SOW for water management contract PWN1.pdf

PDF 269 KB Posted

Attached to
SOURCES SOUGHT - WATER MANAGEMENT SERVICES FOR PAWNEE INDIAN HEALTH CENTER
Solicitation number
246-26-Q-0032
Issued by

About this file

This is a Statement of Work (SOW) for Water Management Services issued by the Department of Health and Human Services Indian Health Service for the Pawnee Indian Health Center located in Pawnee, Oklahoma.

The contractor shall provide comprehensive water management services for a 12-month period from September 1, 2026 through August 31, 2027 to support compliance with federal regulations, Joint Commission standards, CMS QSO 17-30, and AAMI Standard ST108 for water used in medical device processing. Services include developing, implementing, and validating a water management program (WMP) with expert oversight of water quality for Central Sterile Processing. Specific deliverables include: establishing team roles and responsibilities, conducting risk analysis and surveys, categorizing water quality types, creating a validation plan with water quality parameters and equipment specifications, developing process flow diagrams, implementing monitoring and corrective action procedures, establishing alert and action levels, and providing periodic program support including training. The contractor must perform monthly and quarterly testing with reports submitted to Facilities, Infection Prevention, and Safety departments via secured mail or FedRamp-authorized cloud services. Additional requirements include obtaining HSPD-12 compliant access cards, maintaining a tobacco-free environment, complying with facility security protocols, providing a designated point of contact empowered to make daily decisions, and maintaining a toll-free telephone number staffed during business hours (8:00 am to 4:30 pm Monday through Friday). The contractor shall furnish all required personnel, materials, supplies, and equipment, while the government provides facilities and PPE.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Health and Human Services Indian Health Service

Statement of Work (SOW) Water Management Services

1. PURPOSE OF THE PROJECT

The Pawnee Indian Heath Center, Indian Health Services (IHS) has a requirement to procure services to support and monitor water management to adhere water standards as set by federal regulations, the Joint Commission, CMS QSO 17-30, as well as the Association for the Advancement of Medical Instrumentation (AAMI) Standard ST108-Water for the Processing of Medical Devices.

2. DETAILED DESCRIPTION OF THE TECHNICAL REQUIREMENTS

The water management services will aid the facilities, Infection Prevention and Control (IPC) programs, and Environment of Care (EOC) programs to optimize water quality and safety for our patients, visitors, and staff. Developing, implementing, ongoing verification and validation of water management programs (WMP) for healthcare facilities to maximize efficiency and risk management.

The water management services will primarily be responsible for providing expert knowledge and oversight of the WMP. The water management services will provide oversight of the water quality for Central Sterile Processing. The water management services will help the Central Sterile Processing Departments within IHS, follow AAMI ST108.

The water management services will provide the following assistance to implement the following WMP:

1. Team—Identifying roles and responsibilities of each team member.

2. Risk Analysis/survey

3. Categories of water quality and selection (i.e., utility water, critical water, and/or steam)

4. Validation Plan

a. Water quality and operating parameters

b. Equipment

c. Process flow diagram

d. Monitoring and Corrective Action

e. Alert/Action levels/Control Measures

f. Program Support - Periodic review, training

Locations of site to need Water Management Services:

Pawnee Indian Health Center, 1201 Heritage Circle, Pawnee, OK 74058

3. PERIOD OF PERFORMANCE

The Period of Performance will be 12 months from start date.

POP: 9/1/2026 – 8/31/2027

4. LEVEL OF EFFORT

4.1. The contractor will perform monthly and quarterly testing. The reports will go to Facilities, Infection

Prevention, and Safety.

5. SPECIAL REQUIREMENTS

5.1. In accordance with HHSAR 304.1303, To ensure compliance with Homeland Security

Presidential Directive-12: Policy for a Common Identification Standard for Federal Employees and Contractors (HSPD-12) It is the IHS policy that all staff and contractors who require physical access to federally controlled facilities and logical access to the IHS Information Technology (IT) networks and systems must obtain an HSPD-12-compliant access card. Individuals will be issued an access card upon meeting the HSPD-12 requirements and a favorable background investigation.

5.2. The Pawnee Indian Health Center is a tobacco/smoke free environment (buildings and grounds). No tobacco/smoking use will be tolerated during service.

5.3. Security Requirements: Contractor personnel will be required to contact the government designated point of contact upon arrival when reporting for service calls or delivery supplies.

The contractor shall be responsible for the security of all organizational information. Current rules and regulations applicable to the premises, where the work shall be performed shall apply to the contractor and its employees while working on the premises. These regulations include but are not limited to, escort by OKC Area Office official, presenting valid identification, smoking restriction and any safety procedures.

5.4. The contractor shall not disclose or cause to disseminate any information concerning operations of OKC Area Office. Such action(s) could result in violation of the contract.

5.5. All inquiries, comments, or complaints arising from any matter observed, experienced or learned of as a result of or in connection with the performance of the contract, the resolution of which may require the dissemination of official information, shall be directed to the Contracting Officer Representative (COR).

6. DELIVERABLES AND REPORTING REQUIREMENTS

6.1. Reports must be submitted via secured mail to the IHS or through a verified and approved

FedRamp not just hosted in a Fedramp authorized cloud. It should be listed as authorized on the FedRamp Marketplace.

6.2. Contractor Point of Contact: The contractor shall furnish one designated point of contact (POC) to the government’s designated representative for coordination of services. The POC will be empowered to make daily decisions to ensure that the contract implementation and day-to-day maintenance meets the terms and conditions of this contract.

6.3. Contractor’s Phone Numbers: The contractor shall provide a toll-free telephone number for service calls, which must be answered during at least eight working hours, between 8:00 am and 4:30 pm, Monday through Friday.

7. GOVERNMENT FURNISHED PROPERTY, FACILITIES AND SERVICES

The Government shall provide the facilities, equipment and PPE for the use by the contractor for the provision of the services required under this contract.

8. CONTRACTOR FURNISHED PROPERTY, FACILITIES AND SERVICES

Required personnel, materials, supplies and equipment: The contractor shall furnish all personnel, materials, supplies and equipment required to perform work under the contract.

9. CHANGES TO THE STATEMENT OF WORK (SOW)

Any changes to this SOW shall be authorized and approved only through written correspondence from the Contracting Officer. Costs incurred by the contractor through the actions of parties other than the Contracting Officer shall be borne by the contractor.

10. DELIVERABLES/PERFORMANCE MATRIX

10.1. Reports to Facilities, Infection Prevention, and Safety.

10.2. Program monitoring

10.3. Corrective Action Plan

Department Supervisor Signature:_________________

Chief Operating Officer Signature:_________________________

1. PURPOSE OF THE PROJECT
2. DETAILED DESCRIPTION OF THE TECHNICAL REQUIREMENTS
4. LEVEL OF EFFORT
5. SPECIAL REQUIREMENTS
6. DELIVERABLES AND REPORTING REQUIREMENTS
7. GOVERNMENT FURNISHED PROPERTY, FACILITIES AND SERVICES
8. CONTRACTOR FURNISHED PROPERTY, FACILITIES AND SERVICES
9. CHANGES TO THE STATEMENT OF WORK (SOW)
10. DELIVERABLES/PERFORMANCE MATRIX
2026-06-16T07:12:15-0500
KACIE R. SPEARS -S
2026-06-16T09:41:17-0500
JOYCE G. OBERLY -S

File details come from the government source that posted it. Updated .