This document is a contract award notice for the manufacture of MK152 Warhead Bases and Cases for the Naval Surface Warfare Center Indian Head Division (NSWC IHD). The $5,338,280.00 Firm Fixed Price (FFP) indefinite-delivery/indefinite-quantity contract was awarded to Coronet Machinery, Corp located in Bethel, CT. The contract is for a maximum quantity of 17,600 bases and cases in the base year, and 20,000 each in four option years. This was a sole source procurement based on Coronet Machinery being the only responsible vendor that can perform the requirement without substantial delay or duplication of costs to the government. The contract includes detailed specifications, drawings, technical requirements, quality control, packaging, and delivery instructions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 18 Jan 2024
X
A X B X C X D
EX
X
G F
X H sara.j.cooper@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
08-May-2024
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
ASHLEIGH M BOWIE
DO-C9 1 64
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
TODD SUMMER / GOV SALES REP
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE
203-744-8009
15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
CORONET MACHINERY CORP.
CORONET MACHINERY CORP
TODD SUMMER
8 TROWBRIDGE DR
BETHEL CT 06801-2858
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N0017424D0003
N00174 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and via email conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
SARA COOPER 301-744-6605
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 14
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
15 - 25 26 - 28
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
29 - 32 33 - 35
K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 36 - 46 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 47 - 49 M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
9K646 FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
ashleigh.m.bowie.civ@us.navy.mil
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (301) 744-6677 (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
SCD: C
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
$913,880.00
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
X 10 U.S.C. 2304(c)( )1 41 U.S.C. 253(c)( )
S2206A
(4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE HQ0338
DCMA BOSTON
BUILDING 1108
HANSCOM, AFB MA 01731
DFAS COLUMBUS CENTER,SOUTH ENTITLEMENT O
P.O. BOX 182264
COLUMBUS OH 43213
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
50 - 62
PART II - CONTRACT CLAUSES
NSWC IHD C02
4081 N. JACKSON RD
BLDG 841
INDIAN HEAD MD 20640-5116
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
18 Dec 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0017424R0012
N0017424D0003
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 8,800 Each $31.49 $277,112.00 MK 152 Warheads Bases
FFP
The contractor shall manufacture MK152 Warheads Bases In accordance with PWS 2.2 Technical Drawing 233AS2004RevE and 233AS2075RevA FOB: Destination
DWG NR: 233AS2004
PSC CD: 1340
MAX
NET AMT
$277,112.00
ITEM NO SUPPLIES/SERVICES QTY U/I UNIT PRICE AMOUNT
0002 MK 152 Warheads Cases
The contractor shall manufacture MK152 Warheads Cases In accordance with PWS 2.2 Technical Drawing DW233AS2073 and
233AS2075
8,800 Each $71.16 $626,208.00
DWG NR: 233AS2004, 233AS2075
FOB: Destination
FFP
0003 Shipping
Shipping in support of CLIN 0001
1 Lot $3,872.00 $3,872.00 NTE
DWG NR: 233AS2073 233AS2004
0004 Shipping
Shipping in support of CLIN 0002
1 Lot $6,688.00 $6,688.00 NTE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 1 Lot NSP Base Year CDRLs
FFP
Contract Data Requirements List (CDRL)
NOT SEPARATELY PRICED
A001 - Test Inspection Report A002 - Certificate of Compliance A003 - Certification/Data Report FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1001 10,000 Each $32.44 $324,400.00 NTE OPTION MK 152 Warheads Bases
FFP
Option Year I The contractor shall manufacture MK152 Warheads Bases In accordance with PWS 2.2 Technical Drawing 233AS2004RevE
FOB: Destination
$324,400.00
1002 MK 152 Warheads Cases
Option Year I The contractor shall manufacture MK152 Warheads Cases In accordance with PWS 2.2
10,000 Each $73.30 $733,000.00
NTE
OPTION DWG NR: 233AS2004, 233AS2075
1003 1 Lot NSP OPTION Option Year I CDRLs
FFP
Contract Data Requirements List (CDRL)
NOT SEPARATELY PRICED
A001 - Test Inspection Report A002 - Certificate of Compliance A003 - Certification/Data Report FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1004 1 Lot $4,500.00 $4,500.00 NTE OPTION Shipping
FFP
Option Year I Shipping in support of CLIN 1001 FOB: Destination
$4,500.00
1005 Shipping
Option Year I Shipping in support of CLIN
1 Lot $7,800.00 $7,800.00 NTE
OPTION DWG NR: 233AS2073 233AS2004
2001 10,000 Each $33.42 $334,200.00 NTE OPTION MK 152 Warheads Bases
FFP
Option Year II The contractor shall manufacture MK152 Warheads Bases In accordance with PWS 2.2 Technical Drawing 233AS2004RevE FOB: Destination
NET AMT $334,200.00
2002 10,000 Each $75.50 $755,000.00 NTE OPTION MK 152 Warheads Cases
FFP
Option Year II The contractor shall manufacture MK152 Warheads Cases In accordance with PWS 2.2 Technical Drawing DW233AS2073 and 233AS2075 FOB: Destination
DWG NR: 233AS2004, 233AS2075
NET AMT $755,000.00
2003 1 Lot NSP OPTION Option Year II CDRLs
FFP
Contract Data Requirements List (CDRL)
NOT SEPARATELY PRICED
A001 - Test Inspection Report A002 - Certificate of Compliance A003 - Certification/Data Report FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2004 1 Lot $4,600.00 $4,600.00 NTE OPTION Shipping
FFP
Option Year II Shipping in support of CLIN 2001 FOB: Destination
$4,600.00
2005 Shipping
Option Year II Shipping in support of CLIN
1 Lot $8,000.00 $8,000.00 NTE
3001 MK 152 Warheads Bases
Option Year III The contractor shall manufacture MK152 Warheads Bases In accordance with PWS 2.2 Technical Drawing 233AS2004RevE
10,000 Each $34.43 $344,300.00
OPTION DWG NR: 233AS2004
3002 MK 152 Warheads Cases
Option Year III The contractor shall manufacture MK152 Warheads Cases In accordance with PWS 2.2
10,000 Each $77.77 $777,700.00
3003 1 Lot NSP OPTION Option Year III CDRLs
FFP
Contract Data Requirements List (CDRL)
NOT SEPARATELY PRICED
A001 - Test Inspection Report A002 - Certificate of Compliance A003 - Certification/Data Report FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3004 1 Lot $4,700.00 $4,700.00 NTE OPTION Shipping
FFP
Option Year III Shipping in support of CLIN 3001 FOB: Destination
$4,700.00
3005 Shipping
Option Year III Shipping in support of CLIN
1 Lot $8,200.00 $8,200.00 NTE
4001 MK 152 Warheads Bases
Option Year IV The contractor shall manufacture MK152 Warheads Bases In accordance with PWS 2.2 Technical Drawing 233AS2004RevE
10,000 Each $35.47 $354,700.00
OPTION DWG NR: 233AS2004
4002 MK 152 Warheads Cases
Option Year IV The contractor shall manufacture MK152 Warheads Cases In accordance with PWS 2.2
10,000 Each $80.11 $801,100.00
4003 1 Lot NSP OPTION Option Year IV CDRLs
FFP
Contract Data Requirements List (CDRL)
NOT SEPARATELY PRICED
A001 - Test Inspection Report A002 - Certificate of Compliance A003 - Certification/Data Report FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4004 1 Lot $4,800.00 $4,800.00 NTE OPTION Shipping
FFP
Option Year IV Shipping in support of CLIN 4001 FOB: Destination
$4,800.00
4005 Shipping
Option Year IV Shipping in support of CLIN
1 Lot $8,400.00 $8,400.00 NTE
Section C - Descriptions and Specifications
SECTION C
MANUFACTURING OF HARDWARE USING NSWC IHD DRAWINGS
PERFORMANCE WORK STATEMENT (PWS)
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture Bases and Cases for assembly in ordnance at Naval Surface Warfare Center Indian Head Division (NSWC
IHD).
2.0 Applicable Documents
2.1 General Specifications
American National Standards Institute (ANSI)/National Conference of Standards Laboratories (NCSL) Standards:
ANSI/NCSL Z540.3 Requirements for the Calibration of Measuring and Test Equipment
American Society for Testing and Materials Standards:
ASTM D3951 Standard Practice for Commercial Packaging
American Society of Mechanical Engineers Standards:
ASME B1.3 Screw Thread Gaging Systems for Acceptability
Code of Federal Regulations (CFR):
22 CFR 121 The United States Munitions List 22 CFR 122 Registration of Manufacturers and Exporters
Department of Defense (DoD) Directives:
5230.25 Withholding of Unclassified Technical Data From Public Disclosure
International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:
ISO 9001 Quality Management Systems ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration
Laboratories
Military Specifications:
MIL-STD-1916 Department of Defense Test Method Standard
Society of Automotive Engineers (SAE) Standards:
SAE AS6174 Counterfeit Material; Assuring Acquisition of Authentic and
Conforming Material
2.2 Technical Drawings
Department of Defense Drawings:
233AS2004 Base 233AS2073 Case
233AS2075 Case
2.3 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General
The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.
3.2 Subcontractor and Supplier Performance
The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.
3.3 Kickoff Meeting
The Contractor shall host a Government/Contractor Kickoff Meeting or telecon to establish Government/Contractor interfaces within 15 workings days after contract award, or as mutually agreed to by the Government and the Contractor. The anticipated meeting objectives shall include team introduction, general program discussions, as well as more specific information in regards to the supported program.
3.4 Test and Inspection
The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.
3.5 Dimensional Inspection
The Contractor is responsible for performing in-house inspections to ensure each first article or production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.
The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI- NDTI-80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension
3.6 Threaded Features
Threaded features shall be inspected by the Contractor and accepted by the Government using gauges calibrated per PWS 3.8.2, and selected in accordance with ASME B1.3, System 21, unless another gauge is specified in the respective drawing or herein.
3.7 Product Certification
The Contractor shall submit a Certificate of Compliance in accordance with DI-QCIC-81356 per CDRL A002 to accompany the shipment of each first article and production lot, as required by Table 1. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Contractor shall submit a certificate of analysis/test in accordance with DI-MISC-80678 per CDRL A003 showing the first article or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate.
Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:
“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”
Table 1: Certification Requirements Part
Test Requirement
Certificate Dwg Location
Base Material 233AS2004 Note 3 Analysis Surface Preparation
233AS2004 Note 5 Compliance
Oil Coating 233AS2004 Note 6 Compliance Case Material 233AS2073 Note 2 Analysis
Surface Preparation
233AS2073 Note 8 Compliance
Paint 233AS2073 Note 9 Compliance Oil Coating 233AS2073 Note 10 Compliance
Yellow Band Attachment
233AS2075 Note 10
3.8 Quality Control
3.8.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data, which comprise the quality management system, if requested, shall be made available to the Government for review.
3.8.2 Calibration of Measuring and Testing Equipment
Calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of either ANSI/NCSL Z540.3 or ISO/IEC 17025.
3.8.3 Acceptance of Product
Final acceptance of first article samples and production deliverables will be determined by Government dimensional inspection, thread gauging, and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 30 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.
Table 2: Inspection Sampling Plan
MIL-STD-1916:
Critical: 100% Major: Level IV Minor: Level II
Features designated as “Majors” and “Criticals” may be subject to high-precision measurement techniques as part of the sampling plan identified above.
3.8.4 Government-Identified Nonconformity Reporting Procedures The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.
3.9 Preservation
The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with ASTM D3951 to prevent any potential damage during transport.
Bases shall be completely coated in oil, per Note 6 of Drawing 233AS2004, and immediately packaged individually in resealable commercial plastic bags. The plastic bags shall be of sufficient strength to prevent oil contamination of the outer packaging.
Cases shall be coated in oil, per Note 10 of Drawing 233AS2073, and immediately packaged individually in resealable commercial plastic bags. The plastic bags shall be of sufficient strength to prevent oil contamination of the outer packaging.
The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date.
3.10 Export Control
3.10.1 International Trafficking in Arms Regulations (ITAR) Compliance The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.
3.10.2 Joint Certification Program (JCP) Registration
The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.
3.11 Counterfeit Material
The Contractor shall maintain a counterfeit material prevention program in accordance with SAE AS6174, or comparable. The Contractor shall notify the Contracting Officer (KO) if material cannot be obtained from an authorized supplier.
Counterfeit Parts and Materiel Counterfeit materiel is a serious threat to the safety and operational effectiveness of DoD systems. The Contractor (and subcontractors at all tiers) shall implement a risk mitigation process when obtaining critical or high risk materiel in accordance with paragraphs (a) and (b) below:
(a) If the materiel is currently in production or currently available, the materiel shall be obtained only from authorized sources. Authorized sources are the original manufacturer, a source with the express written authority of the original manufacturer or current design activity, or an authorized aftermarket manufacturer.
(b) If the materiel is not in production or currently available from authorized sources, the materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria. Counterfeit avoidance criteria can be found in the following Industry Standards - SAE AS5553A; SAE AS6462; SAE AS6081; SAE ARP6178; SAE AS6174A; and SAE
AS6301.
Contractors shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized source. The contractor shall take mitigating actions to authenticate the materiel if purchased from another source.
The contractor shall report instances of counterfeit and suspect counterfeit materiel to the Contracting Officer and the Government-Industry Data Exchange Program (GIDEP) as soon as the contractor becomes aware of the issue.
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.
CDRL Spec Section Title A001 DI-NDTI-80809 3.5 Final Dimensional Inspection Report A002 DI-QCIC-81356 3.6 Certificate of Compliance A003 DI-MISC-80678 3.6 Certificate of Analysis
4.1 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the units below to the required destination. Lead times listed below represent the maximum allowable delivery timeframe; early deliveries are permitted.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-209-H003 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (OCT 2018)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
N0017423C0002
(End of Text)
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal DOC011124-01112024102812/845 dated 01/10/2024 in response to Solicitation No. N0017424R0012.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A001-A003, attached hereto.
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.
Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph
(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)
The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
Section D - Packaging and Marking
D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) Coronet Machinery Corporation Todd Summer, President 8 Trombridge Drive Bethel CT 06801-2858
(2) Phone number: (203) 744-8009
(3) Sponsor: N/A
D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)
For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-211-H005 IDENTIFICATION MARKING OF PARTS – ALTERNATE I (NAVSEA) (OCT 2018)
(a) For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.
(2) Parts manufactured to Government specifications shall be marked as follows:
(i) Electrical Parts - that is, all parts in electrical equipment and electrical parts when used in equipment which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(2) dated 22 June 2018, or, where MIL-STD-1285D(2) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.
(ii) Electronic Parts - that is, all parts in electronic equipment and electronic parts when used in equipment which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK-454B dated 15 April 2007 with Notice 1 dated 12 December 2012. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.
(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with MIL-STD-130N(1).
(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM- D-3951-18 approved 1 May 2018, Standard Practice for Commercial Packing.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-15 Certificate of Conformance APR 1984 52.246-16 Responsibility For Supplies APR 1984
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.
E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018)
(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).
(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United
States Code, Section 1001.
(c) Beneath the signature include the typed name of the individual signing this certificate.
(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.
(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.
(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(g) The certificate shall read as follows:
I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.
Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________
E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)
(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.
(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(d) The certificate shall read as follows:
I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this document.
Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________
Section F - Deliveries or Performance
DELIVERY SCHEDULE
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 12 wks. ADC 8,800 NSWC IHD
RECEIVING
4522 MCMAHAN ROAD B116
INDIAN HEAD MD 20640-5125
301-744-4221
N00174
0002 12 wks. ADC 8,800 (SAME AS PREVIOUS LOCATION)
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
0005 N/A N/A N/A N/A
1001 12 wks. ADC 10,000 NSWC IHD
RECEIVING
4522 MCMAHAN ROAD B116
INDIAN HEAD MD 20640-5125
301-744-4221
1002 12 wks. ADC 10,000 (SAME AS PREVIOUS LOCATION)
1003 N/A N/A N/A N/A
1004 N/A N/A N/A N/A
1005 N/A N/A N/A N/A
2001 12 wks. ADC 10,000 NSWC IHD
RECEIVING
4522 MCMAHAN ROAD B116
INDIAN HEAD MD 20640-5125
301-744-4221
2002 12 wks. ADC 10,000 (SAME AS PREVIOUS LOCATION)
2003 N/A N/A N/A N/A
2004 N/A N/A N/A N/A
2005 N/A N/A N/A N/A
3001 12 wks. ADC 10,000 NSWC IHD
RECEIVING
4522 MCMAHAN ROAD B116
INDIAN HEAD MD 20640-5125
301-744-4221
3002 12 wks. ADC 10,000 (SAME AS PREVIOUS LOCATION)
3003 N/A N/A N/A N/A
3004 N/A N/A N/A N/A
3005 N/A N/A N/A N/A
4001 12 wks. ADC 10,000 NSWC IHD
RECEIVING
4522 MCMAHAN ROAD B116
INDIAN HEAD MD 20640-5125
301-744-4221
4002 12 wks. ADC 10,000 (SAME AS PREVIOUS LOCATION)
4003 N/A N/A N/A N/A
4004 N/A N/A N/A N/A
4005 N/A N/A N/A N/A
52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
F-242-H001 CONTRACTOR NOTICE REGARDING LATE DELIVERY (NAVSEA) (OCT 2018)
In the event the contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the contractor shall immediately notify, in writing, the Contracting Officer and the cognizant Contract Administration Services Office, if assigned. The notice shall give the pertinent details; however, such notice shall not constitute a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.
F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018)
All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.
Section G - Contract Administration Data
252.204-7006 Billing Instructions--Cost Vouchers MAY 2023
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the…
This is the start of the file's text. The full file is on GovTribe.