This statement of work outlines requirements for inspection and potential repair of a port engine camshaft on a U.S. Coast Guard vessel. The contractor shall inspect the camshaft on the port engine of a 44' 9" vessel with an engine serial number of 06R1032343 within 21 days of award. The contractor will determine if the camshaft needs repair or replacement, and perform any necessary work to have the vessel ready within 20 working days. The contractor must coordinate sea trials with the Coast Guard and submit condition found reports. Additional discovered work items require immediate reporting and estimates. The solicitation number for this opportunity is 70Z04023QSBPL0103 from the Department of Homeland Security Coast Guard. Contact information is provided for questions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
U.S. Coast Guard Station Seattle 1519 Alaskan Way S.
Seattle, WA 98134
(206) 217 - 6762
1. SCOPE: Contractor shall provide general labor, equipment, and parts to perform a camshaft inspection and repair after the front rocker arm assembly exhaust valve rollers failed on the port engine of 45645, engine S/N: 06R1032343.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the contractor shall commence work within 21 days and work diligently to complete the entire project and have vessel ready for use by 20 working days from scheduled inspection after contract award.
3. INFORMATION AND REQUIREMENTS:
Physical Characteristics of Vessel
1. Hull Length 44’ 9”
2. Hull Beam 14’ 8”
3. Highest Points: Fixed 13’ 1”, Unfixed 20’ 9”
4. Hoisting condition 36,700 LBS (boat, full fluids, outfit; no crew or cargo)
Inspect port engine (SN: 06R1032343).
1. Inspect port engine camshaft.
2. Determine need for repair or replace.
3. Replace camshaft as required.
4. Contractors will perform all disconnections, and installations.
Sea Trial Performance
1. US Coast Guard shall perform dockside and sea performance trials with contractor representative.
2. Contractor will organize and submit applicable Condition Found Reports (CFRs).
4. CONDITIONS AFFECTING THE WORK: If additional work items are found after removing/replacing the camshaft, Contractor shall report findings immediately before work continues via CFR along with commercial estimate of necessary work to be completed outside the original SOW.
5. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the Contracting Officer’s Representative of his intended start date. The work shall be done in accordance with the specification.
6. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
7. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer Representative (COR).
8. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.
9. CLEAN UP: All HAZWASTE, trash and debris shall be removed from the site and or recycled as applicable. The job site shall be left in a clean and neat manner.
10. UPON COMPLETION OF WORK: Contact the COR to arrange for inspection/acceptance of work.
11. POINTS OF CONTACT:
Contracting Officer Representative Bryan Briggs, USCG, MKCS Phone: (321) 986-7965 Email: Bryan.p.briggs@uscg.mil
12. Attachment: None.