About this file
This document is Addendum One for Request for Bid (RFB) #2420 issued by Kenosha County, Wisconsin. The addendum provides clarifications to the Front End Documents, Plan Sheets, and General Clarifications for the Kenosha County Detention Center Admin Parking Lot project. The clarifications include changes to the units for Geogrid Type SR, rebar requirements for the concrete slab for the manhole cover, and a minimum 6-foot clear width for all sidewalks to allow for snow removal. The contractor is also responsible for locating any buried electric facilities or wires for the lighting standards.
The Kenosha County Detention Center Admin Parking Lot project involves the rehabilitation of the 33,000 square foot administrative parking lot, including milling and overlaying the existing asphalt pavement, sidewalk/curb ramp ADA replacement with pedestrian curb, new curb & gutter at curb ramp locations, 8 feet of storm sewer pipe replacement, and painted pavement marking lines and symbols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Form F Fee Proposal.docx | DOCX document | |
| Vendor Responsibility Form Construction.pdf | ||
| 2420 Drawings.pdf | ||
| 2420 Bid Documents.pdf | ||
| 2420 Specifications.pdf | ||
| 2420 Drawings.pdf.crdownload | CRDOWNLOAD file | |
| RFP Form E Professional Services Insurance and Indemnification Requirements.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB #2420 Addendum One Page 1 of 1
Yes.
Clarifications:
Front End Documents
1. In Attachment C, Bid Offer form, the units for Item No. 645.0220, “Geogrid Type SR” shall be Square Yards (SY) and NOT Linear Feet (LF)
Plan Sheets
1. Sheet 3, Detail “CONCRETE SLAB FOR MANHOLE COVER (STORM)”, rebar shall be #4 epoxy coated tie bars.
General Clarifications
1. All sidewalk shall have a clear width of 6-feet to permit snow removal.
2. Contractor shall be responsible to locate buried electric facilities/wires for lighting standards.
End Addendum 1
KENOSHA COUNTY
RFB #2420 ADDENDUM ONE DATED 9/24/2024
Kenosha County Detention Center Admin Parking Lot
File details come from the government source that posted it. Updated .