24-8233_Bid_Schedule.xls

XLS spreadsheet 39 KB Posted

Attached to
Immokalee Sidewalks Phase III
Solicitation number
24-8233
Issued by
Collier County, Florida

About this file

The document is a Bid Schedule (24-8233_Bid_Schedule.xls) for the Immokalee Sidewalks Phase III Construction project in Collier County, Florida, advertised on July 17, 2024. The project involves sidewalk construction with a sealed bid deadline of September 3, 2024, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for July 30, 2024, at 10:00 a.m. at the Immokalee CRA Conference Room. The bid schedule includes multiple line items for roadway construction, such as mobilization, construction surveying, maintenance of traffic, driveway maintenance, erosion control, clearing and grubbing, concrete pavement removal, mailbox relocation, and various concrete and infrastructure installations.

The bid schedule indicates multiple line items with zero unit costs at this stage, suggesting that bidders will need to provide pricing during the formal bidding process. Prospective bidders are required to register on the Collier County procurement portal at https://procurement.opengov.com/portal/collier-county-fl to access complete project documents. The project appears to be a public infrastructure improvement initiative focused on sidewalk construction in the Immokalee area, with specific quantities outlined for various construction elements, including 320 cubic yards of commercial material for driveway maintenance, 562 square yards of concrete pavement removal, and 885 square yards of Class I concrete for driveways.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

Immokalee Sidewalks Phase III
Construction ITB 24-8233
BID SCHEDULE
ITEM NO.DESCRIPTIONUNITQTYUNIT COSTTOTAL COST
ROADWAY
1MOBILIZATION (Not to Exceed 10% of Total Bid Amount)LS1$0.00
2PROVIDE CONSTRUCTION SURVEYING AND LAYOUTLS1$0.00
3MAINTENANCE OF TRAFFICLS1$0.00
4COMMERCIAL MATERIAL FOR DRIVEWAY MAINTENANCECY320$0.00
5PRECONSTRUCTION VIDEO OF PROJECT LIMITSLS1$0.00
6EROSION CONTROLLS1$0.00
7CLEARING AND GRUBBING (2.36 AC)LS1$0.00
8REMOVAL OF CONCRETE PAVEMENTSY562$0.00
9MAILBOX (RELOCATE)EA15$0.00
10DITCH GRADINGLS1$0.00
11CLASS I CONCRETE (DRIVEWAYS)(6" THICK)SY885$0.00
12MITERED END SECION (15" RCP)EA1$0.00
13INLETS (DITCH BOTTOM TYPE C)(<10')EA6$0.00
14INLETS (DITCH BOTTOM TYPE C)(3:1 MODIFY)(<10')EA4$0.00
15INLETS (DITCH BOTTOM TYPE C)(<10') - TOP ONLYEA14$0.00
16INLETS (DITCH BOTTOM TYPE D)(<10') - TOP ONLYEA15$0.00
17MANHOLES (P-8) (<10')EA2$0.00
18PIPE CULVERT (CLASS III CONCRETE)(STORM SEWER)(ROUND SHAPE)(18")LF341$0.00
19CONCRETE PIPE COLLAR (18" PIPE)EA1$0.00
20CONCRETE SIDEWALK, 6" THICKSY2,850$0.00
21DETECTABLE WARNING STRIPS (CAST INTO CONCRETE SIDEWALK)SF527$0.00
22PERFORMANCE TURF (BAHIA SOD)(INCLUDES WATER, FERTILIZER & MOWING)SY5,634$0.00
23CHAIN LINK FENCE (4' TALL)LF188$0.00
24DUAL-LEAF GATE (12' WIDE TOTAL) (4' TALL)EA1$0.00
25SINGLE POST SIGNAS2$0.00
26SINGLE POST SIGN (RELOCATE/ADJUST)EA5$0.00
27SINGLE POST SIGN (REMOVE)EA2$0.00
28RETRO-REFLECTIVE PAVEMENT MARKERSEA54$0.00
298" RAISED CERAMIC PAVEMENT MARKERSEA15$0.00
30THERMOPLASTIC (STANDARD)(WHITE)(SOLID)(12")LF1,107$0.00
31THERMOPLASTIC (STANDARD)(WHITE)(SOLID)(24")LF215$0.00
32THERMOPLASTIC (STANDARD)(YELLOW)(SOLID)(6")LF887$0.00
33THERMOPLASTIC (REMOVAL)SF1,002$0.00
SUB-TOTAL:$0.00
DRAINAGE
366" PVC C-900 DR-18 WATERMAINLF93$0.00
37REMOVE/DISPOSE 6" ASBESTOS WATERMAINLF93$0.00
38RELOCATE FIRE HYDRANT ASSEMBLYEA4$0.00
39ADJUST WATERMAIN VALVE TO GRADEEA23$0.00
40ADJUST WATER SERVICEEA2$0.00
41CONNECT WATER SERVICE TO WATERMAINEA4$0.00
426" WATERMAIN DEFLECTIONEA2$0.00
43ADJUST WATER METEREA20$0.00
44RELOCATE BACKFLOW PREVENTIONEA9$0.00
45ADJUST MANHOLEEA1$0.00
46ADJUST SANITARY LATERALEA2$0.00
47ADJUST CLEANOUTEA2$0.00
48RELOCATE BOLLARDEA8$0.00
SUB-TOTAL:$0.00
TOTAL BID AMOUNT:$0.00
*Staff has allocated $85,000.00 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change