24.28 - HSA Ft Worth - White Settlement Elementary - Bid Project Manual.pdf

PDF 24 MB Posted

Attached to
Harmony Science Academy Ground Up - Fort Worth, TX - CSP
Solicitation number
#HPS2026_HSE Fort Worth – Phase I - GU
Issued by
Tarrant County, Texas

About this file

This is a Project Manual and Bid Document for Harmony Public Schools (HPS), a Texas-based educational institution, seeking competitive sealed proposals for ground-up construction of a new elementary school facility. The project scope encompasses a one-story, 55,000 square foot elementary school building at White Settlement Road and Legacy Drive in Fort Worth, Texas, along with associated parking lot, playground, and landscaping improvements. Construction work includes concrete, drywall, glazing, finishes, roofing, electrical, mechanical, plumbing, landscaping, low-voltage systems, and related work as detailed in comprehensive technical specifications organized under 33 divisions of work. A mandatory pre-bid meeting is scheduled for September 2, 2026, at 2:00 p.m. CST via Google Meet, though attendance is not required. Sealed proposals must be submitted by 2:00 p.m. CST on September 29, 2026, through HPS's ebid system or by physical mail to the Central Office in Houston. The bid opening will occur on the same date at 2:00 p.m. CST via Google Meet. HPS intends to execute a contract by November 1, 2026, with all project work required to achieve substantial completion no later than March 1, 2028. Failure to meet this deadline will result in liquidated damages of $2,000 per calendar day.

The estimated project budget is $16 million, with proposers required to submit base bid and three alternate pricing options related to roofing materials and electrical switchgear expediting. Proposals must be accompanied by evidence of financial capability, bonding eligibility, OSHA inspection logs for the preceding three years, insurance loss analysis and history, prevailing wage compliance capability, and completed qualification questionnaires. Proposers are evaluated on a weighted scoring system: price (50 percent), experience and reputation (17 percent), quality (13 percent), financial wherewithal and company size (6 percent), proposed personnel (9 percent), and safety record (5 percent). Contract award will be made to the proposer offering the best value, with HPS retaining the right to negotiate modifications to scope, time, and price with the selected proposer. Contractor must maintain liability insurance, workers' compensation insurance as detailed in project exhibits, and performance and payment bonds. All permit costs, inspection fees, and associated licensing expenses are the contractor's responsibility and must be included in the schedule of values. The project is subject to prevailing wage requirements, federal compliance certifications when federal funds are expended, and comprehensive final completion requirements including asbestos-free certification, as-built documentation, and unconditional final payment releases before retainage is released.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HARMONY PUBLIC SCHOOLS

HARMONY SCHOOL OF EXCELLENCE

NEW ELEMENTARY SCHOOL

WHITE SETTLEMENT RD & LEGACY DR

FORT WORTH, TEXAS 76108

TARRANT COUNTY

PROJECT MANUAL

PROJECT NO. 24.28

ARCHITECT

GIGNAC & ASSOCIATES

416 STARR STREET

CORPUS CHRISTI, TEXAS 78401

(361) 884-2661

TITLE PAGE

TITLE AND LOCATION OF THE WORK

HARMONY PUBLIC SCHOOLS

HARMONY SCHOOL OF EXCELLENECE – FT WORTH

NEW ELEMENTARY

WHITE SETTLEMENT RD & LEGACY DRIVE

76108 FORT WORTH, TEXAS

TARRANT COUNTY

NAME & ADDRESS OF THE OWNER

HARMONY PUBLIC SCHOOLS (HPS)

1255 ENCLAVE PARKWAY

HOUSTON, TX 77077

NAME & ADDRESS OF THE ARCHITECT

GIGNAC ARCHITECTS, LLP

416 STARR STREET

CORPUS CHRISTI, TEXAS 78401

TITLE OF DOCUMENTS BOUND HEREWITH

TITLE PAGE

TABLE OF CONTENTS

PROCUEMENT DOCUMENTS

TECHNICAL SPECIFICATIONS

PROJECT NUMBER: 24.28

DATE: AUGUST 21, 2026

TABLE OF CONTENTS 00 00 03 - Page 1 of 6

00 00 03 - TABLE OF CONTENTS

00 00 01 COVER PAGE

00 00 02 TITLE PAGE

00 00 03 TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 07 SEALS PAGE

00 01 15 INDEX OF DRAWINGS

00 02 00 INVITATION TO BID

00 04 00 PROPOSAL FORM

ATTACHMENT A – CERTIFICATION OF PROPOSER

ATTACHMENT B – BUSINESS QUESTIONNAIRE & QUALIFICATION STATEMENT

ATTACHMENT C – PRICE FORM: SCHEDULE OF SERVICES, EQUIPMENT AND PRICES

ATTACHMENT D – HARMONY PUBLIC SCHOOLS PROPOSER/VENDOR CERTIFICATION

FORMS

HARMONY PUBLIC SCHOOLS ANTITRUST CERTIFICATION STATEMENT

HPS CONFLICT OF INTEREST DISCLOSURE STATEMENT

HPS FELONY CONVICTION NOTIFICATION

SB9 CONTRACTOR CERTIFICATION: CONTRACTOR EMPLOYEES

SB9 CONTRACTOR CERTIFICATION: SUBCONTRACTOR

ATTACHMENT E – ASBESTOS-FREE MATERIALS AND INSPECTION

ATTACHMENT F – ACKNOWLEDGEMENT OF FINAL COMPLETION DOCUMENTS

00 21 00 INSTRUCTIONS TO PROPOSERS

EXHIBIT A – LIABILITY INSURANCE REQUIREMENTS

EXHIBIT B – HPS’ REQUIRED WORKERS COMPENSATION INSURANCE COVERAGES

EXHIBIT C – PREVAILING WAGE RATES

00 26 00 PROCUREMENT SUBSTANTIAL PROCEDURES

00 31 19 EXISTING CONDITIONS INFORMATION

00 31 32 GEOTECHNICAL DATA

00 31 43 PERMIT APPLICATION

00 43 13 BID SECURITY FORMS

00 50 00 AGREEMENT FORM

AIA101-2017 AGREEMENT FORM DRAFT

AIA101 EXHIBIT A DRAFT

00 60 00 BONDS AND CERTIFICATES

00 70 00 GENERAL CONDITIONS

A201-2017 GENERAL CONDITIONS DRAFT

00 80 00 A201-2017 SUPPLEMENTARY CONDITIONS DRAFT

DIVISION 01 – GENERAL REQUIREMENTS

01 10 00 SUMMARY

01 21 00 ALLOWANCES

01 23 00 ALTERNATES

01 25 00 SUBSTITUTION PROCEDURES

01 26 00 CONTRACT MODIFICATION PROCEDURES

01 29 00 PAYMENT PROCEDURES

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION

01 32 33 PHOTOGRAPHIC DOCUMENTATION

01 32 36 VIDEO MONITORING AND DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 40 00 QUALITY REQUIREMENTS

01 42 00 REFERENCES

01 43 39 MOCKUPS

01 45 29 TESTING LABORATORY SERVICES

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 60 00 PRODUCT REQUIREMENTS

01 73 00 EXECUTION

TABLE OF CONTENTS 00 00 03 - Page 2 of 6

01 74 18 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 74 19 WASTE MANAGEMENT DISPOSAL

01 77 00 CLOSEOUT PROCEDURES

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 39 PROJECT RECORD DOCUMENTS

01 79 00 DEMONSTRATION AND TRAINING

DIVISION 02 – EXISTING CONDITIONS

02 41 00 DEMOLITION

02 41 18 SELECTIVE STRUCTURE DEMOLITION

DIVISION 03 – CONCRETE

03 05 57 CONCRETE SEALERS

03 10 00 CONCRETE FORMS

03 20 00 CONCRETE REINFORCEMENT

03 30 00 CAST IN PLACE CONCRETE

DIVISION 04 – MASONRY

04 22 00.13 CONCRETE UNIT VENEER MASONRY

04 72 00 CAST STONE MASONRY

DIVISION 05 – METALS

05 04 00 HOT-DIP GALVANIZING

05 12 00 STRUCTURAL STEEL FRAMING

05 21 00 STEEL JOIST

05 31 00 STEEL DECK

05 40 00 COLD FORMED METAL FRAMING

05 50 00 METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33.13 VERTICAL STEEL LADDERS (INTERIOR)

05 51 33.16 METAL PARAPET ACCESS LADDERS (ALUMINUM)

05 52 13 PIPE AND TUBE RAILINGS

05 52 13.16 ALUMINUM RAILINGS

05 56 13 CAST IRON DOWNSPOUT BOOTS

05 75 10 ALUMINUM FORMED METAL (BRAKE METAL)

DIVISION 06 – WOOD AND PLASTICS

06 10 00 ROUGH CARPENTRY

06 16 43 SHEATHING

06 20 00 FINISH CARPENTRY

06 41 16 PLASTIC LAMINATE FACED ARCHITECTURAL CABINETS

06 41 17 PLASTIC LAMINATE CLAD COUNTERTOPS

06 61 16 SOLID SURFACING FABRICATIONS

06 83 13.13 COMPOSITE COLUMN COVERS

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 19 00 WATER REPELLENTS

07 21 13.13 FOAM BOARD INSULATION

07 21 16 BLANKET INSULATION

07 24 19 WATER-DRAINAGE EXTERIOR INSULATION AND FINISH SYSTEM (EIFS)

07 27 26 FLUID APPLIED MEMBRANE AIR BARRIER

07 41 13.13 FORMED METAL ROOF PANELS

07 42 13.23 METAL COMPOSITE MATERIAL WALL PANELS

07 42 93 SOFFIT PANELS

07 52 16.11 STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING

07 54 23 THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING – ALTERNATE NOS. 1 & 2

07 62 00 SHEET METAL FLASHING AND TRIM

TABLE OF CONTENTS 00 00 03 - Page 3 of 6

07 72 00 ROOF HATCHES

07 84 13 PENETRATION FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 – DOORS AND WINDOWS

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 11 13.19 SEVERE STORM HOLLOW METAL DOORS AND FRAMES

08 14 23.16 PLASTIC LAMINATE FACED WOOD DOORS

08 31 13 ACCESS DOORS & FRAMES

08 33 13.13 ELECTRIC COILING COUNTER DOORS

08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS

08 42 13.13 SECURITY ALUMINUM ENTRANCES

08 43 33.13 SECURITY ALUMINUM FRAMED STOREFRONTS

08 44 13 GLAZED ALUMINUM CURTAINWALLS

08 56 19 ALUMINUM INTERIOR SLIDING SERVICE WINDOW

08 56 19.13 SECURITY ALUMINUM INTERIOR SLIDING SERVICE WINDOW

08 62 00 UNIT SKYLIGHTS

08 71 00 DOOR HARDWARE

08 80 00 GLAZING

08 87 23 SAFETY AND SECURITY FILM

08 88 53 SECURITY GLAZING

08 91 19 FIXED LOUVERS

DIVISION 09 – FINISHES

09 22 16 NON-STRUCTURAL METAL FRAMING

09 28 16 GLASS MAT FACED GYPSUM BACKING BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 30 13.13 PORCELAIN CERAMIC TILING

09 30 16 QUARRY TILING

09 30 33 STONE TILING (LIMESTONE)

09 51 13 ACOUSTICAL PANEL CEILINGS

09 64 00 WOOD FLOORING

09 65 13.13 RESILIENT BASE

09 65 19.19 VINYL COMPOSITION TILE FLOORING (VCT)

09 67 23 RESINOUS FLOORING

09 67 66 FLUID APPLIED ATHLETIC FLOORING

09 68 13 CARPET TILES

09 72 13.13 VINYL WALL GRAPHICS

09 84 33 SOUND ABSORBING WALL UNITS

09 90 00 PAINTING

09 96 00 HIGH PERFORMANCE COATINGS

DIVISION 10 – SPECIALTIES

10 01 00 MISCELLANEOUS SPECIALTIES

10 12 00 DISPLAY CASES

10 14 16 PLAQUES

10 14 19 DIMENSIONAL LETTER SIGNAGE

10 14 23 PANEL SIGNAGE

10 14 26.10 ELECTRONIC MESSAGE DISPLAY – MARQUEE

10 21 13 TOILET COMPARTMENTS

10 21 23 CUBICLE CURTAINS AND TRACKS

10 26 23.13 IMPACT RESISTANT WALL PROTECTION

10 26 41 BULLET RESISTANT PANELS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINQUISHER CABINETS AND ACCESSORIES

10 51 13.13 METAL LOCKERS

10 51 53 LOCKER ROOM BENCHES

10 73 16.13 METAL CANOPIES

10 75 16 FLAGPOLES

TABLE OF CONTENTS 00 00 03 - Page 4 of 6

DIVISION 11 – EQUIPMENT

11 40 00 FOODSERVICE EQUIPMENT

11 61 43 STAGE CURTAINS

11 66 23 GYMNASIUM EQUIPMENT

11 66 43 INTERIOR SCOREBOARDS

11 68 16 PLAY STRUCTURES

DIVISION 12 – FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 66 00 TELESCOPING STANDS

DIVISION 13 – SPECIAL CONSTRUCTION

13 31 33 FRAMED FABRIC STRUCTURES

DIVISION 21 – FIRE SUPPRESSION

21 13 13 WET PIPE SPRINKLER SYSTEM

DIVISION 22 – PLUMBING

22 05 00 BASIC PLUMBING REQUIREMENTS

22 05 23 PLUMBING VALVES

22 05 29 PLUMBING SUPPORTS AND ANCHORS

22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 07 00 PLUMBING INSULATION

22 08 00 COMMISSIONING OF PLUMBING SYSTEMS

22 11 23 DOMESTIC BOOSTER PUMP SYSTEM

22 14 36 ELEVATOR PIT SUMP PUMP

22 20 00 PLUMBING PIPING AND SPECIALTIES

22 31 00 DOMESTIC WATER CONDITIONER

22 34 00 STORAGE WATER HEATERS

22 40 00 PLUMBING FIXTURES

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING (HVAC)

23 05 00 BASIC MECHANICAL REQUIREMENTS

23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 05 29 HANGERS AND SUPPORTS FOR PIPING AND EQUIPMENT – HVAC

23 05 48 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 07 00 MECHANICAL INSULATION

23 08 00 COMMISSIONING OF HVAC SYSTEMS

23 09 23 DIRECT DIGITAL CONTROL SYSTEM

23 20 00 PIPE AND PIPE FITTINGS

23 21 13 HYDRONIC PIPING AND SPECIALTIES

23 23 00 REFRIGERANT PIPING AND SPECIALTIES

23 31 00 DUCTWORK AND ACCESSORIES

23 34 00 FANS

23 36 16 AIR TERMINAL UNITS

23 37 13 AIR DISTRIBUTION DEVICES

23 62 13 AIR COOLED CONDENSING UNITS

23 74 00 PACKAGED ROOFTOP AIR CONDITIONING UNITS

23 74 13 AIR HANDLING UNITS

23 81 26 DUCTLESS SPLIT SYSTEM

23 82 39 ELECTRIC HEATERS

TABLE OF CONTENTS 00 00 03 - Page 5 of 6

23 90 00 TESTING, ADJUSTING AND BALANCING

DIVISION 26 – ELECTRICAL

26 05 00 GENERAL REQUIREMENTS FOR ELECTRICAL WORK

26 05 19 WIRE AND CABLE (600 VOLTS AND LESS)

26 05 20 WIRE CONNECTIONS AND SPLICES (600 VOLTS AND LESS)

26 05 26 GROUNDING

26 05 33 RACEWAY SYSTEMS

26 05 34 BOXES, WIREWAYS AND AUXILIARY GUTTERS

26 05 53 ELECTRICAL IDENTIFICATION

26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION

26 08 00 ELECTRICAL SYSTEMS TECHNICAL COMMISSIONING REQUIREMENTS

26 09 23 LIGHTING CONTROL DEVICES

26 22 13 DRY TYPE TRANSFORMERS

26 24 13 LOW VOLTAGE SWITCHBOARDS SERVICE ENTRANCE AND DISTRIBUTION

26 24 14 DISTRIBUTION PANELBOARDS

26 24 16 BRANCH CIRCUIT PANELBOARDS

26 27 16 POWER MODULE SWITCH – ELEVATOR

26 27 26 WIRING DEVICES

26 28 00 OVERCURRENT PROTECTIVE DEVICES

26 28 16 DISCONNECT SWITCHES

26 32 13 PACKAGED ENGINE GENERATOR ASSEMBLIES

26 36 23 AUTOMATIC TRANSFER SWITCHES

26 43 00 TRANSIENT VOLTAGE SURGE SUPPRESSION/SURGE PROTECTIVE DEVICE

26 51 00 LIGHTING – INTERIOR AND EXTERIOR

DIVISION 27 – COMMUNICATIONS

27 10 00 STRUCTURED CABLE SYSTEM

27 21 00 DATA NETWORK AND WIRELESS

27 31 00 VOICE NETWORK

27 41 00 INTEGRATED AUDIO-VISUAL SYSTEMS

27 51 00 DISTRIBUTED COMMUNICATIONS/PAGING SYSTEM

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 13 00 ACCESS CONTROL SYSTEM

28 16 00 INTRUSION DETECTION SYSTEM

28 23 00 VIDEO SURVEILLANCE

28 31 00 FIRE DETECTION AND ALARM

DIVISION 31 – EARTHWORK

31 31 16 TERMITE CONTROL

31 63 29 DRILLED PIERS

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 01 90 LANDSCAPE MAINTENANCE

32 18 16.13 PLAYGROUND PROTECTIVE SURFACING

32 31 13 CHAIN LINK FENCES AND GATES

32 31 19 DECORATIVE PEDESTRIAN EGRESS GATE SYSTEM

32 31 19.13 DECORATIVE METAL FENCES AND GATES (STEEL)

32 32 23 SEGMENTAL RETAINIGN WALLS

32 35 00 DUMPSTER ENCLOSURE SCREENING GATES

32 35 16 SCREEN WALL ENCLOSURE SYSTEM & GATES

32 39 13 MANUFACTURED METAL BOLLARDS

32 84 00 LANDSCAPE IRRIGATION

32 91 13 SOIL PREPARATION

TABLE OF CONTENTS 00 00 03 - Page 6 of 6

32 92 13 HYDROSEEDING

32 93 03 LANDSCAPE PLANTING

DIVISION 33 – UTILITIES

NONE

Please refer to Civil Drawings for Civil Specifications.

END OF TABLE OF CONTENTS 00 00 03

SEALS PAGE 00 0107

SECTION 00 0107 - SEALS PAGE

PART 1 - Seals Page

1.1 DESIGN PROFESSIONALS OF RECORD

A. Architect:

1. Raymond Gignac, AIA, Gignac & Associates, LLP

2. Texas Board of Architectural Examiners, Registration # 6296

B. Landscape Architect:

1. Alexis Dominguez, Adla Inc

2. Texas Registration No. 2668

C. Structural:

1. Rolando R. Rubiano

2. Professional Engineer Registration # 86369

D. Mechanical:

1. Ian Vohwinkle, PE

2. Texas PE No.: 103809

E. Electrical:

1. Patrick Howard, PE

2. Texas PE No.: 164

F. Plumbing:

1. Ian Vohwinkle, PE

2. Texas PE No.: 103809

G. Technology & Security

1. Jason Gonzalez,

2. BICSI ID #364970

END OF SECTION 00 0107

11/30/2026

08/21/2026

LIST OF DRAWING SHEETS 00 0115 - 1

DOCUMENT 00 0115 - LIST OF DRAWING SHEETS

1.1 LIST OF DRAWINGS

A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of Contents page of the separately bound drawing set titled Harmony Public Schools – Harmony School of Excellence, Ft Worth Campus, dated August 21st, 2026, and as modified by subsequent Addenda and Contract modifications.

B. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:

GENERAL SHEETS

G-000 COVER

G-001 DRAWING INDEX

G-002 PLAQUE, PROJECT SIGN & AERIAL LOCATION MAPS

G-003 ADA GUIDELINES

G-004 ADA GUIDELINES

G-005 CODE REVIEW - 1ST FLOOR PLAN

G-006 CODE REVIEW - 2ND FLOOR PLAN

G-007 OCCUPANCY LOAD CALCULATIONS

G-008 STORM SHELTER DESIGNATION

CIVIL

C001 COVER SHEET

C002 GENERAL NOTES

C003 PRELIMINARY PLAT

C004 SURVEY CONTROL PLAN

C005 PAVING AND DIMENSION PLAN (SHEET 1 OF 2)

C006 PAVING AND DIMENSION PLAN (SHEET 2 OF 2)

C007 OVERALL GRADING PLAN

C008 GRADING PLAN (SHEET 1 OF 2)

C009 GRADING PLAN (SHEET 2 OF 2)

C010 GRADING DETAILS (SHEET 1 OF 2)

C011 GRADING DETAILS (SHEET 2 OF 2)

C012 EXISTING DRAINAGE AREA MAP

C013 PROPOSED DRAINAGE AREA MAP

C014 HYDRAULIC & INLET CALCULATIONS

C015 STORM DRAIN PLAN (SHEET 1 OF 2)

C016 STORM DRAIN PLAN (SHEET 2 OF 2)

C017 STORM DRAIN PROFILES (SHEET 1 OF 3)

C018 STORM DRAIN PROFILES (SHEET 2 OF 3)

C019 STORM DRAIN PROFILES (SHEET 3 OF 3)

C020 WATER PLAN

C021 WASTEWATER PLAN

C022 WASTEWATER PROFILES

C023 EROSION CONTROL PLAN

C024 PAVEMENT MARKING PLAN

C025 MISCELLANEOUS SITE DETAILS

C026 GENERAL DETAILS

C027 PAVING DETAILS (SHEET 1 OF 3)

C028 PAVING DETAILS (SHEET 2 OF 3)

C029 PAVING DETAILS (SHEET 3 OF 3)

C030 DRAINAGE DETAILS (SHEET 1 OF 3)

C031 DRAINAGE DETAILS (SHEET 2 OF 3)

C032 DRAINAGE DETAILS (SHEET 3 OF 3)

C033 WATER DETAILS (SHEET 1 OF 2)

C034 WATER DETAILS (SHEET 2 OF 2)

C035 WASTEWATER DETAILS

LIST OF DRAWING SHEETS 00 0115 - 2

C036 EROSION CONTROL (SHEET 1 OF 2)

C037 EROSION CONTROL (SHEET 2 OF 2)

LANDSCAPE

L-1.1 IRRIGATION NOTES AND LEGEND

L-1.2 IRRIGATION PLAN

L-1.3 IRRIGATION PLAN

L-2.0 PLANTING PLAN

L-3.1 IRRIGATION DETAILS

L-3.2 IRRIGATION DETAILS

L-3.3 IRRIGATION DETAILS

L-3.4 PLANTING DETAILS

UF-1.01 URBAN FORESTRY PART I EXISTING TREES

UF-1.02 URBAN FORESTRY PART I EXISTING TREES

UF-1.03 URBAN FORESTRY PART II DEVELOPMENT PLAN

SURVEY

S1 SURVEY 1

S2 SURVEY 2

S3 SURVEY 3

ARCHITECTURAL SITE

AS-100 OVERALL SITE PLAN

AS-101 ENLARGED SITE PLAN

AS-102 ENLARGED SITE PLAN

AS-103 ENLARGED SITE PLAN

AS-104 ENLARGED SITE PLAN

AS-105 ENLARGED SITE PLAN

AS-106 SITE DETAILS

AS-108 FIRE LANE STRIPING PLAN & DETAILS

AS-109 FENCING PLAN

ARCHITECTURAL FLOOR PLANS

A-101 OVERALL 1ST FLOOR PLAN

A-102 OVERALL 2ND FLOOR PLAN

A-103 1ST FLOOR PLAN - AREA 'A'

A-104 1ST FLOOR PLAN - AREA 'B'

A-105 1ST FLOOR PLAN - AREA 'C'

A-106 1ST FLOOR PLAN - AREA 'D'

A-107 2ND FLOOR PLAN - AREA 'E'

A-108 2ND FLOOR PLAN -AREA 'F' & 'G'

A-109 1ST FLOOR FURNITURE PLAN

A-110 2ND FLOOR FURNITURE PLAN

A-111 ENLARGED FLOOR PLANS - AREA 'A'

A-112 ENLARGED FLOOR PLANS - AREAS 'A' & 'B'

A-113 ENLARGED FLOOR PLANS - AREA 'B' & 'C'

A-114 ENLARGED FLOOR PLANS - AREA 'D'

A-115 ENLARGED FLOOR PLANS - AREAS 'E' & 'F'

A-116 ENLARGED FLOOR PLANS - AREA 'F'

A-117 GYM COURT STRIPING

A-118 ROOM FINISH SCHEDULE

A-119 DOOR SCHEDULE, DOOR TYPES & FRAME TYPES

A-120 DOOR HARDWARE

A-121 DOOR HARDWARE

A-122 WINDOW & LOUVER / WALL CAP / REMOVABLE PANEL SCHEDULE, WINDOW

TYPES & LOUVER / WALL CAP / REMOVABLE PANEL TYPES

LIST OF DRAWING SHEETS 00 0115 - 3

A-123 INTERIOR ELEVATIONS - AREA 'A'

A-124 INTERIOR ELEVATIONS - AREA 'A'

A-125 INTERIOR ELEVATIONS - AREA 'B'

A-126 INTERIOR ELEVATIONS - AREA 'B'

A-127 INTERIOR ELEVATIONS - AREA 'C'

A-128 INTERIOR ELEVATIONS - AREA 'C'

A-129 INTERIOR ELEVATIONS - AREA 'D'

A-130 INTERIOR ELEVATIONS - AREA 'D'

A-131 INTERIOR ELEVATIONS - AREA 'D'

A-132 INTERIOR ELEVATIONS - AREA 'E' & 'F'

A-133 INTERIOR ELEVATIONS - AREA 'F'

A-134 INTERIOR ELEVATIONS - AREA 'F'

A-135 MILLWORK DETAILS

A-136 1ST FLOOR - SIGNAGE PLAN

A-137 2ND FLOOR - SIGNAGE PLAN

A-138 SIGNAGE DETAILS

ARCHITECTURAL EXTERIOR ELEVATIONS

A-201 EXTERIOR ELEVATIONS

A-202 EXTERIOR ELEVATIONS - FINISHES

A-203 EXTERIOR ELEVATIONS - AREA 'A'

A-204 EXTERIOR ELEVATIONS - AREA 'B'

A-205 EXTERIOR ELEVATIONS - AREA 'C'

A-206 EXTERIOR ELEVATIONS - AREA 'D'

A-207 EXTERIOR ELEVATIONS - AREA 'F'

ARCHITECTURAL SECTIONS

A-301 PARTITION TYPES

A-302 PARTITION TYPES

A-303 PARTITION TYPES

A-304 PARTITION TYPES

A-305 BUILDING SECTIONS

A-306 BUILDING SECTIONS

A-307 WALL SECTIONS

A-308 WALL SECTIONS

A-309 WALL SECTIONS

A-310 WALL SECTIONS

A-311 WALL SECTIONS

A-312 WALL SECTIONS

A-313 WALL SECTIONS

A-314 WALL SECTIONS

A-315 WALL SECTIONS

A-316 WALL SECTIONS

A-317 WALL SECTIONS

A-318 WALL SECTIONS

A-319 WALL SECTIONS

A-320 WALL SECTIONS

A-321 WALL SECTIONS

A-322 WALL SECTIONS

A-323 WALL SECTIONS

A-324 WALL SECTIONS

A-325 WALL SECTIONS

A-326 WALL SECTIONS

A-327 WALL SECTIONS

A-328 WALL SECTIONS

LIST OF DRAWING SHEETS 00 0115 - 4

ARCHITECTURAL ROOF PLANS

A-401 OVERALL ROOF PLAN

A-402 ROOF PLAN - AREA 'B'

A-403 ROOF PLAN - AREA 'C'

A-404 ROOF PLAN - AREA 'D'

A-405 ROOF PLAN - AREA 'E'

A-406 ROOF PLAN - AREA 'F'

A-407 ROOF DETAILS

A-408 ROOF DETAILS

A-409 ROOF DETAILS FOR ALTERNATIVE # 2 & # 3

ARCHITECTURAL RCP

A-410 1ST FLOOR OVERALL REFLECTED CEILING PLAN

A-411 2ND FLOOR OVERALL REFLECTED CEILING PLAN

A-412 1ST FLOOR REFLECTED CEILING PLAN - AREA 'A'

A-413 1ST FLOOR REFLECTED CEILING PLAN - AREA 'B'

A-414 1ST FLOOR REFLECTED CEILING PLAN - AREA 'C

A-415 1ST FLOOR REFLECTED CEILING PLAN - AREA 'D'

A-416 2ND FLOOR REFLECTED CEILING PLAN - AREA 'E'

A-417 2ND FLOOR REFLECTED CEILING PLAN - AREA 'F'

A-418 RCP DETAILS

A-419 RCP DETAILS

A-420 RCP DETAILS

ARCHITECTURAL DOOR & WINDOW DETAILS

A-501 EXTERIOR DOOR DETAILS

A-502 INTERIOR DOOR DETAILS

A-503 INTERIOR DOOR DETAILS

A-504 EXTERIOR WINDOW DETAILS

A-505 INTERIOR WINDOW, REMOVABLE PANEL & LOUVER DETAILS

ARCHITECTURAL PLAN DETAILS

A-601 PLAN DETAILS

A-602 PLAN DETAILS

A-603 PLAN DETAILS

A-604 PLAN DETAILS

A-605 PLAN DETAILS

ARCHITECTURAL FINISHES

A-700 OVERALL 1ST FLOOR FINISH PLAN

A-701 OVERALL 2ND FLOOR FINISH PLAN

A-702 FLOOR GRAPHICS

A-703 OVERALL 1ST FLOOR GRAPHICS PLAN

A-704 OVERALL 2ND FLOOR GRAPHICS PLAN

A-705 INTERIOR GRAPHICS - GYM

A-706 INTERIOR GRAPHICS - CAFETERIA - SECURE LOBBY

A-707 GRAPHICS

A-708 TILE PATTERNS / CORRIDOR GRAPHICS

A-709 TILE PATTERNS / CORRIDOR GRAPHICS

FOOD SERVICE

FS-5 GENERAL COORDINATION NOTES

FS-5.0 EQUIPMENT PLAN

FS-5.1 FACILITY MODEL

FS-5.2 EQUIPMENT MODEL

FS-5.3 SPECIAL CONDITIONS & MECHANICAL PLAN

LIST OF DRAWING SHEETS 00 0115 - 5

FS-5.4 PLUMBING PLAN

FS-5.5 ELECTRICAL PLAN

FS-5.6 EXHAUST HOODS

FS-5.7 CONDENSING UNITS

FS-5.8 ELEVATIONS

FS-5.9 SECTIONS & DETAILS

FS-5.10 DETAILS

STRUCTURAL

S1.1 GENERAL STRUCTURAL NOTES

S1.2 GENERAL STRUCTURAL NOTES

S1.3 GENERAL STRUCTURAL DETAILS

S1.4 GENERAL STRUCTURAL DETAILS

S2.0 DIMENSION CONTROL PLAN

S2.1 PARTIAL FOUNDATION PLAN AREAS B, C, AND D

S2.1C PARTIAL CONTROL JOINT PLAN AREAS B, C, AND D

S2.2 PARTIAL FOUNDATION PLAN AREA A

S2.2C PARTIAL CONTROL JOINT PLAN AREA A

S2.3 FOUNDATION DETAILS

S2.4 FOUNDATION DETAILS

S2.5 DUMPSTER PAD & MONUMENT SIGN FOUNDATION & DETAILS

S2.6 GENERATOR FOUNDATION PLAN & DETAILS

S2.7 SEGMENTAL RETAINING WALL PLAN

S3.1-1 PARTIAL 2ND FLOOR AND LOW ROOF COLUMN AND GIRDER FRAMING PLAN AR-

EA B, C, AND E

S3.1-2 PARTIAL 2ND FLOOR AND LOW ROOF JOIST FRAMING PLAN AREA B, C, AND E

S3.2-1 PARTIAL 2ND FLOOR AND LOW ROOF COLUMN AND GIRDER FRAMING PLAN AR-

EA A

S3.2-2 PARTIAL 2ND FLOOR AND LOW ROOF JOIST FRAMING PLAN AREA A

S3.3-1 PARTIAL HIGH ROOF COLUMN AND GIRDER FRAMING PLAN AREA F AND G

S3.3-2 PARTIAL ROOF JOIST FRAMING PLAN AREA F AND G

S3.4-1 PARTIAL HIGH ROOF COLUMN AND GIRDER FRAMING PLAN AREA E

S3.4-2 PARTIAL ROOF JOIST FRAMING PLAN AREA E

S3.5 BRACE PROFILES

S3.6 BRACE PROFILES & DETAILS

S3.7 STAIR PLAN

S3.8 CANOPY FRAMING PLANS, FRAMES, AND DETAILS

S3.9 GENERATOR FRAMING PLAN AND DETAILS

S4.1 FRAMING DETAILS

S4.2 FRAMING DETAILS

S4.3 FRAMING DETAILS

S4.4 FRAMING DETAILS

S4.5 FRAMING DETAILS

S4.6 FRAMING DETAILS

MECHANICAL

MEP204 MECHANICAL AND ELECTRICAL ROOF PLAN

MEP

MEP101 SYMBOLS & ABBRVIATIONS

MEP201 PARTIAL MEP SITE PLAN

MEP202 PARTIAL MEP SITE PLAN - EAST PARKING

MEP203 SITE LIGHTING PHOTOMETRIC

MECHANICAL

M201 OVERALL MECHANICAL PLAN - LEVEL 1

M202 PARTIAL MECHANICAL PLAN - AREA 'A' & 'D'

LIST OF DRAWING SHEETS 00 0115 - 6

M203 PARTIAL MECHANICAL PLAN - AREA 'B', 'C'

M204 OVERALL MECHANICAL PLAN - LEVEL 2

M205 PARTIAL MECHANICAL PLAN - AREA 'E', 'F', & 'G'

M301 SCHEDULES

M401 DETAILS

M501 CONTROL DETAILS

ELECTRICAL

E201 PARTIAL ELECTRICAL LIGHTING PLAN - AREA 'A' & 'D'

E202 PARTIAL ELECTRICAL LIGHTING PLAN - AREA 'B' & 'C'

E203 PARTIAL ELECTRICAL LIGHTING PLAN - AREA 'E','F', & 'G'

E301 PARTIAL ELECTRICAL POWER PLAN - AREA 'A' & 'D'

E301.1 ENLARGED KITCHEN POWER PLAN - AREA 'D'

E301A PARTIAL ELECTRICAL MECH POWER PLAN - AREA 'A' & 'D'

E302 PARTIAL ELECTRICAL POWER PLAN - AREA 'B' & 'C'

E302A PARTIAL ELECTRICAL MECH POWER PLAN - AREA 'B' & 'C'

E303 PARTIAL ELECTRICAL POWER PLAN - AREA 'E', 'F', & 'G'

E303A PARTIAL ELECTRICAL MECH POWER PLAN - AREA 'E', 'F' & 'G'

E401 ELECTRICAL ONE LINE DIAGRAM

E500 LIGHTING FIXTURE SCHEDULE

E501 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

E502 ELECTRICAL PANEL SCHEDULES

E503 ELECTRICAL PANEL SCHEDULES

E504 ELECTRICAL PANEL SCHEDULES

E601 ELECTRICAL DETAILS

FA101 OVERALL ELECTRICAL FIRE ALARM PLAN - LEVEL 1

FA102 OVERALL ELECTRICAL FIRE ALARM PLAN - LEVEL 2

PLUMBING

FP101 OVERALL FIRE PROTECTION PLAN - LEVEL 1

FP102 OVERALL FIRE PROTECTION PLAN - LEVEL 2

P100 COMPOSITE UNDERFLOOR PLUMBING PLAN

P101 PARTIAL UNDERFLOOR PLUMBING PLAN - AREA 'A' & 'D'

P102 PARTIAL UNDERFLOOR PLUMBING PLAN - AREA 'B' & 'C'

P200 COMPOSITE PLUMBING PLAN - LEVEL 1

P201 PARTIAL PLUMBING PLAN - AREA 'A' & 'D'

P202 PARTIAL PLUMBING PLAN - AREA 'B' & 'C'

P203 COMPOSITE PLUMBING PLAN - LEVEL 2

P204 PARTIAL PLUMBING PLAN - AREA 'E', 'F', & 'G'

P301 PARTIAL PLUMBING ENLARGEMENT PLAN - AREA 'A' & 'D'

P302 PARTIAL PLUMBING ENLARGEMENT PLAN - AREA 'B' & 'C'

P303 PARTIAL PLUMBING ENLARGEMENT PLAN - AREA 'F'

P401 PLUMBING SCHEDULES & DETAILS

P402 PLUMBING SCHEDULES & DETAILS

P403 PLUMBING SCHEDULES & DETAILS

TECHNOLOGY

T-000 TECHNOLOGY SYMBOLS & LEGEND

T-100 TECHNOLOGY SITE PLAN

T-101 TECHNOLOGY OVERALL 1ST FLOOR PLAN

T-102 TECHNOLOGY OVERALL 2ND FLOOR PLAN

T-103 TECHNOLOGY 1ST FLOOR PLAN

T-104 TECHNOLOGY 2ND FLOOR PLAN

T-300 TECHNOLOGY ENLARGED VIEWS

T-400 TECHNOLOGY TYPICAL DETAILS

T-401 TECHNOLOGY TYPICAL DETAILS

LIST OF DRAWING SHEETS 00 0115 - 7

T-500 TECHNOLOGY TYPICAL LABELING SCHEME

T-600 TECHNOLOGY EQUIPMENT SCHEDULE

TA-000 AUDIOVISUAL SYMBOLS & LEGEND

TA-101 AUDIOVISUAL OVERALL 1ST FLOOR PLAN

TA-102 AUDIOVISUAL OVERALL 2ND FLOOR PLAN

TA-300 AUDIOVISUAL ENLARGED ELEVATIONS

TA-301 AUDIOVISUAL ENLARGED ELEVATIONS

TA-302 AUDIOVISUAL ENLARGED ELEVATIONS

TA-400 AUDIOVISUAL TYPICAL DETAILS

TA-401 AUDIOVISUAL TYPICAL DETAILS

TA-500 AUDIOVISUAL SIGNAL FLOW DIAGRAM

TA-501 AUDIOVISUAL SIGNAL FLOW DIAGRAM

TPA-000 PUBLIC ADDRESS SYMBOLS & LEGEND

TPA-101 PUBLIC ADDRESS OVERALL 1ST FLOOR PLAN

TPA-102 PUBLIC ADDRESS OVERALL 2ND FLOOR PLAN

TPA-400 PUBLIC ADDRESS TYPICAL DETAILS

TS-000 SECURITY SYMBOLS & LEGEND

TS-100 SECURITY SITE PLAN

TS-103 SECURITY 1ST FLOOR PLAN

TS-104 SECURITY 2ND FLOOR PLAN

TS-400 SECURITY TYPICAL DETAILS

TS-500 SECURITY SCHEDULES

END OF DOCUMENT 00 0115

SECTION 00 02 00

INVITATION TO BID

Project: Harmony School of Excellence – Fort Worth

Location: White Settlement Road & Legacy Dr. Fort Worth, TX 76108

ISSUED BY (Owner): SUBMIT INQUIRIES TO:

Harmony Public Schools (HPS) Name: Mehmed Milanovic 1255 Enclave Parkway Title: Director of Construction Houston, Texas 77077 Email: mmilanovic@harmonytx.org

Project Overview: Harmony Public Schools (“HPS”) is seeking competitive sealed proposals from qualified offerors to provide construction services for a construction project at “Harmony School of Excellence – Fort Worth”. The project scope of work includes a ground up construction of a one story 55,000 square foot elementary school facility including parking lot, playground, and landscaping. Construction scope consists of but is not limited to concrete, drywall, glazing, finishes, roofing, electrical, mechanical, plumbing, landscaping, low voltage and other related work as specified in the project documents. (#HPS2026_HSE Fort Worth – Phase I -

GU)

Estimated Budget: The estimated budget for this project is $16 million

Award/Contract Approval: This procurement, any award under this procurement, and the resulting contract, if any, is subject to approval by HPS’s governing board. Subsequent to Board approval, the only person authorized to commit HPS contractually is the Superintendent or his designee. This solicitation is an invitation for sealed proposals and neither this solicitation nor the response or the bid from any prospective bidder shall create a contractual relationship that would bind HPS until such time as both HPS and the selected proposer/contractor sign a legally binding contract, which includes, without limitation, the terms required by HPS.

Pre-Bid Meeting: Pre-Bid meeting agenda will include review of topics that may affect proper preparation and submittal of proposals and is scheduled for 2:00 p.m. CST on Wednesday, September 2, 2026 via Google Meet. Attendance at the pre-bid meeting is not mandatory, but all proposers are highly encouraged to attend. If you are planning on attending please email mmilanovic@harmonytx.org, See meeting link below:

Pre Bid Meeting - (#HPS2026_HSE Fort Worth – Phase I - GU) Wednesday, September 2 · 2:00 – 3:00pm Time zone: America/Chicago Google Meet joining info Video call link: https://meet.google.com/twu-vjfu-sdr Or dial: 9518-580-(US) +1 904 PIN: 673 272 900# More phone numbers: https://tel.meet/twu-vjfu-sdr?pin=3119463688842 mailto:mmilanovic@harmonytx.org

Proposal Deadline; Opening Time/Location: Sealed proposals in original form for the construction work to be performed as required and/or contemplated under this request for competitive sealed proposals and as described herein and in the construction documents will be received by 2:00 PM CST September 29th, 2026 through Harmony’s ebid system at https://harmonytx.ionwave.net/Login.aspxand will be opened at 2:00 PM CST September 29th, 2026 via Google Meet meeting Join the Meeting at:

Bid Opening - (#HPS2026_HSE Fort Worth – Phase I - GU) Tuesday, September 29 · 2:00 – 3:00pm Time zone: America/Chicago Google Meet joining info Video call link: https://meet.google.com/bgm-cevv-qvj Or dial: 0884-930-(US) +1 216 PIN: 222 225 233# More phone numbers: https://tel.meet/bgm-cevv-qvj?pin=7311415088327

Please send an email to confirm attendance to mmilanovic@harmonytx.org.

Sealed proposals may also be submitted physically by mail. If selecting to mail in proposals, please have them delivered to the Harmony Public Schools Central Office 1255 Enclave Parkway Houston, Texas 77077– Attention Luis De Hoyos. Sealed proposals that are delivered after 2:00 PM CST September 29, 2026, will not be accepted. Please send one (1) binder of your proposal in dividers along with all required documentation outlined in the Invitation to Bid and write “Do Not Open” on the envelope.

Proposers may submit questions through the HPS ebid system at https://harmonytx.ionwave.net/Login.aspx. Question cutoff date and time is Friday , September 11th , 2026 at 5:00 pm CST. Proposers are required to complete all sections provided in the ebid system. Proposals that have been opened may not be changed for the purpose of correcting an error in the price. Other than price, a proposer may have the right to change any other error or mistake in the bid as may be permitted by applicable law and subject to the approval of HPS, unless such change would be in contravention of statutory or common law requirements or unless such change would give an unfair advantage to the proposer making such change.

Contract Term: HPS intends to sign a contract for Construction by 11/1/2026. Actual work to be performed and the schedule for performance under this solicitation will be upon the terms, conditions, and timelines agreed upon by the HPS Superintendent and the selected contractor.

Time is of the essence for this project. All items listed in the construction documents shall be completed no later than March 1st, 2028. Deadline will not be moved due to rainy days.

Liquidated Damages: Time is of the essence regarding the performance of all Work. If the Contractor fails to achieve Substantial Completion on or before March 1st, 2028, Contractor shall pay to the Owner, as liquidated damages, $2000 per day for each calendar day that Substantial Completion is delayed thereafter.

Reservations and Waivers: This procurement solicitation shall be in accordance with Harmony Public Schools’s procurement policies and general terms, including the following:

mailto:mmilanovic@harmonytx.org

1. This Request for Competitive Sealed Proposals does not obligate HPS to award a contract or pay any costs incurred by the proposer in the preparation and submittal of a proposal. HPS assumes no financial responsibility for any costs incurred by proposers in developing and submitting a proposal, participating in pre-bid meetings, or any other costs incurred by proposers in connection with this procurement solicitation.

2. HPS, IN ITS SOLE DISCRETION, RESERVES THE RIGHT TO ACCEPT ANY

PROPOSAL AND/OR REJECT ANY AND ALL PROPOSALS OR A PART OF A

PROPOSAL, WITHOUT REASON OR CAUSE, SUBMITTED IN RESPONSE TO

THIS SOLICITATION.

3. HPS RESERVES THE RIGHT TO REJECT ANY NON-RESPONSIVE OR

CONDITIONAL PROPOSAL.

4. HPS RESERVES THE RIGHT TO WAIVE ANY FORMALITIES,

IRREGULARITIES, AND/OR TECHNICALITIES IN THIS SOLICITATION,

THE CONSTRUCTION AND/OR PROCUREMENT DOCUMENTS, AND/OR

ANY PROPOSALS RECEIVED OR SUBMITTED.

5. BY SUBMITTING A PROPOSAL, PROPOSER AGREES TO WAIVE ANY

CLAIM IT HAS OR MAY HAVE AGAINST HARMONY PUBLIC SCHOOLS,

AND/OR ANY OF EITHER ENTITY'S BOARD MEMBERS, ADMINISTRATORS,

EMPLOYEES, AND/OR AGENTS ARISING OUT OF OR IN CONNECTION

WITH (1) THE ADMINISTRATION, EVALUATION, OR RECOMMENDATION

OF ANY PROPOSAL; (2) ANY REQUIREMENTS UNDER THE SOLICITATION,

PROCUREMENT PACKAGE, OR RELATED DOCUMENTS; (3) THE

REJECTION OF ANY PROPOSAL OR ANY PART OF ANY PROPOSAL;

AND/OR (4) THE AWARD OF A CONTRACT, IF ANY.

6. HPS reserves the right to withdraw/cancel this solicitation at any time for any reason, remove any scope component for any reason and to issue such clarifications, modifications and/or amendments as deemed appropriate by HPS, in its sole discretion.

7. A response to this procurement solicitation is an offer to contract with HPS based upon the terms, conditions, scope of work, and specifications contained in this procurement solicitation and the construction documents. A contract is not formed unless and until a proposal is accepted and awarded by HPS after approval by the HPS Board of Directors.

8. Proposals may be withdrawn only by delivery of a written request to Harmony Public

Schools prior to the specified deadline time/date stated in this request for proposal. The authorized signatory must sign such request.

9. Proposals received will become a part of Harmony Public School’s official files without further obligation to the respondents.

10. Respondents shall not, under penalty of law, offer any gratuities, favors, or anything of monetary value to any officer or employee of Harmony Public Schools, or to any consultant, employee, or member of HPS for the purpose of or having the effect of influencing favorable disposition toward their own proposal or any other proposal submitted hereunder.

11. No employee, officer or member of HPS shall participate in the selection, development of a response to this procurement solicitation, award or administration of a contract resulting from this procurement solicitation if a conflict of interest, real or apparent, would be involved.

12. Proposers shall not engage in any activity that will restrict or eliminate competition. This does not preclude joint ventures or subcontracts.

13. HPS is subject to the Texas Public Information Act. Proposals submitted to HPS as a result of this procurement solicitation may be subject to release as public information after contracts are executed or the procurement is terminated. If a contractor believes that its proposal, or parts of its proposal, may be exempted from disclosure under Texas law, the contractor must specify page-by-page and line-by-line the parts of the proposal which it believes are exempt. In addition, the contractor must specify which exception(s) to the Texas Public Information Act are applicable and provide detailed reasons to substantiate the exception(s). Vague or general claims to confidentiality will not be accepted. HPS assumes no obligation or responsibility relating to the disclosure or nondisclosure of information submitted by proposers.

14. HPS is an equal opportunity/educational institution, which does not discriminate on the basis of race, color, religion, national origin, gender, age or disability.

END OF SECTION 00 02 00

SECTION 00 04 00

PROPOSAL FORM

PROJECT TITLE: Harmony School of Excellence – Fort Worth

Name of Proposer/Contractor: _______________________ Address: __________________________

Telephone: _______________________ Fax: _____________________________

E-mail: ___________________________

Receipt of Proposal Amendments Number(s): ___________________________

1 Base Bid Amount $ 2 Alternate No. 1: 80 Mil TPO Roofing in lieu of SBS

Modified Bitumen Membrane Roofing $

3 Alternate No. 2: 60 Mil TPO Roofing in lieu of SBS Modified Bitumen Membrane Roofing $

4 Alternate No. 3: Electrical Switchgear Expediting $

The undersigned hereby proposes to furnish all labor, materials, supervision and any other services necessary to complete the above referenced project for the proposal amount(s) listed on the Scope of Work: Schedule of Services, Equipment and Prices, Attachment No. 3.

The undersigned certifies that the amount(s) contained in Attachment No. 2 have been carefully checked and are submitted as correct and final.

Signed By: ______________________________

Name: __________________________________

(Type or Print)

Title: ___________________________________

(Type or Print)

ATTEST: _______________________________

(Secretary, if Proposer is a Corporation)

SEAL:

(If Corporation)

ATTACHMENT A

CERTIFICATION OF PROPOSER

The undersigned Proposer has carefully examined all instructions, requirements, specifications, terms and conditions of this procurement solicitation and the construction documents and certifies:

1. It is a reputable company regularly engaged in providing construction services necessary to meet the requirements, specifications, terms and conditions of the procurement solicitation.

2. It has the necessary experience, knowledge, abilities, skills, and resources to satisfactorily perform the requirements, specifications, terms and conditions of this procurement solicitation. Further, if awarded, the Proposer agrees to perform the requirements, specifications, terms and conditions of this procurement solicitation and to obtain final completion for the entire project on or before March 1st, 2028

3. Proposer proposes to furnish all labor, materials, supervision and any other services necessary to complete the project for the proposal amount(s) listed on Attachment C. The undersigned certifies that the amount(s) contained in Attachment C have been carefully checked and are submitted as correct and final.

4. All statements, information, and representations prepared and submitted in response to this procurement solicitation are current, complete, true, and accurate. Proposer acknowledges that HPS will rely on such statements, information, and representations in selecting the successful proposer. Proposer shall be bound by all statements, representations, warranties, and guarantees made in its proposal.

5. It is not currently barred or suspended from doing business with the Federal government, any of the members represented, or any of their respective agencies.

6. That all of the requirements of this procurement solicitation and the construction documents have been read and understood, including any amendments/addenda. In addition, compliance with all requirements, terms and conditions will be assumed by HPS if not otherwise noted in the proposal.

7. The individual signing below has authority to submit this proposal on behalf of Proposer.

PROJECT TITLE: HSE Fort Worth

PROPOSER NAME:

AUTHORIZED SIGNATURE:

PRINT NAME:

TITLE:

DATE:

ADDRESS:

CITY, STATE, ZIP CODE:

PHONE: FAX:

EMAIL ADDRESS:

WEBSITE URL:

ATTACHMENT B

BUSINESS QUESTIONNAIRE & QUALIFICATION STATEMENT

FIRM NAME: _______________________________________________________________

CONTACT PERSON’S NAME AND PHONE NUMBER:

Do you or any officer, partner, owner, sales representative, and/or spouse work for Harmony Public Schools? Yes No

If yes, please specify: ___________________________________________________

Please indicate how you became aware of this procurement.

Source: _________________________________________________________________

I. ORGANIZATION

1. Type of Organization

_____ Individual _____ Sole Proprietorship _____ Partnership _____ Corporation, Incorporated in ________

2. Federal Employer Identification Number: __________________________

3. Number of persons currently employed: ________________________

4. How many years has your organization been in business as a contractor? ___________

5. How many years has your organization been in business under its present business name?

List any other or former names your organization has operated under:

6. If your organization is a corporation, answer the following:

Date of incorporation: ____________________

State of incorporation: ____________________

President’s name: _______________________

Vice-president’s name: ___________________

7. If your organization is a partnership, answer the following:

Date of organization: _____________________________

Type of partnership (if applicable): __________________

Names(s) of general partner(s): _____________________

8. If your organization is individually owned, answer the following:

Date of organization: ___________________

Name of owner: _______________________

9. If the form of your organization is other than those listed above, describe it and name the principals/owners:

II. LICENSING

1. List the jurisdiction(s) and trade categories in which your organization is legally qualified to do business, and indicate registration or license numbers, if applicable.

2. List the jurisdiction(s) in which your organization’s partnership or trade name is filed.

III. EXPERIENCE

1. List the categories of work that your organization normally performs with its own forces.

2. Claims and Suits: (If the answer to any of the questions below is yes, please attach details.)

Has your organization ever failed to complete any work awarded to it?

Yes No

Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? Yes No

Has your organization filed any lawsuits or requested arbitration with regard to construction contracts within the last five years? Yes No

3. On a separate sheet, list major construction projects your organization has in progress, giving the name of the project, owner, architect, contract amount, percent complete, and scheduled completion date.

IV. REFERENCES

List a minimum of three references (local or otherwise) which have been or are now your customer and at least one in which you have performed comparable work in quantity and scope to that specified in this solicitation.

Name of Entity Contact Person Telephone # Address Amount of Contract

1. ___________________________________________________________________________

2. ___________________________________________________________________________

3. __________________________________________________________________________

V. FINANCING

Name of Proposer’s Financial Institution: ___________________________________________

Contact Person: _______________________________

Title: _______________________________________

1. Attach a financial statement, preferably audited, including your organization’s latest balance sheet and income statement showing the following items:

a. Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses)

b. Net Fixed Assets

c. Other Assets

d. Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provisions for income taxes, advances, accrued salaries and accrued payroll taxes)

e. Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings)

2. Name and address of firm/individual preparing attached financial statement, and date thereof:

3. Is the attached financial statement for the identical organization (proposer) named on page one? Yes No

If no, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent-subsidiary):

4. Will the organization whose financial statement is attached act as a guarantor of the contract for construction? Yes No

ATTACHMENT C

PRICE FORM: SCHEDULE OF SERVICES, EQUIPMENT AND PRICES

The contractor shall furnish all resources and services necessary and required to perform the construction services for this project detailed in the procurement solicitation and construction documents, in accordance with the specifications and the general terms and conditions of the proposed contract for the proposed price(s) listed below.

All equipment shall be new.

Appendix A is representative of the scopes dictated under the construction/procurement documents. Use the appropriate schedule of values. Note: Use only those line items appropriate to the scope of work.

SCHEDULE OF VALUES (APPENDIX A)

Contractor: __________________________

Contact:_____________________________ Proposal Date:_______________________

Please refer to scope of work for detailed information. (Please mark N/A if it is not necessary for the project scope of work. If something is in another line item, please note that. Do not leave blanks.)

Job Name Job Description Total Price

1 General Requirements Project Supervision and management; weekly and final cleanup

2 Reports, Tests and Inspections

All necessary material testing and reporting (concrete, steel, inspections, etc.)

3 County approvals, Certificate of Occupancy

Preparing, submitting and follow-up with Fire Marshall and MUD requirements.

4 Mobilization Trailer, Dumpster, Toilet, Trailer Furniture, Equipment, Temporary utilities, etc.

5 Site Work Earthwork, water service piping, storm sewerage, sanitary sewerage, excavation, grading, landscape etc.

6 Playgrounds Material and Installation

7 Driveway, Parking Area, Sidewalk

Concrete and asphalt pavement and sidewalks, striping, painting curbs and ramps, traffic signs, repairs, and cleaning.

8 Retaining Wall Material and Labor

9 Concrete for Building Material and Installation

10 Exterior Finishes Sheathing, stucco, EIFS, brick, CMU etc.

11 Waterproofing Material & Labor

12 Metals Material and Installation of new steel, flashing, metal stud framing.

13 Drywall and Ceiling Material & Labor

Toilet/Changing Room Partitions and toilet accessories

Material and Installation of toilet/changing room partitions and toilet accessories

15 Kitchen Equipment Material & Labor

16 Thermal & Moisture Protect. Wall insulation, sealants

17 Doors, Frames & Windows Material & Labor

18 Finishes Interior finishes: Paint, tile, ceiling tile, carpet.

19 Mechanical RTU’s, curbs, wiring, testing, air-balancing, generator, etc.

20 Electrical Electrical power, panels, breakers, lighting, sensors, switching.

Relocating Light Poles.

21 Structured Cabling Material and Installation

22 Audio Visual Systems Material and Installation

23 Distributed Communication (PA) System Material and Installation

24 Intrusion Detection System Material and Installation

25 Access Control System Material and Installation

26 Video Surveillance System Material and Installation

27 Underground Fiber Optic Material and Installation

28 Plumbing Water, waste, vent, fixtures, etc.

29 Fire Prevention Fire sprinkler, fire alarm, and related permits & approvals.

30 Painting Material and labor per specs.

31 Fences Material and installation of the fence, gates, concrete footing etc.

32 Roofing Material and Installations

33 Exterior Awning Material and Installation

34 Performance/Payment Bond Bonds

35 All permit costs, inspection costs and associated fees.

Including but, not limited to, building permit, sprinkler permit, canopy permits, fence permits, etc.

36 Owner Contingency $500,000 Contingency $500,000.00

37 Data Network and Wireless Material and Installation

38 Voice Network System Material and Installation

39 Gym Equipment Material and Installation

40 Marquee with Electronic Message Display

Delegated Design, Material and Installation

41 Construction Camera Material/Labor/Service – Per Specifications

42 Other Any other costs related to the project

TOTAL BASE BID AMOUNT

SCHEDULE OF VALUES (APPENDIX B) – Alternate Bid

Job Name Total Price

Alternate No. 1: 80 Mil TPO Roofing in lieu of SBS Modified Bitumen Membrane Roofing

2 Alternate No. 2: 60 Mil TPO Roofing in lieu of SBS Modified Bitumen Membrane Roofing $

3 Alternate No. 3: Electrical Switchgear Expediting $

ATTACHMENT D

HARMONY PUBLIC SCHOOLS’S

PROPOSER/VENDOR CERTIFICATION FORMS

CERTIFICATION OF RESIDENCY

The State of Texas has a law concerning non-resident vendors. This law can be found in Texas Education Code under Chapter 2252, Subchapter A. This law makes it necessary for HPS to determine the residency of its Vendors. In part, this law reads as follows:

Section: 2252.001: "Non-resident bidder” refers to a person who is not a resident. “Resident bidder” refers to a person whose principal place of business is in this state, including a vendor whose ultimate parent company or majority owner has its principal place of business in this state.

Section: 2252.002: "A governmental entity may not award a governmental contract to a non-resident bidder unless the nonresident underbids the lowest bid submitted by a resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident’s principal place of business is located.”

Company submitting bid is a resident bidder: Yes No

City and State of vendor's principal place of business:

CERTIFICATION OF COMPLIANCE WITH TEXAS FAMILY CODE PROVISION

As per Section 231.006, Texas Family Code, as amended by Section 82 of H.B. 433, 74th Legislature, R.S.

(Acts 1995, 74th Leg., R.S., ch. 751), all proposers must complete and submit with the proposal the following affidavit:

I, the undersigned vendor, do hereby acknowledge that a child support obligor who is more than 30 days delinquent in paying child support and a business entity in which such a person is the sole proprietor, partner, shareholder, or owner with an ownership interest of at least 25% is not eligible to receive payments from state funds under a contract to provide property, materials, or services.

I further acknowledge that a child support obligor or business entity ineligible to receive payments described above shall continue to be ineligible until: (1) all arrearage have been paid; (2) the obligor is in compliance with a written repayment agreement or court order as to any existing delinquency; or (3) the court of continuing jurisdiction over the child support order has granted the obligor an exemption.

In accordance with 231.006, the names and social security numbers of the individual identified in the contract, bid or application or the sole proprietor and each partner, shareholder, or owner with a minimum 25% ownership interest in the business entity identified therein are provided below:

Name Social Security Number

Pursuant to Section 231.006, the vendor hereby certifies that the individual or business entity named in this contract, bid, or application, is not ineligible to receive the specified grant, loan, or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate.

______ Initials of Authorized Representative of Vendor

REQUIRED CONTRACT PROVISIONS FOR NON-FEDERAL ENTITY CONTRACTS

UNDER FEDERAL AWARDS – APPENDIX II TO 2 CFR PART 200

The following provisions are required and apply when federal funds are expended by HPS for any contract resulting from this procurement process.

(A) Contracts for more than the simplified acquisition threshold currently set at $150,000, which is the inflation adjusted amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate.

Pursuant to Federal Rule (A) above, when federal funds are expended by HPS, HPS reserves all rights and privileges under the applicable laws and regulations with respect to this procurement in the event of breach of contract by either party.

Does vendor agree? YES ________ Initials of Authorized Representative of vendor

(B) Termination for cause and for convenience by the grantee or subgrantee including the manner by which it will be effected and the basis for settlement. (All contracts in excess of $10,000)

Pursuant to Federal Rule (B) above, when federal funds are expended by HPS, HPS reserves the right to immediately terminate any agreement in excess of $10,000 resulting from this procurement process in the event of a breach or default of the agreement by Vendor, in the event vendor fails to: (1) meet schedules, deadlines, and/or delivery dates within the time specified in the procurement solicitation, contract, and/or a purchase order; (2) make any payments owed; or (3) otherwise perform in accordance with the contract and/or the procurement solicitation. HPS also reserve the right to terminate the contract immediately, with written notice to vendor, for convenience, if HPS believes, in its sole discretion that it is in the best interest of HPS to do so. The vendor will be compensated for work performed and accepted and goods accepted by HPS as of the termination date if the contract is terminated for convenience of HPS. Any award under this procurement process is not exclusive and HPS reserves the right to purchase goods and services from other vendors when it is in the best interest of HPS.

(C) Equal Employment Opportunity. Except as otherwise provided under 41 CFR Part 60, all contracts that meet the definition of “federally assisted construction contract” in 41 CFR Part 60-1.3 must include the equal opportunity clause provided under 41 CFR 60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 CFR part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.”

Pursuant to Federal Rule (C) above, when federal funds are expended by HPS on any…