the following:
(d) TANKTIME Fuel Consumption Template
(e) TANKTIME Part X. FAR 52.212-1 Instructions to Offerors — Commercial Products and Commercial Services (MAR 2023) (tailored pursuant to FAR 12.302(a))
(f) FAR 52.209-5 Certification Regarding Responsibility Matters (AUG 2020)
(g) TANKTIME Part II FAR 52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services (DEC 2022) (tailored pursuant to FAR 12.302(a))
Owners/Offerors shall comply with all parts of the solicitation and shall use the guidelines set forth in Part X for submission of offers.
PART X. INSTRUCTIONS TO OFFERORS
REPLACE PART X(a)(1) WITH THE FOLLOWING:
FAR 52.212-1 Instructions to Offerors — Commercial Products and Commercial Services (MAR 2023) (tailored pursuant to FAR 12.302(a)) (See PART IX. ATTACHMENTS, Attachment (e))
AMEND PART XI Title to read as follows: PART XI. FAR 52.212-2 Evaluation— Commercial Products and Commercial Services (NOV 2021) (tailored pursuant to FAR 12.302 (a)) – SPOT CHARTER
PART XI(b); Add the following as the final sentence:
“Offers will be forwarded by the technical team to COMSC Intelligence (N2) to determine if the vessel complies with the classified requirement.”
PART XI(e) PRICE; Amend the following:
XI(e)(a) The Offeror’s price proposal will be evaluated based on the value of the charter hire rate(s) offered for the entire charter period of (a) 55 days, price for fuel, and any other pricing elements set forth in the offer. For evaluation purposes the period of performance will consist of (b) 55 days. Fuel calculations will be based upon (c) 18 days underway laden at the speed specified in the individual solicitation, using fuel consumptions provided in TANKTIME Boxes 89 and 91), (d) 02 days underway ballast at the speed specified in the individual solicitation, using fuel consumptions provided in TANKTIME Boxes 90 and 91, (e) 27 days in port idle/loading, using the fuel consumption provided in TANKTIME Box 92a, and (e) 08 days in port discharging, using the fuel consumption provided in TANKTIME Box 92b). This will represent the overall cost to the Government. The proposed price(s) must be determined to be fair and reasonable.
XI(e)(b) Add the following to the body of the already-existing paragraph: MGO/MDO:
$1,141.39 per metric ton.
REPLACE PART XII(c)(3) WITH THE FOLLOWING:
FAR 52.212-3 Offeror Representations and Certifications – Commercial Products and Commercial Services (SEP 2023)
ADD: (c)(9) FAR 52.209-5 Certification Regarding Responsibility Matters (AUG 2020) - CHECKED. (See PART IX. ATTACHMENTS, Attachment (f))
THIS CONCLUDES THE CHANGES TO PART I, TANKTIME BOX 6
(TERMS/CONDITIONS/ATTACHMENTS ADDED, DELETED OR MODIFIED).
SIGNED: MICHELLE JAMES, CONTRACTING OFFICER, MSC, N103A
27 October 2023
File details come from the government source that posted it. Updated .