About this file

This is a project scope of work document prepared by The Garland Company for the County of Kenosha, Wisconsin, detailing the installation of a flush seam metal cladding system on the Fleet Maintenance Garage located at 1116 57th Street, Kenosha, Wisconsin 53140. The project involves installing metal cladding over the exterior brick surface of the building's southern face and front entrance. The scope of work includes surface preparation of the brick, installation of waterproof underlayment, hat channels, and flush seam wall panels with proper fastening and sealing. Installation requires coordination of flashing and sheet metal work to ensure weathertight conditions, with panels installed to be true to line and plane and free of defects. The contractor is responsible for removing and reinstalling the building sign above the front entrance, detaching and reattaching the facility camera at the western corner, trimming glass block windows and door entrances with the metal cladding system, and maintaining the ability to block off the front entrance during construction with owner approval.

The document provides detailed specifications for installation standards, including fastener spacing per manufacturer specifications, proper lap sealing, temperature expansion and contraction provisions, and finish work including paint touch-up of exposed fasteners and final cleaning of all exposed surfaces. Technical details are provided for window heads, jambs, coping caps, sills, and metal cladding panel profiles. The project notes indicate coordination requirements with the building owner regarding entrance access and timing, with the document marked "Approved for Bidding," indicating that this is the final specification document for contractors submitting bids for the metal cladding installation work.

View the file

Other files

File Type Posted
2414 Specification Section 074113.pdf PDF
Vendor Responsibility Form Construction.pdf PDF
2414 Bid Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K E

N O

S H

A C

O U

N T

Y

F le e t M a in te n a n c e

G a ra g e th S tr e e t, K e n o s h a W

I

SHEET NO. 1

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

APPROVED FOR

BIDDING

A-1

FLEET MAINTENANCE GARAGE

METAL CLADDING PROJECT

1116 57TH STREET, KENOSHA, WI 53140

FLEET

MAINTENANCE

GARAGE

COVER PAGE

N O

S H

A C

O U

N T

Y

F le e t M a in te n a n c e

G a ra g e th S tr e e t, K e n o s h a W

I

SHEET NO. 1

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

APPROVED FOR

BIDDING

A-2

Scope of Work A – Flush Seam Metal Cladding System

Roof Preparation & Installation:

1. Clean surface of brick surface of all dirt and debris

3. Install self-adhered layer of Waterproof Underlayment brick surface

4. Install Hat Channels along Wall, fastening into brick wall

5. Install Flush Seam wall panel system:

A. Directly over the wall substrate, install wall panels using specified exposed fasteners and sealants. Fastener spacing for anchorage to wall structure and stitching of lap seams shall be in accordance with manufacturer’s shop drawings and as required for structural strength and serviceability.

B. Wall panels will be installed by starting from one end and working towards the opposite end. If panel end laps are approved by architect and shown on contract documents, installation shall be from bottom-to-top to allow for proper shingling effect of end laps.

C. Seal laps and joints in accordance with wall panel system manufacturer's product data.

D. Coordinate flashing and sheet metal work to provide weathertight conditions at wall terminations. Fabricate and install in accordance with standards of SMACNA Manual.

E. Provide for temperature expansion/contraction movement of panels at wall penetrations and wall mounted equipment in accordance with system manufacturer's product data and design calculations.

F. Installed system shall be true to line and plane and free of dents, and physical defects.

G. At joints in linear sheet metal items, set sheet metal items in two ¼-inch beads of butyl sealant.

Extend sealant over all metal surfaces. Mate components for positive seal. Allow no sealant to migrate onto exposed surfaces.

H. Remove damaged work and replace with new, undamaged components.

I. Touch up exposed fasteners using paint furnished by the panel manufacturer and matching exposed panel surface finish.

J. Clean exposed surfaces of wall panels and accessories after completion of installation. Leave in clean condition at date of substantial completion. Touch up minor abrasions and scratches in finish.

6. Install Wall Cladding Head, Sil, and Edge metal

7. Install Head of Cladding underneath Coping Cap

Alternate:

8. Install a secondary Sil detail below glass block windows, going across full length of the wall.

Project Notes

1. Ensure Cladding surface is uniform and has an undisturbed surface.

2. Building sign above front entrance will be removed and re-installed by “Contractor”.

3. Facility Camera at Western corner of Wall will be detached and re-attached by

“Contractor”.

4. Glass Block window and door entrance will be trimmed around with Metal Cladding system.

5. Front entrance can be blocked/closed off during project, as long as times and dates of closed off entrance is approved by “Owner”.

FLEET MAINTENANCE GARAGE

FRONT ENTRANCE EXTERIOR

WALL

SCOPE OF WORK

Alternate:

Install a secondary Sil detail below glass block windows, going across full length of the wall.

N O

S H

A C

O U

N T

Y

F le e t M a in te n a n c e

G a ra g e th S tr e e t, K e n o s h a W

I

SHEET NO. 1

The Garland Company

3800 E. 91 st

Street

Cleveland, OH 44105

SHEET TITLE:

THE INFORMATION CONTAINED HEREIN IS OF

A PROPRIETARY NATURE AND IS SUBMITTED

IN CONFIDENCE FOR USE BY THE CLIENTS

APPROVED BY THE ORIGINATOR OF THIS

DOCUMENT - ONLY. THE USE OF THESE

DOCUMENTS FOR ANY OTHER PROJECTS,

PURPOSE, LOCATION, PUBLICATION,

REPRODUCTION OR DISTRIBUTION IN WHOLE

OR PART, BY ANY INDIVIDUAL OR

ORGANIZATION WITHOUT WRITTEN

PERMISSION THE ORIGINATING COMPANY IS

PROHIBITED. THE INFORMATION HEREIN

REMAINS THE PROPERTY AND ITS USE OR

DISCLOSURE TO OTHERS IS PROHIBITED FOR

ANY USE NOT AUTHORIZED BY THE

ORIGINATING COMPANY.

APPROVED FOR

BIDDING

A-3

WINDOW HEAD

KENOSHA COUNTY

A

WINDOW HEAD

KENOSHA COUNTY

A

JAMB

KENOSHA COUNTY

A

JAMB

KENOSHA COUNTY

A

COPING CAP

KENOSHA COUNTY

A

COPING CAP

KENOSHA COUNTY

A

SIL AT SLAB

KENOSHA COUNTY

A

SIL AT SLAB

KENOSHA COUNTY

A

WINDOW SIL

KENOSHA COUNTY

A

WINDOW SIL

KENOSHA COUNTY

A

METAL CLADDING – PANEL PROFILE

KENOSHA COUNTY

A

METAL CLADDING – PANEL PROFILE

KENOSHA COUNTY

A

DETAILS

Kenosha County - Fleet Maintenance Garage - Scope of Work.vsdm
Page-1
Page-2
Page-3

File details come from the government source that posted it. Updated .