This is Addendum No. 1 to the bid documents for the 2026 Spray Field Vegetation Improvements project for the City of Helen, Georgia, issued December 2, 2025, by Engineering Management, Inc. The project encompasses reforestation, supplemental planting, select tree cutting, and invasive species removal across the city's Land Application System (spray fields). A non-mandatory pre-bid meeting was held on November 20, 2025, at Helen City Hall. The deadline for submitting technical questions is Thursday, December 4, 2025. The bid form has been updated to clarify that some bid items are lump sum while others are unit price. Select cutting is based on an assumed quantity of 10 trees per acre across approximately 35 acres of well-forested areas, totaling 350 trees, though the final number may vary and will be adjusted through change orders at the unit cost per tree. Silt fence has been added to the scope as a unit price item with an assumed quantity of 500 linear feet for erosion control during tree felling. Planting work includes reforestation with bare root stock (P1: 1,140 trees), reforestation with 1-gallon containerized stock (P2: 210 trees), and supplemental planting with bare root stock (P3: 1,830 trees). Additional planting items (P4 and P5) are available at the owner's request with unit pricing. Select cutting items are also unit priced by tree diameter classes (M1.1 for 20-25 inches diameter at breast height and M1.2 for 15-19.9 inches).
All pricing is inclusive of labor, equipment, materials, delivery, taxes, and removal or disposal costs as applicable. The bid form requires contractors to provide unit and lump sum prices for the designated items. Payment for select cutting, additional planting, and the allowance for unforeseen issues is contingent upon owner and engineer approval prior to work completion. Mobilization and de-mobilization combined shall not exceed 3 percent of the total bid price, while performance bonds, labor and material payment bonds, and insurance combined shall not exceed 2 percent of the total bid price. The bid schedule includes a $25,000 allowance for unforeseen issues at the owner's discretion. Revised plan sheets G2 and C1 have been provided with this addendum, showing revision clouds to highlight changes. The specifications have been updated to remove ambiguity regarding measurement and payment methodology, with new sections 3.07, 3.08, and 3.09 clarifying payment structures for lump sum items versus unit price items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Full Ad.pdf | ||
| 24022 Addendum No 2 20251205.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
ADDENDUM NO. ONE (1)
CITY OF HELEN, GEORGIA
2026 SPRAY FIELD VEGETATION IMPROVEMENTS
ISSUED DECEMBER 2, 2025
RE: 2026 SPRAY FIELD VEGETATION IMPROVEMENTS
EMI PROJECT No. 24-022
FROM: ENGINEERING MANAGEMENT, INC.
303 SWANSON DRIVE
LAWRENCEVILLE, GA 30043
WILEY HELM, P.E.
TO: PROSPECTIVE BIDDERS
This Addendum forms a part of the Contract Documents and Drawings and modifies the original bidding documents dated October 2025.
The following items of the Contract Documents are modified as part of this Addendum:
Pre-Bid Meeting:
A non-mandatory pre-bid meeting was held on November 20, 2025, at Helen City Hall. A copy of the attendance is attached.
Clarifications
1. The intent of this addendum was to update the Bid Form and to remove ambiguity in certain work items.
2. Is there a deadline for technical questions?
EMI Response: The deadline for technical questions is Thursday December 4, one week before bid opening.
3. Is this a lump sum bid because some of the bid items are notated as unit price?
EMI Response: In the bid form, some bid items are lump sum and others are unit price.
The bid form corresponds with Section 01025 Measurement and Payment in the technical specifications which provides additional detail on each bid item.
4. How do we know the quantity of trees to be select cut before field approval of marked trees during construction.?
EMI Response: Our select cut bid quantity is based on an assumed quantity of 10 trees per/acre of the “well forested areas” for a total of 350 trees to be select cut. See the Drawings for the definition of “well forested areas.” The Contractor will only be paid for the number of trees approved for select cut during construction, but for bidding purposes we are assuming 350 trees will be cut. The final number of trees may be more or less than
350. Any deviation from the total number of trees will be added to or deducted from the contract price through a change order at the unit cost per tree.
- 2 -
5. Can silt fencing be added to the scope, to be used on an as needed basis?
EMI Response: Yes, silt fence has been added to the bid form with an assumed quantity of 500 linear feet (LF) in connection with the felling and removal of trees. The final quantity of silt fence may be more or less than 500-LF. Any deviation from the bid quantity of silt fence will be added to or deducted from the contract price through a change order at the unit cost per linear foot.
Plans
Plan sheets G2 and C1 have been revised. See attached revised plan sheets. (revisions are shown with revision clouds)
Specifications
Section C-410, Bid Form
Add in its entirety bid item M1.3, 500 linear feet of silt fence.
Section 01025, Measurement and Payment
Remove in its entirety paragraph 3.07 (shown in italics below).
3.07 EQUIPMENT AND SPECIALTY ITEMS
A. CONTRACTOR shall list lump sum and unit prices for the major items of work listed in the bid schedule. Prices shall include all costs for equipment and labor for installing the equipment and all miscellaneous hardware, fittings, connections, etc. required. The prices shall include delivery, all taxes and royalties applicable, where specified, for the specialty items. The Owner and Engineer must approve of additional planting prior to the completion of any work the Contractor feels is eligible. Contractor will not be paid for additional planting without prior approval from the Owner and Engineer.
1. P1-P5
2. M1.1-M2
Add in their entirety paragraphs 3.07, 3.08, and 3.09 (shown in italics below).
3.07 LUMP SUM REFORESTATION, SUPPLEMENTAL PLANTING, AND INVASIVE
SPECIES REMOVAL WORK ITEMS
A. CONTRACTOR shall list the lump sum price for the major items of work listed in the bid schedule. Prices shall include all cost for removal and disposal of invasive species from project site. Prices shall include all costs for equipment, labor, materials, and all incidentals to perform the work. The prices shall include delivery, all taxes and royalties applicable, for the lump sum items.
1. P1-P3
- 3 -
2. M2
3.08 UNIT PRICE ADDITIONAL PLANTING WORK ITEMS
A. CONTRACTOR shall list unit prices for the additional planting items of work listed in the bid schedule. Prices shall include all costs for equipment, labor, materials, and all incidentals to perform the work. The prices shall include delivery, all taxes and royalties applicable, where specified, for the unit price items. The Owner and Engineer must approve of additional planting prior to the completion of any work the Contractor feels is eligible. Contractor will not be paid for additional planting without prior approval from the Owner and Engineer.
1. P4 – unit price per tree planted (bare root stock)
2. P5 – unit price per tree planted (1-gallon containerized stock)
3.09 UNIT PRICE SELECT CUTTING WORK ITEMS
A. CONTRACTOR shall list unit prices for the select cutting items of work listed in the bid schedule. Prices shall include all costs for equipment, labor, materials, and all incidentals to perform the work. Prices shall include all cost for removal and disposal of select cut trees from project site. Prices shall include all cost for erosion control to do the work. The prices shall include all taxes and royalties applicable, for the unit price items. The Owner and Engineer must approve of trees to be select cut prior to the completion of any work the Contractor feels is eligible. Contractor will not be paid for select cutting without prior approval from the Owner and Engineer.
1. M1.1 – unit price per tree select cut (20” to 25” diameter at breast height)
2. M1.2 – unit price per tree select cut (15” to 19.9” diameter at breast height)
3. M1.3 – unit price per linear foot of silt fence installed
END OF ADDENDUM NO. 1
Z:\PROJECTS\24\24022 Helen Las Vegetation Plan\Bid Phase\BP8-Addendum No. 1\24022 Addendum No 1 20251202.doc
NO.
STAMP SHEET NO.
G1
DATE
LAND APPLICATION SYSTEM
DESCRIPTION
LAS
FIELDS
PATH & FILE: Z:\PROJECTS\24\24022 Helen Las Vegetation Plan\Design Stage\24022 Base - 2026 Spray Field Vegetation Improvements.dwg
OWNER:
BOARD OF COMMISSIONERS
MAYOR
CLIFF HOOD
CITY OF HELEN
CITY HALL
25 ALPENROSEN STRASSE,
HELEN, GA 30545
PHONE (706) 878-2733
CITY MANAGER
DARRELL WESTMORELAND
STEVE FOWLER
MERVIN BARBREE
LEE LANDRESS
HELEN WILKINS
PUBLIC WORKS DIRECTOR
JACK MORGAN
FOR THE
CITY OF HELEN
OCTOBER 2025
WHITE COUNTY, GEORGIA
PROJECT CONTACT: WILEY HELM, P.E.
2026 SPRAY FIELD VEGETATION IMPROVEMENTS
RELEASE FOR BID10/31/25
Experience Trust Solutions
MANAGEMENT
ENGINEERING
303 Swanson Drive, Lawrenceville, GA 30043 www.eminc.biz fax # 770-962-8010phone 770-962-1387
Civil and Environmental Engineers
SHEET INDEX
SHEET NO. DESCRIPTION
G1 COVER SHEET
G2 GENERAL NOTES & LEGEND
C1 LAS VEGETATIVE MANAGEMENT PLAN
A
B ADDENDUM NO. 112/02/25
AutoCAD SHX Text
PROJECT MAP
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text
NO. PE051941
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text 10/31/2025
SH
EE
T
SH
EE
T
TI
TL
E
STAMP
R
EV
IS
IO
N
N O
D
ES
C
R
IP
TI
O
N D
AT
E
PA
TH
F
IL
E:
Z :\P
R O
JE
C
TS
\2
4\
H el en L as V eg et at io n Pl an \D es ig n St ag e\
Ba se
S pr ay F ie ld
V eg et at io n
Im pr ov em en ts
Ex pe rie nc e Tr us t So lu tio ns
MA
NA
GE
ME
NT
EN
GI
NE
ER
IN
G
Sw an so n
Dr iv e, L aw re nc ev ill e, G A w w
.e m in c.
bi z fa x
0-
2-ph on e
0-
2-
Ci vi l a nd
E nv iro nm en ta l E ng in ee rs
G2
/3
1/
PB
H
R
PM
W
SH
LA
N
D A
PP
LI
C A
TI
O
N S
YS
TE
M
S
PR
A
Y
FI
EL
D
V
EG
ET
A
TI
O
N
IM
PR
O
VE
M
EN
TS
FO
R
T H
E
C
IT
Y O
F H
EL
EN
W H
IT
E
C O
U N
TY
, G
EO
R
G
IA
GE
NE
RA
L N
OT
ES
LE
GE
ND
ABBREVIATION
AFF, A.F.F. ABOVE FINISHED FLOOR
AL ALUMINUM
ARV AIR RELEASE VALVE
BLDG BUILDING
BM BENCHMARK
BTM BOTTOM
B/W BARBED WIRE
C&G CURB AND GUTTER
CB CATCH BASIN
CF, C.F. CUBIC FEET
C/L CENTER LINE
CLMN COLUMN
CLVT CULVERT
CMP CORRUGATED METAL PIPE
CO, C/O CLEANOUT
CONC CONCRETE
CONSTR CONSTRUCTION
CONT, CONT'D CONTINUED
CY, C.Y. CUBIC YARD
DBH DIAMETER AT BREAST HEIGHT
D.E. DRAINAGE EASEMENT
DEPT DEPARTMENT
DI DROP INLET
DIAG DIAGONAL
D.I., D.I.P. DUCTILE IRON PIPE
D/W DRIVEWAY
EL, ELEV ELEVATION
EOP EDGE OF PAVEMENT
ER EDGE OF ROAD
ESMT EASEMENT
EX, EXIST EXISTING
EQ, EQL EQUAL
FAB FABRICATED
FES FLARED END SECTION
FFE, F.F.E. FINISHED FLOOR ELEVATION
FH FIRE HYDRANT
FIN FINISHED
FM FORCEMAIN
FUT FUTURE
GDOT GEORGIA DEPARTMENT OF TRANSPORTATION
GMD GEORGIA MILITIA DISTRICT
GV GAS VALVE
GW GUY WIRE
HC HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDWL HEADWALL
HORIZ HORIZONTAL
LP LIGHT POLE
ABBREVIATION
INV INVERT
I.E., IE INVERT ELEVATION
IPF IRON PIN FOUND
JB JUNCTION BOX
JT JOINT
LAS LAND APPLICATION SYSTEM
LF, L.F. LINEAR FOOT
MAX MAXIMUM
MFG, MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MJ MECHANICAL JOINT
N.A., N/A NOT APPLICABLE
N.I.C. NOT IN THIS CONTRACT
N/F NOW OR FORMERLY
N.T.S. NOT TO SCALE
OPNG OPENING
PERM PERMANENT
PJF PRE MOLDED JOINT FILLER
P/L PROPERTY LINE
PP POWER POLE
PVC POLYVINYLCHLORIDE PIPE
PVMT PAVEMENT
RCP REINFORCED CONCRETE PIPE
REINF REINFORCE, REINFORCING
REQD REQUIRED
R/W, R.O.W. RIGHT OF WAY
SAN SANITARY
SERV SERVICE
SHT SHEET
SPG SPACING
SSE SANITARY SEWER EASEMENT
SS, SST STAINLESS STEEL
STA STATION
STRC STRUCTURE
S/W SIDEWALK
T.O. TOP OF
TBM TEMPORARY BENCHMARK
TEMP TEMPORARY
UP UTILITY POLE
UTIL UTILITY
VERT VERTICAL
WWM WELDED WIRE MESH
VCP VITRIFIED CLAY PIPE
WL WATER LINE
WM WATER METER
WS WATER STOP
WV WATER VALVE
UTILITY OWNER INFORMATION
POWER: GEORGIA POWER
HABERSHAM EMC
PHONE:
PHONE:
(404) 506-6539
(706) 839-4127
LOCAL TELEPHONE/
TELECOMMUNICATIONS:
AT&T
WINDSTREAM
TRAILWAVE
PHONE:
PHONE:
PHONE:
(770) 784-3972
(800) 289-1901
(800) 640-6812
WATER SYSTEM: CITY OF HELEN PHONE: (706) 778-6341
SANITARY SEWER: CITY OF HELEN PHONE: (706) 778-6341
GAS: ATLANTA GAS LIGHT PHONE: (470) 218-5996
GENERAL NOTES:
1. LOCATION OF LOT LINES, PROPERTY LINES, RIGHT-OF-WAY LINES, AND OTHER LAND DIVISION
REFERENCES WERE OBTAINED FROM RECORDED DATA, HABERSHAM COUNTY TAX MAPS,
AND LAND USE OBSERVATIONS. THE LAND DIVISIONS WERE NOT FIELD CHECKED.
THEREFORE, THEY MUST ONLY BE CONSIDERED TO APPROXIMATELY REPRESENT THE
ACTUAL LAND DIVISIONS, PROPERTY AND/OR EASEMENTS.
2. THE CONTRACTOR SHALL NOTIFY EACH INDIVIDUAL UTILITY OWNER OF HIS PLAN OF
OPERATION IN THE AREA OF WORK. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL
CONTACT THE UTILITY LOCATION SERVICE AND REQUEST THEM TO PROPERLY LOCATE THEIR
RESPECTIVE UTILITY ON THE GROUND. THIS NOTIFICATION SHALL BE GIVEN AT LEAST THREE
BUSINESS DAYS PRIOR TO COMMENCEMENT OF WORK.
3. CONTRACTOR TO NOTIFY THE UTILITY PROTECTION AGENCY 72 HOURS PRIOR TO START OF
WORK. PHONE 811.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ADJUSTMENT OR RELOCATION OF ALL
EXISTING UTILITIES, WITH THE EXCEPTION OF POWER AND TELEPHONE. ALL COSTS AND/OR
FEES RESULTING FROM UTILITY ADJUSTMENT OR RELOCATION SHALL BE PAID FOR BY THE
CONTRACTOR.
5. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UTILITIES PRIOR TO
EXCAVATION OR DEMOLITION. ADDITIONAL UTILITIES MAY NOT BE SHOWN ON THESE PLANS.
THE ENGINEER ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN.
6. IF THE CONTRACTOR DAMAGES ANY EXISTING UTILITIES DURING CONSTRUCTION, HE SHALL, AT HIS OWN EXPENSE, HAVE REPLACED OR REPAIRED THE UTILITIES TO THEIR ORIGINAL OR
BETTER CONDITION AND QUALITY, AS APPROVED BY THE OWNER AND REPRESENTATIVE OF
THE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE
FOR CONTACTING ALL AFFECTED UTILITIES PRIOR TO SUBMITTING HIS BID IN ORDER TO
DETERMINE THE EXTENT TO WHICH UTILITY RELOCATION'S AND/OR ADJUSTMENT WILL
AFFECT THE SCHEDULING OF WORK FOR THE PROJECT. SOME UTILITY FACILITIES MAY NEED
TO BE ADJUSTED CONCURRENTLY WITH THE CONTRACTOR'S OPERATIONS, WHILE SOME
WORK MAY BE REQUIRED "AROUND" UTILITY FACILITIES THAT WILL REMAIN IN PLACE. IT IS
UNDERSTOOD AND AGREED THAT THE CONTRACTOR WILL RECEIVE NO ADDITIONAL
COMPENSATION FOR ANY DELAYS OR INCONVENIENCE CAUSED BY THE UTILITY
ADJUSTMENTS.
7. CONTRACTOR SHALL MEET ALL LOCAL UTILITY COMPANY REGULATIONS IN ANY
READJUSTMENT OR RELOCATION OF EXISTING SERVICES.
8. A MINIMUM HORIZONTAL SEPARATION OF 10' SHALL BE MAINTAINED BETWEEN WATER LINES
AND SANITARY SEWER LINES UNLESS OTHERWISE SHOWN. AN 18" MINIMUM VERTICAL
SEPARATION SHALL BE MAINTAINED AT CROSSINGS OF WATER AND SEWER LINES. WHEN
CROSSING A WATER LINE OR SEWER LINE, PIPE JOINTS SHALL BE PLACED AS FAR AWAY AS
POSSIBLE FROM THE OTHER PIPE.
9. ALL CONSTRUCTION STAKING SHALL BE BY THE CONTRACTOR AT HIS EXPENSE.
10. WHEN CONSTRUCTION INVOLVES THE REMOVAL OF FENCE, POLES, SIDEWALKS, DRIVE,
TEMPORARY OR FIXED STRUCTURES; THE CONTRACTOR AT HIS EXPENSE SHALL PROVIDE
FOR TEMPORARY SERVICE OR CONTAINMENT TO THE AFFECTED PROPERTY, AND SHALL
REPLACE SUCH ITEMS WITH SIMILAR OR BETTER MATERIALS AS SOON AS PRACTICAL OR AS
DIRECTED BY THE OWNER FOLLOWING UTILITY INSTALLATION.
11. THE CONTRACTOR SHALL RESTORE OR HAVE RESTORED, AT HIS EXPENSE, ALL EXISTING
FACILITIES WHICH HAVE BEEN DAMAGED DUE TO HIS CONSTRUCTION ACTIVITIES, TO THE
ORIGINAL OR BETTER CONDITION. THE CONTRACTOR SHALL UTILIZE THE SAME MATERIAL
COMPOSITION AS EXISTING TO REPLACE THE EXISTING FACILITIES UNLESS APPROVED
OTHERWISE BY THE OWNER.
12. SEE SHEETS EC1-EC6 FOR SOIL EROSION AND SEDIMENT CONTROL INFORMATION.
13. PEDESTRIAN AND LOCAL VEHICULAR TRAFFIC SHALL BE MAINTAINED AT ALL TIMES DURING
CONSTRUCTION. SAFETY DEVICES AND FLAGMEN SHALL BE PROVIDED BY THE CONTRACTOR
AT HIS EXPENSE. WRITTEN PERMISSION TO CLOSE THE CONSTRUCTION AREA TO TRAFFIC
MUST BE OBTAINED FROM THE APPROPRIATE GOVERNMENT AGENCY PRIOR TO THE
CLOSING. ALL LOCAL EMERGENCY SERVICES SHALL BE NOTIFIED IN WRITING A MINIMUM 72
HOURS PRIOR TO ROAD CLOSINGS.
14. DURING CONSTRUCTION THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY
TRAFFIC CONTROL MEASURES TO ENSURE SAFETY AT ALL TIMES FOR EMPLOYEES,
RESIDENTS, AND MOTORISTS, IN ACCORDANCE WITH THE 'MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES', LATEST REVISION.
15. IN ACCORDANCE WITH THE GENERALLY ACCEPTED CONSTRUCTION PRACTICES THE
CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF
THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE
OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
NORMAL WORKING HOURS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN
AND CONSTRUCTION OF PROPER SHORING OF TRENCHES IN ACCORDANCE WITH
OCCUPATIONAL SAFETY LAWS. THE DUTIES OF THE PROJECT CIVIL ENGINEER DO NOT
INCLUDE REVIEW OF THE ADEQUACY OR THE CONTRACTOR'S SAFETY IN, ON, OR NEAR THE
CONSTRUCTION SITE.
16. SURVEY AND CONTOUR INFORMATION FOR THE WATER TREATMENT PLANT IS BY LAND
DEVELOPMENT SURVEYORS. AUTOCAD FILE: 23107.dwg DATED 3/29/23.
17. CONTRACTOR IS RESPONSIBLE FOR REPLACING ALL PROPERTY PINS THAT ARE DISTURBED
DURING CONSTRUCTION ACTIVITIES.
18. DISTURBED LANDSCAPE AREAS SUCH AS TREES, SHRUBS, GRASS LAWNS, ETC. SHALL BE
RESTORED AND REPLACED WITH MATERIALS OF LIKE KIND (I.E.: SOD LAWNS SHALL BE
REPLACED WITH SOD OF SAME VARIETY AND QUALITY). THE CONTRACTOR WILL BE
RESPONSIBLE FOR REPLACING ANY EXISTING TREES, SHRUBS, GRASS LAWNS, OR OTHER
EXISTING LANDSCAPE PLANT MATERIALS THAT ARE DAMAGED OR KILLED AS A RESULT OF
CONSTRUCTION ACTIVITIES FOR ONE YEAR AFTER INSTALLATION OF WATERLINE. PLANT
MATERIAL SHALL BE REPLACED WITH LIKE SIZE AND KIND OR PROPERTY OWNER SHALL BE
APPROPRIATELY COMPENSATED. COMPENSATION WILL BE APPRAISED BY A QUALIFIED
LANDSCAPE COMPANY.
19. THE WASTEWATER TREATMENT PLANT SHALL REMAIN IN SERVICE DURING CONSTRUCTION.
OWNER MAY BE ABLE TO SUSPEND FLOWS FOR SHORT PERIODS OF TIME IF NEEDED. IF
LONGER PERIODS OF SHUT DOWN OF VARIOUS COMPONENTS ARE NECESSARY
CONTRACTOR MAY BE REQUIRED TO BYPASS THE FLOW FROM AREAS OF WORK. DETAILED
PLANS AND COORDINATION FOR BYPASSING SHALL BE APPROVED BY ENGINEER AND OWNER.
20. THE CONTRACTOR SHALL MAINTAIN ACCESS ROADS INSIDE THE PLANT DURING
CONSTRUCTION. EXCESS MUD SHALL BE REMOVED AND TEMPORARY G.A.B. OR SURGE
STONE SHALL BE INSTALLED DURING CONSTRUCTION AT THE DISCRETION OF THE OWNER SO
AS TO PERMIT CLEAN, SAFE ACCESS TO THE PLANT COMPONENTS AT ALL TIMES.
21. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE AND SECURE AN
APPROPRIATE STAGING AREA (OR AREAS) FOR THE DURATION OF THE PROJECT. THE
STAGING AREA (OR AREAS) SHALL PROVIDE A SECURE LOCATION WHERE THE CONTRACTOR
CAN STORE MATERIALS DURING THE CONSTRUCTION OF THE PROJECT. PUBLIC ROAD
RIGHT-OF-WAYS CANNOT BE USED AS STAGING AREAS. THE CONTRACTOR WILL BE SOLELY
RESPONSIBLE FOR SECURITY OF THE STAGING AREA (OR AREAS). THE OWNER WILL NOT BE
RESPONSIBLE FOR ANY THEFT OR OTHER LOSS OF MATERIALS OR EQUIPMENT FROM THE
JOB SITE OR FROM A STAGING AREA. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE
FOR ALL COSTS ASSOCIATED WITH THE STAGING AREA. NO SEPARATE PAYMENTS WILL BE
MADE TO THE CONTRACTOR FOR THE STAGING AREA.
22. CONTRACTOR SHALL PROVIDE THE SERVICES OF A GEOTECHNICAL ENGINEER FOR ALL
COMPACTION AND MATERIALS TESTING FOR THE PROJECT
MANHOLE
TREATMENT PLANT WATER LINES
(SIZE AND MATL AS NOTED ON PLANS)
UNDERGROUND POWER LINE
YARD PIPING
(TYPE, SIZE, AND MATL
AS NOTED ON PLANS)
LAS LINE W/SPRINKLER
GATE VALVE
FIRE HYDRANT
CONCRETE HEADWALL
CONCRETE JUNCTION BOX
LEGEND
UTILITY POLE
UTILITY POLE
GUY WIRE
CONTOUR (MINOR)
ROAD RIGHT OF WAY
EDGE OF PAVEMENT
R/W P/L
WATER METER
EXISTING
PROPERTY LINE
CONTOUR (MAJOR)
OVERHEAD POWER LINE
LIGHT POLE
YARD HYDRANT
GAS LINE
STORM CULVERT
DROP INLET
R/W P/L
PROPOSED
C/L DRAINAGE DITCH
C/L EXISTING STREAM
N/A
N/A
N/A
N/A
N/A
STORM CULVERT METAL END SECTION
N/A
RW RW RW RAW WATER LINE RW RW
PW PW PROCESS WASTE LINE PW PW
N/A
N/A
N/A
RIPRAPN/A
FILTERED WATER LINE
UNDERGROUND TELEPHONE LINE N/A
BENCH MARK N/A
CONTROL POINTN/A
SPOT ELEVATION
FG:
679.02N/A
W15 D1
CONSTRUCTION DETAIL NO.
PLAN SHEET NO.
FW FW
BW BW BACKWASH LINE N/A
N/A
N/A
N/A
SANITARY SEWER LINE N/A
POTABLE WATER LINE
TO BE REMOVEDN/A
R
EL
EA
SE
F O
R B
ID
/3 1/
OBSTRUCTIONS ENCOUNTERED:
IN ADDITION TO SHOWING THE STRUCTURES TO BE BUILT FOR THIS PROJECT, THE DRAWINGS SHOW CERTAIN INFORMATION OBTAINED BY THE ENGINEER REGARDING THE PIPES, POLE LINES, CONDUITS AND OTHER STRUCTURES WHICH EXIST ALONG THE LINE OF THE WORK, BOTH AT AND BELOW THE SURFACE OF THE GROUND. THE ENGINEER AND THE OWNER EXPRESSLY DISCLAIM ANY RESPONSIBILITY FOR THE ACCURACY
OR COMPLETENESS OF THE INFORMATION GIVEN ON THE DRAWINGS WITH REGARD TO EXISTING
STRUCTURES, AND THE CONTRACTOR WILL NOT BE ENTITLED TO ANY EXTRA COMPENSATION ON ACCOUNT OF INACCURACY OR INCOMPLETENESS OF SUCH INFORMATION, SAID STRUCTURES BEING INDICATED ONLY FOR THE CONVENIENCE OF THE CONTRACTOR, WHO MUST VERIFY THE INFORMATION TO HIS OWN SATISFACTION. THE GIVING OF THIS INFORMATION UPON THE CONTRACT DRAWINGS WILL NOT RELIEVE THE CONTRACTOR OF HIS OBLIGATION TO SUPPORT AND PROTECT ALL PIPES, CONDUITS, AND OTHER STRUCTURES WHICH MAY BE ENCOUNTERED DURING THE CONSTRUCTION OF WORK, AND TO MAKE GOOD ALL
DAMAGES DONE TO SUCH PIPES, CONDUITS, AND OTHER STRUCTURES, AS PROVIDED IN THESE
SPECIFICATIONS. THE CONTRACTOR SHALL LOCATE ALL UNDERGROUND OBSTRUCTIONS PRIOR TO EXCAVATION SO AS TO PREVENT DAMAGE TO THOSE SERVICES OR OTHER UTILITIES. ANY SUCH DAMAGES MUST BE REPAIRED WITHOUT DELAY AND THE COST OF SUCH REPAIRS SHALL BE PAID FOR BY THE
CONTRACTOR.
N/A
VEGETATIVE MAINTENANCE NOTES:
1. CONTRACTOR TO INCLUDE FOLLOWING ITEMS IN THE SCOPE OF WORK:
M1 - SELECT CUTTING TREES
M2 - INVASIVE SPECIES REMOVAL - PRIVET AND KUDZU
2. SELECT CUTTING SHALL INCLUDE THE FELLING AND REMOVAL FROM SITE OF SELECT TREES THROUGHOUT THE ADEQUATELY FORESTED AREAS OF THE LAND APPLICATION SYSTEM (AREAS NOT REQUIRING REFORESTATION NOR SUPPLEMENTAL PLANTING). THE CONTRACTOR SHALL NOT CUT MORE
THAN 10 TREES PER ACRE. THE CONTRACTOR SHALL REPLANT EACH CUT TREE WITH ONE
CONTAINERIZED ROOT STOCK FROM TABLE NO 1.
3. SPECIAL CARE MUST BE TAKEN FOR TREES CUT NEAR ABOVE GROUND PIPING, SUCH THAT FELLING THE TREE DOES NOT DAMAGE THE PIPING. IF NECESSARY, TEMPORARILY DISASSEMBLE PIPING TO FELL THE TREE TO AVOID ANY DAMAGE AND THEN REASSEMBLE THE PIPING ONCE THE TREE IS REMOVED.
COORDINATE ANY PIPE DISASSEMBLY AND REASSEMBLY WITH THE OWNER AND ENGINEER.
4. STUMPS FROM FELLED TREES SHALL NOT BE TALLER THAN 24" FROM GRADE.
5. CONTRACTOR SHALL TAKE CARE TO MINIMIZE ANY GROUND DISTURBANCE FROM FELLING AND
REMOVAL OF TREES. WHEN NECESSARY, THE CONTRACTOR SHALL USE SILT FENCE TO PROVIDE
EROSION AND SEDIMENTATION CONTROL WHEN FELLING AND REMOVING TREES FROM SITE. NECESSITY OF SILT FENCE SHALL BE DETERMINED BY THE ENGINEER AND COMMUNICATED TO THE CONTRACTOR.
6. CONTRACTOR TO MARK AND ENGINEER TO APPROVE TREES AND SHRUBS SELECTED FOR CUTTING
PRIOR TO CONTRACTOR PERFORMING THE MAINTENANCE WORK.
7. SELECT CUTTING SHALL ONLY OCCUR IN AREAS WHERE SLOPES ARE CONDUSIVE TO THE SAFE
PERFORMANCE OF THE WORK.
8. ALL PRIVET AND KUDZU SHALL BE REMOVED FROM THE LAND APPLICATION SYSTEM. SEE SPECIFICATION
02961 - INVASIVE SPECIES REMOVAL FOR APPROVED REMOVAL PROCEDURES.
9. INVASIVE SPECIES HAVE BEEN IDENTIFIED IN FIELDS 1, 2, AND 3. CONTRACTOR TO VERIFY LOCATION AND QUANTITY OF KUDZU AND PRIVET ACROSS THE LAND APPLICATION SYSTEM. INVASIVE SPECIES LOCATION AND QUANTITY SHALL BE VERIFIED OUTSIDE OF WINTER, WHEN THE SPECIES ARE MORE
VISIBLE.
A B
AD
D
EN
D U
M N
O . 1
/0
2/
B
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FILE LOCATION
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGN BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
..ALL RIGHTS RESERVED..
AutoCAD SHX Text
ENGINEERING MANAGEMENT ASSOC., INC.
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text THESE CONSTRUCTION DOCUMENTS AND PERMITTED REPRODUCTIONS, IN WHOLE OR IN PART, ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF ENGINEERING MANAGEMENT INC. UNLESS OTHERWISE AGREED TO. THEY SHALL NOT BE REPRODUCED OR CONVEYED IN ANY MANNER NOR ARE THEY TO BE USED FOR ANY OTHER PROJECTS OTHER THAN THAT SPECIFICALLY INDICATED HEREIN WITHOUT WRITTEN PERMISSION FROM AND DUE COMPENSATION TO ENGINEERING MANAGEMENT INC.
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text
NO. PE051941
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text z:\projects
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text
WM
1550156015701580
15901600
156015701580
1630164016501660
14301440
70148014
15701580
1490150015
152015301540
1510152015301540155015601570158015901600161016201630164016
154015501560
401750
162016301640 16601670168016
90170017101720
70178017901800181018201830
LA
S
VE
GE
TA
TI
VE
MA
NA
GE
ME
NT
P
LA
N A
R
EL
EA
SE
F O
R B
ID
/3 1/
LA
N D
A
PP
LI
C
A
TI
O N
S
YS
TE
M
S
PR
A Y
FI
EL
D V
EG
ET
A
TI
O N
IM
PR
O
VE
M
EN
TS
FO
R T
H E
C
IT
Y O
F H
EL
EN
W H
IT
E
C O
U N
TY
, G
EO
R
G
IA
TABLE NO. 1
REFORESTATION, ONGOING HARVEST & SUPPLEMENTAL PLANTING
SCIENTIFIC NAME COMMON NAME
CEPHALANTHUS ACCIDENTALIS BUTTONBUSH
SALIX SERICEA SILKY WILLOW
SALIX NIGRA BLACK WILLOW
SAMBUCUS CANADENSIS ELBERBERRY
CORNUS AMOMUM SILKY DOGWOOD
VIBURNUM DENTATUM ARROWWOOD VIBURNUM
PHYSOCARPUS OPULIFOLIUS ATLANTIC NINEBARK
TABLE NO. 2
REFORESTATION, NO HARVEST & SUPPLEMENTAL PLANTING
SCIENTIFIC NAME COMMON NAME
ACER FLORIDANUM SOUTHERN SUGAR MAPLE
LIRIODENDRON TULIPIFERA TULIP POPLAR
ACER RUNBRUM RED MAPLE
LIQUIDAMBAR STYRACIFLUA SWEETGUM
PINUS ECHINATA SHORTLEAF PINE
PRUNUS SEROTINA BLACK CHERRY
PLATANUS ACCIDENTALIS SYCAMORE
QUERCUS NIGRA WATER OAK
REFORESTATION, ONGOING HARVEST
SUPPLEMENTAL PLANTING
REFORESTATION, NO HARVEST
PLANTING ZONE
WORK ITEM AREA (AC.) TREES PER ACRE ROW SPACING QUANTITY STOCK
P1 - REFORESTATION, ONGOING HARVEST 3.9 290 15FT BY 10FT 1140 BAREROOT
P2 - REFORESTATION, NO HARVEST 0.7 303 12FT BY 12FT 210 1-GALLON
P3 - SUPPLEMENTAL PLANTING 16.8 109 20FT RADIUS 1830 BAREROOT
PLANTING ZONE LEGEND
SH
EE
T
SH
EE
T
TI
TL
E
STAMP
R
EV
IS
IO
N
N O
D
ES
C
R
IP
TI
O
N D
AT
E
PA
TH
F
IL
E:
Z :\P
R O
JE
C
TS
\2
4\
H el en L as V eg et at io n Pl an \D es ig n St ag e\
Ba se
S pr ay F ie ld
V eg et at io n
Im pr ov em en ts
Ex pe rie nc e Tr us t So lu tio ns
MA
NA
GE
ME
NT
EN
GI
NE
ER
IN
G
Sw an so n
Dr iv e, L aw re nc ev ill e, G A w
.e m in c.
bi z fa x
0-
2-ph on e
0-
2-
Ci vi l a nd
E nv iro nm en ta l E ng in ee rs
C1
/3
1/
PB
H
R
PM
W
SH
APPROX. 0.67 AC OF
REFORESTATION,
ONGOING HARVEST
APPROX. 0.08 AC OF
REFORESTATION,
ONGOING HARVEST
APPROX. 3.17 AC OF
SUPPLEMENTAL PLANTING
APPROX. 1.88 AC OF
SUPPLEMENTAL PLANTING
APPROX. 4.86 AC OF
SUPPLEMENTAL PLANTING
APPROX. 0.40 AC OF
REFORESTATION,
ONGOING HARVEST
APPROX. 0.98 AC OF
REFORESTATION,
ONGOING HARVEST
APPROX. 4.40 AC OF
SUPPLEMENTAL PLANTING
APPROX. 0.42 AC OF
SUPPLEMENTAL PLANTING
APPROX. 0.21 AC OF
REFORESTATION,
NO HARVEST
APPROX. 1.00 AC OF
REFORESTATION,
ONGOING HARVEST
APPROX. 2.03 AC OF
SUPPLEMENTAL PLANTING
APPROX. 0.43 AC OF
REFORESTATION,
NO HARVEST
APPROX. 0.09 AC OF
REFORESTATION,
NO HARVEST
APPROX. 0.80 AC OF
REFORESTATION,
ONGOING HARVEST
WATER TANK
CITY OF HELEN, GA
LAY-DOWN
YARD
D-2
TEST WELL
D-3
TEST WELL
D-1
TEST WELL
NARR WEG
EDELWEISS STRASSE
M
UN
IC
H
ST
RA
SS
E
CH
AT
TA
HO
OC
HE
E
ST
RA
SS
E
CHATTAHOOCHEE STRASSE
NORBA WEG
PRIVATE DRIVE
PRIVATE DRIVE
PR
IV
AT
E
D R
IV
E
PR
IV
AT
E
DR
IV
E
INTERNATIONAL
VILLAGE DRIVE
BA
H
N
IN
N
SB
R U
C K
WILK STRASSE
BA
HN
IN
NS
BR
UC
K
ZEPPELIN STRASSE
AC
C
ES
S
R O
AD
AC
C
ESS
R O
AD
ACCESSROAD
ACCESS
ROAD
ACCESS
ROAD
AC
C
ES
S
R O
AD
CHATTAHOOCHEE RIVER
CONSTRUCTION NOTES:
1. WORK TO TAKE PLACE ON AN ACTIVE LAND APPLICATION SYSTEM. ALL
WORK SHALL BE COORDINATED WITH THE OWNER TO MINIMIZE ANY
IMPACT TO SPRAY SYSTEM OPERATION.
2. OWNER ROTATES SPRAY FIELD APPLICATION. CONTRACTOR NOT TO
PERFORM WORK ON ANY FIELD BEING ACTIVELY SPRAYED.
3. CONTRACTOR TO COORDINATE WITH OWNER SUCH THAT NEW PLANTINGS
ARE SPRAYED WITHIN 1-3 DAYS AFTER PLANTING.
4. CONTRACTOR TO PLANT AN EVEN MIX OF LISTED SPECIES, BARRING
PRICING AND NURSERY AVAILABILITY.
5. NO SHRUBS TO BE PLANTED WITHIN 10 FEET OF ANY ABOVE GROUND
PIPING.
6. NO TREES TO BE PLANTED WITH 20 FEET OF ANY ABOVE GROUND PIPING.
7. PLANTING ZONES ARE APPROXIMATE AND BOUNDARIES ARE TO BE FIELD
MARKED BY EMI STAFF PRIOR TO CONSTRUCTION.
8. PLANTING SHALL FOLLOW PRESCRIBED DETAIL D-1.
D-1 TREE ON SLOPE 5% (20:1) TO 50% (2:1) - UNMODIFIED SOIL
Existing soil.
Trunk caliper shall meet ANSI Z60 current edition for root ball size.
Round-topped soil berm 4" high x 8" wide above root ball surface shall be centered on the downhill side of the root ball for 240°.
Berm shall begin at root ball periphery.
Original grade.
Bottom of root ball rests on existing or recompacted soil.
Central leader.
SECTION VIEW
Original slope should pass through the point where the trunk base meets substrate/soil.
Prior to mulching, tamp soil adjacent to root ball to stabilize root ball and ensure that irrigation flows through the root ball.
Loosened soil. Dig and turn the soil to reduce the compaction to the area and depth shown.
Root ball modified as required.
4" layer of mulch. No more than 1" of mulch on top of root ball. (See specifications for mulch).
Slope sides of loosened soil.
Notes:
1- Trees shall be of quality prescribed in specifications.
2- See specifications for further requirements related to this detail.
3x widest dimension of root ball
URBAN TREE FOUNDATION © 2014
OPEN SOURCE FREE TO USE
SPRAY FIELD NUMBER
(TYPICAL 1A-5B) B
AD
D
EN
D
U M
N O
. 1
/0 2/
B
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5A
AutoCAD SHX Text
AutoCAD SHX Text 3A
AutoCAD SHX Text 3C
AutoCAD SHX Text 3B
AutoCAD SHX Text 2A
AutoCAD SHX Text 2B
AutoCAD SHX Text 1B
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FILE LOCATION
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGN BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
..ALL RIGHTS RESERVED..
AutoCAD SHX Text
ENGINEERING MANAGEMENT ASSOC., INC.
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text THESE CONSTRUCTION DOCUMENTS AND PERMITTED REPRODUCTIONS, IN WHOLE OR IN PART, ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF ENGINEERING MANAGEMENT INC. UNLESS OTHERWISE AGREED TO. THEY SHALL NOT BE REPRODUCED OR CONVEYED IN ANY MANNER NOR ARE THEY TO BE USED FOR ANY OTHER PROJECTS OTHER THAN THAT SPECIFICALLY INDICATED HEREIN WITHOUT WRITTEN PERMISSION FROM AND DUE COMPENSATION TO ENGINEERING MANAGEMENT INC.
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text
NO. PE051941
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text W
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text z:\projects
AutoCAD SHX Text 5B
AutoCAD SHX Text 1A
24-022/10-25 (Bid Form) 00300-1
BID FORM
2026 Spray Field Vegetation Improvements City of Helen, Georgia
THIS BID IS SUBMITTED TO:
City of Helen City Hall 25 Aplenrosen Strasse Helen, GA 30545 (Hereinafter called "Owner")
THIS BID IS SUBMITTED BY:
(Name) (Address)
(Telephone) (Hereinafter called "Bidder")
BIDDER, in compliance with the Advertisement for Bids for the construction of this project, having examined the Drawings and Specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project, including the availability of materials and labor, hereby proposes to furnish all labor, materials and supplies, and to construct the project in accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the price(s) stated below. This price(s) is to cover all expenses including overhead and profit incurred in performing the Work required under the CONTRACT DOCUMENTS, of which this proposal is a part.
BID SCHEDULE
TITLE
The Contractor is directed to Section 01025 “Measurement and Payment” for the methods and limits for payments to the Contractor for the pay items listed below.
24-022/12-25 (Bid Form) 00300-2
Item No.
Description
Unit
Est. No.
of Units
Unit Price Bid Total for Item
00001.00
Allowance for Unforeseen Issues to be Used at the OWNER’S discretion.
LS
_$25,000.00_____$25,000.00 Dollars and Cents Twenty-Five Thousand and 00/100 (Unit Price in Words)
00002.00
Mobilization – The total of Mobilization & De-Mobilization shall not to exceed 3% of the total bid price.
00003.00
De-Mobilization – The total of Mobilization & De-Mobilization shall not to exceed 3% of the total bid price.
00520.00
Performance Bond – The total of bods and Insurance shall not exceed 2% of the total bid price.
00530.00
Labor & Material Payment Bond – The total of bods and Insurance shall not exceed 2% of the total bid price.
00700.00
Insurance – The total of bods and Insurance shall not exceed 2% of the total bid price.
24-022/12-25 (Bid Form) 00300-3
P1
Reforestation (Bare Root Stock)
P2
Reforestation, No Harvest (1-Gallon Containerized Stock)
P3
Supplemental Planting (Bare Root Stock)
P4
Additional Planting at Owners Request (Bare Root Stock)
EA
(trees)
P5
Additional Planting at Owners Request (1-Gallon Containerized Stock)
24-022/12-25 (Bid Form) 00300-4
M1.1
Select Cutting – 20 to 25” DBH
M1.2
Select Cutting – 15-19.9” DBH
M1.3
Silt Fence
LF
M2
Invasive Species Removal - Privet and Kudzu
24-022/12-25 (Bid Form) 00300-5
Total Amount Base Bid: $
(Price in Words)
NOTE: Amounts shall be shown in words and figures; the amount written in words shall take precedence.
24-022/12-25 (Bid Form) 00300-6
BIDDER hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" from the OWNER and to fully complete WORK within a total construction time of _______________(____) consecutive calendar days of the date specified in this "Notice to Proceed".
BIDDER acknowledges receipt of the following addenda:
Addendum No.
Date Received
BIDDER agrees to perform all of the construction of the project complete with appurtenances and accessory work described in the Specifications and shown on the Drawings for the above scheduled price(s).
The above scheduled price(s) shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.
BIDDER understands that OWNER reserves the right to reject any or all bids and to waive any informalities in the bidding.
BIDDER agrees that his bid shall be good and may not be withdrawn for a period of ( ) calendar days after the scheduled closing time for receiving bids.
24-022/12-25 (Bid Form) 00300-7
Upon receipt of the written notice of the acceptance of this bid, BIDDER will execute the formal Contract attached within ten (10) days and deliver a surety bond or bonds, as required by the General Conditions. The bid security attached in the sum of five (5%) percent of the total bid is to become the property of the OWNER in the event the Contract and bond are not executed within the time set forth, as liquidated damages for the delay and additional expense to the OWNER caused thereby.
Respectfully Submitted: Name:
Address:
Phone No.:
Fax No.:
Email Address.:
Dun & Bradstreet Data Universal Numbering System (DUNS) No:
FEDERAL TAX NO. OR
SOCIAL SECURITY NO.:
Signature of Principal:
Title:
Date:
Telephone:
ATTEST:
Signature:
Corporate Secretary/Partner/Notary
(SEAL)
Name:
(Please type)
NOTE: Attest for a corporation must be by the corporate secretary; for a partnership by another partner; for an individual by a Notary.
END OF SECTION
24-022/10-25 (Measurement and Payment) 01025-1
SECTION 01025
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.01 SCOPE OF WORK
A. This Section describes the methods by which measurement will be made of the quantities for which payment will be made for the PROJECT.
B. The project is to be bid as one (1) contract:
1.02 MEASUREMENT OF WORK
A. WORK shall be measured by the ENGINEER or his representative, with assistance from the CONTRACTOR prior to preparation of a payment request by the CONTRACTOR.
B. Unit quantities that are measured in place shall be measured monthly. The
CONTRACTOR shall give the ENGINEER a minimum of two days notice for making all required measurements.
C. Materials that must be measured as delivered shall be measured at the time of delivery by the ENGINEER or his representative; the CONTRACTOR shall provide sufficient advance notice so that such measurements can be made.
D. WORK completed shall be measured for completion against the schedule of values provided by the CONTRACTOR in accordance with the General Conditions. Related work necessary for a complete and operational job, such as relocation of mail boxes removal of trees, relocation of utilities, field engineering, clearing and grubbing, traffic control, etc., not specifically identified as a pay item shall be included in the unit price bid. No additional payments will be made for such activities.
1.03 PROGRESS PAYMENTS
A. Progress payments shall be based on the quantity of units installed.
B. All items of WORK not specifically listed in the Bid Schedule shall be considered incidental to the construction, and the cost of all such work and material shall be included in the prices bid for various items listed.
C. All items listed for measurement and payment shall include all machinery, plant, materials and labor, etc., to successfully and satisfactorily complete WORK specified.
D. Payment: The CONTRACTOR will receive payment only for the items listed in the Bid Schedule of his contract, and no separate payments will be made for the work under any section of the CONTRACT DOCUMENTS except as provided for in the Bid Form.
Where measurements are required to be made by the ENGINEER, for the payment of a pay item, the failure of the CONTRACTOR to give the adequate notification or failure of the CONTRACTOR to give the ENGINEER assistance for the measurement shall result in the forfeiture of payment for the work or item which was not measured.
24-022/10-25 (Measurement and Payment) 01025-2 ure of payment for the work or item which was not measured.
re of payment for the work or item which was not measured.
E. WORK to be paid for as a "Lump Sum" shall be measured for completion against the
"Schedule of Values" provided by the CONTRACTOR. The "Schedule of Values" shall be submitted at the preconstruction conference and shall include quantities and prices of items aggregating the total "Lump Sum" and will subdivide the work into component parts in sufficient detail to serve as the basis for progress payments during construction.
PART 2 PRODUCTS
2.01 STORED MATERIALS
Partial payment shall be made for approved materials stored at the project site, provided invoices for said materials are furnished in accordance with payment request submittal.
PART 3 EXECUTION
CONTRACT NO. 1
3.01 ALLOWANCE FOR UNFORESEEN ISSUES TO BE USED AT THE DISCRETION OF
THE OWNER
This line item refers to the additional costs for labor and/or materials necessary to address unforeseen issues during construction which are out of the scope of work and not included in any other measurement and payment item or included in any specification section for any item.
The Owner and Engineer must approve use of this allowance prior to the completion of any work the Contractor feels is eligible. Contractor will not be paid under this allowance without prior approval from the Owner and Engineer.
3.02 MOBILIZATION AND SET-UP
Payment for this item shall be lump sum and shall include all labor, equipment and materials required to mobilize and set-up or install all necessary equipment to the site for the purpose of the project.
3.03 DE-MOBILIZATION
Payment for this item shall be lump sum and shall include all labor, equipment and materials required to disassemble as necessary, all equipment for the purpose of re-moving all equipment and materials from the site.
3.04 PERFORMANCE BOND (Section 00520)
This bid item shall be paid lump sum and shall cover all costs to provide and execute the performance bond as required in Section 00520 of the Contract Documents. The total of bonds and insurance shall not exceed 2% of the total bid price.
24-022/10-25 (Measurement and Payment) 01025-3
3.05 LABOR & MATERIAL PAYMENT BOND (Section 00530)
This bid item shall be paid lump sum and shall cover all costs to provide and execute labor & material bond as required in Section 00530 of the Contract Documents. The total of bonds and insurance shall not exceed 2% of the total bid price.
3.06 INSURANCE (Section 00700 & Section 800)
This bid item shall be paid lump sum and shall cover all costs to provide for all insurance as required by the Contract Documents. The total of bonds and insurance shall not exceed 2% of the total bid price.
3.07 LUMP SUM REFORESTATION, SUPPLEMENTAL PLANTING, AND INVASIVE SPECIES
REMOVAL WORK ITEMS
A. CONTRACTOR shall list the lump sum price for the major items of work listed in the bid schedule. Prices shall include all cost for removal and disposal of invasive species from project site. Prices shall include all costs for equipment, labor, materials, and all incidentals to perform the work. The prices shall include delivery, all taxes and royalties applicable, for the lump sum items.
1. P1-P3
2. M2
3.08 UNIT PRICE ADDITIONAL PLANTING WORK ITEMS
A. CONTRACTOR shall list unit prices for the additional planting items of work listed in the bid schedule. Prices shall include all costs for equipment, labor, materials, and all incidentals to perform the work. The prices shall include delivery, all taxes and royalties applicable, where specified, for the unit price items. The Owner and Engineer must approve of additional planting prior to the completion of any work the Contractor feels is eligible. Contractor will not be paid for additional planting without prior approval from the Owner and Engineer.
1. P4 – unit price per tree planted (bare root stock)
2. P5 – unit price per tree planted (1-gallon containerized stock)
3.09 UNIT PRICE SELECT CUTTING WORK ITEMS
A. CONTRACTOR shall list unit prices for the select cutting items of work listed in the bid schedule. Prices shall include all costs for equipment, labor, materials, and all incidentals to perform the work. Prices shall include all cost for removal and disposal of select cut trees from project site. Prices shall include all cost for erosion control to do the work. The prices shall include all taxes and royalties applicable, for the unit price items. The Owner and Engineer must approve of trees to be select cut prior to the completion of any work the Contractor feels is eligible. Contractor will not be paid for select cutting without prior approval from the Owner and Engineer.
1. M1.1 – unit price per tree select cut (20” to 25” diameter at breast height)
24-022/10-25 (Measurement and Payment) 01025-4
2. M1.2 – unit price per tree select cut (15” to 19.9” diameter at breast height)
3. M1.3 – unit price per linear foot of silt fence installed
END OF CONTRACT NO. 1 - MEASUREMENT AND PAYMENT
END OF SECTION