This is a comprehensive construction design and bid document for the Yankee Springs Shooting Range project, prepared by the State of Michigan's Department of Technology, Management, and Budget (DTMB) and designed by Colliers Engineering and Design. The project involves constructing a new shooting range facility located at 10370 Gun Lake Road in Middleville, Michigan. The design documents include detailed architectural, structural, civil, and electrical plans for a single-story wooden building with shooting lanes, storage areas, and associated site infrastructure. The project is dated for construction in March 2025, with a total building square footage of approximately 2,654 square feet.
The project follows the 2015 Michigan Building Code, 2015 Michigan Rehab Code, and various other state and national construction standards. The facility will be constructed using Type VB construction with wood framing, pressure-treated lumber, and a concrete slab-on-grade foundation. The estimated project cost is not explicitly stated in the documents. The site plan includes provisions for gravel parking, underground electrical service, erosion control measures, and specific construction sequencing requirements. The electrical design shows a 100A single-phase power service, with provisions for lighting, receptacles, and site electrical infrastructure. The design emphasizes compliance with local building codes, safety regulations, and environmental considerations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCSpec Yankee Springs Shooting Range.pdf | ||
| DTMB-0415 Advertisement_Yankee Springs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCCUPANCY CLASSIFICATION':
• USE GROUP: A-3
SPRINKLED: NO
CONSTRUCTION TYPE: VB
BUILDING DATA: ACTUAL ALLOWABLE
• SQUARE FOOTAGE: 2654 SF 6000 SF
• HEIGHT: 19 FT 40'-0"
• NO. OF STORIES: 1 1
FIRE RATING (BUILDING ELEMENTS): REQUIRED PROVIDED
• STRUSTURAL FRAME: 0-HOUR 0-HOUR
• BEARING WALLS (EXTERIOR): 0-HOUR 0-HOUR
• BEARING WALLS (INTERIOR): 0-HOUR 0-HOUR
• NON BEARING WALLS (EXTERIOR): 0-HOUR 0-HOUR
• NON BEARING WALLS (INTERIOR): 0-HOUR 0-HOUR
• ROOF CONSTRUCTION: 0-HOUR 0-HOUR
MEANS OF EGRESS: REQUIRED PROVIDED
• MINIMUM NUMBER OF EXITS: 1 1
• EXIT ACCESS TRVAEL DISTANCE 200' PER PLANS
• DEAD-END LIMIT: 20' N/A
• COMMON PATH OF TRAVEL LIMIT: 30' N/A
• CORRIDOR FIRE RATING: 0-HOUR 0-HOUR
BUILDING DATA & CODE SUMMARY
1. APPLICABLE CODES:
A. CONSTRUCTION SHALL CONFORM TO THE FOLLOWING CODES:
• MICHIGAN REHAB CODE FOR EXISTING BUILDINGS, 2015 EDITION
• MICHIGAN BUILDING CODE, 2015 EDITION
• ICC A117.1, 2009 EDITION
• INTERNATIONAL FIRE CODE, 2012 EDITION
• MICHIGAN MECHANICAL CODE, 2021 EDITION
• MICHIGAN PLUMBING CODE, 2021 EDITION
• NATIONAL ELECTRIC CODE, 2023 EDITION
WORK SHALL CONFORM TO FEDERAL, STATE AND LOCAL CODES AS
NTERPRETED BY THE AUTHORITY HAVING JURISDICTION.
2. COMPLIANCE:
A. PROVIDE FIRE EXTINGUISHERS IN CONFORMANCE WITH THE FIRE CODE
SECTION 906 AND COORDINATE WITH FIRE MARSHAL PRIOR TO
INSTALLATION. DO NOT INSTALL FIRE EXTINGUISHERS UNTIL LOCATIONS
HAVE BEEN REVIEWED AND APPROVED BY THE AUTHORITY HAVING
JURISDICTION.
B. OBTAIN ALL REQUIRED PERMITS AND PAYMENT OF PERMIT AND APPLICATION
FEES FOR THE WORK.
GENERAL NOTES
TOILET ROOMS:
• ON SITE, LESS THAN 500' PER MPC 403.3.3
ENTRANCE
STORAGE
137 SF
STAGING
328 SF
7 PEOPLE
UNOCCUPIED
X75 1/2
.D
PL
YA
NK
EE
SP
RI
NG
S
SH
O O
TI
NG
RA
NG
E Y2
DA
TE
SH
EE
T
ID
EN
TI
FI
C
AT
IO
N
NO
IS
SU
ED
FO
R
G un La ke R oa d, M id dl ev ille ,M ic hi ga n
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y ,M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
LA
C
H ,R
A ,N
C A
R B
,D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
RV
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FI
LE
N O
P R
EL
IM
IN
A R Y
EN
GI
NE
ER
PR
OJ
EC
T
NO
IN
D
EX
N O
FI
N A L
R
EC
O R D
C O N S
TR
U C
TI
O N
DR
AW
N
DE
SI
GN
ED
AP
PR
OV
ED
C H
EC
KE
D
P.
A.
K
D.
P.
L.
R.
E.
G.
W es t S ag in aw
H w y.
S ui te
La ns in g, M I 4 of fic e:
.8
.8 w w w .c ol lie rs en gi ne er in g.
co m D.
P.
L.
R.
E.
G.
D.
P.
L.
R.
E.
G.
G000
1-
1-
DRAWING INDEX - WITH SCHEDULED...
00 - GENERAL
G000 COVER SHEET
01 - CIVIL
C200 SITE PLAN
C300 GRADING PLAN
C310 SESC PLAN
C311 SESC DETAILS
03 - STRUCTURAL
S001 GENERAL NOTES
04 - ARCHITECTURAL
A101 FIRST FLOOR PLAN
A103 FOUNDATION PLAN
A104 ROOF PLAN
A201 EXTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A501 ENLARGED PLAN DETAILS
A521 SECTION DETAILS
A522 SECTION DETAILS
08 - ELECTRICAL
E001 LEGEND
ES001 SITE POWER PLAN
E101 FIRST FLOOR PLAN
E801 SCHEDULES
PROJECT LOCATION MAP
PROJECT CONTACT LIST DRAWING INDEX
CED PROJECT: 24003879A
YANKEE SPRINGS
SHOOTING RANGE
10370 Gun Lake Road, Middleville, Michigan 49333
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY,
MANAGEMENT, AND BUDGET
ARCHITECT
COLLIERS ENGINEERING AND DESIGN
DAVID MOSS, AIA
7050 WEST SAGINAW HWY. SUITE 200
LANSING, MI 48917
517.827.8672
OWNER
STATE OF MICHIGAN,
DTMB
DAVID LENZ
430 W ALLEGAN ST.
LANSING, MI 48933
DATE: 03/21/2025
SITE
CIVIL ENGINEER
COLLIERS ENGINEERING AND DESIGN
ANNIA ALVAREZ-NODARSE, PE
7050 WEST SAGINAW HWY. SUITE 200
LANSING, MI 48917
517 827 8667
ELECTRICAL ENGINEER
COLLIERS ENGINEERING AND DESIGN
ANGIE ROBINSON, PE
7050 WEST SAGINAW HWY. SUITE 200
LANSING, MI 48917
517 827 3354
SCALE : 1/16" = 1'-0"1 CODE COMPLIANCE DIAGRAM - FIRST FLOOR N
G R
A V
E L R
O A
D
G U N
LA
K E R
O A D
G R
A V
E S
H
IL
L T
R A
IL
APPROXIMATE AREA FOR
PROPOSED GATE. COORDINATE
WITH TENANT FOR EXACT
LOCATION
EX. TREES
EX. TREES
EX. TREES
EX. GATE TO REMAIN
EX. WOOD POSTS
APPROXIMATE LOCATION OF
BURIED COMMUNICATIONS
EX. BACKSTOP AND BENCHES TO
BE RELOCATED COORDINATE
WITH TENANT FOR DETAILS
PROPOSED
SHOOTING
RANGE
±2663 SQ.
FT.
A
A
D
B
F
E
C
22.0'
18.0'
34.0'
22.0'
5.0'
5.0'
R60.0'
H
8.5'
(TYP.)
A
I
I
I
E X
O
V E R
H E A
D E
L E C
T R
IC
G
GENERAL NOTES:
1. THE UNDERGROUND STRUCTURES AND UTILITIES SHOWN ON THESE
PLANS HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORD
MAPS, THEY ARE NOT CERTIFIED TO THE ACCURACY OF THEIR
LOCATION AND/OR COMPLETENESS. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE LOCATION AND EXTENT OF ALL
UNDERGROUND STRUCTURES AND UTILITIES PRIOR TO ANY DIGGING
OR CONSTRUCTION ACTIVITIES IN THEIR VICINITY.
2. THE CONTRACTOR SHALL PERFORM ALL WORK IN COMPLIANCE WITH
TITLE 29 OF FEDERAL REGULATIONS, PART 1926, SAFETY AND HEALTH
REGULATIONS FOR CONSTRUCTION (OSHA).
3. ALL ROADS AND PRIVATE DRIVES SHALL BE KEPT CLEAN OF MUD, DEBRIS
ETC. AT ALL TIMES.
4. REFER TO ARCHITECTURAL DRAWINGS FOR PRECISE BUILDING
DIMENSIONS.
5. THE CONTRACTOR SHALL CONSULT THE CONSTRUCTION MANAGER
BEFORE DEVIATING FROM THESE PLANS.
6. IN ALL TRENCH EXCAVATIONS, CONTRACTOR MUST LAY THE TRENCH
SIDE SLOPES BACK TO A SAFE SLOPE, USE A TRENCH SHIELD OR PROVIDE
SHEETING AND BRACING.
7. ALL EXISTING SURFACE APPURTENANCES (I.E. WATER VALVES, CATCH
BASIN FRAMES AND GRATES, MANHOLE COVERS) WITHIN THE PROJECT
LIMITS SHALL BE ADJUSTED TO FINISHED GRADE.
8. AREAS DISTURBED OR DAMAGED AS PART OF THIS PROJECT'S
CONSTRUCTION THAT ARE OUTSIDE OF THE PRIMARY WORK AREA
SHALL BE RESTORED, AT THE CONTRACTOR'S EXPENSE, TO THE
SATISFACTION OF THE OWNER'S REPRESENTATIVE.
9. THE CONTRACTOR SHALL CALL "MISS DIG" AT LEAST 3 WORKING DAYS
(EXCLUDING WEEKENDS AND HOLIDAYS) PRIOR TO CONSTRUCTION.
10. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE APPLICABLE
CODES, ORDINANCES, DESIGN STANDARDS AND STANDARD
SPECIFICATIONS OF THE AGENCIES WHICH HAVE THE RESPONSIBILITY OF
REVIEWING PLANS AND SPECIFICATIONS FOR CONSTRUCTION OF ALL
ITEMS INCLUDED IN THESE PLANS.
11. UNLESS SPECIFICALLY STATED, THE CONTRACTOR SHALL APPLY FOR
AND OBTAIN ALL NECESSARY PERMITS AS REQUIRED FOR
CONSTRUCTION OF THIS PROJECT PRIOR TO THE BEGINNING OF WORK
FROM THE PREVIOUSLY MENTIONED AGENCIES.
12. THE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE RESPONSIBILITY
FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION
OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND
PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
13. WHEN ANY EXISTING UTILITY REQUIRES ADJUSTMENT OR RELOCATION,
THE CONTRACTOR SHALL NOTIFY THE PROPER UTILITY COMPANY AND
COORDINATE THE WORK ACCORDINGLY. THERE SHALL BE NO CLAIM
MADE BY THE CONTRACTOR FOR ANY COSTS CAUSED BY DELAYS IN
CONSTRUCTION DUE TO THE ADJUSTMENT OR RELOCATION OF
UTILITIES.
14. THE CONTRACTOR IS TO VERIFY THAT THE PLANS AND SPECIFICATIONS
THAT HE/SHE IS BUILDING FROM ARE THE VERY LATEST PLANS AND
SPECIFICATIONS THAT HAVE BEEN APPROVED BY ALL APPLICABLE
PERMIT-ISSUING AGENCIES AND THE OWNER. ALL ITEMS CONSTRUCTED
BY THE CONTRACTOR PRIOR TO RECEIVING THE FINAL APPROVAL AND
PERMITS HAVING TO BE ADJUSTED OR RE-DONE, SHALL BE DONE AT THE
CONTRACTOR'S EXPENSE.
15. SHOULD THE CONTRACTOR ENCOUNTER CONFLICT BETWEEN THESE
PLANS AND SPECIFICATIONS, EITHER AMONG THEMSELVES OR WITH THE
REQUIREMENTS OF ANY AND ALL REVIEWING AND PERMIT-ISSUING
AGENCIES, HE/SHE SHALL SEEK CLARIFICATION IN WRITING FROM THE
CONSTRUCTION MANAGER BEFORE COMMENCEMENT OF
CONSTRUCTION. FAILURE TO DO SO SHALL BE AT THE SOLE EXPENSE
TO THE CONTRACTOR.
16. THE CONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS INDICATING
ALL CHANGES AND DEVIATIONS FROM APPROVED DRAWINGS.
17. ALL SIGNS AND TRAFFIC CONTROL MEASURES DURING CONSTRUCTION
AND MAINTENANCE ACTIVITIES SHALL BE CONSTRUCTED AND
INSTALLED PER THE LATEST EDITION OF THE MICHIGAN MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES (M.M.U.T.C.D.).
18. ALL WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL CONFORM TO
THE STANDARDS OF THE MICHIGAN DEPARTMENT OF
TRANSPORTATION.
SITE LEGEND:
PROPOSED GRAVEL
NUMBER OF PARKING SPACES
EXISTING GRAVEL
KEY NOTEA
KEY NOTES:
A. GRAVEL 6" 22A CRUSHED LIMESTONE OVER 4" OF
AGGREGATE BASE
B. CONCRETE SIDEWALK 4" NON-REINFORCED CONCRETE
OVER 4" AGGREGATE BASE
C. CONCRETE PAVEMENT 6" NON-REINFORCED CONCRETE
OVER 4" AGGREGATE BASE
D. VAULT BATHROOMS (BY OTHERS)
E. ADA STRIPPING AND SIGNAGE
F. WHEEL STOP (TYP.)
G. PROPOSED ELECTRICAL CONDUIT TO PROVIDE POWER FOR
LIGHTING AND GENERAL PURPOSE OUTLETS. CONDUIT TO
BE CONNECTED TO THE EXISTING UTILITY POLE EAST OF
THE GRAVES HILL TRAIL. COORDINATE EXACT LOCATION
AND CONNECTION WITH TENANT AND ELECTRICAL PLANS.
H. APPROXIMATE LOCATION OF PROPOSED TREE LINE
I. REMOVE EXISTING VEGETATION AS NECESSARY TO
ACCOMMODATE PROPOSED GRAVEL DRIVE.
A
X75 1/2
.D
PL
YA
NK
EE
S
PR
IN
G S
SH
O
O
TI
NG
R
AN
G
E Y2
DA
TE
SH
EE
TI
DE
NT
IF
IC
AT
IO
N
NO
IS
SU
ED
F
OR
M id dl ev ille , M
I
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
L A
C H
, R A
, N C
A R
B , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FI
LE
N
O
P R
EL
IM
IN
A R Y
EN
GI
NE
ER
P
RO
JE
C T
NO
IN
D
EX
N O
FI
N A L R
EC
O R D
C O N S
TR
U C
TI
O N
DR
AW
N
DE
SI
GN
ED
AP
PR
OV
ED
C H
EC
KE
DK.
S.
W es t S ag in aw
H w y.
S ui te
La ns in g, M I 4 of fic e:
.8
.8 w w w .c ol lie rs en gi ne er in g.
co m
A.
A.
N.
A.
A.
N.
D.
M.
RELOCATED TREE LINE
PROPOSED CONCRETE
EXISTING TREE LINE
C200
SCALE : 1"=30'1 SITE PLAN
DEMO TREE LINE
EXISTING TREE LINE (TYP.)
H
R30.0'
R26.0'
R25.0'
R25.0'
R78.0'
1" = 30' SCALE BAR
30 60 90 FT
UNDERGROUND ELECTRIC SERVICE
796.20
795.87795.82
795.74
795.64
796.20 795.80
791.50
792.52
795.42
796.40
795.74
795.50
792.07
789.86
789.83
793.05
794.66
796.20
792.26
792.65
795.88
796.45
796.24
-1 .4
-1.0%
-3.1%
-2.4%
-2 .6
-2 .7
-5.5%
-5.2%
796.50
796.50
796.50796.50
796.50
HP=797.38
FF=796.50
796.85
796.12
796.30
796.00
796.31
796.10
795.90
796.01
C300
GRADING NOTES
1. REFER TO EROSION AND SEDIMENT CONTROL PLAN FOR REQUIRED
EROSION AND SEDIMENT CONTROL MEASURES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE AND
REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS. EROSION
CONTROL MEASURES SHALL NOT BE REMOVED BEFORE VEGETATION HAS
OCCURRED COMPLETELY.
3. ALL SILT FENCE TO BE REPLACED WHENEVER THEY BECOME CLOGGED
OR INOPERABLE AND SHALL BE REPLACED AT A MINIMUM OF EVERY 3
MONTHS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATION OF
TOPSOIL TO ALL DISTURBED AREAS. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO MAINTAIN EROSION CONTROL MEASURES AT ALL
TIMES.
5. SILT FENCE, JUTE MESH, AND/OR EROSION CONTROL BLANKETS WILL BE
USED ON STEEP SLOPES AND WHEREVER NECESSARY TO CONTROL
EROSION AND SILTATION OF EXISTING DRAINAGE SYSTEMS AS ORDERED
BY THE ENGINEER OR SPECIFIED ON PLANS.
6. THE CONTRACTOR SHALL DESIGNATE A MEMBER OF HIS/HER FIRM TO BE
RESPONSIBLE TO MONITOR EROSION CONTROL, EROSION CONTROL
STRUCTURES, TREE PROTECTION AND PRESERVATION THROUGHOUT
CONSTRUCTION.
7. ALL DISTURBED AREAS SHALL BE PROTECTED FROM EROSION EITHER BY
MULCH OR TEMPORARY SEEDING WITHIN 2 WEEKS OF DISTURBANCE.
8. ALL SITE GRADING MUST BE PERFORMED TO INSURE POSITIVE DRAINAGE
ACROSS THE ENTIRE SITE, THROUGHOUT THE PERIOD OF
CONSTRUCTION AND AFTER PROJECT COMPLETION.
9. ALL SEDIMENTATION AND SOIL EROSION CONTROL MEASURES SHALL BE
CONSTRUCTED PRIOR TO THE COMMENCEMENT OF SITE GRADING AND
MUST CONFORM TO PART 91 OF ACT 451 OF THE PUBLIC ACTS OF 1994
AS AMENDED. ALL APPLICABLE PERMITS SHALL BE OBTAINED BEFORE
IMPLEMENTING THESE MEASURES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR MAINTAINING THE SEDIMENTATION AND SOIL
EROSION CONTROL MEASURES THROUGHOUT CONSTRUCTION.
10. IN GENERAL, EARTHWORK AND PAVEMENT CONSTRUCTION SHOULD BE
PERFORMED IN ACCORDANCE WITHE THE LATEST MDOT STANDARD
SPECIFICATIONS FOR CONSTRUCTION UNLESS OTHERWISE NOTED.
11. REMOVE ANY EXISTING TOPSOIL, ORGANIC SOILS, UNSUITABLE FILL,
VEGETATION, TREES AN OTHER DELETERIOUS MATERIALS TO EXPOSE
THE SUBGRADE SOIL, TREE ROOTS SHOULD BE COMPLETELY REMOVED.
12. EXCAVATE TO THE DEPTH OF THE FINAL SUBGRADE ELEVATION TO
ALLOW FOR GRADE CHANGES AND THE PLACEMENT OF THE
RECOMMENDED PAVEMENT SYSTEM.
13. ON SITE FILL MATERIAL CAN BE USED IF THE SPECIFIED COMPACTION
REQUIREMENTS CAN BE ACHIEVED. IF ON SITE MATERIAL IS USED, IT
SHOULD BE CLEAN AND FREE OF FROZEN SOIL, ORGANICS, OR OTHER
DELETERIOUS MATERIALS.
14. THE FINAL SUBGRADE SHOULD BE THOROUGHLY PROOFROLLED USING
A LOADED TANDEM AXLE TRUCK UNDER THE OBSERVATION OF
GEOTECHNICAL/PAVEMENT ENGINEER. LOOSE OR YIELDING AREAS THAT
CANNOT BE MECHANICALLY STABILIZED SHOULD BE REMOVED AND
REPLACED WITH ENGINEERED FILL OR AS DICTATED BY FIELD
CONDITIONS.
15. THE AGGREGATE BASE SHOULD BE COMPACTED TO ACHIEVE A MINIMUM
OF 95 PERCENT OF THE MAXIMUM MODIFIED PROCTOR DRY DENSITY.
THE BASE AND SUBGRADE COMPACTION SHOULD EXTEND A MINIMUM
OF 12 INCHES BEYOND THE PAVED EDGE OR BACK OF CURB.
PROPOSED TOP OF CURB / BOTTOM OF CURB
ELEVATION
PROPOSED SPOT ELEVATION
TC=78.01
BC=77.51
77.73
76 PROPOSED MINOR CONTOUR
72 EXISTING CONTOUR
75 PROPOSED MAJOR CONTOUR
PROPOSED SLOPE
FINISHED FLOOR ELEVATIONFF=77.73
2.5%
GRADING LEGEND:
EXISTING ELEVATIONEG=77.73
SCALE : 1"=30'1 GRADING PLAN
X75 1/2
.D
PL
YA
NK
EE
S
PR
IN
G S
SH
O
O
TI
NG
R
AN
G
E Y2
DA
TE
SH
EE
TI
DE
NT
IF
IC
AT
IO
N
NO
IS
SU
ED
F
OR
M id dl ev ille , M
I
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
L A
C H
, R A
, N C
A R
B , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FI
LE
N
O
P R
EL
IM
IN
A R Y
EN
GI
NE
ER
P
RO
JE
C T
NO
IN
D
EX
N O
FI
N A L R
EC
O R D
C O N S
TR
U C
TI
O N
DR
AW
N
DE
SI
GN
ED
AP
PR
OV
ED
C H
EC
KE
DK.
S.
W es t S ag in aw
H w y.
S ui te
La ns in g, M I 4 of fic e:
.8
.8 w w w .c ol lie rs en gi ne er in g.
co m
A.
A.
N.
A.
A.
N.
D.
M.
RIDGE LINE
SWALE
SWALE
SWALE
1" = 30' SCALE BAR
E5
E5
E5
E5
S53
2 793
E6 E8
E6 E8
E6 E8
E6 E8
E6 E8
E6 E8
-2 .7
E6 E8
E6 E8
E6 E8
-1.0%
E6 E8
E6 E8
-2.3%
-1 .5
-2 .6
-3.0%
-3.8%
SESC NOTES:
1. CONTRACTOR IS TO CONTACT THE DTMB OFFICE AT LEAST THREE (3)
DAYS PRIOR TO THE START OF CONSTRUCTION.
2. CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL
SOIL EROSION CONTROL MEASURES DURING CONSTRUCTION. SESC
MEASURES SHOULD BE CHECKED DAILY AND AFTER STORM EVENTS FOR
EFFECTIVENESS. OWNER SHALL MAINTAIN ALL PERMANENT SESC
MEASURES AFTER CONSTRUCTION IS COMPLETE. ALL SESC MEASURES
SHALL BE CHECKED MONTHLY FOR ONE YEAR FOR EFFECTIVENESS. ANY
MEASURES THAT HAVE FAILED SHALL BE REPAIRED AND/OR REPLACED.
3. ALL TEMPORARY S.E.C. MEASURES SHALL BE MAINTAINED 30 DAYS AFTER
CONSTRUCTION IS COMPLETE OR UNTIL GRADED AREAS ARE
STABILIZED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING
TEMPORARY SESC MEASURES.
4. ALL GRADED AREAS EXPOSED FOR MORE THAN 20 DAYS SHALL HAVE
STRAW MULCH APPLIED AT THE RATE OF 3 TONS / ACRE. AREAS NOT AT
FINISHED GRADE AND WHICH WILL BE DISTURBED AGAIN WITHIN ONE
YEAR MUST BE SEEDED AND MULCHED WITH QUICK GROWING
TEMPORARY SEEDING MIXTURE AND MULCH. AREAS WHICH ARE AT
FINISHED GRADE AND WILL NOT BE DISTURBED FOR A YEAR MUST BE
SEEDED AND MULCHED WITH A PERMANENT SEED MIXTURE.
5. ONLY LIMITED DISTURBANCE WILL BE PERMITTED TO PROVIDE ACCESS
TO THE SITE FOR GRADING AND TO CONSTRUCT SEDIMENT BASINS,
SEDIMENT TRAPS, DIVERSION TERRACES, INTERCEPTOR CHANNELS,
AND/OR CHANNELS OF CONVEYANCE AS APPROPRIATE.
6. EROSION AND SEDIMENTATION CONTROLS MUST BE CONSTRUCTED,
STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE WITH THE
TRIBUTARY AREAS OF THOSE CONTROLS.
7. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION MUST
BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS
OF ALL EROSION AND SEDIMENTATION CONTROL ON A DAILY BASIS
AND AFTER EACH STORM EVENT. ALL PREVENTATIVE AND REMEDIAL
MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT,
REGRADING, RESEEDING, REMULCHING, AND RENETTING, MUST BE
PERFORMED IMMEDIATELY.
8. APPROVAL OF THE SOIL EROSION PERMIT DOES NOT AUTHORIZE ANY
EARTH DISTURBANCE ACTIVITY OFF-SITE WITHOUT WRITTEN
PERMISSION FOR THAT EARTH DISTURBANCE ACTIVITY FROM THE
LANDOWNER.
9. NO DEWATERING IS PLANNED FOR THIS PROJECT. IF DEWATERING IS
REQUIRED, THE CONTRACTOR SHALL SUBMIT A DEWATERING PLAN FOR
APPROVAL TO THE DTMB AND/OR EGLE AS REQUIRED. NO DEWATERING
SHALL COMMENCE UNTIL APPROVAL HAS BEEN OBTAINED.
REFERS TO THE APPROPRIATE M.D.M.B. S.E.S.C.
KEYING SYSTEM DETAIL
SILT FENCE
LIMITS OF EARTH DISTURBANCE (0.70 ACRES)
SEED AND MULCH
COLOMA LOAMY SAND, 0 TO 6 PERCENT SLOPES
SOIL TYPES:
SESC LEGEND:
SEQUENCE OF CONSTRUCTION NOTES:
NOTE: THIS TEXT IS NOT INTENDED TO DICTATE A METHODS AND MEANS TO
THE CONTRACTOR. IT IS THE SUGGESTED PROCESS FOR
CONSTRUCTION ACTIVITIES IN ORDER TO MINIMIZE THE AMOUNT OF
SOIL EROSION TO THE SITE AND TO COMPLY WITH THE REQUIREMENTS
OF THE SOIL EROSION AND SEDIMENTATION CONTROL PERMIT. AS
PART OF THE PERMIT CONDITIONS, THE CONTRACTOR WILL BE HELD
TO THIS SCHEDULE AND TO THE SOIL EROSION PLAN. IF THE
CONTRACTOR SEES FIT, HE OR SHE MAY AMEND THIS SCHEDULE
AND/OR PLAN, BUT A REVISED WRITTEN SEQUENCING SCHEDULE
AND/OR SOIL EROSION PLAN MUST BE SUBMITTED TO THE DTMB FOR
APPROVAL PRIOR TO DEVIATING TO THIS SCHEDULE AND/OR PLAN.
STEP 1: INSTALL TEMPORARY SOIL EROSION CONTROL MEASURES
STEP 2: ROUGH GRADING: STRIPPING AND STOCKPILING TOPSOIL. AREAS
THAT WILL NOT BE FURTHER DISTURBED DURING THE COURSE OF
CONSTRUCTION SHALL BE IMMEDIATELY SEEDED WITH MULCH. EXCESS
MATERIAL SHALL EITHER BE STOCKPILED IN THE AREAS SHOWN ON THE
DRAWINGS, LEVELED ON SITE, OR DISPOSED OF OFF-SITE IN A LEGAL
MANNER. STOCKPILES SHALL BE TEMPORARILY STABILIZED WITH SILT
FENCE AND/OR TEMPORARY SEEDING.
STEP 4: BUILDING CONSTRUCTION
STEP 5: AREAS OUTSIDE THE INFLUENCE OF FURTHER CONSTRUCTION
ACTIVITIES SHALL BE FINAL GRADED AND STABILIZED WITH PERMANENT
SEED AND MULCH.
STEP 6: PAVING.
STEP 7: FINAL GRADING ALL REMAINING AREAS SHALL BE SEEDED AND
MULCHED WITHIN 5 DAYS OF FINAL GRADING.
STEP 8: TEMPORARY SOIL EROSION CONTROL MEASURES ARE TO BE REMOVED
WHEN PERMANENT MEASURES ARE IN PLACE AND THE AREA IS
STABILIZED.
CONTINUED MAINTENANCE OF ALL PERMANENT SOIL EROSION AND
SEDIMENTATION CONTROL MEASURES SHALL BE THE RESPONSIBILITY OF THE
OWNER. MAINTENANCE RESPONSIBILITIES SHALL BECOME A PART OF ANY SALES
OR EXCHANGE AGREEMENT FOR THE LAND ON WHICH THE PERMANENT SOIL
EROSION AND SEDIMENTATION CONTROL MEASURES ARE LOCATED.
SOIL EROSION/SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
C310
SCALE : 1"=30'1 SESC PLAN
X75 1/2
.D
PL
YA
NK
EE
S
PR
IN
G S
SH
O
O
TI
NG
R
AN
G
E Y2
DA
TE
SH
EE
TI
DE
NT
IF
IC
AT
IO
N
NO
IS
SU
ED
F
OR
M id dl ev ille , M
I
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
L A
C H
, R A
, N C
A R
B , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FI
LE
N
O
P R
EL
IM
IN
A R Y
EN
GI
NE
ER
P
RO
JE
C T
NO
IN
D
EX
N O
FI
N A L R
EC
O R D
C O N S
TR
U C
TI
O N
DR
AW
N
DE
SI
GN
ED
AP
PR
OV
ED
C H
EC
KE
DK.
S.
W es t S ag in aw
H w y.
S ui te
La ns in g, M I 4 of fic e:
.8
.8 w w w .c ol lie rs en gi ne er in g.
co m
A.
A.
N.
A.
A.
N.
D.
M.
SESC KEYING SYSTEM
1" = 30' SCALE BAR
X75 1/2
.D
PL
YA
NK
EE
S
PR
IN
G S
SH
O
O
TI
NG
R
AN
G
E Y2
DA
TE
SH
EE
TI
DE
NT
IF
IC
AT
IO
N
NO
IS
SU
ED
F
OR
M id dl ev ille , M
I
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
L A
C H
, R A
, N C
A R
B , D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FI
LE
N
O
P R
EL
IM
IN
A R Y
EN
GI
NE
ER
P
RO
JE
C T
NO
IN
D
EX
N O
FI
N A L R
EC
O R D
C O N S
TR
U C
TI
O N
DR
AW
N
DE
SI
GN
ED
AP
PR
OV
ED
C H
EC
KE
DK.
S.
W es t S ag in aw
H w y.
S ui te
La ns in g, M I 4 of fic e:
.8
.8 w w w .c ol lie rs en gi ne er in g.
co m
A.
A.
N.
A.
A.
N.
D.
M.
C311
GFI
36"
WP
GFI
WP
36"
GFI
36"
WP
LOAD DIAGRAMSDESIGN CRITERIA - GENERAL NOTES GENERAL NOTESGENERAL NOTES
A B L M N O
TY
P
3' -2
TYP
3' - 2"
TYP
3' - 2"
TY
P
3' -2
1.5
2.5
3.5
GENERAL
STRUCTURAL DESIGN CRITERIA
CAST-IN-PLACE CONCRETE
WOOD FRAMING
1. LUMBER SHALL BE GRADE STAMPED AS FOLLOWS:
A. STUDS, JOISTS, BEAMS, POSTS, ETC: AS NOTED ON PLANS
B. PLATES, BLOCKING: SPRUCE-PINE-FIR, SYP OR HEM-FIR STUD GRADE OR BETTER
2. ALL STRUCTURAL LUMBER WILL BE FREE OF SPLITS, CHECKS AND SHAKES.
3. NO WOOD MEMBER SHALL BE CUT, NOTCHED OR BORED, EXCEPT AS INDICATED ON THE STRUCTURAL
DRAWINGS. CONTACT THE ENGINEER OF RECORD PRIOR TO FRAMING MODIFICATIONS IF PENETRATIONS ARE
REQUIRED IN WOOD MEMBERS BY OTHER TRADES.
4. ALL TOPS OF COLUMNS AND WALLS SHALL BE ADEQUATELY BRACED UNTIL THE FLOOR DECK AND ROOF
SHEATHING ARE COMPLETELY NAILED IN PLACE.
5. ALL STRUCTURAL LUMBER SHALL BE FREE OF SPLITS, CHECKS AND SHAKES.
6. TYPICAL FASTENING OF WOOD FRAMING SHALL BE PER TABLE 2304.10.1 OF THE 2015 MICHIGAN BUILDING CODE, UNLESS OTHERWISE NOTED.
7. NAIL SIZES INDICATED ON THE DRAWINGS ARE BASED ON THE SIZES FOR COMMON NAILS. VERIFY THAT
DIAMETERS AND LENGTHS FOR COMMON NAILS ARE MET OR EXCEEDED IF POWER DRIVEN NAILS OR OTHER TYPES OF NAILS ARE UTILIZED. THE FOLLOWING ARE THE DIAMETERS AND LENGTHS FOR COMMON NAILS:
A. 8d / DIA-0.131" / LENGTH-2.5" B. 10d / DIA-0.148" / LENGTH-3" C. 16d / DIA-0.162" / LENGTH-3.5"
8. NAILS INTO SHEATHING SHALL BE DRIVEN SO THE HEAD IS FLUSH WITH THE SURFACE OF THE SHEATHING.
9. ALL WOOD SHEATHING (PLYWOOD OR OSB) SHALL BE RATED AS FOLLOWS:
A. ROOF - 5/8" APA SPAN RATED 32/16
B. WALL - 15/32" APA SPAN RATED 32/16
10. STEEL CONNECTORS IN CONTACT WITH TREATED LUMBER SHALL BE GALVANIZED WITH ASTM A653 G185 COATING OR HAVE AN ALTERNATIVE COATING APPROVED BY THE TREATMENT SUPPLIER. FASTENERS IN
CONTACT WITH TREATED LUMBER SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM A153.
11. WHERE STEEL CONNECTORS ARE SPECIFIED, FILL ALL PROVIDED FASTENER HOLES WITH FASTENERS SPECIFIED
BY THE MANUFACTURER.
DEFLECTION CRITERIA
FRAMING ELEMENT
ALLOWABLE DEFLECTION
FLOOR MEMBER
LOADING
DEAD+LIVE
LIVE
ROOF MEMBER
DEAD+LIVE
LIVE
DEFLECTION LIMIT
L/240 L/360 L/180 L/240
1. CAST-IN-PLACE CONCRETE WORK SHALL CONFORM TO THE ACI-318 "BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE" AND ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE."
2. ALL CONCRETE SHALL BE CONTROLLED CONCRETE, PROPORTIONED, MIXED AND PLACED IN THE PRESENCE OF A
REPRESENTATIVE OF AN APPROVED TESTING AGENCY.
3. PRIOR TO PLACEMENT OF CONCRETE, A FIELD REPRESENTATIVE SHALL BE INFORMED A MINIMUM OF 24 HOURS IN ADVANCE OF PLACEMENT, TO ALLOW FOR INSPECTION OF REINFORCING STEEL, AND PREPARATION FOR TAKING CONCRETE SAMPLES. INDEPENDENT TESTING IS REQUIRED FOR ALL CONCRETE PLACEMENTS. CONCRETE TO BE SAMPLE IN ACCORDANCE WITH ACI 318 AND APPLICABLE ASTM TESTING PROCEEDURES. QUANTITY OF SPECIMENS, FREQUENCY OF SAMPLING AND CYLINDER COMPRESSION TESTING SCHEDULE TO BE DETERMINED BY ACI 318, OWNERS REQUIREMENTS, AND / OR LOCAL JURISDICTION REQUIREMENTS, WHICHEVER IS MORE STRINGENT.
4. UNLESS NOTED OTHERWISE, STRUCTURAL CONCRETE SHALL HAVE THE FOLLOWING STRENGTH, AND DURABILITY
REQUIREMENTS:
EXPOSURE CLASS AIR MIN 28 DAY MAX W/C
TYPE F S W C CONTENT(*) COMP STRENGTH RATIO
INT SLAB-ON-GRADE F0 S0 W0 C0 1.0% - 3.0% 3000 PSI 0.55
EXT SLAB-ON-GRADE F3 S0 W0 C2 4.5% - 7.5% 5000 PSI 0.40
FDN/RETAINING WALLS F2 S0 W0 C1 4.5% - 7.5% 4500 PSI 0.45
EXT FOOTINGS/PIERS F2 S0 W0 C1 4.0% - 7.0% 4500 PSI 0.45
(*) AIR CONTENT ASSUMES TOTAL AIR CONTENT (ENTRAINED AND ENTRAPPED)
5. ALL CONCRETE EXPOSED TO THE WEATHER IN THE FINISHED PROJECT SHALL BE AIR ENTRAINED PER ACI 318
BASED ON AGGREGATE SIZE, OR PER EXPOSURE CLASS, WHICHEVER IS MORE STRINGENT.
6. UNLESS NOTED OTHERWISE, ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE (144 PCF +/-) WITH ALL CEMENT CONFORMING TO ASTM C150/C595, TYPE I / II. MAXIMUM AGGREGATE SIZE SHALL BE 1-1/2" FOR FOOTINGS AND 3/4"
FOR WALLS AND SLABS, CONFORMING TO ASTM C33.
7. CONTRACTOR SHALL SUBMIT A CONCRETE MIX DESIGN IN ACCORDANCE WITH ACI 318 FOR EACH TYPE OF CONCRETE APPLICABLE TO THE PROJECT PRIOR TO THE PLACEMENT OF CONCRETE FOR APPROVAL. THE ADDITION OF WATER AT THE PLANT OR IN THE FIELD GREATER THAN THE SPECIFIED WATER CONTENT IS PROHIBITED.
ADMIXTURE PRODUCT DATA SHALL BE SUBMITTED FOR APPROVAL.
8. THE USE OF HIGH EARLY STRENGTH CONCRETE MAY BE REQUESTED BY THE CONTRACTOR. MIX DESIGN DATA
USING FIELD CURED SPECIMENS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL.
9. ALL FORMWORK TO BE CONSTRUCTED IN ACCORDANCE WITH ACI-347 "GUIDE TO FORMWORK FOR CONCRETE" WITHIN TOLERANCE LIMITS DEFINED IN ACI-117 "SPECIFICATION FOR TOLERANCES FOR CONCRETE CONSTRUCTION
AND MATERIALS."
10. CONCRETE FOR FOOTINGS IS TO BE POURED ON THE SAME DAY AS THE SUBGRADE PREPARATION IS APPROVED BY
THE INDEPENDENT INSPECTION AGENCY / GEOTECHNICAL ENGINEER.
11. CONCRETE SHALL NOT BE POURED OVER STANDING WATER, SATURATED OR FROZEN SOILS.
12. STRUCTURAL STEEL BELOW GRADE SHALL BE ENCASED IN CONCRETE WITH A MINIMUM COVER OF 2".
13. REVIEW ALL ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR LOCATIONS AND
ELEVATIONS OF ALL SLAB PENETRATIONS, FLOOR DRAINS, EQUIPMENTS PADS, TRENCHES, CHASES, ANCHOR BOLTS, ETC. ALL SLOTS, SLEEVES AND OTHER EMBEDDED ITEMS SHALL BE SET BEFORE CONCRETE IS PLACED.
REFER TO APPLICABLE DRAWINGS FOR SIZES AND LOCATIONS.
14. PLUMBING LINES AND ELECTRICAL CONDUITS ARE TO BE PLACED BELOW (NOT WITHIN) THE SLAB ON GRADE.
VERTICAL PENETRATIONS ARE PERMITTED.
15. UTILITY PIPING SHALL NOT PASS THROUGH FOOTINGS. TOP OF UTILITY PIPING MUST BE ATLEAST 12" BELOW BOTTOM OF WALL FOOTINGS OR ABOVE OR OTHERWISE FOOTINGS MUST BE LOWERED. COORDINATE LOCATIONS WITH CIVIL AND MEP DRAWINGS. ALL PIPE PENETRATIONS THROUGH FOUNDATION WALLS SHALL BE SLEEVED.
PROVIDE SCHEDULE 40 PVC PIPE SLEEVES TWO SIZES LARGER THAN PROPOSED PIPE OR CONDUIT. DO NOT CUT
OR BEND MAIN REINFORCING STEEL AT SLEEVE LOCATIONS.
16. ANY CUTTING/CORING OF CONCRETE IS PROHIBITED UNLESS APPROVED BY THE EOR.
17. CONTRACTOR SHALL PROVIDE THE FOLLOWING CONTRACTION AND ISOLATION JOINTS IN SLABS ON GRADE.
• ISOLATION JOINTS AT COLUMNS SHALL BE 1/2" PREFORMED JOINT FILLER, DIAMOND SHAPED, AS INDICATED ON
THE TYPICAL DETAILS.
• UNLESS NOTED OTHERWISE ON DRAWINGS, PROVIDE CONTRACTION JOINTS AT COLUMN LINES AND ADDITIONALLY AS REQUIRED SO THAT THE SPACING DOES NOT EXCEED 12 FEET AND THE AREA BOUNDED BY
JOINTS LENGTH TO WIDTH RATIO NOT EXCEED 1.5 TO 1.
• BEGIN SAW CUTTING ONCE CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT DISLODGEMENT OF AGGREGATES. SAW CUTS ARE TO BE 1/4 SLAB DEPTH (1" MINIMUM) AND SHALL BE MADE WITHIN 12 HOURS OF
PLACING THE SLAB.
• AFTER CONCRETE PLACED FOR SLABS INSIDE THE BUILDING HAS CURED AND IS READY FOR PLACEMENT OF FLOOR FINISHES, ALL CONTROL JOINTS SHALL BE FILLED WITH AN APPROVED JOINT FILLER.
18. PROVIDE 1/2" PREFORMED JOINT FILLER AND CAULK WHERE ALL HORIZONTAL CONCRETE SURFACES MEET ANY
VERTICAL SURFACES.
19. PROVIDE 3/4" x 3/4" CHAMFER AT ALL EDGES OF EXPOSED CONCRETE COLUMNS, PIERS AND WALLS.
20. THE CONTRACTOR SHALL PROTECT THE CONCRETE FROM THE FOLLOWING IMMEDIATELY AFTER PLACEMENT:
• PREMATURE DRYING.
• HOT WEATHER, REFER TO ACI-305R "HOT WEATHER CONCRETING"
• COLD WEATHER / FREEZING, REFER TO ACI-306R "COLD WEATHER CONCRETING"
21. BEGIN THE SELECTED CURING METHOD OF CONCRETE SLABS WITHIN TWO HOURS AFTER SURFACE FINISHING OPERATIONS ARE COMPLETED. CURING METHOD SHALL REMAIN IN PLACE UNTIL THE CONCRETE HAS REACHED A
MINIMUM OF 75% OF THE REQUIRED 28 DAY COMPRESSIVE STRENGTH.
22. THE CONTRACTOR SHALL FINISH CONCRETE FLATWORK TO THE FOLLOWING RANDOM TRAFFIC FLOOR FINISH
TOLERANCES (ACI-117 4.8.5) WHEN MEASURED IN ACCORDANCE WITH ASTM E1155:
• SLAB ON GRADE
SPECIFIED OVERALL FF = 35 / FL = 25
MINIMUM LOCAL FF = 21 / FL = 15
* - LEVELNESS F-NUMBERS APPLY ONLY TO SLABS ON GRADE AND ELEVATED SLABS-ON-DECK THAT ARE
SHORED AT THE TIME OF TESTING.
1. DETAILING, FABRICATION, AND INSTALLATION OF REINFORCEMENT SHALL CONFORM TO ACI-318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE," AND THE MOST RECENT ADDITIONS OF SP-66 "ACI DETAILING
MANUAL" AND THE CRSI "MANUAL OF STANDARD PRACTICE."
2. STEEL REINFORCEMENT, UNLESS NOTED OTHERWISE, SHALL CONFORM TO THE FOLLOWING:
BARS, TIES, AND STIRRUPS ASTM A615 GRADE 60 (MIN. YIELD STRESS FY = 60 KSI)
WELDED WIRE FABRIC (WWF) ASTM A185
3. CONTRACTOR SHALL SUBMIT REBAR SHOP DRAWINGS FOR APPROVAL. PROVIDE AND SCHEDULE ON SHOP
DRAWINGS THE NECESSARY ACCESSORIES TO HOLD REINFORCEMENT SECURELY IN POSITION.
4. ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE WHILE PLACING CONCRETE. IF REQUIRED, ADDITIONAL BARS, STIRRUPS, OR CHAIRS SHALL BE PROVIDED BY THE CONTRACTOR TO FURNISH SUPPORT FOR ALL BARS.
• MAXIMUM OF 4'-0" OC SPACING FOR CHAIRS IN SLABS.
5. MINIMUM CONCRETE PROTECTIVE COVERING FOR REINFORCEMENT, UNLESS NOTED OTHERWISE, SHALL BE AS
FOLLOWS:
• UNFORMED SURFACES CAST AGAINST AND PERMANENTLY IN CONTACT WITH EARTH 3.0"
6. FORMED SURFACES IN CONTACT WITH EARTH OR EXPOSED TO WEATHER
#6 THROUGH #18 BARS 2.0"
#5 BARS, 5/8" WIRE AND SMALLER 1.5"
• FORMED SURFACES NOT IN CONTACT WITH EARTH OR EXPOSED TO WEATHER
WALLS, SLABS, JOISTS
#14 AND #18 BARS 1.5"
#11 BARS AND SMALLER 1.0"
• BEAMS, GIRDERS AND COLUMNS:
PRINCIPAL REINFORCEMENT, TIES, STIRRUPS OR SPIRALS 1.5"
7. WHERE CONTINUOUS REINFORCEMENT IS SPECIFIED IT SHALL BE EXTENDED CONTINUOUSLY AROUND CORNERS AND LAPPED AT NECESSARY SPLICES OR HOOKED AT DISCONTINUOUS ENDS. LAP SHALL BE CLASS B TENSION LAP SPLICES PER ACI 318, UNLESS NOTED OTHERWISE ON PLANS. STAGGER REINFORCING LAP SPLICES A
MINIMUM OF 6 FEET.
8. REINFORCEMENT SHALL BE CONTINUOUS THROUGH THE FOLLOWING, UNLESS NOTED OTHERWISE:
• CONSTRUCTION JOINTS
• FOUNDATION WALL REINFORCEMENT SHALL BE CONTINUOUS THROUGH COLUMN PIERS
9. WHERE REINFORCEMENT IS NOT SHOWN ON DRAWINGS PROVIDE REINFORCEMENT IN ACCORDANCE WITH APPLICABLE DETAILS AS DETERMINED BY THE ARCHITECT. IN NO CASE SHALL REINFORCEMENT BE LESS THAN
THE MINIMUM REINFORCEMENT PERMITTED BY THE APPLICABLE CODES.
10. WHERE REINFORCEMENT IS REQUIRED IN SECTION, REINFORCEMENT IS CONSIDERED TYPICAL WHEREVER THE
SECTION APPLIES.
11. DOWELS FROM FOOTINGS INTO WALLS AND PIERS SHALL MATCH BAR SIZE AND NUMBER, UNLESS NOTED
OTHERWISE.
12. WELDED WIRE FABRIC
• SHALL BE IN FLAT SHEETS
• LAP SHEETS ONE AND ONE-HALF SPACES (6" MINIMUM) AND WIRE TOGETHER AT 3'-0" OC MAX.
• SUPPORT SHEETS WITH APPROVED SLAB BOLSTERS OR CHAIRS AT NOT MORE THAN 4'-0" OC IN EACH
DIRECTION AT THE PROPER ELEVATION.
• SEE NOTES, TYPICAL DETAILS AND PLANS FOR MATERIAL, SIZE AND LOCATION.
13. REINFORCEMENT SHALL NOT BE TACK WELDED.
14. PROVIDE 2 - #4 x 3'-0" LONG TOP BARS AT ALL RE-ENTRANT CORNERS IN SLAB-ON-GRADE CONSTRUCTION.
15. INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AND A FIELD REPRESENTATIVE SHALL BE INFORMED A
MINIMUM OF 24 HOURS IN ADVANCE OF CONCRETE PLACEMENT, TO ALLOW FOR INSPECTION OF THE
REINFORCING STEEL.
CONCRETE REINFORCEMENT
1. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING LOCAL MUNICIPAL CODES AND SPECIFICATIONS (INCLUDING SUPPLEMENTS) FOR THIS TYPE OF CONSTRUCTION. THE STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE GOVERNING CODES AND
REFERENCED STANDARDS LISTED BELOW.
2. THE STRUCTURAL DRAWINGS ARE INTENDED TO BE USED IN CONJUNCTION WITH THE ARCHITECTURAL DRAWINGS AND ALL OTHER APPLICABLE DISCIPLINE DRAWINGS. ANY CONFLICT BETWEEN NOTES, DETAILS, AND SPECIFICATIONS, THE MOST RIGID REQUIREMENTS SHALL GOVERN.
3. THE CONTRACTOR SHALL NOT MAKE DEVIATIONS FROM THE DESIGN DOCUMENTS WITHOUT WRITTEN APPROVAL FROM THE ARCHITECT AND/OR ENGINEER OF RECORD (EOR). CHANGES BY THE CONTRACTOR, DUE TO CONTRACTOR PROPOSED ALTERNATIVES OR TO CORRECT CONTRACTOR ERRORS/OMISSIONS, MUST BE SUBMITTED TO THE ARCHITECT/E.O.R FOR APPROVAL. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS INCLUDING ENGINEERING FEES FOR REVIEW, OBSERVATIONS, STRUCTURAL CALCULATIONS, AND REVISIONS.
THE CONTRACTOR SHALL ALSO PROCESS THE REVISED PLANS REFLECTING ALL SUBSTITUTIONS THROUGH
THE APPROPRIATE OFFICE OF ALL GOVERNING AGENCIES.
4. THE STRUCTURE IS DESIGNED AS SELF SUPPORTING AFTER THE BUILDING IS FULLY COMPLETED. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION METHODS, PROCEDURES AND SEQUENCES, UNLESS SPECIFICALLY INDICATED ON THE DRAWINGS. TEMPORARY BRACING, SHEETING, SHORING/ETC., TO ENSURE THE STRUCTURAL STABILITY OF THE NEW STRUCTURE, EXISTING STRUCTURES, SIDEWALKS, AND UTILITIES, IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED IN THE LOCAL JURISDICTION. LOADS GREATER THAN THE INDICATED DESIGN LIVE LOADS SHALL NOT BE PLACED ON THE STRUCTURE. ALL CONSTRUCTION PROCESSES SHALL MEET ALL APPLICABLE OSHA
REQUIREMENTS.
5. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE ENGINEER FREE AND HARMLESS OF ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THE PROJECT, EXCEPT FOR
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE ENGINEER.
6. ALL SECTIONS AND DETAILS, WHETHER EXPLICITLY CUT ON PLAN OR NOT, SHALL BE CONSIDERED TYPICAL AND SHALL APPLY AT SIMILAR CONDITIONS. SIGNIFICANT ADJUSTMENTS ACCOUNTING FOR VARYING CONDITIONS IN THE FIELD SHOULD BE SUBMITTED TO ARCHITECT AND/OR EOR FOR APPROVAL AND BE RESOLVED PRIOR TO
BEGINNING WORK.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AND COORDINATION INVOLVED TO PROVIDE OPENINGS, CHASES, EQUIPMENT PADS, HANGERS, INSERTS, SLEEVES, ETC. INDICATED ON ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS. OPENINGS SHOWN ON THE STRUCTURAL DRAWINGS
SHALL NOT BE REVISED WITHOUT APPROVAL FROM THE ARCHITECT AND/OR EOR.
8. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL DIMENSIONS AND INFORMATION NOT SHOWN.
WORKING DIMENSIONS SHALL NOT BE SCALED FROM STRUCTURAL PLANS, SECTIONS, OR DETAILS. ANY REFERENCE TO WATERPROOFING AND FIREPROOFING ON THE STRUCTURAL DRAWINGS ARE FOR REFERENCE
ONLY, SEE ARCHITECTURAL DRAWINGS FOR SPECIFIC REQUIREMENTS.
9. CONTRACTOR SHALL VISIT THE SITE AND VERIFY EXISTING CONDITIONS AND UTILTIES PRIOR TO STARTING ANY CONSTRUCTION. [STRUCTURAL MEMBER INFORMATION INDICATED AS EXISTING (EXST) ON DRAWINGS WAS OBTAINED DURING LIMITED FIELD OBSERVATIONS AND/OR FROM LIMITED DRAWINGS IF AVAILABLE. ACTUAL CONDITIONS MAY DIFFER FROM THAT WHICH IS INDICATED ON PLAN. IF FIELD CONDITIONS VARY FROM THOSE SHOWN ON CONTRACT DOCUMENTS, THE CONTRACTOR IS TO CONTACT THE ARCHITECT IMMEDIATELY.
10. SEISMIC DESIGN AND ANCHORAGE OF NON-STRUCTURAL COMPONENTS TO BE IN ACCORDANCE WITH ASCE 7-10 / REFERENCE STANDARDS BELOW AND ANY LOCAL MUNICIPAL CODES. SEISMIC ANCHORAGES OF NON-
STRUCTURAL COMPONENTS ARE NOT INDICATED ON THESE STRUCTURAL DRAWINGS, REFER TO
ARCHITECTURAL AND MEP DRAWINGS FOR MORE INFORMATION.
11. THESE DRAWINGS DO NOT DEFINE THE ENTIRE SCOPE OF THE CONTRACTOR OR SUBCONTRACTOR CONTRACTS. REFER TO ALL APPLICABLE ARCHITECTURAL, STRUCTURAL, AND OTHER DISCIPLINE DRAWINGS
AS REQUIRED.
1. A GEOTECHNICAL REPORT HAS NOT BEEN PROVIDED FOR THIS SITE. THE CONTRACTOR, THROUGH THE CLIENT, IS RESPONSIBLE FOR OBTAINING A GEOTECHNICAL REPORT TO CONFIRM THE PRESUMPTIVE LOAD BEARING VALUES (IBC TABLE 1806-2) UNLESS WAIVED BY THE BUILDING OFFICIAL. COLLIERS ENGINEERING & DESIGN ASSUMES NO LIABILITY FOR THESE DESIGN ASSUMPTIONS OR FOR ANY FOUNDATION REDESIGN NECESSITATED
BY DIFFERING SOIL CONDITIONS.
2. FOUNDATION SYSTEM - CONCRETE WALLS, SLABS-ON-GRADE AND SPREAD FOOTINGS.
3. EXTERIOR CONSTRUCTION SHALL BE FOUNDED BELOW FINISHED GRADE AT A MINIMUM DEPTH OF 3'-6", UNLESS
NOTED OTHERWISE.
4. FOUNDATION UNITS SHALL BE CENTERED UNDER SUPPORTED STRUCTURAL MEMBERS, UNLESS NOTED
OTHERWISE ON THE DRAWINGS.
5. ALL FOUNDATION ELEMENTS ARE TO BE PLACED ON UNDISTURBED APPROVED NATIVE SOIL OR ON 1'-0"
MINIMUM APPROVED COMPACTED STRUCTURAL FILL. STRUCTURAL FILL SHALL EXTEND 1'-0" MINIMUM BEYOND THE FOUNDATION ELEMENT AND THEN DOWNWARD TO NATURAL SOILS AT A SLOPE OF 2 HORIZ. TO 1 VERT.
6. EACH PRIME CONTRACTOR SHALL PROVIDE ALL TRENCHING WORK REQUIRED FOR ITS CONTRACT, INCLUDING TRENCH EXCAVATION, AND BACKFILL (WITH ACCEPTABLE FILL, SEE GEOTECHNICAL REPORT) TO WITHIN 1'-0" OF FINISH GRADE/FLOOR. ALL TRENCHING WORK WITHIN THE BUILDING FOOTPRINT SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. GENERAL CONTRACTOR MUST ACCEPT, IN WRITING, THE QUALITY OF THE TRENCH BACKFILL OF OTHER PRIME CONTRACTORS BEFORE BEGINNING WORK OVER THE TOP OF THE TRENCH.
7. EXCAVATION AND BACKFILL OPERATIONS SHALL BE MAINTAINED IN A DRY CONDITION. SURFACE AND INFILTRATING WATER SHALL BE REMOVED BY SITE GRADING AND PUMPING FROM SUMPS AS REQUIRED.
8. NO FOUNDATION CONCRETE SHALL BE PLACED IN WATER OR ON FROZEN SUBGRADE MATERIAL.
9. PROTECT IN-PLACE FOUNDATIONS AND SLABS FROM FROST PENETRATION UNTIL THE PROJECT IS COMPLETED.
10. THE CONTRACTOR IS RESPONSIBLE FOR EXCAVATION SAFETY. EXCAVATIONS MUST BE PERFORMED IN
ACCORDANCE WITH THE CURRENT OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
11. PROVIDE TEMPORARY OR PERMANENT SUPPORTS WHETHER SHORING, SHEETING OR BRACING SO THAT NO
HORIZONTAL MOVEMENT OR VERTICAL SETTLEMENT OCCURS TO EXISTING STRUCTURES, STREETS OR
UTILITIES ADJACENT TO THE PROJECT SITE.
FOUNDATION NOTES
A. GOVERNING CODES
a. BUILDING CODE 2015 MICHIGAN BUILDING CODE
b. GENERAL DESIGN LOADS ASCE 7-10
c. CONCRETE ACI 318-14
d. WOOD AWC NDS-2015 & SDPWS-08
e. STEEL FRAMING AISC 360-10 & AISC 341-10
B. RISK CATEGORY II
C. ROOF
a. DEAD LOAD
• ROOFING 03 PSF
• SHEATHING 03 PSF
• MISC 04 PSF
• STRUCTURE 06 PSF
• TOTAL ROOF DEAD LOAD 16 PSF
b. LIVE LOAD 20 PSF
D. GROUND FLOOR (SLAB-ON-GRADE)
a. LIVE LOAD 100 PSF
E. SNOW LOADS
a. GROUND SNOW LOAD Pg 35 PSF
b. FLAT ROOF SNOW LOAD Pf 29.4 PSF
F. WIND LOADS
a. WIND VELOCITY 115 MPH
b. EXPOSURE CATEGORY B
c. ENCLOSURE CLASSIFICATION PARTIALLY ENCLOSED
G. SEISMIC DESIGN DATA
a. SEISMIC DESIGN CATEGORY B
b. SEISMIC IMPORTANCE FACTOR 1.00
c. SEISMIC SITE CLASS (SOILS) B
d. SEISMIC RESISTING SYSTEM
• BUILDING FRAME SYSTEMS
• LIGHT-FRAME (WOOD) WALLS
e. RESPONSE MODIFICATION FACTOR 7.0
f. DEFLECTION AMPLIFICATION FACTOR 4.5
g. EARTHQUAKE SPECTRAL RESPONSE
• ACCELERATION AT SHORT PERIODS Ss = 0.080
h. EARTHQUAKE SPECTRAL RESPONSE
• ACCELERATION, PERIOD = 1 SECOND S1 = 0.046
i. DESIGN 5% DAMPED, SPECTRAL RESPONSE
• ACCELERATION AT SHORT PERIODS SDS = 0.085
j. DESIGN 5% DAMPED, SPECTRAL RESPONSE
ACCELERATION, PERIOD = 1 SECOND SD1 = 0.074
k. SEISMIC BASE SHEAR V = 0.012 W
l. ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE PROCEDURE
COMPONENT AND CLADDING WIND LOAD SCHEDULE
ROOF ENCLOSURE STRUCTUREEFFECTIVE
WIND AREA
(SQ FT) CORNER ZONE (PSF)
5/-46
5/-38
4/-26
EDGE ZONE (PSF)
3/-18
5/-30
5/-26
4/-21
3/-18
<= 10
INTERIOR ZONE (PSF)
5/-16
5/-16
4/-15
3/-15
WALL ENCLOSURE STRUCTURE
EDGE ZONE (PSF)
16/-23
16/-21
14/-19
14/-18
INTERIOR ZONE (PSF)
16/-18
16/-17
14/-16
14/-15
3/-18 3/-18>=500 3/-15 12/-13 12/-13
NOTES:
1. SEE ASCE 7-10, CHAPTER 30, PART 3. BUILDINGS WITH H < 60 FT FOR DESIGN METHOD USED TO CALCULATE
ULTIMATE COMPONENT AND CLADDING WIND LOADS. LOADS SHOWN IN TABLE ABOVE ARE ULTIMATE
COMPONENT AND CLADDING WIND LOADS
2. PER ASCE 7-10, CHAPTER 30. SECTION 30.2.2, THE MINIMUM ULTIMATE COMPONENT AND CLADDING DESIGN WIND PRESSURES SHALL NOT BE LESS THAN A NET PRESSURE OF 16.0 PSF ACTING IN EITHER DIRECTION
NORMAL TO THE SURFACE
3. POSITIVE PRESSURES ACT TOWARDS THE SURFACE. NEGATIVE PRESSURES ACT AWAY FROM THE SURFACE
4. LINEARLY INTERPOLATE PRESSURES FOR EFFECTIVE WIND AREAS BETWEEN THOSE SCHEDULED OR USE
PRESSURES FOR THE SMALLER EFFECTIVE WIND AREA
INTERIOR ZONE
EDGE ZONE
CORNER ZONE
X75 1/2
.D
PL
YA
NK
EE
SP
RI
NG
S
SH
O O
TI
NG
RA
NG
E Y2
DA
TE
SH
EE
T
ID
EN
TI
FI
C
AT
IO
N
NO
IS
SU
ED
FO
R
M id dl ev ille ,M
I
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y ,M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
LA
C
H ,R
A ,N
C A
R B
,D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
RV
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FI
LE
N O
P R
EL
IM
IN
A R Y
EN
GI
NE
ER
PR
OJ
EC
T
NO
IN
D
EX
N O
FI
N A L
R
EC
O R D
C O N S
TR
U C
TI
O N
DR
AW
N
DE
SI
GN
ED
AP
PR
OV
ED
C H
EC
KE
D
P.
A.
K
D.
P.
L.
R.
E.
G.
W es t S ag in aw
H w y.
S ui te
La ns in g, M I 4 of fic e:
.8
.8 w w w .c ol lie rs en gi ne er in g.
co m D.
P.
L.
R.
E.
G.
D.
P.
L.
R.
E.
G.
S001
1-
SCALE : 12" = 1'-0"1 COMPONENT AND CLADDING WIND LOAD SCHEDULE
A201
A2012
A201
A301
A301
CA
NO
PY
O
VE
RH
AN
G
ENTRANCE
STORAGE
FACILITY
CANOPY OVERHANG
LANE #1
LANE #2
SL
O
PE
DO
W N
1/ 2%
LANE #4
LANE #1
LANE #2
LANE #3
LANE #4
SH
O
O
TI
NG
AR
EA
BENCHES
N.I.C.
A B C D E F G H I J K L M
8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0"
N O
112' - 0"
5' -6
5'
-6
5' -6
5'
-6
5' -0
5'
-0
7/
8"
0"
4' - 1" 3' - 11" 8' - 0" 2' - 6"
92' - 1" 14' - 5" 5' - 6"
112' - 0"
7/
8" 5'
-1 1/
8" 5'
-6
5' -6
5'
-1 1/
8"
7/ 8"
A501
A501
A501
1.5
2.5
3.5 A501
A501
SIDING TO INTERIOR
SIDING TO INTERIOR
SIDING TO EXTERIOR
SIDING TO EXTERIOR
A501
1/
4"
A501
A501
Sim
SL
O
PE
DO
W N
1/ 2%4
A103
LANE #3
A522
A. ALL WOOD MUST BE PRESSURE TREATED OR APPROVED
OTHERWISE BY OWNER.
B. REFER TO DETAIL A-103 FOR SPECIFIC INFORMATION ON CONCRETE
SLAB SLOPES AND POST ELEVATIONS.
C. ALL ROOF LINE AND BEAM ELEVATIONS ARE LEVEL AND DO NOT
FOLLOW THE FINISH CONCRETE SLAB GRADE. REFER TO SECTION
CUTS AND ELEVATIONS FOR SPECIFIC INFORMATION.
D. ALL FASTENERS, WOOD MEMBERS, SHEATHING, ROOFING,
CONCRETE MIX DESIGNS, AGGREGATE MATERIAL, COLUMN
ANCHORS, JOIST HANGERS, POST CAPS, AND HURRICANE STRAPS
MUST BE SUBMITTED AND APPROVED BY THE OWNER PRIOR TO
INSTALLATION OF THE SPECIFIC MATERIAL.
E. DEFLECTION MEMBERS WILL BE PLACED 1.0' O.C. AT 45 (DEG) TO THE
HORIZONTAL PLANE. THE GLARE SCREENS WILL BE STAGGERED
BETWEEN EACH SHOOTING LANE BY 0.5'. (REFER TO FRAMING PLAN
FOR LAYOUT AND SECTION A-104 FOR HORIZONTAL ALIGNMENT.)
F. TONGUE AND GROOVE SIDING IS TO BE FASTENED ON THE INTERIOR
SIDE OF THE ARCHERY RANGE WITH NO GAPS OR BREAKS
THROUGHOUT THE LENGTH OF THE WALL.
G. PROVIDE A 2" SPACE BETWEEN THE TOP OF GRADE AND THE
BOTTOM OF THE TONGUE AND GROOVE SIDING. THIS EXCLUDES THE
STORAGE FACILITY.
H. THE FOOTING AND SLABS ARE TO BE PLACED SEPARATELY.
FOOTINGS ARE REQUIRED TO BE PLACED FIRST FOLLOWED BY THE
SLAB.
I. ALL LUMBER TO BE SYP #1 OR BETTER, UNLESS NOTED OTHERWISE.
J. INDICATES 2-2x4 KNEE BRACE AT 45 DEGREES. BOTTOM OF
BRACE @ 3' BELOW TOP OF POST.
GENERAL NOTES
7' -0
2"
2" 3' - 0" 2"
GALV. H.M.
FRAME,
PAINTED
GALV. H.M.
DOOR, PAINTED
DOOR HARDWARE SETS:
3 EA
1 EA
1 EA
1 EA
1 EA
1 EA
3 EA
HINGE MPB91 x NRP 4 1/2" x 4 1/2" US32D McKINNEY
CYLINDRICAL STROREROOM LOCK 3480 SCC MK ARC US32D McKINNEY
SURFACE CLOSER 5100 HDCS ALM HAGER
THRESHOLD 424 36" NATIONAL GUARD
GASKETING 160VA 1/36" 2/84" NATIONAL GUARD
SWEEP C627A X 36" NATIONAL GUARD
SILENCER 608 ROCKWOOD
X75 1/2
.D
PL
YA
NK
EE
SP
RI
NG
S
SH
O O
TI
NG
RA
NG
E Y2
DA
TE
SH
EE
T
ID
EN
TI
FI
C
AT
IO
N
NO
IS
SU
ED
FO
R
M id dl ev ille ,M
I
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y ,M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
LA
C
H ,R
A ,N
C A
R B
,D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
RV
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FI
LE
N O
P R
EL
IM
IN
A R Y
EN
GI
NE
ER
PR
OJ
EC
T
NO
IN
D
EX
N O
FI
N A L
R
EC
O R D
C O N S
TR
U C
TI
O N
DR
AW
N
DE
SI
GN
ED
AP
PR
OV
ED
C H
EC
KE
D
P.
A.
K
D.
P.
L.
R.
E.
G.
W es t S ag in aw
H w y.
S ui te
La ns in g, M I 4 of fic e:
.8
.8 w w w .c ol lie rs en gi ne er in g.
co m D.
P.
L.
R.
E.
G.
D.
P.
L.
R.
E.
G.
A101
1-
1-
SCALE : 3/16" = 1'-0"1 FLOOR PLAN
N
SCALE : 1/4" = 1'-0"
DOOR - TYPE 12
A201 3
A B C D E F G H I J K L M N O
EDGE OF CONCRETE SLAB
1/ 2%
SH
EE
T
DR
AI
N
1/ 2%
SH
EE
T
DR
AI
N
8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0"
112' - 0"
5' -6
5'
-6
5' -6
5'
-6
5' -0
5'
-0
0"
1.5
2.5
3.5
A103
F.2.0F.2.0
F.2.0 F.2.0 F.2.0
F.2.0 F.2.0 F.2.0
F.2.0
F.2.0
F.2.0
F.2.0
F.2.0F.2.0F.2.0
F.2.0 F.2.0
F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5
F.1.5
F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5 F.1.5
F.1.5F.1.5F.1.5F.1.5F.1.5F.1.5F.1.5F.1.5F.1.5F.1.5F.1.5F.1.5
F.1.5
0' - 0"
-0' - 1"
0' - 0"
RIDGE
6" SLAB ON GRADE JOINTED @
12' OC AND AROUND COLUMNS
W/6X6 - W1.4 X W1.4 WWF
1/
4"
14' - 5 1/4" 5' - 5 7/8"
6" SLAB ON GRADE JOINTED @
12' OC AND AROUND COLUMNS
W/6X6 - W1.4 X W1.4 WWF
6"
A. ALL WOOD MUST BE PRESSURE TREATED OR APPROVED
OTHERWISE BY OWNER.
B. REFER TO DETAIL A-103 FOR SPECIFIC INFORMATION ON CONCRETE
SLAB SLOPES AND POST ELEVATIONS.
C. ALL ROOF LINE AND BEAM ELEVATIONS ARE LEVEL AND DO NOT
FOLLOW THE FINISH CONCRETE SLAB GRADE. REFER TO SECTION
CUTS AND ELEVATIONS FOR SPECIFIC INFORMATION.
D. ALL FASTENERS, WOOD MEMBERS, SHEATHING, ROOFING,
CONCRETE MIX DESIGNS, AGGREGATE MATERIAL, COLUMN
ANCHORS, JOIST HANGERS, POST CAPS, AND HURRICANE STRAPS
MUST BE SUBMITTED AND APPROVED BY THE OWNER PRIOR TO
INSTALLATION OF THE SPECIFIC MATERIAL.
E. DEFLECTION MEMBERS WILL BE PLACED 1.0' O.C. AT 45 (DEG) TO THE
HORIZONTAL PLANE. THE GLARE SCREENS WILL BE STAGGERED
BETWEEN EACH SHOOTING LANE BY 0.5'. (REFER TO FRAMING PLAN
FOR LAYOUT AND SECTION A-104 FOR HORIZONTAL ALIGNMENT.)
F. TONGUE AND GROOVE SIDING IS TO BE FASTENED ON THE INTERIOR
SIDE OF THE ARCHERY RANGE WITH NO GAPS OR BREAKS
THROUGHOUT THE LENGTH OF THE WALL.
G. PROVIDE A 2" SPACE BETWEEN THE TOP OF GRADE AND THE
BOTTOM OF THE TONGUE AND GROOVE SIDING. THIS EXCLUDES THE
STORAGE FACILITY.
H. THE FOOTING AND SLABS ARE TO BE PLACED SEPARATELY.
FOOTINGS ARE REQUIRED TO BE PLACED FIRST FOLLOWED BY THE
SLAB.
I. ALL LUMBER TO BE SYP #1 OR BETTER, UNLESS NOTED OTHERWISE.
J. INDICATES 2-2x4 KNEE BRACE AT 45 DEGREES. BOTTOM OF
BRACE @ 3' BELOW TOP OF POST.
GENERAL NOTES
SLAB HIGH POINT
0' - 0"
4" MIN. SAND SUBBASE
6" MIN CONCRETE SLAB
1/2" EXPANSION JOINT TYP.
8X8 WOOD POST
SIMPSON POST BASE MPB88Z
4-#5 BARS VERT W/ #4 TIES AT
12" OC W/2 IN TOP 12"
2'-0" DIA CONCRETE FOOTING
4' -0
EQEQ
5/4" TONGUE AND GROOVE WOOD
SIDING
2" SLAB HIGH POINT
0' - 0"
4" MIN. SAND SUBBASE
6" MIN CONCRETE SLAB
1/2" EXPANSION JOINT TYP. AROUND
COLUMN.
8X8 WOOD POST
SIMPSON POST BASE MPB88Z
4' -6
4-#5 BARS VERT W/ #4 TIES AT
12" OC W/2 IN TOP 12"
1'-6" DIA CONCRETE
FOOTING
VA
RI
ES
EQ EQ
SLAB HIGH POINT
0' - 0"
1/2"3 1/2"1 1/4"
5/4" TONGUE AND GROOVE
WOOD SIDING
1/2" PLYWOOD SHEATHING
4" SAND
SUBBASE
6" MIN. CONCRETE SLAB
1/2" EXPANSION JOINT
6"
1 6" 6"
2x4 WOOD STUD @ 1'-4" O.C.
2x4 P.T. SILL PLATE
6" CONCRETE SLAB
5" BARS @ TOP & BOTTOM.
#4 @ 18" LONG BENT
DOWELS AT 18" O.C.
X75 1/2
.D
PL
YA
NK
EE
SP
RI
NG
S
SH
O O
TI
NG
RA
NG
E Y2
DA
TE
SH
EE
T
ID
EN
TI
FI
C
AT
IO
N
NO
IS
SU
ED
FO
R
M id dl ev ille ,M
I
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y ,M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
LA
C
H ,R
A ,N
C A
R B
,D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
RV
IC
ES
A
D M
IN
IS
TR
A
TI
O
N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
FI
LE
N O
P R
EL
IM
IN
A R Y
EN
GI
NE
ER
PR
OJ
EC
T
NO
IN
D
EX
N O
FI
N A L
R
EC
O R D
C O N S
TR
U C
TI
O N
DR
AW
N
DE
SI
GN
ED
AP
PR
OV
ED
C H
EC
KE
D
P.
A.
K
D.
P.
L.
R.
E.
G.
W es t S ag in aw
H w y.
S ui te
La ns in g, M I 4 of fic e:
.8
.8 w w w .c ol lie rs en gi ne er in g.
co m D.
P.
L.
R.
E.
G.
D.
P.
L.
R.
E.
G.
A103
1-
1-
SCALE : 3/16" = 1'-0"1 FOUNDATION PLAN N
SCALE : 3/4" = 1'-0"2 FOOTING F.2.0 DETAIL
SCALE : 3/4" = 1'-0"3 FOOTING F.1.5 DETAIL
SCALE : 1 1/2" = 1'-0"4 DETAIL
A301
A301
A B C D E F G H I J K L M N O
CA
NO
PY
O
VE
RH
AN
G
CANOPY OVERHANG2' - 1"
8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0"
8' - 0" 88' - 0" 16' - 0"
112' - 0"
5' -6
5'
-6
5' -6
5'
-6
5' -0
5'
-0
0"
EQ
.S P.
5' -6
EQ
.S
P.
5'
-6
EQ
SP
0"
EQ
SP
0"
0"
0"
0"
2-2x8 TYP 2-2x8 TYP
2-2x8 TYP2-2x8 TYP
2- 2x
2- 2x
2- 2x
2- 2x
2- 2x
2- 2x
3- 2x
2-
2x
2- 2x
2x8 TYP2-2x8 TYP
2x8 TYP
2- 2x
TY
P
1' - 0"
2-2x8 LOW
2-2x8
2x8 LOW
2x8 @ 12" O.C.
45 DEG ANGLE
TYP.
2x8 TYP
EQ
SP
EQ
SP
8x8 COLUMN TYP.
2- 2x
2-
2x
2- 2x
LO
W 2-
2x
LO
W
1.5
2.5
3.5
2' - 1"
A104
A104 3 4
A521
5' -3
7/ 8"
5' -6
5'
-6
5' -3
7/ 8"
A522
2' - 1"
2' - 1"
2' -1
2' - 0 1/8" 2' - 1"
2' -1
2' - 1"
2' -1
2' - 1"
2' -1
2' -1
2x6 RAKING @
1'-4" ALONG
SLOPE
2x6 RAKING @
1'-4" ALONG
SLOPE
2x6 RAKING @
1'-4" ALONG
SLOPE
2x6 RAKING @
1'-4" ALONG
SLOPE
KNEE BRACE. TYP.
TYP.
TYP.
2x4 KNEE
WALL (ABOVE
BEAM)
2x8 TYP
2x8 TYP 2x8 TYP
A. ALL WOOD MUST BE PRESSURE TREATED OR APPROVED
OTHERWISE BY OWNER.
B. REFER TO DETAIL A-103 FOR SPECIFIC INFORMATION ON CONCRETE
SLAB SLOPES AND POST ELEVATIONS.
C. ALL ROOF LINE AND BEAM ELEVATIONS ARE LEVEL AND DO NOT
FOLLOW THE FINISH CONCRETE SLAB GRADE. REFER TO SECTION
CUTS AND ELEVATIONS FOR SPECIFIC INFORMATION.
D. ALL FASTENERS, WOOD MEMBERS, SHEATHING, ROOFING,
CONCRETE MIX DESIGNS, AGGREGATE MATERIAL, COLUMN
ANCHORS, JOIST HANGERS, POST CAPS, AND HURRICANE STRAPS
MUST BE SUBMITTED AND APPROVED BY THE OWNER PRIOR TO
INSTALLATION OF THE SPECIFIC MATERIAL.
E. DEFLECTION MEMBERS WILL BE PLACED 1.0' O.C. AT 45 (DEG) TO THE
HORIZONTAL PLANE. THE GLARE SCREENS WILL BE STAGGERED
BETWEEN EACH SHOOTING LANE BY 0.5'. (REFER TO FRAMING PLAN
FOR LAYOUT AND SECTION A-104 FOR HORIZONTAL ALIGNMENT.)
F. TONGUE AND GROOVE SIDING IS TO BE FASTENED ON THE INTERIOR
SIDE OF THE ARCHERY RANGE WITH NO GAPS OR BREAKS
THROUGHOUT THE LENGTH OF THE WALL.
G. PROVIDE A 2" SPACE BETWEEN THE TOP OF GRADE AND THE
BOTTOM OF THE TONGUE AND GROOVE SIDING. THIS EXCLUDES THE
STORAGE FACILITY.
H. THE FOOTING AND SLABS ARE TO BE PLACED SEPARATELY.
FOOTINGS ARE REQUIRED TO BE PLACED FIRST FOLLOWED BY THE
SLAB.
I. ALL LUMBER TO BE SYP #1 OR BETTER, UNLESS NOTED OTHERWISE.
J. INDICATES 2-2x4 KNEE BRACE AT 45 DEGREES. BOTTOM OF
BRACE @ 3' BELOW TOP OF POST.
GENERAL NOTES
45.00°
BEAM PER PLAN
SIMPSON KBSIZ
EA SIDE
2-2X4 BRACE
SIMPSON GA2 EA
SIDE
COLUMN PER PLAN
3' -0
45.00°
KNEE BRACE
SYMMETRICAL
WHERE INDICATED.
1. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING LOCAL MUNICIPAL CODES AND SPECIFICATIONS (INCLUDING SUPPLEMENTS) FOR THIS TYPE OF CONSTRUCTION. THE STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE [WITH THE GOVERNING CODES AND REFERENCED STANDARDS LISTED BELOW] / [TO THE INTERNATIONAL BUILDING CODE 2009 (IBC 2009) AS ADOPTED BY THE PENNSYLVANIA UCC
ADMINISTRATION AND ENFORCEMENT.]
2. THE STRUCTURAL DRAWINGS ARE INTENDED TO BE USED IN CONJUNCTION WITH THE ARCHITECTURAL DRAWINGS AND ALL OTHER APPLICABLE DISCIPLINE DRAWINGS. ANY CONFLICT BETWEEN NOTES, DETAILS, AND SPECIFICATIONS, THE MOST RIGID REQUIREMENTS SHALL GOVERN.
3. THE CONTRACTOR SHALL NOT MAKE DEVIATIONS FROM THE DESIGN DOCUMENTS WITHOUT WRITTEN APPROVAL FROM THE ENGINEER OF RECORD (EOR). CHANGES BY THE CONTRACTOR, DUE TO CONTRACTOR PROPOSED ALTERNATIVES OR TO CORRECT CONTRACTOR ERRORS/OMISSIONS, MUST BE SUBMITTED TO THE EOR FOR APPROVAL. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS INCLUDING ENGINEERING FEES FOR REVIEW, OBSERVATIONS, STRUCTURAL CALCULATIONS, AND REVISIONS. THE CONTRACTOR SHALL ALSO PROCESS THE REVISED PLANS REFLECTING ALL SUBSTITUTIONS THROUGH THE APPROPRIATE OFFICE OF ALL GOVERNING
AGENCIES.
4. THE STRUCTURE IS DESIGNED AS SELF SUPPORTING AFTER THE BUILDING IS FULLY COMPLETED. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION METHODS, PROCEDURES AND SEQUENCES, UNLESS SPECIFICALLY INDICATED ON THE DRAWINGS. TEMPORARY BRACING, SHEETING, SHORING/ETC., TO ENSURE THE STRUCTURAL STABILITY OF THE NEW STRUCTURE, EXISTING STRUCTURES, SIDEWALKS, AND UTILITIES, IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED IN THE LOCAL JURISDICTION. LOADS GREATER THAN THE INDICATED DESIGN LIVE LOADS SHALL NOT BE PLACED ON THE STRUCTURE. ALL CONSTRUCTION PROCESSES SHALL MEET ALL APPLICABLE OSHA REQUIREMENTS.
5. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE ENGINEER FREE AND HARMLESS OF ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THE PROJECT, EXCEPT FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE
OF THE ENGINEER.
6. ALL SECTIONS AND DETAILS, WHETHER EXPLICITLY CUT ON PLAN OR NOT, SHALL BE CONSIDERED TYPICAL AND SHALL APPLY AT SIMILAR CONDITIONS. SIGNIFICANT ADJUSTMENTS ACCOUNTING FOR VARYING CONDITIONS IN THE FIELD
SHOULD BE SUBMITTED TO EOR FOR APPROVAL AND BE RESOLVED PRIOR TO BEGINNING WORK.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AND COORDINATION INVOLVED TO PROVIDE OPENINGS, CHASES, EQUIPMENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .