24R0040_Specifications_12Apr2023_1.pdf

PDF 1 MB Posted

Attached to
GAOA NOME CREEK ROAD REPAIRS
Solicitation number
140L0624R0040
Issued by

About this file

This document is a set of specifications for the GAOA Nome Creek Road Repair project, located in the White Mountains National Recreation Area north of Fairbanks, Alaska.

The project involves repair work on Nome Creek Road, Ophir Campground, Mt. Prindle Campground, Administrative Site Runway Drainage, and the Nome Creek Bridge gabions. The specifications cover general requirements, contract modification procedures, project management and coordination, construction progress documentation, photographic documentation, submittal procedures, quality requirements, temporary facilities and controls, construction waste management, temporary traffic controls, product requirements, execution requirements, field engineering, and selective demolition. Key details include the project location and access, work schedule requirements, coordination with government occupancy and public access, and submittal and quality control processes. The document also includes a submittal register outlining required submittals across the various specification sections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Land Management Nome Creek Road Repair Nome Creek Road, Alaska

Final Construction Documents Specifications

For:

222 University Avenue Fairbanks, Alaska 99709

April 12, 2023

Nome Creek Road Repair Nome Creek Road, Alaska

Final Construction Documents

Table of Contents

Submittal Register

By:

Design Alaska, Inc.

601 College Road Fairbanks, Alaska 99701

April 12, 2023

BUREAU OF LAND MANAGEMENT

NOME CREEK ROAD REPAIR

NOME CREEK ROAD, ALASKA

SPECIFICATION INDEX

Design Alaska, Inc. Index‐ 1

DIVISION 01 GENERAL REQUIREMENTS

01 10 00 Summary 01 25 00 Contract Modification Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 32 20 Photographic Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 52 40 Construction Waste Management 01 55 26 Temporary Traffic Control 01 60 00 Product Requirements 01 70 00 Execution Requirements 01 71 23 Field Engineering 01 73 20 Selective Demolition 01 77 00 Closeout Procedures 01 78 10 Project Record Documents 01 78 20 Operation and Maintenance Data

DIVISION 03 CONCRETE

03 33 00 Cast in Place Concrete

DIVISION 31 EARTHWORK

31 10 00 Site Clearing 31 20 00 Earth Moving

DIVISION 32 EXTERIOR IMPROVEMENTS

32 33 00 Site Furnishings 32 92 19 Seeding

DIVISION 33 UTILITIES

33 21 00 Water Supply Wells 33 42 13 Stormwater Culverts

NOME CREEK ROAD, ALASKA

SECTION 01 10 00

SUMMARY

Design Alaska, Inc. 01 10 00‐ 1

PART 1 GENERAL

1.1 SCOPE: SECTION 01 10 00 ‐ SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Geotechnical data.

3. Work under other contracts.

4. Use of premises.

5. Government occupancy requirements.

6. Specification formats and conventions.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: Repair Nome Creek Road

1. Project Location: Nome Creek Road within the BLM White Mountains Recreation Area. Access to the project location is at approximately 57 mile on the Steese Highway and another 7 miles down US Creek Road to Nome Creek Road.

B. The Work consists of the following:

1. The Work includes establishment of a borrow source and repair work of Nome Creek Road, Ophir Campground, Mt. Prindle Campground, Administrative Site Runway Drainage, and the Nome Creek Bridge gabions as presented on the Con‐ tract Documents.

C. Project will be constructed under a single prime contract.

1.3 GEOTECHNICAL DATA

A. Geotechnical Report: A copy of the geotechnical data obtained during the design of the project is included as a reference document for the contractor’s awareness. The geotech‐ nical reports are not part of the Contract Documents. The Government is not responsible for the contents of these reports.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 10 00‐ 2

1.4 WORK UNDER OTHER CONTRACTS

A. Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts.

1.5 USE OF PREMISES

A. Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.

B. Schedule operations so that Work is conducted during the hours of 7 am – 10 pm Monday

– Friday. The roads to Mt. Prindle Campground and Ophir Campground shall be available for weekend and Federal holiday use for the duration of the project. With the approval of the Government, either the road to Mt. Prindle Campground or the road to Ophir Campground may be closed to the public in its entirety between Monday at 7 am and Friday at 5 pm. Both roads may not be closed at the same time. BLM has commitments to recreation guides and the public to allow access to the area during the project within the constraints identified above. The contractor may offer alternate schedules of opera‐ tions for review by the Government provided that they meet these minimum require‐ ments. The Government is under no obligation to accept alternate work schedules.

C. The Government reserves the right to require a two‐week period where the Contractor must keep the entirety of Nome Creek Road drivable with at least one lane to support access by recreational hunters. By July 01 of any year that the Contractor will be doing work on Nome Creek Road, the Contractor shall request from the Government the appli‐ cable dates for the two‐week period and subsequently update or submit a date specific traffic control plan for the identified hunting access period.

D. Schedule and sequence operations necessary to complete the work, including coordina‐ tion with other crafts relative to the Contractor's requirements. Schedule Work in such manner as to avoid delays in overall construction and permit proper installation of work.

E. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Government Occupancy: Allow for Government occupancy of Project site and use by the public. Government personnel will be continuously occupying areas within the contract limits. Conduct work in a manner that will minimize needs for disruption of normal Government operations. Provide a minimum of 72 hours ad‐ vance notice to Government of activities that will impact normal Government op‐ erations. Secure Government's written approval of activities that will impact nor‐ mal Government operations to avoid delays in overall construction and permit proper installation or work.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 10 00‐ 3

2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on‐site.

1.6 GOVERNMENT OCCUPANCY REQUIREMENTS

A. Full Government Occupancy: Government will occupy site and need access to their ad‐ ministrative buildings and the campgrounds during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Gov‐ ernment usage. Perform the Work so as not to interfere with Government day‐to‐day operations. Maintain existing exits, unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities hav‐ ing jurisdiction.

1.7 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the 50‐division format and CSI/CSC's "MasterFormat" six‐digit numbering system.

1. Division 1: Sections in Division 1 govern the execution of the Work of all Sections in the Specifications.

B. Specification Content: The Specifications use certain conventions for the style of lan‐ guage and the intended meaning of certain terms, words, and phrases when used in par‐ ticular situations. These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appro‐ priate. Words implied, but not stated, shall be inferred as the sense requires.

Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 10 00‐ 4

2. Imperative mood and streamlined language are generally used in the Specifica‐ tions. Requirements expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

NOME CREEK ROAD, ALASKA

SECTION 01 25 00

CONTRACT MODIFICATION PROCEDURES

Design Alaska, Inc. 01 25 00‐ 1

1.1 SCOPE: SECTION 01 25 00 ‐ CONTRACT MODIFICATION PROCEDURES

A. This Section specifies administrative and procedural requirements for handling and pro‐ cessing Contract modifications.

1.2 MINOR CHANGES IN THE WORK

A. Government will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, in a format deter‐ mined suitable to BLM.

1.3 PROPOSAL REQUESTS

A. Government‐Initiated Proposal Requests: Government will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Draw‐ ings and Specifications.

1. Proposal Requests issued by Government are for information only. Do not con‐ sider them instructions either to stop work in progress or to execute the proposed change.

2. Within the requested amount of time after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If re‐ quested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change.

d. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity du‐ ration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 25 00‐ 2

B. Contractor‐Initiated Proposals: If latent or unforeseen conditions require modifications to the Contract, Contractor may propose changes by submitting a request for a change to Government.

1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

4. Include costs of labor and supervision directly attributable to the change.

5. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

6. Comply with requirements in Division 1 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified.

C. Proposal Request Form: Prior to submitting any proposal requests, provide a sample form to the Government for approval.

1.4 ALLOWANCES

A. Allowance Adjustment: To adjust allowance amounts, base each Change Order proposal on the difference between purchase amount and the allowance, multiplied by final meas‐ urement of work‐in‐place. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins.

1. Include installation costs in purchase amount only where indicated as part of the allowance.

2. If requested, prepare explanation and documentation to substantiate distribu‐ tion of overhead costs and other margins claimed.

3. Delete both subparagraphs below if no unit‐cost allowances.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 25 00‐ 3

4. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to unit‐cost allowances.

5. Government reserves the right to establish the quantity of work‐in‐place by inde‐ pendent quantity survey, measure, or count.

B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the Purchase Order amount or Con‐ tractor's handling, labor, installation, overhead, and profit. Submit claims within 21 days of receipt of the Change Order or Construction Change Directive authorizing work to pro‐ ceed. Government will reject claims submitted later than 21 days after such authoriza‐ tion.

1. Do not include Contractor's or subcontractor's indirect expense in the Change Or‐ der cost amount unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the Contract Documents.

2. No change to Contractor's indirect expense is permitted for selection of higher‐ or lower‐priced materials or systems of the same scope and nature as originally indicated.

1.5 CHANGE ORDER PROCEDURES

A. On Government's approval of a Proposal Request, Government will issue a Change Order for signatures of Government and Contractor.

PART 2 PRODUCTS (NOT USED)

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 25 00‐ 4

THIS PAGE INTENTIONALLY LEFT BLANK

NOME CREEK ROAD, ALASKA

SECTION 01 31 00

PROJECT MANAGEMENT AND COORDINATION

Design Alaska, Inc. 01 31 00‐ 1

1.1 SCOPE: SECTION 01 31 00 ‐ PROJECT MANAGEMENT AND COORDINATION

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Coordination Drawings.

2. Project meetings.

3. Requests for Interpretation (RFIs).

B. See Division 1 Section "Execution Requirements" for procedures for coordinating general installation and field‐engineering services, including establishment of benchmarks and control points.

1.2 DEFINITIONS

A. Request for Interpretation (RFI): Request from Contractor seeking interpretation or clar‐ ification of the Contract Documents.

1.3 COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coor‐ dinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other com‐ ponents, before or after its own installation.

2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installa‐ tion.

4. Where availability of space is limited, coordinate installation of different compo‐ nents to ensure maximum performance and accessibility for required mainte‐ nance, service, and repair of all components, including mechanical and electrical.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 2

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of at‐ tendees at meetings.

1. Prepare similar memoranda for Government and separate contractors if coordi‐ nation of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities in‐ clude, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Pre‐installation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

9. Project closeout activities.

1.4 SUBMITTALS

A. Coordination Drawings: Prepare Coordination Drawings if limited space availability ne‐ cessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by sep‐ arate entities.

1. Content: Project‐specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architec‐ tural, structural, civil, mechanical, and electrical systems.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 3

b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equip‐ ment and minimum clearance requirements. Provide alternate sketches to Government for resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

2. Revise first subparagraph below to establish a standard sheet size and format.

3. Sheet Size: At least 8‐1/2 by 11 inches but no larger than 22 by 34 inches.

4. Number of Copies: Submit two copies of each submittal. Government will return one copy.

5. Refer to individual Sections for Coordination Drawing requirements for Work in those Sections.

1.5 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless other‐ wise indicated.

1. Attendees: Inform participants and others involved, and individuals whose pres‐ ence is required, of date and time of each meeting. Notify Government and Ar‐ chitect of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited at‐ tendees.

3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Government and other at‐ tendees, within three days of the meeting.

B. Preconstruction Conference: Schedule a preconstruction conference before starting con‐ struction, at a time convenient to Government, but no later than 15 days after execution of the Agreement. Hold the conference at Project site or another convenient location.

Conduct the meeting to review responsibilities and personnel assignments, review re‐ quired work, project drawings, specifications, construction schedules, payroll, payments, and administrative provisions of the Contract. Be prepared to summarize and explain pro‐ cedures planned for the project and present specified preconstruction submittals.

1. Attendees: Authorized representatives of Government, Architect, and their con‐ sultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. All participants at the con‐ ference shall be familiar with Project and authorized to conclude matters relating to the Work. The mechanical and electrical subcontractors’ attendance will be required.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 4

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule.

b. Phasing.

c. Critical work sequencing and long‐lead items.

d. Designation of key personnel and their duties.

e. Procedures for processing field decisions and Change Orders.

f. Procedures for RFIs.

g. Procedures for testing and inspecting.

h. Procedures for processing Applications for Payment.

i. Distribution of the Contract Documents.

j. Submittal procedures.

k. Preparation of Record Documents.

l. Use of the premises, Nome Creek Road, Mt. Prindle Campground, Ophir Campground, US Creek Road, and the 56‐mile pit.

m. Work restrictions.

n. Government occupancy requirements.

o. Responsibility for temporary facilities and controls.

p. Construction waste management and recycling.

q. Parking availability.

r. Office, work, and storage areas.

s. Equipment deliveries and priorities.

t. First aid.

u. Security.

v. Progress cleaning.

w. Working hours.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 5

3. Minutes: Contractor shall record and distribute meeting minutes within three days.

C. Pre‐installation Conferences: Conduct a pre‐installation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators in‐ volved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Government of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the follow‐ ing:

a. The Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility problems.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written recommendations.

n. Warranty requirements.

o. Compatibility of materials.

p. Temporary facilities and controls.

q. Space and access limitations.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 6

r. Regulations of authorities having jurisdiction.

s. Testing and inspecting requirements.

t. Installation procedures.

u. Coordination with other work.

v. Required performance results.

w. Protection of adjacent work.

x. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, in‐ cluding required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.

5. Do not proceed with installation if the conference cannot be successfully con‐ cluded. Initiate whatever actions are necessary to resolve impediments to per‐ formance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Conduct progress meetings at bi‐weekly intervals unless another schedule is agreed upon by the Government. Hold the meetings at the Project site. Coor‐ dinate dates of meetings with preparation of payment requests. Additional progress meetings may be requested by either the Government or Contractor.

1. Attendees: In addition to representatives of Government, each contractor, sub‐ contractor, supplier, and other entity concerned with current progress or in‐ volved in planning, coordination, or performance of future activities shall be rep‐ resented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting.

Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meet‐ ing. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. De‐ termine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 7

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Status of submittals.

4) Deliveries.

5) Off‐site fabrication.

6) Access.

7) Site utilization.

8) Temporary facilities and controls.

9) Work hours.

10) Hazards and risks.

11) Progress cleaning.

12) Quality and work standards.

13) Status of correction of deficient items.

14) Field observations.

15) RFIs.

16) Status of proposal requests.

17) Pending changes.

18) Status of Change Orders.

19) Pending claims and disputes.

20) Documentation of information for payment requests.

3. Minutes: Contractor shall record and distribute the meeting minutes within three days.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 8

4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.

a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

1.6 REQUESTS FOR INTERPRETATION (RFIS)

A. Procedure: Immediately on discovery of the need for interpretation of the Contract Doc‐ uments, and if not possible to request interpretation at Project meeting, prepare and sub‐ mit an RFI in a form agreed upon by the Government.

1. RFIs shall originate with Contractor. RFIs submitted by entities other than Con‐ tractor will be returned with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contrac‐ tor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:

1. Project name.

2. Date.

3. Name of Contractor.

4. Name of Government and Governments Representative.

5. RFI number, numbered sequentially.

6. Specification Section number and title and related paragraphs, as appropriate.

7. Drawing number and detail references, as appropriate.

8. Field dimensions and conditions, as appropriate.

9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

10. Contractor's signature.

11. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop Drawings, and other information necessary to fully describe items needing interpretation.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 9

C. Hard‐Copy RFIs:

1. Identify each page of attachments with the RFI number and sequential page num‐ ber.

D. Government's Action: Government will review each RFI, determine action required, and return it. Allow 14 calendar days for Government's response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.

1. The following RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for coordination information already indicated in the Contract Documents.

d. Requests for adjustments in the Contract Time or the Contract Sum.

e. Requests for interpretation of Government's actions on submittals.

f. Incomplete RFIs or RFIs with numerous errors.

2. Government's action may include a request for additional information, in which case Government's time for response will start again.

E. On receipt of Government's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Government within seven days if Contractor disagrees with response.

F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log monthly. Include the following:

1. Project name.

2. Name and address of Contractor.

3. Name and address of Government.

4. RFI number including RFIs that were dropped and not submitted.

5. RFI description.

6. Date the RFI was submitted.

7. Date Government's response was received.

8. Identification of related bilateral or unilateral modifications, extensions, and changes in scope, as appropriate.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 31 00‐ 10

PART 2 PRODUCTS (NOT USED)

NOME CREEK ROAD, ALASKA

SECTION 01 32 00

CONSTRUCTION PROGRESS

DOCUMENTATION

Design Alaska, Inc. 01 32 00‐ 1

1.1 SCOPE: SECTION 01 32 00 ‐ CONSTRUCTION PROGRESS DOCUMENTATION

A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's Construction Schedule.

2. Submittals Schedule.

3. Daily construction reports.

4. Field condition reports.

B. See Division 1 Section "Unit Prices and Schedule of Values" for submitting the Schedule of Values.

C. See Division 1 Section "Photographic Documentation" for submitting construction photo‐ graphs.

1.2 SUBMITTALS

A. Submittals Schedule: Submit three copies of schedule. Arrange the following information in a tabular format:

1. Revise list below to suit Project. Add information, such as scheduled dates for purchasing and installation and the activity or event number, if a CPM construc‐ tion schedule is used.

2. Scheduled date for first submittal.

3. Specification Section number and title.

4. Submittal category (action or informational).

5. Name of subcontractor.

6. Description of the Work covered.

7. Scheduled date for Government's final release or approval.

NOME CREEK ROAD, ALASKA

SECTION 01 32 00

Design Alaska, Inc. 01 32 00‐ 2

B. Contractor's Construction Schedule: Submit initial schedule at or before the preconstruc‐ tion conference. Submit three copies of initial schedule, large enough to show entire schedule for entire construction period.

1. Submit an electronic copy of schedule, using software indicated, on CD‐R, and labeled to comply with requirements for submittals. Include type of schedule (Initial or Updated) and date on label.

C. Daily Construction Reports: Submit two copies at weekly intervals.

D. Field Condition Reports: Submit two copies at time of discovery of differing conditions.

1.3 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.

B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of sub‐ contracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from par‐ ties involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 PRODUCTS

2.1 SUBMITTALS SCHEDULE

A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, order‐ ing, manufacturing, fabrication, and delivery when establishing dates.

1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's Construction Schedule.

2. Submit concurrently with the first complete submittal of Contractor's Construc‐ tion Schedule.

NOME CREEK ROAD, ALASKA

SECTION 01 32 00

Design Alaska, Inc. 01 32 00‐ 3

2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final Completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.

B. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. Comply with the following:

1. Revise first subparagraph below to suit Project. Long activity durations provide less detail and, therefore, less information with which to manage a project. As an alternative to specifying activity duration, indicate minimum and maximum number of activities, which will result in a similar effect.

2. Activity Duration: Define activities so no activity is longer than 21 calendar days, unless specifically allowed by Government.

3. Submittal Review Time: Include review and resubmittal times indicated in Divi‐ sion 1 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule.

4. Substantial Completion: Indicate completion in advance of date established for Substantial Completion and allow time for Government's administrative proce‐ dures necessary for certification of Substantial Completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Docu‐ ments and as follows in schedule and show how the sequence of the Work is affected.

1. Work by Government: Include a separate activity for each portion of the Work performed by Government.

2. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction.

b. Limitations of continued occupancies.

c. Uninterruptible services.

d. Partial occupancy before Substantial Completion.

e. Use of premises restrictions.

f. Provisions for future construction.

g. Seasonal variations.

h. Environmental control.

NOME CREEK ROAD, ALASKA

SECTION 01 32 00

Design Alaska, Inc. 01 32 00‐ 4

3. Work Stages: Indicate important stages of construction for each major portion of the Work.

D. Milestones: Include milestones indicated in the Contract Documents in schedule, includ‐ ing, but not limited to, the Notice to Proceed, Substantial Completion, and Final Comple‐ tion.

E. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time‐impact analysis to demonstrate the effect of the proposed change on the overall project schedule.

2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)

A. Gantt‐Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt‐chart‐ type, Contractor's Construction Schedule within 21 days of date established for the Notice of Award. Base schedule on the Preliminary Construction Schedule and whatever updat‐ ing and feedback was received since the start of Project.

B. Preparation: Indicate each significant construction activity separately. Identify first work‐ day of each week with a continuous vertical line.

1. For construction activities that require 3 months or longer to complete, indicate an estimated completion percentage in 10 percent increments within time bar.

2.4 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site:

1. List of subcontractors at Project site.

2. Equipment at Project site.

3. Material deliveries.

4. High and low temperatures and general weather conditions.

5. Accidents.

6. Stoppages, delays, shortages, and losses.

7. Orders and requests of authorities having jurisdiction.

8. Areas where work is being accomplished, listed by station number.

NOME CREEK ROAD, ALASKA

SECTION 01 32 00

Design Alaska, Inc. 01 32 00‐ 5

B. Field Condition Reports: Immediately on discovery of a difference between field condi‐ tions and the Contract Documents, prepare and submit a detailed report. Submit with a request for interpretation. Include a detailed description of the differing conditions, to‐ gether with recommendations for changing the Contract Documents.

PART 3 EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and ac‐ tivity durations.

3. As the Work progresses, indicate Actual Completion percentage for each activity.

B. Distribution: Distribute copies of approved schedule to Government, separate contrac‐ tors, testing and inspecting agencies, and other parties identified by Contractor with a need‐to‐know schedule responsibility.

1. Post copies in Project meeting rooms and temporary field offices.

2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have com‐ pleted their assigned portion of the Work and are no longer involved in perfor‐ mance of construction activities.

NOME CREEK ROAD, ALASKA

SECTION 01 32 00

Design Alaska, Inc. 01 32 00‐ 6

NOME CREEK ROAD, ALASKA

SECTION 01 32 20

PHOTOGRAPHIC DOCUMENTATION

Design Alaska, Inc. 01 32 20‐ 1

1.1 SCOPE: SECTION 01 32 20 ‐ PHOTOGRAPHIC DOCUMENTATION

A. This Section includes administrative and procedural requirements for the following:

1. Preconstruction photographs.

2. Periodic construction photographs.

B. See Division 1 Section "Closeout Procedures" for submitting digital media as Project Rec‐ ord Documents at Project closeout.

C. See Division 1 Section "Demonstration and Training" for submitting videotapes of demon‐ stration of equipment and training of Government personnel.

1.2 SUBMITTALS

A. Construction Photographs: Submit MS Word electronic file via email within seven days of taking photographs.

1. Format: Insert digital photos into MS Word file with two 4‐by‐6‐inch prints per page and titles beneath each photo.

2. Identification: On first page of MS Word file, provide the following information:

a. Name of Project.

b. Name of Contractor.

c. Date photograph was taken if not date stamped by camera.

d. Stationing where photograph was taken.

3. Digital Images: Submit a complete set of digital image electronic files on CD‐ROM.

Identify electronic media with date photographs were taken. Submit images that have same aspect ratio as the sensor, uncropped.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 32 20‐ 2

PART 2 PRODUCTS

2.1 PHOTOGRAPHIC MEDIA

A. Format below is compatible with all digital cameras.

B. Digital Images: Provide images in uncompressed JPG format, produced by a digital cam‐ era with minimum sensor size of 4.0 megapixels, and at an image resolution of not less than 1600 by 1200 pixels.

PART 3 EXECUTION

3.1 CONSTRUCTION PHOTOGRAPHS

A. Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out‐of‐focus areas will not be ac‐ cepted.

B. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image‐editing software.

1. Date and Time: Include date, time, and stationing in filename for each image.

2. Field Office Images: Maintain one set of images on CD‐ROM in the field office at Project site, available at all times for reference. Identify images same as for those submitted to Government.

C. Preconstruction Photographs: Before starting construction, take color, digital photo‐ graphs of Project site and surrounding properties, including existing items to remain dur‐ ing construction, from different vantage points, as directed by Government.

1. Flag excavation areas before taking construction photographs.

2. Take photographs to show existing conditions adjacent to property before start‐ ing the Work including conditions at borrow sites and US Creek Road. Take at least 12 photos at borrow site and photos at least every 1/4 mile on US Creek Road. Discuss mutual benefits with the Government of recording a video of the entirety of US Creek Road and the Nome Creek Bridge prior to beginning work.

3. Take 8 photographs of each existing building or bridge either on or adjoining property to accurately record physical conditions at start of construction. This includes, but is not limited to, Nome Creek Bridge, outhouses, BLM Admin area buildings, wells, or other hard infrastructure.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 32 20‐ 3

D. Periodic Construction Photographs: Take 25 color, digital photographs weekly with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last photographs were taken.

E. Additional Photographs: Government may issue requests for additional photographs, in addition to periodic photographs specified.

1. Three days' notice will be given, where feasible.

2. In emergency situations, take additional photographs within 24 hours of request.

3. Circumstances that could require additional photographs include, but are not lim‐ ited to, the following:

a. Special events planned at Project site.

b. Immediate follow‐up when on‐site events result in construction damage or losses.

c. Photographs to be taken at fabrication locations away from Project site.

These photographs are not subject to unit prices or unit‐cost allowances.

d. Substantial Completion of a major phase or component of the Work.

e. Extra record photographs at time of final acceptance.

f. Government request for special publicity photographs.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 32 20‐ 4

NOME CREEK ROAD, ALASKA

SECTION 01 33 00

SUBMITTAL PROCEDURES

Design Alaska, Inc. 01 33 00‐ 1

1.1 SCOPE: SECTION 01 33 00 ‐ SUBMITTAL PROCEDURES

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, Design Computations, and other submittals.

B. See Division 1 Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's Construction Schedule.

C. See Division 1 Section "Photographic Documentation" for submitting construction photo‐ graphs.

D. See Division 1 Section "Quality Requirements" for submitting test and inspection reports

E. See Division 1 Section "Closeout Procedures" for submitting warranties.

F. See Division 1 Section "Project Record Documents" for submitting Record Drawings, Rec‐ ord Specifications, and Record Product Data.

G. See Division 1 Section "Operation and Maintenance Data" for submitting operation and maintenance manuals.

H. See Division 1 Section "Demonstration and Training" for submitting videotapes of demon‐ stration of equipment and training of Government personnel.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Government's respon‐ sive action.

B. Informational Submittals: Written information that does not require Government's re‐ sponsive action. Submittals may be rejected for not complying with requirements.

1.3 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other sub‐ mittals, and related activities that require sequential activity.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 33 00‐ 2

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals con‐ currently for coordination.

a. Government reserves the right to withhold action on a submittal requir‐ ing coordination with other submittals until related submittals are re‐ ceived.

B. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Pro‐ gress Documentation" for list of submittals and time requirements for scheduled perfor‐ mance of related construction activities.

C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Government's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submit‐ tals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 14 calendar days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Govern‐ ment will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 14 calendar days for review of each resubmittal.

D. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 6 by 8 inches on label or beside title block to rec‐ ord Contractor's review and approval markings and action taken by Government.

3. Include the following information, as it applies, on label for processing and re‐ cording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name and address of subcontractor.

e. Name and address of supplier.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 33 00‐ 3

f. Name of manufacturer.

g. Submittal number or other unique identifier, including revision identifier.

1) Submittal number shall use Specification Section number fol‐ lowed by a decimal point and then a sequential number (e.g., 06100.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 06100.01.A). Work schedule and value schedules shall be numbers 01000.01 and 01000.02.

h. Number and title of appropriate Specification Section.

i. Drawing number and detail references, as appropriate.

j. Location(s) where product is to be installed, as appropriate.

k. Other necessary identification.

E. Cover Sheet: Develop and use a Cover Sheet that is reviewed and approved by the Gov‐ ernment.

1. Ensure that cover sheet includes following information:

a. Submittal Number.

b. Contract Number.

c. Specification section number and title, paragraph, and complete descrip‐ tion of item being submitted. Be specific and clearly identify what is being submitted. When appropriate, reference a specific sheet and detail of the Drawings. Note multiple items individually.

d. Signature and date.

e. Name and telephone number of individual to contact for further infor‐ mation, if other than Contractor.

2. Submitted Information: Link submittal to cover sheet by contract number, project name, and submittal number. Stamp is recommended but may be hand‐written on each copy; ensure submittal stamp includes project name and contract num‐ ber and blank space in which to write submittal number. Stamp or write this in‐ formation on all copies.

F. Deviations: Highlight, encircle, or otherwise specifically identify deviations from the Con‐ tract Documents on submittals.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 33 00‐ 4

G. Additional Copies: Unless additional copies are required for final submittal, and unless Government observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

H. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Government will return sub‐ mittals, without review received from sources other than Contractor.

I. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are marked ”BLM Approved".

J. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppli‐ ers, fabricators, installers, authorities having jurisdiction, and others as necessary for per‐ formance of construction activities. Show distribution on transmittal forms.

K. Use for Construction: Use only final submittals with mark indicating ”BLM Approved" taken by Government.

1.4 ELECTRONIC SUBMITTALS

A. Contractor may provide electronic versions of the submittal information. When provided in electronic form, provide in PDF file format, current version. Separate file for each vol‐ ume.

B. Electronically Index (Bookmark) each section and item by item data number and name within the electronic submittal.

C. Provide digital copies on Compact Disc (CD) or USB compatible memory card (Flash Drive), or submittals may be by file transfer or email if coordinated.

1.5 CONTRACTOR'S USE OF DESIGNER’S CAD FILES

A. At Contractor's written request, copies of Designers CAD files will be provided to Contrac‐ tor for Contractor's use in connection with Project, subject to the following conditions:

1. Neither the Government, nor the Designer, warrant the accuracy or complete‐ ness of models used in design of the project. The CAD files and the model are not part of the Contract Documents and will be provided for reference only. By ac‐ cepting and utilizing the model, the Contractor relieves the Government and the Designer of any inaccuracy in the files.

NOME CREEK ROAD, ALASKA

Design Alaska, Inc. 01 33 00‐ 5

2. The contractor will sign an acknowledgement that the model is not part of the contract documents and is not warranted to be complete, accurate, or compati‐ ble for use on the job site by GPS operated equipment.

PART 2 PRODUCTS

2.1 ACTION SUBMITTALS

A. Prepare and submit Action Submittals required by individual Specification Sections.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are appli‐ cable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory‐installed wiring.

f. Printed performance curves.

g. Operational range diagrams.

h. Compliance with specified referenced standards.

i. Testing by recognized testing agency.

4. Number of Copies: Submit three copies of Product Data,…