24q71 Attch 1 PWS APC Schneider 23 April 2024.pdf

PDF 194 KB Posted

Attached to
APC UPS Maintenance Federal contract opportunity
Solicitation number
FA875124Q0071
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document is a Performance Work Statement (PWS) for a federal contract opportunity. The PWS details the requirements for the contractor to provide preventative and unscheduled maintenance on specified APC/Schneider uninterrupted power supply (UPS) units located at the Air Force Research Laboratory Information Directorate in Rome, New York. Key details include:

The contractor must provide annual preventative maintenance visits, next business day on-site service response, and 24/7 technical support for the listed UPS models. The contractor must use only APC/Schneider certified OEM installers/technicians. The period of performance is a 1-year base period with two 1-year option periods. The contract is set aside for small businesses under NAICS code 811310. Offers are due by 3 PM Eastern Time on May 28, 2024. The government intends to award to the lowest priced technically acceptable offer. Offerors must be authorized resellers/distributors for APC Schneider services.

View the file

Other files for this federal contract opportunity

Other files attached to APC UPS Maintenance, newest first.
File Type Posted
24q71 Attch 3 Offeror Representations and Certifications--Commercial Products and Commercial Services.pdf PDF
Q0071 - BNJA__Redacted.pdf PDF
24q71 Attch 4 WD 2015-4165 Rev 24 (1).pdf PDF
24q71 APC Attch 2 List of Materials 2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NEW YORK

April 23, 2024

SOLICITATION NO. FA8751-24-Q-0071

CONTRACT NO. TBD

DESCRIPTION OF SERVICES

1.0 SCOPE. The contractor shall provide all personnel, equipment, tools, materials, supervision, travel expenses and other items and services necessary to perform preventative and unscheduled maintenance to the specified APC/Schneider uninterruptable power supplies (UPS) listed below at the Air Force Research Laboratory Information Directorate at the Rome Research Site (RRS), Rome, New York buildings 106, 3, and 2.

1.1. The contractor shall provide unscheduled and preventative maintenance visits, on-site service, tech support, priority access to the supply chain, parts and labor and travel in accordance to each specific APC/Schneider service plan specified.

1.1.1. Preventative maintenance visits shall be performed annually for power products.

1.1.2. On-site service response time shall be next business day by a certified field service engineer.

1.1.3. Tech support shall be provided on a 24/7 basis for equipment covered under APC/Schneider Electric Service Plans listed below.

1.2. The contractor shall provide the APC/Schneider Advantage Plus or Ultra service plans specified for the following three phase UPS Models, excluding any remote monitoring services (remote services are not authorized).

1.2.1. Model SYCF40KF, SN# PD0811360122; service plan part number WADVPLUS-PX-24 and part number WPMV5X8-PX-23 for battery cabinet (B2). This unit includes the attached PDU SN: WF0833111118 – Model PSX-PDU120V#500182 and additional battery cabinet SN: PD1131150021 – model SYCFXR8.

1.2.2. Model SYCF40KF, SN# ED0439000397; service plan part number WADVPLUS-PX-24. This includes the attached PDU SN: XF0439002479 – Model PSX-PDU120V*276652.

1.2.3. Model SUVTRTF30KB5F, SN# PS0633241603; service plan part number WADVPLUS-G3-23.

1.2.4. Model SUVTRTF30KB5F, SN# QS1649350021; service plan part number WADVPLUS-G3-23.

1.2.5. Model SUVTRTF20KB5F, SN# PS1114241559; service plan part number WADVULTRA-G3-22.

1.2.6. Model SUVTPF10KB4F, SN# PS1122330371; service plan number WADVPLUS-G3-21.

1.2.7. Model GVSUPS10KB4FS, SN# QS2024180190; service plan number WADVULTRA-VS1-A15.

1.3. The contractor shall provide the APC/Schneider Advantage service plans specified for the following single phase UPS Models, excluding any remote monitoring services (remote services are not authorized) for one (1) year.

1.3.1. Model SYA16K16P, SN# QD1020160301; service plan part number is WADVPLN1P-SY-08.

1.3.2. Model SYA12K16RMP, SN# QD0851160301; service plan part number is WADVPLN1P-SY-08.

1.3.3. Model SYA16K16P, SN# AD1734320500; service plan part number is WADVPLN1P-SY-08.

2.0 SERVICE SUMMARY.

Performance Objective Performance Threshold Accurately, timely and safely comply with all services IAW paragraphs 1.1 thru 1.3

No more than 2 non-corrected discrepancies per month

3.0 GOVERNMENT FURNISHED SERVICES/BASE SUPPORT.

3.1. There is no base support under this effort.

4.0 GENERAL INFORMATION. In addition to the description of services provided above, the contractor shall perform the following general tasks.

4.1. CONTRACTOR PERSONNEL:

4.1.1. Personnel Qualifications. The contractor shall provide qualified personnel who meet the minimum qualifying criteria at the beginning of their employment as specified. Listed below are the qualification and experience requirements for functional area personnel.

4.1.1.1. Personnel Qualifications. Only APC/Schneider certified OEM installers/technicians shall be allowed to perform service on the units specified in paragraphs 1.1 thru 1.3.3. APC/Schneider certified OEM installers/technicians must meet all of the APC/Schneider standards and requirements.

4.2. QUALITY ASSURANCE. The Government will periodically evaluate and monitor performance to ensure services are received. The Government will evaluate the contractor's performance through intermittent inspections and receipt of valid and verified complaints. The Government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated complaints. Likewise, the Government may decrease the number of quality control inspections if merited by performance. The contractor shall take necessary actions and coordinate with the Government to resolve any discrepancies found as part of these inspections.

4.2.1. Government Remedies. The contracting officer shall follow FAR 52.212-4, Contract Terms and Conditions -

Commercial Items, for contractor’s failure to perform satisfactory services or failure to correct non-conforming service

4.3. HOURS OF OPERATION.

4.3.1. Normal Hours. The contractor shall perform the services required under this contract during the following hours:

Monday through Friday, 7 AM- 5 PM hours unless otherwise stated. Emergency maintenance for units that have 24X7 coverage will be coordinated with security for entry to the site.

4.3.2. Recognized Holidays. The contractor is not required to provide service on the following days:

New Year’s Day January 1 (except weekends, then it will be either Monday or Friday)

Martin Luther King’s Birthday 3rd Monday in January

President’s Day 3rd Monday in February

Memorial Day Last Monday in May

Juneteenth June 19 (except weekends, then it will be either Mon or Fri)

Independence Day July 4 (except weekends, then it will be either Monday or Friday)

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veteran’s Day November 11 (except weekends, then it will be either Monday or

Friday)

Thanksgiving Day 4th Thursday in November

Christmas Day December 25 (except weekends, then it will be either Monday or Friday)

4.4. PERFORMANCE. The performance of these services is not considered to be mission essential during time of crisis.

Should a crisis be declared, the Contracting Officer or his/her representative will advise the contractor of any revised requirements, followed by written direction.

4.5. PLACE OF PERFORMANCE. The contractor shall perform the requirements of this contract at Rome Research Site Rome, New York, (Bldg.’s 106, 3, and 2).

4.6. SECURITY REQUIREMENTS.

4.6.1. The work to be done on this project is located in and around areas that are under the scrutiny of the Department of Defense Police assigned to the RRS Information Directorate. To gain access to the areas to examine the work to be done for job estimation purposes, arrangements must be made through the Contracting Office.

Contractor personnel will be escorted into the areas for the purpose of project estimation.

4.6.2. When it has been determined which Contractor will accomplish these services, a Visit Request letter, from the company, preferably on Company letterhead, identifying all personnel who will be employed during the work will be necessary prior to work commencement. The Visit Request letter needs to be signed by the Company President or Director of Human Resources and will also be used as the Entry Authority List. The Contractor will supply the Visit Request letter to the Security Office (AFRL/RIOF) through the Contracting Officer Representative (COR). The request will contain the full name of each individual, to include a middle initial, date of birth, state of driver’s license issuance and city and state of birth. This information will be used to perform a local files check prior to the beginning of work. This check will provide driver’s license information, any wants and warrants and protection orders and will also provide information on possible illegal immigration issues and terrorist affiliations.

4.6.3. Provide the Company’s phone number and a Project Leaders or Supervisor/Foremen cell-phone number is necessary for the Law Enforcement Desk Sergeant.

4.6.4. All facilities are entered using a magnetic media entry badge. Contractor work within the facilities will be required to obtain an Unescorted Visitor Badge; this will be procured by the Division/Branch with oversight of the work. The badge is obtained in the lobby of Bldg 3, West Wing, Security Office. This badge will be worn at all times within the facility. These badges will be returned to the Contracting Officers’ Technical Representative before completion of the final inspection. Any badges lost during the period of work will be reported to Security as soon as possible.

4.6.5. Access to the RRS Complex is controlled by a Main Gate at 304 Brooks Rd. Identification for the contractor to enter with a vehicle will be an access list supported by the electronic badge issued. All commercial vehicles entering the gate will be searched. One-time deliveries can be escorted from the gate to delivery point by project personnel.

4.6.6. All commercial vehicles are searched prior to entry into the RRS Complex. Vehicle operators will be aware of the vehicle search pull-off area prior to approaching the Main Gate. A search of the vehicle will be conducted prior to its entry. All vehicles not needed for delivery of equipment or tools will be parked in the visitor parking area unless cleared through Security. There are No vehicles allowed within 25 meters (80 ft) of the RRS facilities.

4.6.7. All personnel should be aware that the Rome Research Site is Property of the United States Air Force. All personnel will follow all posted signage.

4.6.8. Contractor personnel will be notified by RRS Police of any emergencies which would require an evacuation or work stoppage, such as an increase in the Force Protection Condition.

4.6.9. Building/Room Keys: If the contractor needs access to area(s) that are locked (i.e. mechanical rooms, janitor’s closet, etc.), a request for entry of at least 2 working days prior to the need for access will be submitted to AFRL/RIOC construction representative. The area(s) will be provided on a daily basis. The area(s) will be locked down at the end of the day’s work.

4.6.10. The 24 hour Desk Sgt can be reached at 330-2961.

4.6.11. Regarding Access to Air Force Facilities and Government Information Technology Networks

4.6.11.1. Contractor employees requiring access to USAF bases, AFRL facilities, and/or access to U.S.

Government Information Technology (IT) networks in connection with the work on this contract must be U.S. Citizens. For the purpose of base and network access, possession of a permanent resident card (“Green Card”) does not equate to U.S. citizenship. This requirement does not apply to foreign nationals approved by the U.S. Department of Defense of U.S. State Department under international personnel exchange agreements with foreign governments. It also does not apply to dual citizens who possess US citizenship, to include Naturalzied citizens. Any waivers to this requirement must be granted in writing by the Contracting Officer prior to providing access. Specific format for waiver request will be provided upon request to the Contracting Officer. The above requirements are in addition to any other contract requirements related to obtaining a Common Access Card (CAC).

4.6.11.2 For purposes of paragraph (a) above, if an IT network/system does not require AFRL to endorse a contractor’s application to said network/system in order to gain access, the organization operating the IT network/system is responsible for controlling access to its system. If an IT network/system requires an U.S.

Government sponsor to endorse the application in order for access to the IT network/system; AFRL will only endorse the following types of applications; consistent with the requriements above:

(1) Contractor employees who are U.S. citizens performing work under this contract.

(2) Contractor employees who are non-U.S. citizens and who have been granted a waiver.

Any additional access restrictions established by the IT network/system owner apply.

4.7. SAFETY REQUIREMENTS:

4.7.1. The contractor shall comply with all safety and health requirements necessary for the protection of personnel, facilities and equipment including, but not limited to all applicable Occupational Safety and Health Administration (OSHA) (Public Law 91-596) and all applicable OSHA standards, while performing this contract at the Air Force Research Laboratory (AFRL), Rome Research Site (RRS), Rome NY (Bldg.’s 106, 3, and 2). It is the contractor’s sole responsibility to make certain that all safety requirements are met.

4.7.2. The contractor shall maintain a written Safety Program, as required by OSHA and make said plan available for review by the government upon request by the Contracting Officer.

4.7.3. In the event of a mishap, or a “near miss”, during the performance of this contract at AFRL RRS, notify the Contracting Officer or the DET 4 Safety Office in an expeditious manner. Written notification shall be provided to the Contracting Officer (who will forward a copy to the DET 4 Safety Office) within 72 hours and shall include the following information:

a. Contract, Contract number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (events leading to accident/incident)

d. Cause of accident/incident (if known)

e. Type of injury sustained and/or estimated cost of accident/incident (material and labor to replace/repair) when damage is to government property.

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective Actions (taken or proposed)

h. Other pertinent information

2.0 SERVICE SUMMARY.
4.1. CONTRACTOR PERSONNEL:
4.3. HOURS OF OPERATION.
4.6. SECURITY REQUIREMENTS.
4.7. SAFETY REQUIREMENTS:

File details come from the government source that posted it. Updated .