This is a combined synopsis and solicitation for commercial items and services. The solicitation seeks proposals for grounds maintenance services at Fort Devens, Massachusetts in support of the Department of Public Works. Services include mowing, edging, trimming, fertilizing, aerating, pest control, debris removal, lawn repair, tree and shrub pruning, fence line clearing, planting, mulching, and herbicide treatments. The period of performance is a one-year base period starting from date of award, plus four one-year option periods. The solicitation is set aside 100% for small businesses with a NAICS code of 561730 and size standard of $9.5M. The closing date for proposals is February 16, 2024. Proposals shall be submitted electronically by the deadline to the identified contracting officer and contract specialist.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W15QKN24R5013 25-Jan-2024
b. TELEPHONE NUMBER
609-562-0000
8. OFFER DUE DATE/LOCAL TIME
12:00 AM 16 Feb 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W15QKN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
RYAN P NICKLOUS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CONTRACTING COMMAND
5418 S. SCOTT PLAZA
JOINT BASE MDL NJ 08640
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W13GPY 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W1DC DRFTA MASS
USAG FORT DEVENS RFTA
30 QUEBEC STREET, BOX 10
DEVENS MA 01434-4479
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$9,500,000
NAICS:
561730
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF111
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W15QKN24R5013
Section SF 30 - BLOCK 14 CONTINUATION PAGE
INSTRUCTIONS TO OFFERORS
THIS REQURIEMENT IS SOLICITED AS A SMALL BUSINESS SET ASIDE
THIS REQUIREMENT IS SUBJECT TO THE AVAILABILITY OF FUNDS
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 and 13.5, as supplemented with additional information included in this notice. This accouncemnet consistutes the only solicitation; proposals are beign requested and a written solicitation will not be issued.
1. The Army Contracting Command – New Jersey (ACC-NJ) on behalf of the United States Army Garrison Fort Devens DRFTA has a requirement to procure a Grounds Maintenance Services. The scope of this requirement is for the contractor to provide Grounds Maintenance Services to USAG Fort Devens in accordance to the Performance Work Statement.
2. The Government intends to award a single, firm-fixed-price (FFP) contract. The period of performance for this effort shall consist of a 12-month base period from date of contract award and four (4) 12-month option years.
3. The Offeror must be registered in the System for Award Management (SAM) in order to be eligible to receive a Department of Defense contract award. If you need to register in SAM go to https://www.SAM.gov/.
4. See Federal Acquisition Regulation (FAR) Clause 52.212-1, “Instructions to Offerors – Commercial Services” and FAR 52.212-1, Addendum for additional information.
5. See FAR Clause 52.212-2, “Evaluation – Commercial Services” and FAR 52.212-2, Addendum for additional information and evaluation criteria.
6. A Site Visit shall be avaliable 6 February 2024 starting promptly at 11:00 AM Eastern Standarad Time (EST). This will be the only site visit to view the grounds. Parties interested in a site visit sahll visti Fort Devens Offical Website (https://home.army.mil/devens/) and fill out a visitor pass request on the Visitor Information Page, no later than 11:00 AM EST on Monday 5 February 2023. Once a visitor request has been made, send an email to the Site Visit POC: Mr. Kyle Crafts at kyle.j.crafts.civ@army.mil, the Contract Specialist: Ryan Nicklous at ryan.p.nicklous.civ@army.mil and the Contracting Officer: Jeffrey L.
Zeichner at jeffrey.l.zeichner.civ@army.mil. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Meeting Location for the site visit is 64 Quebec Street, the parking lot to the right once you enter the main gate. Anyone who is late to the Site Visit shall lose their opportunity for a site visit. No other site visit will be scheduled. No questions will be responded to at the site visit.
7. All questions regarding this solicitation shall be submitted via Email no later than 10:00 AM EST on Thursday 8 February 2024 to the Contract Specialist: Ryan Nicklous at ryan.p.nicklous.civ@army.mil and the Contracting Officer: Jeffrey L. Zeichner at jeffrey.l.zeichner.civ@army.mil. The questions will be answered all at once and uploaded to the Contract Opportunities website at https://www.sam.gov/ posting after the question period has ended.
8. COMPLETING A QUOTE FOR SUBMITTAL
a. Proposals are due no later than the date and time listed in Block 8 and shall be submitted via email to Ryan Nicklous at ryan.p.nicklous.civ@army.mil and Jeffrey L. Zeichner at jeffrey.l.zeichner.civ@army.mil. Updates to this solicitation will be posted on the Contract Opportunities website at https://www.sam.gov.
b. The Offeror shall provide the name, title, address, email address, and telephone number of the company/division point of contact regarding business decisions made wit respect to the proposal and who can contractually obligate the company. In addition, the contractor shall sign and acknowledge any potential resulting amendments to this solicitation. In doing so, the offeror accedes to the contract terms and conditions as written in the Solicitation.
c. The Offeror shall submit a price for each FFP Contract Line Item Number (CLIN) on the Standard
Form (SF) 1449 Continuation Sheets of the solicitation. The Government maintains a tax-exempt status.
d. The offeror shall submit a signed SF1449 (Pg. 1, Block 30a. Signature of Offeror/Contractor). The offeror is required to complete blocks 17, 30a, 30b, and 30c of the SF1449. In doing so, the Offeror accedes to the contract terms and conditions as written in the solicitation.
e. Pricing for each CLIN must be submitted in the proper format. The proper format consists of
QUANTITY * UNIT PRICE = AMOUNT/NET AMOUNT. In the event there is a discrepancy in the calculation, the UNIT PRICE will be held to the intended price multiplied by the QUANTITY.
If the offeror shows only the AMOUNT/NET AMOUNT, but fails to enter a UNIT PRICE, the AMOUNT/NET AMOUNT divided by the QUANTITY will be held to be the intended price.
f. The Offeror shall provide proof of Valid Certificate of Insurance in accordance with FAR 52.228-
5 “Insurance – Work on a Government Installation” and “Required Insurance”.
g. The offeror is reminded it shall offer on any issued plans, drawings, and specifications as amended. Any deviations, conditions or attachments made by the offeror itself may render the offer non-responsive and may be cause for its rejection.
9. All services shall be performed in accordance with the Performance Work Statement (PWS)
10. All offers shall remain valid for 120 calendar days.
11. SAM Eunique ID#:__________________________
12. CAGE(commercial and government entity)code___________________
13. Federal Tax ID __________________
14. ****This project is small business set aside under NAICS 561730 with the business size standard of
$9,500,000.00.
15. Multiple proposals will not be accepted.
16. The following are part of this solicitation:
- Attachment 1: Performance Work Statement DRFTA Grounds Maintenance Services
SOLICITATION ADMINISTRATION
CONTRACT ADMINISTRATORS: Army Contracting Command – New Jersey Ryan Nicklous, Contract Specialist Ryan.p.nicklous.civ@army.mil
Jeffrey Zeichner, Contracting Officer Jeffrey.l.zeichner.civ@army.mil
CUSTOMER: United States Army Garrison Fort Devens Devens Reserve Forces Training Area (DRFTA) Kyle Crafts, Natural Resources Specialist Kyle.j.crafts.civ@army.mil
PERFORMANCE LOCATION: USAG Fort Devens DRFTA 30 Quebec Street Devens, Massachussetts, 01434-4479
PERIOD OF PERFORMANCE: 12-month base year and four (4) 12-month option periods from date of contract award
INSURANCE REQUIREMENTS
FAR 28.307-2 Liability In accordance with FAR 28.307-2, the Contractor is required to provide and maintain the kinds and minimum amounts of insurance stated below:
a) Workers’ Compensation and Employer’s Liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General Liability.
(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile Liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the contracting officer shall require aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
HQ LEVEL PROTEST
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103.Send protests (other than protests to the contracting officer) to:
Headquarters U.S. Army Materiel Command
Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000
Fax: (256) 450-8840
Email: usarmy.redstone.usamc.mbx.protests@mail.mil
The AMC-level protest procedures are found at: Web Address:
http://www.amc.army.mil/amc/commandcounsel.html
If Internet ACC contracting officer or HQ, AMC to obtain the AMC-Level Protest
LEVEL 1 ANTI-TERRORISM
52.000-4002 LEVEL 1 ANTI TERRORIST AWARENESS TRAINING REQUIREMENTS FOR CONTRACTOR
EMPLOYEES (OCT 2010)
1. All contractor employees requiring access to any Federally-controlled facility and logical access to
Federally controlled information systems except for “national security systems” as defined by 44 U.S.C.
3542(b)(2), should be certified in Level 1 Anti Terrorism Training. The training is accessible from any computer with access to the World Wide Web and is available at https:/atlevel1.dtic.mil/at. The contractor is responsible for ensuring that the training has been satisfactorily completed and that valid certificates of completion have been submitted to the Contracting Officers Representative (COR) with a copy furnished to the Contracting Officer. The Certificates are valid for one year, therefore, training shall be completed every year for the duration of the contract.
2. The term Federally-controlled facility is defined as:
• Federally-owned buildings or leased space, whether for single or multi-tenant occupancy, and approaches, all or any portion of which is under the jurisdiction, custody or control of a department or agency;
• Federally-controlled commercial space shared with non-government tenants. For example, if a department or agency leased the 10th floor of a commercial building, the Directive applies to the 10th floor only;
• Government-owned, contractor-operated facilities, including laboratories engaged in national defense research and production activities; and
• Facilities under a management and operating contract, such as for the operation, maintenance, or support of a
Government-owned or Government-controlled research, development, special production, or testing establishment.
3. The term “Federally-controlled information system” means an information system (44 U.S.C. 3502(8)) used or operated by a Federal agency, or a contractor or other organization on behalf of the agency (44 U.S.C. 3544(a)).
4. The term “contractor employee” includes employees, agents, students or representatives and all employees, agents or representatives of all subcontractors and suppliers.
DISCLOSURE OF UNIT PRICE
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 7 Months BASE - Mowing, Edging and Trimming (IP)
FFP
IAW PWS Section 2.2.1: The Contractor shall mow, edge and trim the Improved Grounds IAW the Work Capability Levels table. Mowing, edging and trimming will be conducted during the period from 1 April through 31 October. The Contractor shall mow grass to maintain it below the maximum height of 5 inches as indicated in the Work Capability Levels table in paragraph 4.0. The Contractor shall inspect the Improved Grounds at least once weekly to determine if mowing is required. The Contractor shall set the mower height to three (3) inches for all areas, and shall alternate mowing direction when feasible. The Contractor shall remove any and all trash, litter, tree limbs, debris, etc., present on the Improved Grounds prior to mowing. The Contractor shall mulch mow the grass and remove any visible grass clippings after mowing and ensure that there are no grass trimmings left on sidewalks or other paved areas before leaving the work area. The grass shall be mowed in a manner that results in a uniform appearance, free of skips, gaps, rutting, or scalping. The Contractor shall, in conjunction with mowing, edge in and around flowerbeds, mulched areas, sidewalks, driveways, street edges, curbs, and other impervious surfaces in the Improved Grounds to present a neat appearance.
Edging includes the removal of all grass or weeds sprouting from cracks in sidewalks, pavement, and curbing to include the edge between the curb and road/parking lot. The Contractor shall not use postemergent herbicides for edging purposes. The Contractor shall collect and dispose of all edging debris the same day edging is performed. The Contractor shall, in conjunction with mowing and edging, trim grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and all other fixed objects in the Improved Grounds that project above the ground so grass height is maintained consistent with adjacent grass. The Contractor shall remove all trimming debris from sidewalks and driveways on the same day trimming is performed.
FOB: Destination
PURCHASE REQUEST NUMBER: 0012056489-0002
PSC CD: S208
NET AMT
0001 7 Months BASE - Mowing, Edging and Trimming (IP)
FFP
IAW PWS Section 2.2.1: The Contractor shall mow, edge and trim the Improved Grounds IAW the Work Capability Levels table. Mowing, edging and trimming will be conducted during the period from 1 April through 31 October. The Contractor shall mow grass to maintain it below the maximum height of 5 inches as indicated in the Work Capability Levels table in paragraph 4.0. The Contractor shall inspect the Improved Grounds at least once weekly to determine if mowing is required. The Contractor shall set the mower height to three (3) inches for all areas, and shall alternate mowing direction when feasible. The Contractor shall remove any and all trash, litter, tree limbs, debris, etc., present on the Improved Grounds prior to mowing. The Contractor shall mulch mow the grass and remove any visible grass clippings after mowing and ensure that there are no grass trimmings left on sidewalks or other paved areas before leaving the work area. The grass shall be mowed in a manner that results in a uniform appearance, free of skips, gaps, rutting, or scalping. The Contractor shall, in conjunction with mowing, edge in and around flowerbeds, mulched areas, sidewalks, driveways, street edges, curbs, and other impervious surfaces in the Improved Grounds to present a neat appearance.
Edging includes the removal of all grass or weeds sprouting from cracks in sidewalks, pavement, and curbing to include the edge between the curb and road/parking lot. The Contractor shall not use postemergent herbicides for edging purposes. The Contractor shall collect and dispose of all edging debris the same day edging is performed. The Contractor shall, in conjunction with mowing and edging, trim grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and all other fixed objects in the Improved Grounds that project above the ground so grass height is maintained consistent with adjacent grass. The Contractor shall remove all trimming debris from sidewalks and driveways on the same day trimming is performed.
FOB: Destination
0002 1 Job BASE - Fertilizing and Liming
FFP
IAW PWS Section 2.2.2 the Contractor shall apply commercial, N-P-K granular fertilizer and pulverized agricultural lime to the Special Seeding Areas which are the parade and athletic fields (approximately 15.2 acres) IAW the Work Capability Levels table and IAW the product manufacturerƒ??s recommendation. Fertilizing and Liming will be performed once annually in the month of September unless an alternative schedule is approved by the COR.
FOB: Destination
0002 1 Job BASE - Fertilizing and Liming
FFP
IAW PWS Section 2.2.2 the Contractor shall apply commercial, N-P-K granular fertilizer and pulverized agricultural lime to the Special Seeding Areas which are the parade and athletic fields (approximately 15.2 acres) IAW the Work Capability Levels table and IAW the product manufacturerƒ??s recommendation. Fertilizing and Liming will be performed once annually in the month of September unless an alternative schedule is approved by the COR.
FOB: Destination
0003 1 Job BASE - Aerating and Overseeding
FFP
BASE - Aerating and Overseeding FOB: Destination
0003 1 Job BASE - Aerating and Overseeding
FFP
BASE - Aerating and Overseeding FOB: Destination
0004 2 Job BASE - Pest Control
FFP
BASE - Pest Control FOB: Destination
0004 2 Job BASE - Pest Control
FFP
BASE - Pest Control FOB: Destination
0005 3 Job BASE - Mowing and Trimming (SEMI-IP)
FFP
BASE - Mowing and Trimming (SEMI-IP) FOB: Destination
0005 3 Job BASE - Mowing and Trimming (SEMI-IP)
FFP
BASE - Mowing and Trimming (SEMI-IP) FOB: Destination
0006 1 Job BASE - Spring Debris Removal
FFP
BASE - Spring Debris Removal FOB: Destination
0006 1 Job BASE - Spring Debris Removal
FFP
BASE - Spring Debris Removal FOB: Destination
0007 1 Job BASE - Spring Lawn Repair
FFP
BASE - Spring Lawn Repair FOB: Destination
0007 1 Job BASE - Spring Lawn Repair
FFP
BASE - Spring Lawn Repair FOB: Destination
0008 1 Job BASE - Spring Tree and Shrub Pruning
FFP
BASE - Spring Tree and Shrub Pruning FOB: Destination
0008 1 Job BASE - Spring Tree and Shrub Pruning
FFP
BASE - Spring Tree and Shrub Pruning FOB: Destination
0009 1 Job BASE - Fall Debris Removal
FFP
BASE - Fall Debris Removal FOB: Destination
0009 1 Job BASE - Fall Debris Removal
FFP
BASE - Fall Debris Removal FOB: Destination
0010 1 Job BASE - Fall Tree Pruning
FFP
BASE - Fall Tree Pruning FOB: Destination
0010 1 Job BASE - Fall Tree Pruning
FFP
BASE - Fall Tree Pruning FOB: Destination
0011 7 Months BASE - Clear Fence Lines
FFP
BASE - Clear Fence Lines FOB: Destination
0011 7 Months BASE - Clear Fence Lines
FFP
BASE - Clear Fence Lines FOB: Destination
0012 2 Job BASE - Plant Main Cantonment Planters
FFP
BASE - Plant Main Cantonment Planters FOB: Destination
0012 2 Job BASE - Plant Main Cantonment Planters
FFP
BASE - Plant Main Cantonment Planters FOB: Destination
0013 10 Job BASE - Plant New Trees
FFP
BASE - Plant New Trees FOB: Destination
0013 10 Job BASE - Plant New Trees
FFP
BASE - Plant New Trees FOB: Destination
0014 7 Months BASE - Perennial Beds and Tree Mulching
FFP
BASE - Perennial Beds and Tree Mulching FOB: Destination
0014 7 Months BASE - Perennial Beds and Tree Mulching
FFP
BASE - Perennial Beds and Tree Mulching FOB: Destination
0015 2 Job BASE - Herbicide Treatments
FFP
BASE - Herbicide Treatments FOB: Destination
0015 2 Job BASE - Herbicide Treatments
FFP
BASE - Herbicide Treatments FOB: Destination
1001 7 Months OPTION OY1 - Mowing, Edging and Trimming (IP)
FFP
IAW PWS Section 2.2.1: The Contractor shall mow, edge and trim the Improved Grounds IAW the Work Capability Levels table. Mowing, edging and trimming will be conducted during the period from 1 April through 31 October. The Contractor shall mow grass to maintain it below the maximum height of 5 inches as indicated in the Work Capability Levels table in paragraph 4.0. The Contractor shall inspect the Improved Grounds at least once weekly to determine if mowing is required. The Contractor shall set the mower height to three (3) inches for all areas, and shall alternate mowing direction when feasible. The Contractor shall remove any and all trash, litter, tree limbs, debris, etc., present on the Improved Grounds prior to mowing. The Contractor shall mulch mow the grass and remove any visible grass clippings after mowing and ensure that there are no grass trimmings left on sidewalks or other paved areas before leaving the work area. The grass shall be mowed in a manner that results in a uniform appearance, free of skips, gaps, rutting, or scalping. The Contractor shall, in conjunction with mowing, edge in and around flowerbeds, mulched areas, sidewalks, driveways, street edges, curbs, and other impervious surfaces in the Improved Grounds to present a neat appearance.
Edging includes the removal of all grass or weeds sprouting from cracks in sidewalks, pavement, and curbing to include the edge between the curb and road/parking lot. The Contractor shall not use postemergent herbicides for edging purposes. The Contractor shall collect and dispose of all edging debris the same day edging is performed. The Contractor shall, in conjunction with mowing and edging, trim grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and all other fixed objects in the Improved Grounds that project above the ground so grass height is maintained consistent with adjacent grass. The Contractor shall remove all trimming debris from sidewalks and driveways on the same day trimming is performed.
FOB: Destination
PURCHASE REQUEST NUMBER: 0012056489-0001
1002 1 Job OPTION OY1 - Fertilizing and Liming
FFP
IAW PWS Section 2.2.2 the Contractor shall apply commercial, N-P-K granular fertilizer and pulverized agricultural lime to the Special Seeding Areas which are the parade and athletic fields (approximately 15.2 acres) IAW the Work Capability Levels table and IAW the product manufacturerƒ??s recommendation. Fertilizing and Liming will be performed once annually in the month of September unless an alternative schedule is approved by the COR.
FOB: Destination
1003 1 Job OPTION OY1 - Aerating and Overseeding
FFP
OY1 - Aerating and Overseeding FOB: Destination
1004 2 Job OPTION OY1 - Pest Control
FFP
OY1 - Pest Control FOB: Destination
1005 3 Job OPTION OY1 - Mowing and Trimming (SEMI-IP)
FFP
OY1 - Mowing and Trimming (SEMI-IP) FOB: Destination
1006 1 Job OPTION OY1 - Spring Debris Removal
FFP
OY1 - Spring Debris Removal FOB: Destination
1007 1 Job OPTION OY1 - Spring Lawn Repair
FFP
OY1 - Spring Lawn Repair FOB: Destination
1008 1 Job OPTION OY1 - Spring Tree and Shrub Pruning
FFP
OY1 - Spring Tree and Shrub Pruning FOB: Destination
1009 1 Job OPTION OY1 - Fall Debris Removal
FFP
OY1 - Fall Debris Removal FOB: Destination
1010 1 Job OPTION OY1 - Fall Tree Pruning
FFP
OY1 - Fall Tree Pruning FOB: Destination
1011 7 Months OPTION OY1 - Clear Fence Lines
FFP
OY1 - Clear Fence Lines FOB: Destination
1012 2 Job OPTION OY1 - Plant Main Cantonment Planters
FFP
OY1 - Plant Main Cantonment Planters FOB: Destination
1013 10 Job OPTION OY1 - Plant New Trees
FFP
OY1 - Plant New Trees FOB: Destination
1014 7 Months OPTION OY1 - Perennial Beds and Tree Mulching
FFP
OY1 - Perennial Beds and Tree Mulching FOB: Destination
1015 2 Job OPTION OY1 - Herbicide Treatments
FFP
OY1 - Herbicide Treatments FOB: Destination
2001 7 Months OPTION OY2 - Mowing, Edging and Trimming (IP)
FFP
IAW PWS Section 2.2.1: The Contractor shall mow, edge and trim the Improved Grounds IAW the Work Capability Levels table. Mowing, edging and trimming will be conducted during the period from 1 April through 31 October. The Contractor shall mow grass to maintain it below the maximum height of 5 inches as indicated in the Work Capability Levels table in paragraph 4.0. The Contractor shall inspect the Improved Grounds at least once weekly to determine if mowing is required. The Contractor shall set the mower height to three (3) inches for all areas, and shall alternate mowing direction when feasible. The Contractor shall remove any and all trash, litter, tree limbs, debris, etc., present on the Improved Grounds prior to mowing. The Contractor shall mulch mow the grass and remove any visible grass clippings after mowing and ensure that there are no grass trimmings left on sidewalks or other paved areas before leaving the work area. The grass shall be mowed in a manner that results in a uniform appearance, free of skips, gaps, rutting, or scalping. The Contractor shall, in conjunction with mowing, edge in and around flowerbeds, mulched areas, sidewalks, driveways, street edges, curbs, and other impervious surfaces in the Improved Grounds to present a neat appearance.
Edging includes the removal of all grass or weeds sprouting from cracks in sidewalks, pavement, and curbing to include the edge between the curb and road/parking lot. The Contractor shall not use postemergent herbicides for edging purposes. The Contractor shall collect and dispose of all edging debris the same day edging is performed. The Contractor shall, in conjunction with mowing and edging, trim grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and all other fixed objects in the Improved Grounds that project above the ground so grass height is maintained consistent with adjacent grass. The Contractor shall remove all trimming debris from sidewalks and driveways on the same day trimming is performed.
FOB: Destination
2002 1 Job OPTION OY2 - Fertilizing and Liming
FFP
IAW PWS Section 2.2.2 the Contractor shall apply commercial, N-P-K granular fertilizer and pulverized agricultural lime to the Special Seeding Areas which are the parade and athletic fields (approximately 15.2 acres) IAW the Work Capability Levels table and IAW the product manufacturerƒ??s recommendation. Fertilizing and Liming will be performed once annually in the month of September unless an alternative schedule is approved by the COR.
FOB: Destination
2003 1 Job OPTION OY2 - Aerating and Overseeding
FFP
OY2 - Aerating and Overseeding FOB: Destination
2004 2 Job OPTION OY2 - Pest Control
FFP
OY2 - Pest Control FOB: Destination
2005 3 Job OPTION OY2 - Mowing and Trimming (SEMI-IP)
FFP
OY2 - Mowing and Trimming (SEMI-IP) FOB: Destination
2006 1 Job OPTION OY2 - Spring Debris Removal
FFP
OY2 - Spring Debris Removal FOB: Destination
2007 1 Job OPTION OY2 - Spring Lawn Repair
FFP
OY2 - Spring Lawn Repair FOB: Destination
2008 1 Job OPTION OY2 - Spring Tree and Shrub Pruning
FFP
OY2 - Spring Tree and Shrub Pruning FOB: Destination
2009 1 Job OPTION OY2 - Fall Debris Removal
FFP
OY2 - Fall Debris Removal FOB: Destination
2010 1 Job OPTION OY2 - Fall Tree Pruning
FFP
OY2 - Fall Tree Pruning FOB: Destination
2011 7 Months OPTION OY2 - Clear Fence Lines
FFP
OY2 - Clear Fence Lines FOB: Destination
2012 2 Job OPTION OY2 - Plant Main Cantonment Planters
FFP
OY2 - Plant Main Cantonment Planters FOB: Destination
2013 10 Job OPTION OY2 - Plant New Trees
FFP
OY2 - Plant New Trees FOB: Destination
2014 7 Months OPTION OY2 - Perennial Beds and Tree Mulching
FFP
OY2 - Perennial Beds and Tree Mulching FOB: Destination
2015 2 Job OPTION OY2 - Herbicide Treatments
FFP
OY2 - Herbicide Treatments FOB: Destination
3001 7 Months OPTION OY3 - Mowing, Edging and Trimming (IP)
FFP
IAW PWS Section 2.2.1: The Contractor shall mow, edge and trim the Improved Grounds IAW the Work Capability Levels table. Mowing, edging and trimming will be conducted during the period from 1 April through 31 October. The Contractor shall mow grass to maintain it below the maximum height of 5 inches as indicated in the Work Capability Levels table in paragraph 4.0. The Contractor shall inspect the Improved Grounds at least once weekly to determine if mowing is required. The Contractor shall set the mower height to three (3) inches for all areas, and shall alternate mowing direction when feasible. The Contractor shall remove any and all trash, litter, tree limbs, debris, etc., present on the Improved Grounds prior to mowing. The Contractor shall mulch mow the grass and remove any visible grass clippings after mowing and ensure that there are no grass trimmings left on sidewalks or other paved areas before leaving the work area. The grass shall be mowed in a manner that results in a uniform appearance, free of skips, gaps, rutting, or scalping. The Contractor shall, in conjunction with mowing, edge in and around flowerbeds, mulched areas, sidewalks, driveways, street edges, curbs, and other impervious surfaces in the Improved Grounds to present a neat appearance.
Edging includes the removal of all grass or weeds sprouting from cracks in sidewalks, pavement, and curbing to include the edge between the curb and road/parking lot. The Contractor shall not use postemergent herbicides for edging purposes. The Contractor shall collect and dispose of all edging debris the same day edging is performed. The Contractor shall, in conjunction with mowing and edging, trim grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and all other fixed objects in the Improved Grounds that project above the ground so grass height is maintained consistent with adjacent grass. The Contractor shall remove all trimming debris from sidewalks and driveways on the same day trimming is performed.
FOB: Destination
3002 1 Job OPTION OY3 - Fertilizing and Liming
FFP
IAW PWS Section 2.2.2 the Contractor shall apply commercial, N-P-K granular fertilizer and pulverized agricultural lime to the Special Seeding Areas which are the parade and athletic fields (approximately 15.2 acres) IAW the Work Capability Levels table and IAW the product manufacturerƒ??s recommendation. Fertilizing and Liming will be performed once annually in the month of September unless an alternative schedule is approved by the COR.
FOB: Destination
3003 1 Job OPTION OY3 - Aerating and Overseeding
FFP
OY3 - Aerating and Overseeding FOB: Destination
3004 2 Job OPTION OY3 - Pest Control
FFP
OY3 - Pest Control FOB: Destination
3005 3 Job OPTION OY3 - Mowing and Trimming (SEMI-IP)
FFP
OY3 - Mowing and Trimming (SEMI-IP) FOB: Destination
3006 1 Job OPTION OY3 - Spring Debris Removal
FFP
OY3 - Spring Debris Removal FOB: Destination
3007 1 Job OPTION OY3 - Spring Lawn Repair
FFP
OY3 - Spring Lawn Repair FOB: Destination
3008 1 Job OPTION OY3 - Spring Tree and Shrub Pruning
FFP
OY3 - Spring Tree and Shrub Pruning FOB: Destination
3009 1 Job OPTION OY3 - Fall Debris Removal
FFP
OY3 - Fall Debris Removal FOB: Destination
3010 1 Job OPTION OY3 - Fall Tree Pruning
FFP
OY3 - Fall Tree Pruning FOB: Destination
3011 7 Months OPTION OY3 - Clear Fence Lines
FFP
OY3 - Clear Fence Lines FOB: Destination
3012 2 Job OPTION OY3 - Plant Main Cantonment Planters
FFP
OY3 - Plant Main Cantonment Planters FOB: Destination
3013 10 Job OPTION OY3 - Plant New Trees
FFP
OY3 - Plant New Trees FOB: Destination
3014 7 Months OPTION OY3 - Perennial Beds and Tree Mulching
FFP
OY3 - Perennial Beds and Tree Mulching FOB: Destination
3015 2 Job OPTION OY3 - Herbicide Treatments
FFP
OY3 - Herbicide Treatments FOB: Destination
4001 7 Months OPTION OY4 - Mowing, Edging and Trimming (IP)
FFP
IAW PWS Section 2.2.1: The Contractor shall mow, edge and trim the Improved Grounds IAW the Work Capability Levels table. Mowing, edging and trimming will be conducted during the period from 1 April through 31 October. The Contractor shall mow grass to maintain it below the maximum height of 5 inches as indicated in the Work Capability Levels table in paragraph 4.0. The Contractor shall inspect the Improved Grounds at least once weekly to determine if mowing is required. The Contractor shall set the mower height to three (3) inches for all areas, and shall alternate mowing direction when feasible. The Contractor shall remove any and all trash, litter, tree limbs, debris, etc., present on the Improved Grounds prior to mowing. The Contractor shall mulch mow the grass and remove any visible grass clippings after mowing and ensure that there are no grass trimmings left on sidewalks or other paved areas before leaving the work area. The grass shall be mowed in a manner that results in a uniform appearance, free of skips, gaps, rutting, or scalping. The Contractor shall, in conjunction with mowing, edge in and around flowerbeds, mulched areas, sidewalks, driveways, street edges, curbs, and other impervious surfaces in the Improved Grounds to present a neat appearance.
Edging includes the removal of all grass or weeds sprouting from cracks in sidewalks, pavement, and curbing to include the edge between the curb and road/parking lot. The Contractor shall not use postemergent herbicides for edging purposes. The Contractor shall collect and dispose of all edging debris the same day edging is performed. The Contractor shall, in conjunction with mowing and edging, trim grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and all other fixed objects in the Improved Grounds that project above the ground so grass height is maintained consistent with adjacent grass. The Contractor shall remove all trimming debris from sidewalks and driveways on the same day trimming is performed.
FOB: Destination
4002 1 Job OPTION OY4 - Fertilizing and Liming
FFP
IAW PWS Section 2.2.2 the Contractor shall apply commercial, N-P-K granular fertilizer and pulverized agricultural lime to the Special Seeding Areas which are the parade and athletic fields (approximately 15.2 acres) IAW the Work Capability Levels table and IAW the product manufacturerƒ??s recommendation. Fertilizing and Liming will be performed once annually in the month of September unless an alternative schedule is approved by the COR.
FOB: Destination
4003 1 Job OPTION OY4 - Aerating and Overseeding
FFP
OY4 - Aerating and Overseeding FOB: Destination
4004 2 Job OPTION OY4 - Pest Control
FFP
OY4 - Pest Control FOB: Destination
4005 3 Job OPTION OY4 - Mowing and Trimming (SEMI-IP)
FFP
OY4 - Mowing and Trimming (SEMI-IP) FOB: Destination
4006 1 Job OPTION OY4 - Spring Debris Removal
FFP
OY4 - Spring Debris Removal FOB: Destination
4007 1 Job OPTION OY4 - Spring Lawn Repair
FFP
OY4 - Spring Lawn Repair FOB: Destination
4008 1 Job OPTION OY4 - Spring Tree and Shrub Pruning
FFP
OY4 - Spring Tree and Shrub Pruning FOB: Destination
4009 1 Job OPTION OY4 - Fall Debris Removal
FFP
OY4 - Fall Debris Removal FOB: Destination
4010 1 Job OPTION OY4 - Fall Tree Pruning
FFP
OY4 - Fall Tree Pruning FOB: Destination
4011 7 Months OPTION OY4 - Clear Fence Lines
FFP
OY4 - Clear Fence Lines FOB: Destination
4012 2 Job OPTION OY4 - Plant Main Cantonment Planters
FFP
OY4 - Plant Main Cantonment Planters FOB: Destination
4013 10 Job OPTION OY4 - Plant New Trees
FFP
OY4 - Plant New Trees FOB: Destination
4014 7 Months OPTION OY4 - Perennial Beds and Tree Mulching
FFP
OY4 - Perennial Beds and Tree Mulching FOB: Destination
4015 2 Job OPTION OY4 - Herbicide Treatments
FFP
OY4 - Herbicide Treatments FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government
0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government
4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government 4008 Destination Government Destination Government 4009 Destination Government Destination Government 4010 Destination Government Destination Government 4011 Destination Government Destination Government 4012 Destination Government Destination Government 4013 Destination Government Destination Government 4014 Destination Government Destination Government 4015 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 25-APR-2024 TO
24-APR-2025
N/A W1DC DRFTA MASS
USAG FORT DEVENS RFTA
30 QUEBEC STREET, BOX 10
DEVENS MA 01434-4479
FOB: Destination
W13GPY
0002 POP 25-APR-2024 TO
24-APR-2025
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0011 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0012 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0013 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0014 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0015 POP 25-APR-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 25-APR-2025 TO
24-APR-2026
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1011 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1012 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1013 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1014 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1015 POP 25-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 25-APR-2026 TO
24-APR-2027
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2011 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2012 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2013 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2014 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2015 POP 25-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 25-APR-2027 TO
24-APR-2028
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3005 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3006 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3007 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3008 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3009 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3010 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3011 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3012 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3013 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3014 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
3015 POP 25-APR-2027 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 25-APR-2028 TO
24-APR-2029
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4004 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4005 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4006 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4007 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4008 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4009 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4010 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4011 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4012 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4013 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4014 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
4015 POP 25-APR-2028 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.203-11 Certification And Disclosure Regarding Payments To
Influence Certain Federal Transactions
SEP 2007
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
JUN 2020
52.203-18 Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements or Statements-- Representation
JAN 2017
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020
52.204-19 Incorporation by Reference of Representations and Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.208-9 Contractor Use of Mandatory Sources of Supply or Services MAY 2014 52.212-1 Instructions to Offerors--Commercial Products and
Commercial Services
SEP 2023
52.212-2 Evaluation - Commercial Items NOV 2021 52.212-4 Contract Terms and Conditions--Commercial Products and
Commercial Services
NOV 2023
52.217-5 Evaluation Of Options JUL 1990 52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.222-42 Statement Of Equivalent Rates For Federal Hires MAY 2014 52.222-50 Combating Trafficking in Persons NOV 2021 52.222-55 Minimum Wages for Contractor Workers Under Executive
Order 14026
JAN 2022
52.223-1 Biobased Product Certification MAY 2012 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.225-25 Prohibition on Contracting with Entities Engaging in Certain…
This is the start of the file's text. The full file is on GovTribe.