Northeast Hawthorn Wellfield - 11 Perimeter Wells
Solicitation number
24-8272
Issued by
Collier County, Florida

About this file

The document is a Bid Schedule for Collier County, Florida, specifically for the Northeast Hawthorn Wellfield - 11 Perimeter Wells Project (Bid No. 24-8272). The project involves the construction of 11 perimeter wells, with detailed specifications for drilling, casing, and testing. The bid is set to be received by October 21, 2024, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for September 19, 2024, at 10:00 a.m. The bid schedule outlines comprehensive tasks including pilot boring, geophysical logging, reaming, casing installation, grouting, well development, and performance testing across various depths ranging from 0 to approximately 1,000 feet below land surface.

The bid schedule includes a total of 11 wells with multiple line items covering mobilization, drilling, casing, testing, and associated activities. An owner's allowance of $600,000 has been allocated for unforeseen conditions or owner-directed work, which will be disbursed through change orders with proper documentation. The bid schedule provides unit rates and quantities for each specific task, though in this document the actual unit rates are not filled in, leaving the total bid amount at $0. Prospective bidders are required to register on the Collier County procurement portal to obtain complete bidding documents, with the project located in Collier County, Florida.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule Northeast Hawthorn Wellfield - 11 Perimeter Wells Bid Schedule Construction ITB 24-8272 Part Description Unit Unit Rate Quantity Total

1General
aMobilization/Demobilization (not to exceed 10% of the Total Bid Amount)LS$ - 01$ - 0
bFluid managementEA$ - 011$ - 0
2Installation of Production Wells (11)
aDrill 12.25-inch dia. pilot boring to approximately 710 feet ± bls using the mud-rotary method, with deviation surveysLF$ - 07810$ - 0
bDrill 12.25-inch dia. pilot boring using reverse air drilling method from 700 feet± bls to approximately 1,000-feet± bls with deviation surveysLF$ - 03300$ - 0
cPerform geophysical loggingEA$ - 011$ - 0
dReam to a minimum of 34-inch dia. nominal borehole using the mud-rotary method to 120 feet ± bls with deviation surveysLF$ - 01430$ - 0
eReam a nominal 28-inch diameter borehole using the mud-rotary method to approximately 700 feet± bls with deviation surveysLF$ - 06490$ - 0
fReam a nominal 16-inch diameter borehole using the reverse air drilling method from 700 feet± bls to approximately 1,000-feet± bls with deviation surveysLF$ - 03410$ - 0
g28-inch outer diameter (OD), 0.375-inch thick wall steel surface casing from 0 feet to approximately 120 feet ± blsLF$ - 01430$ - 0
h16-inch ID, 0.5-inch thick wall fiberglass casing from 0 feet to approximately 580 feet± bls, 16-inch ID, 24-inch corrugated, 0.5-inch thick wall fiberglass casing from 580 feet± bls to approximately 700 feet± blsLF$ - 07810$ - 0
iGrout in place (casing annulus) 34-inch OD, 28-inch OD 0.375-inch wall surface casing, from 0 feet to approximately 120 feet± bls and 28-inch OD, 16-inch ID 0.5-inch wall casing, from 0 feet to approximately 700 feet± blsCF$ - 031,170$ - 0
jPlumbness and alignment test and installation of temporary wellheadEA$ - 011$ - 0
kDevelop the well utilizing temporary pump with flow rate up to 1,400 gpmHour$ - 0440$ - 0
lConduct step drawdown testsEA$ - 011$ - 0
mConduct 72-hour aquifer performance testsEA$ - 03$ - 0
nLaboratory servicesLS$ - 01$ - 0
oEquipment standby time with crew offsiteDays$ - 020$ - 0
pEquipment and crew standby timeHours$ - 0264$ - 0
qFurnishing and installing clean fillCY$ - 01100$ - 0

TOTAL BID AMOUNT $ - 0

* Staff has allocated $600,000 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

KEY:

LS - Lump Sum; LF - Linear Feet; CF - Cubic Feet; CY - Cubic Yards; TM - Time and Material 10/30/24