Bid Schedule Revised 080520.pdf

PDF 262 KB Posted

Attached to
A new water main for the Otoe-Missouria Tribe of Oklahoma
Solicitation number
246-20-Q-00108
Issued by

View the file

Other files

File Type Posted
SF30-16c (1).pdf PDF
OM New WL Revised SOW 08-05-20.pdf PDF
SF18 Request for Quotation.pdf PDF
OM New WL SOW Updated (2).pdf PDF
SF24-16d (1) Bid Bond.pdf PDF
Otoe-Missouria DEQ letter.pdf PDF
Otoe-Missouria_WL200383_Plans DWGs.pdf PDF
Bid Schedule.pdf PDF
Otoe-Missouria_WL200383_Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Otoe-Missouria New Water Line

OK 12-T10

Bid Schedule Revised 8/5/2020

Item Description Qty Unit Unit Cost Total Cost

1 1 LS

2 1 LS

3 3010 LF

4 132 LF

5 200 LF

6 20 LF

7 3210 LF

8 1 Each

9 1 Each

10 1 Each

11 1 Each

12 1 Each

13 1 Each

14 1 Each

15 2 Each

16 300 CY

Clearing and Grubbing

ROW Restoration, Cleanup, Topsoil, and

Seeding

6" PVC DR21 Waterline, with all appurtenances necessary

Road Bore w/ 12" Steel Casing

Creek Crossing Bore w/6" HDPE DR 7

Open cut driveway w/10" Steel Casing

Tracer Wire

6" Gate Valve and Box

4" Gate Valve and Box

Connection at End of Line with 4"X4"X4"

Tee

Connection to existing 6" Waterline w/Tapping Sleeve and Valve

6" to 4" Reducer

Air Relief Valve

6" Water Sampling Station & Manhole

6-inch 90° Bend (DIP)

Rock Removal w/ Imported Bedding

Mobilization 1 LS

Total

File details come from the government source that posted it. Updated .