24AQP010_RFP_FINAL.pdf
PDF 3 MB Posted
- Solicitation number
- 0000035694
- Issued by
- California
About this file
This is a Request for Proposal (RFP) issued by the California Air Resources Board (CARB) for a project titled "Assessing Feasibility and Cost of Zero-Emission Taxiing at Commercial Airports" (RFP No. 24AQP010). The 18-month contract, with a potential six-month extension, seeks a contractor to conduct a comprehensive study analyzing zero-emission (ZE) technologies for taxiing commercial aircraft at selected California airports. The project will involve assessing available and emerging ZE technologies, examining real-world applications, selecting representative airports, conducting a safety and risk management panel, evaluating operational and infrastructure impacts, and performing modeling and cost-benefit analyses. Proposals are due by June 10, 2025, with a total budget of $500,000.
The contract includes provisions for potential DVBE (Disabled Veteran Business Enterprise) and small business participation incentives. Proposers must meet minimum qualifications, including two years of experience in airport layout/design, one year of computer modeling for airport design, one year of government research studies, and two years of interfacing with regulatory agencies like the FAA. Proposals will be evaluated on technical approach, experience, work plan, and cost, with a maximum of 100 points available. The state reserves the right to renew the contract for an additional six months with up to $250,000 in additional funding, and proposals exceeding the initial $500,000 budget may be deemed non-responsive.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (SECONDARY METHOD)
Notice to Prospective Proposers
RFP No. 24AQP010
May 23, 2025
You are invited to review and respond to this Request for Proposal (RFP) No. 24AQP010, titled, “Assessing Feasibility and Cost of Zero-Emission Taxiing at Commercial Airports”. In submitting your proposal, you must comply with the instructions found herein.
This RFP is published online in the California State Contracts Register (CSCR) at https://caleprocure.ca.gov/pages/index.aspx. To ensure receipt of any addenda to this RFP that may be issued, interested parties are encouraged to register online at: https://caleprocure.ca.gov.
The California Air Resources Board’s (CARB) deadline for receipt of proposals is June 10, 2025 no later than 2:00 p.m. (PST). All proposals received late will be rejected. File size cannot exceed 50 Mega Bytes (MB). The naming convention of the proposal must be in the following format: “RFP 24AQP010 [insert vendor name] Proposal”. Proposals must be received on or before the date and time specified herein at email addresses provided below:
EMAIL RFP Proposal to:
Purchasing@arb.ca.gov CC: Domunique.Tyler@arb.ca.gov CC: Carmen.Padilla@arb.ca.gov
You are advised that you are responsible for ensuring that your proposal is received by the above listed contact person by the time and date required. Any proposal reaching the contact person after the deadline date and time will be rejected.
In the opinion of CARB, this RFP is complete and without need of explanation. However, if you have questions, notice any discrepancies or inconsistencies, or need any clarifying information, contact the person listed below. All questions must be submitted in accordance with the RFP instructions contained herein and sent via email directly to the below listed contact person and not through the Cal eProcure system.
Contact: Domunique Tyler Email: Domunique.Tyler@arb.ca.gov
CC: Carmen.Padilla@arb.ca.gov
We appreciate your interest in this project and hope to receive a proposal from you if this is within your area of expertise.
https://caleprocure.ca.gov/pages/index.aspx https://caleprocure.ca.gov/ mailto:Purchasing@arb.ca.gov mailto:Domunique.Tyler@arb.ca.gov mailto:Carmen.Padilla@arb.ca.gov mailto:Domunique.Tyler@arb.ca.gov mailto:Carmen.Padilla@arb.ca.gov
California Air Resources Board
Table of Contents
SECTION PAGE
I. PURPOSE / BACKGROUND / SCOPE OF WORK 3
A) Purpose 3
B) Background 4 C) Scope of Work 4
II. PROPOSAL REQUIREMENTS (GENERAL) AND INFORMATION 4
A) RFP Key Action Dates 4 B) Questions Regarding RFP Requirements 5 C) General Proposal Requirements 5 D) Submission of Proposals 5 E) Modification and/or Withdrawal of Proposals 6 F) Proposer Responsibilities 6 G) Signature 9 H) Disposition of Proposals 10 I) Socio-Economic and Preference Programs 10
1) Disabled Veteran Business Enterprise (DVBE) Incentive 10
2) Small Business (SB) or Microbusiness (MB) Preference 10
3) Target Area Contract Preference Act (TACPA) 10
4) Preference and Incentive Application 12
III. PROPOSAL REQUIREMENTS (TECHNICAL) 13
A) Technical Proposal Requirements 13
1) Proposer Minimum Qualifications 13
3) Title Page 13
4) Cover Letter / Letter of Commitment 13
5) Table of Contents 14
6) Summary 14
7) Minimum Qualifications Response 14
8) Required Attachments 14
9) References 14
10) Conflict of Interest and Confidentiality Statement 14
11) Subcontracts / Subcontractors 15
12) Technical Portion 15
a) Management Plan 15
b) Methodology (Approach to Work) 15
c) Work Plan and Work Schedule 15
d) Personnel / Experience 18
e) Page Headers and Page Numbering 19
B) Cost Proposal Requirements 19
1) Cost Detail 19
a) Itemized Tasks 19
b) Subcontracts / Subcontractors 19
IV. EVALUATION, SELECTION, AND AWARD 19
A) Administrative Evaluation (Phase 1) 19 B) Technical Evaluation (Phase 2) 20
1) Scoring Criterion Guidelines 20
2) Cost Points 20
3) Proposal Evaluation Form 22 C) Proposal Rejection 24 D) Selection 24
E) Notice of Proposed Award 24 F) Standard Conditions of Service 25 G) Post Award Requirements 25
ATTACHMENTS
1) Required Attachment Checklist 27
2) Draft Standard Agreement (STD 213) 28
Exhibit A, Scope of Work 29 Exhibit A, Attachment 1, Technical Proposal 41
Exhibit B, Budget Detail and Payment Provisions 42 Exhibit B, Attachment 1, Contractor Cost Sheet 43 Exhibit C, General Terms and Conditions (GTC 02/2025) 44 Exhibit D, Special Terms and Conditions 45 Exhibit E, Additional Provisions 51
Exhibit F, Final Report Format 54 Exhibit G, Quarterly Report Format Template 59
3) Proposer References Form 61
4) Payee Data Record (STD 204) 62
5) Payee Data Record Supplement (STD 205) 64
6) Contractor Certification Clauses (CCC 04/2017) 66
7) California Civil Rights Laws Certification (DGS OLS 04) 70
8) Darfur Contracting Act Certification (DGS PD 1) 71
9) Bidder Declaration Form (GSPD-05-105) 72
10) California Disabled Veteran Business Enterprise (DVBE) Bid
Incentive Instructions
11) Contractor Cost Sheet 77
12) Detailed Response for Minimum Qualifications 80
13) COVID-19 Prevention Contractor Self-Certification 81
14) Conflict of Interest and Confidentiality Statement 82
I. PURPOSE / BACKGROUND / SCOPE OF WORK
A. Purpose
This Request for Proposal (RFP) is to solicit competitive proposals from experienced and qualified Contractors to provide a thorough analysis of how zero-emission (ZE) technologies could be utilized to taxi commercial aircraft at California airports.
For a detailed description of the work to be performed, please refer to Attachment 2, Draft Standard Agreement (STD 213). No work shall begin until all required signatures and approvals are obtained, and the California Air Resources Board (CARB) Contract Manager provides direction.
The contract term shall be for eighteen (18) months from the actual start date of the Agreement. The total budget for the entire contract is Five Hundred Thousand Dollars and Zero Cents ($500,000.00). Proposals exceeding this amount may be deemed non-responsive and ineligible for award.
The State reserves the option to renew the contract for one (1) additional six (6) month period and for an additional $250,000.00. If at the State’s sole-discretion, the optional six (6) month extension is granted, the State may amend the Agreement to include the additional six (6) months and increase funds as appropriate.
B. Background
California Air Resources Board (CARB) has successfully implemented regulations over past decades that have substantially decreased criteria pollutants and greenhouse gas emissions in California. Despite these monumental successes, more emission reductions are necessary throughout the State. Addressing ozone nonattainment, as well as other air quality standards, will require reducing Nitrogen Oxide (Nox), Hydrocarbon, and Particulate Matter (PM) pollutants.
C. Scope of Work
The Contractor will assess the feasibility of implementing zero-emission taxiing for commercial aircraft at select California airports. This will include an assessment of available and emerging ZE technologies, modeling and analysis of present-day operations and infrastructure of the selected California airports.
The Contractor will determine what modifications to airport operations and airport infrastructure, or additional resources, will be necessary to implement ZE taxiing while maintaining typical flight landing/takeoff rates. A Risk and Safety Management panel will be organized to identify and mitigate safety risks associated with ZE taxiing. Finally, a cost-benefit analysis will be performed to provide insight into operationally and technically feasible ZE taxiing application approaches for California airports and airlines.
II. PROPOSAL REQUIREMENTS (GENERAL) AND INFORMATION
This section contains instructions for the submission of your proposal. It is the responsibility of the Proposer to carefully read and follow all proposal requirements within this RFP. Compliance with the RFP instructions is mandatory for your proposal to be considered for award. Failure to comply with the RFP instructions may cause your proposal to be deemed non-compliant and non-responsive, thus ineligible for award.
A. RFP Key Action Dates
Below is the tentative time schedule for this RFP. CARB reserves the right to modify the RFP and/or change dates and times at its sole discretion, prior to the date fixed for submission of proposals, by the issuance of an addendum that will be posted on the California State Contracts Register (CSCR) at: https://caleprocure.ca.gov.
1. CARB reserves the right to modify or cancel in whole or any part of this solicitation.
2. Clarifications to the solicitation will only be provided in the form of a written addendum to all
Proposers.
RFP Key Actions Dates Time (PST) RFP available to prospective Proposers 05/23/2025 N/A Written Questions Submittal Deadline 05/28/2025 3:00 p.m.
Question and Answers Addendum Posted 06/03/2025 5:00 p.m.
Final Date for Proposal Submission/Receipt by CARB 06/10/2025 2:00 p.m.
Complete Evaluation of Proposals 06/12/2025 N/A https://caleprocure.ca.gov/
Posting of Intent to Award Notice(s) (Notice is posted for five [5] business days) 06/13/2025 N/A
Agreement sent to successful Proposer 06/23/2025 N/A Signed Agreement returned to CARB for counter-signature 06/25/2025 N/A Agreement Approved and Executed – work begins 06/30/2025 N/A
RFP Key Action Dates listed above are estimates only, and subject to change at CARB’s sole discretion. No work shall begin until all required approvals and signatures, including the Department of General Services (DGS) Office of Legal Services are obtained.
B. Questions Regarding RFP Requirements
All questions or concerns related to the RFP requirements must be directed electronically to:
Fiscal Services Division Acquisitions Branch Contact: Domunique Tyler Email: Domunique.Tyler@arb.ca.gov
Questions must be received by the date and time specified under Section II, A. Key Action Dates. Answers to all questions submitted will be in the form of an addendum posted to the DGS California State Contracts Register (CSCR) website https://caleprocure.ca.gov/pages/index.aspx by the date and time specified under Section II, A.
Key Action Dates. Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum to all parties/participants.
All questions must be submitted referencing the RFP number in the subject line, directly to the above listed contact person and not through the Cal eProcure system.
C. General Proposal Requirements
1. Proposals should provide straightforward and concise descriptions of the Proposer’s ability to satisfy the requirements of this RFP. The proposal must be complete and accurate.
Omissions, inaccuracies or misstatements will be sufficient cause for rejection of a proposal.
2. Proposals must be submitted for the performance of all services described herein. Any deviation from the work specifications (Section Ill, Proposal Requirements, and Attachment 2, Draft Standard Agreement [STD 213]) may cause a proposal to be rejected.
D. Submission of Proposals
1. Proposals must be submitted no later than the date and time indicated in Section II, A. Key
Action Dates and must be addressed as follows in Item 2.
Proposals received after this date and time will not be considered and will be rejected.
2. Delivery Instructions https://caleprocure.ca.gov/pages/index.aspx
Responses to this RFP shall be submitted to CARB at the following email addresses provided below in Section 2.b. in PDF format, cannot exceed 50 Mega Bytes (MB) and include:
a. One (1) copy containing the Technical Proposal and all other required elements along with the Cost Proposal.
b. Submit to the following email addresses and reference the RFP number in the subject line.
Purchasing@arb.ca.gov CC: Domunique.Tyler@arb.ca.gov
3. Each proposal will be reviewed to determine if it meets the proposal requirements contained in Section III, Proposal Requirements (Technical). Failure to meet the requirements for the RFP may be cause for rejection of the proposal.
4. A proposal may be rejected if it is conditional or incomplete, or if it contains any alterations of form or other irregularities of any kind. The State may reject any or all proposals and may waive any immaterial deviation in a proposal. The State’s waiver of immaterial defect shall in no way modify the RFP document or excuse the Proposer from full compliance with all requirements if the Proposer is awarded the Agreement.
5. CARB may modify the RFP up to the specified time of the date fixed listed for submission of proposals by the issuance of an addendum to all parties who received a proposal package. Any addendum(s) will be issued through the Cal eProcure system.
6. The State reserves the right to reject all proposals.
7. More than one (1) proposal from an individual, firm, partnership, corporation or association under the same or different name will not be considered. Reasonable grounds for believing that any Proposer has submitted more than one proposal for the work contemplated herein will cause the rejection of all proposals submitted by that Proposer. If there is reason to believe that collusion exists among the Proposers, none of the participants in such collusion will be considered in this or future procurements.
E. Modification and/or Withdrawal of Proposals
1. A Proposer may modify a proposal after its submission by withdrawing its original proposal and resubmitting a new proposal prior to the proposal submission deadline. The Proposer modifications offered in any other manner, oral or written, will not be considered.
2. A Proposer may withdraw its proposal by submitting a written withdrawal request to CARB signed by the Proposer or an agent authorized in accordance with Section II, G., titled “Signature”. A Proposer may thereafter submit a new proposal prior to the proposal submission deadline. Proposals may not be withdrawn without cause subsequent to proposal submission deadline.
F. Proposer Responsibilities mailto:Purchasing@arb.ca.gov
1. Proposers should carefully examine the entire RFP, with special attention to the tasks and deliverables found in Attachment 2, Draft Standard Agreement (STD 213). Proposers shall investigate obstacles that might be encountered. No additions or increases to the agreement amount will be made due to a lack of careful examination of the requirements.
2. Before submitting a response to this RFP, the Proposer should review their response, correct all errors, and confirm compliance with the RFP requirements. It is the Proposer’s responsibility to complete and submit all required attachments as listed on Attachment 1, Required Attachment Checklist.
3. Costs incurred for developing proposals and in anticipation of award of the Agreement are entirely the responsibility of the Proposer and shall not be charged to CARB.
4. It is the Proposer’s responsibility to promptly notify CARB’s contract analyst identified in the solicitation, in writing, by e-mail, if the Proposer believes that the solicitation is unfairly restrictive, contains errors or discrepancies, or is otherwise unclear. Notification must be done immediately upon receipt of the solicitation in order that the matter may be fully considered, and appropriate action taken by CARB prior to the closing time set to receive solicitation responses. Such notification must be submitted no later than the question-and-answer period referenced in Section II, A. Key Action Dates. All such correspondence received after the question-and-answer deadline will not be considered.
5. Proposer is responsible to review, read, understand, and comply in full with the State’s General Terms and Conditions along with the Contractor’s Certification Clauses (CCC) as listed at: https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services- Resources-List-Folder/Standard-Contract-Language.
6. Each proposal must constitute an irrevocable offer for a period of at least one hundred eighty (180) working days after proposal submission.
7. The Proposer must provide evidence to show that members of the team possess the specific qualifications, competence, experience, resources, and business integrity necessary to carry out the work under the contract as expected. Proposer must provide resumes for each member of the team. Proposer may also include letters of reference, project summaries that highlight the team’s experience. Proposers must complete Attachment 3, Proposer References Form.
8. The Proposer must own and operate a legitimate business. If required by law, the Proposer must be registered and in good standing with the California Secretary of State. All businesses that are required to be registered with the California Secretary of State must be registered prior to date of Agreement award. Evidence of registration shall be submitted with the proposal.
9. In the event that any required license(s) and/or permit(s) expire at any time during the term of this agreement, Proposer agrees to provide the contract manager a copy of the renewed license(s) and/or permit(s) within thirty (30) days following the expiration date. In the event the Proposer fails to keep in effect at all times all required license(s) and permit(s), the State may, in addition to any other remedies it may have, terminate this Agreement upon occurrence of such event.
https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language
10. It is unlawful for any person engaged in business within this state to sell or use any article or product as a “loss leader” as defined in Section 17030 of the Business and Professions Code.
11. The Proposer must complete and submit to CARB, Attachment 4, Payee Data Record (STD 204), to determine if the selected proposer is subject to state income tax withholding, pursuant to California Revenue and Taxation Code, Section 18662. This form can be found on the Internet at http://www.documents.dgs.ca.gov/dgs/fm c/pdf/std204.pdf. No payment shall be made unless a completed STD 204 and/or Attachment 5, Payee Data Record Supplement (STD 205), (if applicable) has been returned to CARB. This form can be found on the Internet at https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std205.pdf.
12. The Proposer must sign and submit to CARB, page one (1) of the Attachment 6, Contractor Certification Clauses (CCC 04/2017), or the form can be obtained via the Internet at: https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-
13. The Proposer must sign and submit to CARB, Attachment 7, California Civil Rights Laws
Certifications (DGS OLS 04).
14. The Proposer must sign and submit to CARB, Attachment 8, Darfur Contracting Act Certification (DGS PD 1).
15. The Proposer must sign and submit to CARB, Attachment 9, Bidder Declaration Form
(GSPD-05-105).
16. The Proposer must complete and submit to CARB, Attachment 11, Contractor Cost Sheet.
Failure to fully complete and return this attachment with your proposal will cause your bid to be rejected and deemed non-responsive.
17. The Proposer must complete and submit to CARB, Attachment 12, Detailed Response for Minimum Qualifications. Failure to fully complete and return this attachment with your proposal will cause your bid to be rejected and deemed non-responsive.
18. As part of CARB’s ongoing efforts to protect the health and safety of its employees, CARB is requesting all vendors / Contractors who perform work in person or on site to provide certification that the vendor’s / Contractor’s employees and subcontractors have provided documentation to the vendor / Contractor that the employees are either fully vaccinated against COVID-19 (as defined by the CDC), or have obtained a negative COVID-19 test result within seventy-two (72) hours of in-person or on-site work. The vendor / Contractor does not need to provide the documentation of employees’ or subcontractors’ vaccination status or negative test result to CARB. If no employees or subcontractors of the vendor / Contractor will interact with any CARB employees or perform work on site, CARB requests the vendor / Contractor certify to this effect.
Additionally, all Contractors who perform services under a contract with CARB are expected to, at their own expense, comply with all applicable health and safety laws and regulations. This includes, but is not limited to, all laws, regulations, and public health orders related to the COVID-19 pandemic. The Proposer must sign and submit to CARB, Attachment 13, COVID-19 Prevention Contractor Self-Certification.
http://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std205.pdf https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language
19. The Proposer must sign and submit to CARB, Attachment 14, Conflict of Interest and Confidentiality Statement. The Proposer shall require each of its employees or officers who will be involved in the performance of this Agreement to agree to the terms and the terms of the Conflict of Interest and Confidentiality Statement.
20. Generative Artificial Intelligence (GenAI)
The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
Bidder / Offeror must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
21. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals.
“Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
G. Signature
1. All documents requiring signatures contained in the original proposal package must have original or electronic signatures.
2. Only an individual who is authorized to bind the proposing firm contractually shall sign the required Cover Letter for the proposal. The signature must indicate the title or position that the individual holds in the firm. An unsigned proposal may be rejected.
H. Disposition of Proposals
Upon proposal opening, all documents submitted in response to this RFP will become the property of the State of California and will be regarded as public records under the California Public Records Act (Government Code Section 6250 et seq.) and subject to review by the public. The State cannot prevent the disclosure of public documents.
I. Socio-Economic and Preference Programs
1. Disabled Veteran Business Enterprise (DVBE) Incentive – Optional
This solicitation does not require a minimum amount of DVBE participation. However, you are strongly encouraged to either become certified, if eligible, or to subcontract a portion of the work to a certified DVBE. If a prime proposer is a certified DVBE or commits to subcontracting with DVBE(s), the proposal may be eligible to receive a proposal preference provided that the DVBE provides a commercially useful function as defined in California Code of Regulations, Title 2, Section 1896.61(l). For evaluation purposes only, the State shall apply an incentive to proposals that propose California certified DVBE participation as identified on Attachment 10, California Disabled Veteran Business Enterprise (DVBE) Bid Incentive Instructions and confirmed by the State. Proposers claiming the DVBE incentive must complete and return the Disabled Veteran Business Declarations form found at:
http://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/pd_843.pdf
The incentive amount varies in conjunction with the percentage of DVBE participation offered. The minimum requirement is one percent (1%) with a maximum of five percent (5%) DVBE participation and the incentive will be equal to the participation offered as defined below:
Confirmed DVBE Participation of: DVBE Incentive:
1% to 1.99% inclusive 1% 2% to 2.99% inclusive 2% 3% to 3.99% inclusive 3% 4% to 4.99% inclusive 4%
5% or Over 5%
2. Small Business (SB) or Microbusiness (MB) Preference – Optional
If Proposer is claiming the five percent (5%) certified SB or MB preference or is committing to subcontract twenty-five percent (25%) or more of their net proposal price to one (1) or more certified SB or MB (Non-small business preference [NSB]), list firm names on Attachment 9, Bidder Declaration Form (GSPD-05-105) and attach a copy of the certification. Additional References: http://www.dgs.ca.gov/PD/.
Questions regarding the certification approval process or the SB program should be directed to the Department of General Services, Procurement Division at (800) 559-5529 or
(916) 375-4940. For the 24-Hour Recording & Mail Request call (916) 322-5060.
SB, MB or NSB proposers using the SB preference shall be granted a preference consisting of five percent (5%) of the highest responsible proposal’s total score.
3. Target Area Contract Preference Act (TACPA) - Optional http://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/pd_843.pdf http://www.dgs.ca.gov/PD/
a. Government Code (GC) Section 4530 (TACPA) provides that California based companies shall be granted a five percent (5%) preference whenever a state agency prepares a solicitation for services in excess of one hundred thousand dollars and zero cents ($100,000.00). The preference(s) shall apply if the worksite is not fixed by the government agency and the proposer can demonstrate and certify, under the penalty of perjury, that at least ninety percent (90%) of the total labor hours required to perform the services shall be performed at an identified worksite located in a distressed area (TACPA). TACPA preferences will only be applied if this procurement results in more than one (1) responsive proposal receiving a passing narrative proposal score.
b. Additional work force preferences ranging from one percent (1%) to four percent (4%) can be earned by eligible proposers that agree to hire five percent (5%) to twenty percent (20%) of persons with a high risk of unemployment or those living in a targeted employment area or that are enterprise zone eligible to perform a specified percentage of the contract work.
c. The granting of TACPA preference cannot displace an award to a certified small business.
d. Proposers seeking TACPA preference must submit a completed STD 830 - Target Area Contract Preference Act Request https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std830.pdf. Preference Request https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd0525.pdf https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd0526.pdf with their proposal. The applicable preference request form must include the following:
i. All appropriate certifications. (TACPA). The proposing firm’s name and the name of all suppliers and subcontractors that will work with the proposer to fulfill the terms of the contract along with the addresses of each of the worksite(s) and estimated labor hours;
ii. County census tract number and block group number;
iii. Proposer’s original signature; and
iv. A checkbox marked to identify the additional one percent (1%) to four percent (4%) preference sought for hiring persons with a high risk of unemployment.
e. TACPA preference cannot be granted if:
i. The lowest proposed cost does not equal or exceed one hundred thousand dollars and zero cents ($100,000.00) for the entire term;
ii. The work site or any part thereof is fixed or preset by the State;
iii. The services involve construction or a public works project; or
iv. A proposer who has claimed a TACPA preference and is awarded the contract will be obligated to perform in accordance with the preference(s) requested, provided the preference was granted in obtaining the contract.
f. Firms receiving preference must:
i. Report their labor hours to the State and reference the state contract on which the award is based for the specific reporting requirements.
g. Proposers wishing to learn more about TACPA requirements, designated work site(s) or enterprise zones in California should contact the appropriate office of the Department of https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std830.pdf https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd0525.pdf https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd0526.pdf
General Services at (916) 375-4940. DGS will attempt to determine TACPA eligibility within two (2) working days.
4. Preference and Incentive Application – Optional
a. DVBE Incentive Points are factored by multiplying a Proposer’s DVBE participation commitment percentage (%) by the total possible points that could be awarded (see Table 1 below). This amount is then added to the Proposer’s total points. In the Table 2 sample below, Proposer B received a 60-point incentive (.05% commitment x 1200 total points available), which was added to its total points resulting in its proposal ranking as first in line for award. Proposer C’s two percent (2%) commitment resulted in its receiving twenty-four (24) incentive points and making its proposal rank as second in line for award.
b. Preference is calculated by multiplying five percent (5%) of the highest scoring NSB proposer, and adding those points to SB proposers and NSBs subcontracting twenty-five percent (25%) or more to a SB. In the Table 2 sample below, the calculation is based on Proposer B’s 1155 points x .05 resulting in 57.75 additional points added to the certified SBs (A and C).
c. Under the High Score Method, it is possible to displace a high point certified SB with the application of the DVBE Incentive.
TABLE 1: HIGH SCORE METHOD SAMPLE
Available points example using sliding scale:
Administrative: 200 points Technical: 400 points
Cost: 600 points Total: 1200 points
Possible Maximum 60 points DVBE incentive calculated as follows:
Confirmed DVBE Participation Possible Points Calculation:
1% - 1.99% inclusive 1% X 1200 = 12 2% - 2.99% inclusive 2% X 1200 = 24 3% - 3.99% inclusive 3% X 1200 = 36 4% - 4.99% inclusive 4% X 1200 = 48
5% and Higher 5% X 1200 = 60
TABLE 2: HIGH SCORE METHOD SAMPLE RESULTS
Proposer A B C Responsive/Responsible Yes Yes Yes
Total Points 1050 1155 1125 Eligible Preference SB None SB
SB Preference Points Applied
57.75 0 57.75
Subtotal 1107.75 1155 1182.75 Rank 3 2 1
Confirmed DVBE Participation
No (0%) Yes (5%) Yes (2%)
Incentive Points Applied None 60 24 Adjusted Points 1107.75 1215 1206.75
New Rank 3 1 2
III. PROPOSAL REQUIREMENTS (TECHNICAL)
A. Technical Proposal Requirements
The proposal must contain the following components, information and documents outlined below. Each requirement’s location must be listed in the Proposal’s Table of Contents. Also see Section II, D. Submission of Proposal, for general submittal details.
1. Proposer Minimum Qualifications
The Proposer must provide a detailed response, outlining information as to how the Proposer meets each of the minimum qualifications listed below. The Proposer must provide their detailed response on Attachment 12, Detailed Response for Minimum Qualifications. Proposals that do not meet the minimum qualifications will be determined non-responsive and ineligible for award.
a. The Proposer must have at least two (2) years of experience accessing new layout/design remodeling of airport spaces or new technology implementation at airports and resulting impacts to airport procedure or operations
b. The Proposer must have at least one (1) year of experience utilizing computer modeling to inform decisions made in an airport design process.
c. The Proposer must have at least one (1) year of experience performing assessments or research studies for government agencies or public universities.
d. The Proposer must have at least two (2) years of interfacing with governing agencies that oversee regulatory compliance at airports, such as the Federal Aviation Administration (FAA).
2. Title Page
The purpose of this page is to provide information needed by CARB administrative staff. It must contain the following items:
a. The title of the proposal, which must be the same as the title of the RFP.
b. The number of the RFP, 24AQP010; and
c. The date of proposal.
3. Cover Letter / Letter of Commitment
The cover letter must not be more than two (2) pages, in Arial size 11-point font or similar, and must include the following paragraph and the signature of the representative authorized to make the proposal on behalf of the firm:
“The enclosed proposal is submitted in response to the above referenced Request for Proposal 24AQP010, including any addenda. Through submission of this proposal, we agree to all of the terms and conditions of the Request for Proposal and agree that any inconsistent provisions in our proposal may result in a lower score, up to and including disqualification. We have carefully read and examined the Request for Proposal and have conducted such other investigations as were prudent and reasonable in preparing the proposal. We agree to be bound by statements and representations in our proposal.”
The cover letter must be provided on the company’s letterhead and include the following information and statements:
a. The name and address of your company [NOTE: You may use a Post Office box, but please provide your company's street address];
b. The name, title, and signature of a company official authorized to bind the proposal; and
c. Name, email and/or phone number for the Proposer’s contact for CARB inquiries related to the proposal.
4. Table of Contents
5. Summary
The abstract shall be no longer than one (1) page. Include a brief description of the proposed project briefly summarizing the main point of the various sections of the proposal, including the features and benefits of the proposal.
6. Minimum Qualifications Response
Provide a response, outlining detailed information demonstrating how the Proposer meets each of the minimum qualifications listed in Section III, A. Submit applicable documentation on Attachment 12, Detailed Response for Minimum Qualifications.
7. Required Attachments
The Technical Proposal must include all of the completed attachments listed in Attachment 1, Required Attachment Checklist.
8. References
The Proposer must provide at least three (3) references for detailing previous experience related to the goals and objectives outlined in the RFP.
References must be provided using Attachment 3, Proposer References Form.
Submission of this attachment is mandatory. Failure to fully complete and return this attachment with your proposal may cause your proposal to be rejected and deemed non-responsive. Attachment 3, Proposer References Form may be copied for additional references.
9. Conflict of Interest and Confidentiality Statement
Proposer and each member of Proposer’s technical staff proposed to work on this project must sign and submit Attachment 14, Conflict of Interest and Confidentiality Statement with your proposal.
10. Subcontracts / Subcontractors
If subcontractors are to be used, the Proposer must include in the Technical Proposal a description of each person or firm and the work to be done by each subcontractor. Please use Attachment 9, Bidder Declaration (GSPD 05-105), to list all subcontractors used for this project. All subcontracts must be approved by CARB, and no work shall be subcontracted without the prior written approval of the State. The cost of the subcontract work is to be itemized in the Cost Proposal as described below in the section entitled Cost Proposal Requirements, and not in the Technical Proposal.
11. Technical Portion
The Proposer shall demonstrate their understanding of the questions, or needs that CARB is seeking to have addressed. The technical approach and work plan are considered the heart of the proposal and will receive a high level of scrutiny. This part of the proposal will be evaluated to ensure all tasks and deliverables, listed in the Scope of Work, are included and responsive. The technical portion of the Proposal must include a written response to all scoring elements listed in the Technical Evaluation Scoring Criteria, Section IV.B.3 and must include the following:
a. Management Plan
The Proposer shall provide a project management plan including the management structure and project organization. The Proposer shall designate, by name, the Contract Manager to be employed. The selected Proposer shall not cause the substitution of the Contract Manager without prior written approval of the State. Proposers should include methods to measure project progress against the project management plan to maintain project schedule.
b. Methodology (Approach to Work)
The Proposer shall describe their methodology and approach to the work, identify specific techniques and methodologies that will be used and specific administrative and operational management expertise that will be employed in order to accomplish the tasks listed in this RFP under Attachment 2, Draft Standard Agreement (STD 213). The Proposer shall indicate how skills developed in previous related work will be applied to the work described in this RFP.
The Proposer shall demonstrate their knowledge in program and/or project evaluation and lay the groundwork for the actual work to be performed for this project. The Proposer shall provide a detailed description of the overall approach and methodologies utilized to accomplish the tasks listed in Attachment 2, Draft Standard Agreement (STD 213), Exhibit A.
c. Work Plan and Work Schedule
The Proposer shall develop a Work Plan and Work Schedule that allows all tasks to be completed within the timeframes outlined in the Scope of Work. The Work Plan and Work
Schedule shall identify each major task, necessary subtasks, and milestones by which progress can be measured and payments made. The Work Plan shall specify the estimated hours to accomplish each task and the Work Schedule shall provide the responsible party for performing the task, and anticipated dates of completion.
The Work Plan and Work Schedule must reflect the total project timeline of twenty-four
(24) months.
The Work Plan shall indicate how the supervision and oversight will be conducted for ensuring that the project will remain on schedule and that the distribution of workload is appropriate.
See Attachment 2, Draft Standard Agreement (STD 213), for details on the tasks required. A work plan schedule format is provided below:
Task Responsible Party (Prime or Subcontractor)
Date of Completion
Task 1: Assessment of Available and Emerging ZE Technologies
Task 1a: Compile all technologies for taxiing aircraf t Due three (3) Months f rom Contract Start Date
Task 1b: Assess the current technologies for taxiing Due three (3) Months f rom Contract Start Date
Task 1c: Address the f ive (5) questions regarding ZE technology
Due three (3) Months f rom Contract Start Date
Task 1d: Collect emerging technologies for taxiing aircraf t Due three (3) Months f rom Contract Start Date
Task 1e: Determine timeframes for emerging technologies Due three (3) Months f rom Contract Start Date
Task 1f : Literature review Due three (3) Months f rom Contract Start Date
Task 2: Analyze Real-World Applications of ZE Aircraft Taxiing
Task 2a: Examine implementation of ZE taxiing underway in United States, Europe and other parts of the world
Due Six (6) Months f rom Contract Start Date
Task 2b: Analyze tests and demonstrations performed by
HERON
Due Six (6) Months f rom Contract Start Date
Task 2c: Review the three (3) SAS Taxibot zero-emission taxiing deployments
Due Six (6) Months f rom Contract Start Date
Task 2d: Investigate SCAQMD demonstration Due Six (6) Months f rom Contract Start Date
Task 2e: Address the seven (7) questions regarding deployment
Due Six (6) Months f rom Contract Start Date
Task 3: Selection of California Airports Task 3: CARB and Contractor mutually choose a group of
California airports Due Six (6) Months f rom Contract Start Date
Task 4: Trial Safety and Risk Management (SRM) Panel
Task 4a: Organize and lead a trial Safety and Risk Management (SRM) panel to determine major safety risks associated with taxiing aircraf t with ZE technologies and possible risk mitigation methods
Due Six (6) Months f rom
Task 4b: Ask each panel attendee to compile their primary operational and safety concerns related to implementing ZE taxiing
Task 4c: Organize the panel to convene for at least two (2) hours or more
Due Six (6) Months f rom Contract Start Date
Task 4d: Prepare the panel agenda to discuss the four (4) topics
Due Six (6) Months f rom Contract Start Date
Task 4e:Detail all operational concerns, SRCs, associated risk rank, and mitigation approaches identif ied during the panel and include in an intermediate and/or f inal report
Task 5: Operational and Infrastructure Assessment of California Airports
Task 5a: Evaluate the present-day energy supply
Due three (3) months prior to contract end date
Task 5b: Detailed study of each of the selected airport’s operational procedures and current inf rastructure
Due three (3) months prior to contract end date
Task 5c: Determine the Flight Percentage with Current Inf rastructure (FPCI), of the current f lights that could be taxied with ZE
Due three (3) months prior to contract end date
Task 5d: Determine specif ic operational modif ications that will need to be made for the airport to operate at its
FPCI
date
Task 5e: Answer “Can each of these operational modif ications be implemented without impacting airport ef f iciency?”
date
Task 5f : Determine operational and inf rastructure modif ications needed to operate the selected airport’s typical f light-load with ZE taxiing penetration at each quartile interval above the FPCI date
Task 5g: (If Applicable) Separate the FPCI into two (2) separate parameters: Incoming Flight Percentage with Current Inf rastructure (IFPCI) and Outgoing Flight Percentage with Current Inf rastructure
(OFPCI)
date
Task 5h: Address any additional technical challenges that may be encountered in reaching higher penetrations of ZET application date
Task 5i: Address seven (7) Operational Elements Due three (3) months prior to contract end date
Task 5j: Address two (2) Inf rastructure Elements Due three (3) months date
Task 5k: Address one (1) Technical Element prior to contract end date
Task 6: Modeling of ZE Taxiing at Selected Airports Task 6a: Construct a model that can simulate the real-time use of ZE units tugging aircraf t f rom gates to take-of f points on runways date
Task 6b: Gather data elements and use to inform the airport model to ensure accurate simulation of real-time f light taxiing date
Task 6c: Construct a model that can output four (4) dif ferent estimates
Due three (3) months prior to contract end date
Task 6d: Report what specif ic inf rastructure element of each example airport is limiting the FPCI value
Due three (3) months prior to contract end date
Task 6e: Detail the hindrances that prevent penetration f rom reaching one hundred percent (100%)
Due three (3) months prior to contract end date
Task 7: Cost Benefit Analysis
Task 7a: Perform a cost analysis for each of the quartile penetration levels at each California airport studied Due three (3) months prior to contract end date
Task 7b: Address the f ive (5) items for capital cost/savings Due three (3) months prior to contract end date
Task 7c: Group all commercial airports in California as being most similar to one (1) of the selected California airports and estimate the total cost investment date
Final Report Due two (2) weeks prior to contract end date
Presentation Due two (2) weeks prior to contract end date
d. Personnel / Experience
For this criterion, reviewers will rate the Proposer’s experience in conducting similar or related work described in the Scope of Work, and how skills developed in previous related work will be applied to this project as outlined in Attachment 2, Draft Standard Agreement (STD 213). The Proposer shall indicate how previous experience will be applied to the development of this project.
The Proposer shall list technical staff (specify staff name) who will be working on the project. Include their titles, qualifications, a summary of similar work or studies performed, a resume for each technical staff person, a statement indicating how many hours each professional will be assigned to the Agreement and what tasks each professional will perform. The selected Proposer shall not cause key members of the project team to be substituted without prior written approval of the State.
The Proposer shall demonstrate experience and breadth of knowledge around program and project evaluation as described in Attachment 2, Draft Standard Agreement (STD 213).
e. Page Headers and Page Numbering
All pages of the Technical Proposal, including cover pages, Table of Contents, references and resumes, and Attachment 9, Bidder Declaration Form (GSPD-05-105), shall have the following header and page numbering format in the upper right-hand corner:
Technical Proposal
Exhibit A, Attachment 1 Page ## of ##
B. Cost Proposal Requirements
The cost breakdown (Cost Proposal) shall be included in the Technical Proposal. Cost Proposals shall include the following required information: Budget, and Preference Program Documents (See Section II, I. Socio-Economic and Preference Programs) and at a minimum, all information listed in Cost Detail (below). Proposers must use the Attachment 11, Contractor Cost Sheet.
All costs must be provided for each task and deliverable. The proposed costs should be broken down into the outline in the Work Plan and Work Schedule for the purpose of this cost proposal submittal.
CARB’s budget for the proposed contract is limited to Five Hundred Thousand Dollars and Zero Cents ($500,000.00). Any cost proposals exceeding this amount will be disqualified and ineligible for award. Proposers shall submit a cost proposal for all tasks described in Attachment 2, Draft Standard Agreement (STD 213).
1. Cost Detail
a. Itemized Tasks – Using Attachment 11, Contractor Cost Sheet, provide firm-fixed costs for specific tasks listed in Attachment 2, Draft Standard Agreement (STD 213).
For all tasks, the Proposer must include all items such as labor, personnel, subcontractors, travel, meetings, materials, reports, and tax, if applicable, as necessary to perform and complete the tasks on Attachment 11, Contractor Cost Sheet.
b. Subcontracts / Subcontractors – If subcontractors are to be used, the Proposer must include in the Technical Proposal, a description of each person or firm and the work to be done by each subcontractor. Additionally, all subcontractors proposed to be used for this project must be identified on Attachment 9, Bidder Declaration Form (GSPD-05- 105).
IV. EVALUATION, SELECTION, AND AWARD
A. Administrative Evaluation (Phase 1)
CARB will conduct an administrative evaluation in accordance with the RFP requirements to determine a Proposer’s responsiveness and responsibility. Each proposal will be checked for completeness and/or absence of all required information and to ensure that the Proposer meets the minimum qualifications in conformance with the submission requirements. During the evaluation period, if an item is unclear, or needs further clarification, Proposers may be requested to provide additional documentation.
B. Technical Evaluation (Phase 2)
CARB will also conduct an evaluation of the Technical Proposal by an evaluation panel consisting of CARB employees. If deemed necessary, independent academic, technical or policy experts may be called upon to answer any specific questions regarding the responses to the RFP. These individuals will not participate in the scoring process.
1. Scoring Criterion Guidelines
Note: There will be no individual sheets, no written scores, and no written notes.
There will be one (1) final score for each Proposer. Proposer must score a minimum of seventy (70) points (combined score of technical evaluation and cost points to be eligible for award.
The Proposal Evaluation Form in Section IV, B.3 contains the scoring criteria that will be used by reviewers evaluating proposals submitted in response to this RFP. The evaluation team shall determine a consensus score for each item, based on the team's verbal discussion of each Proposer's responses. To determine the consensus score, evaluators will meet either in person or by teleconference to discuss in detail the strengths, weaknesses, and ratings of each proposal to determine scores.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .