This document is a Questions and Answers (Q&A) file related to Request for Proposal (RFP) 24-SWU15 issued by the City of Sun Prairie Department of Public Works for the Stormwater Native Vegetation Installation project. The RFP solicits proposals from qualified vendors for the installation and maintenance of native vegetation. The Q&A addresses several key points, including the use of subcontractors, the ability to partner with Disadvantaged Business Enterprises (DBEs), the availability of a water refill facility, and the potential need for the City to approve alternative methods for ground preparation. The related state and local contract opportunity is located in the state of Wisconsin.
The Q&A clarifies that the selected vendor may use subcontractors and partner with a DBE, though the latter will not receive credit in the RFP scoring process. It also confirms the availability of a water refill facility and the City's willingness to approve alternative ground preparation methods, if necessary. The responses aim to provide vendors with the information they need to prepare their proposals for this project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
608.837-2511 300 E Main St. Sun Prairie, WI 53590 engineering@cityofsunpraicom CityofSunPrairie.com
RFP 24-SWU15
Stormwater Native Vegetation Installation
Questions & Answers
Questions Received by 8/16/2024 Answers Posted by 8/23/2024
1. Can the selected vendor use a subcontractor be used in any capacity? In example: Subcontractor completes bid items 2-8, Prime oversees bid items 2-8, and completes all remaining bid items.
Yes. Please refer to the Draft Contract, Section F - ASSIGNABILITY/SUBCONTRACTING.
2. Can the selected vendor partner with a DBE to perform a percentage of the work?
Yes, the selected vendor may partner with a DBE, however, they will not receive credit in the RFP scoring process.
3. Will the selected vendor be able to use the Public Works facility to refill water during Hydro
Seeding?
Yes, a water refill facility will be made available.
4. With such a specific piece of equipment called out in the Vegetation Restoration and
Management Plan – will the city need to approve an alternative method for ground preparation?
Yes, the City will need to approve alternate methods for ground preparation.