24-8233_Bid_Schedule.xls
XLS spreadsheet 39 KB Posted
- Attached to
- Immokalee Sidewalks Phase III
- Solicitation number
- 24-8233
- Issued by
- Collier County, Florida
About this file
The document is a Bid Schedule (24-8233_Bid_Schedule.xls) for the Immokalee Sidewalks Phase III Construction project in Collier County, Florida, advertised on July 17, 2024. The project involves sidewalk construction with a sealed bid deadline of September 3, 2024, at 3:00 p.m. local time. A non-mandatory pre-bid meeting is scheduled for July 30, 2024, at 10:00 a.m. at the Immokalee CRA Conference Room. The bid schedule includes multiple line items for roadway construction, such as mobilization, construction surveying, maintenance of traffic, driveway maintenance, erosion control, clearing and grubbing, concrete pavement removal, mailbox relocation, and various concrete and infrastructure installations.
The bid schedule indicates multiple line items with zero unit costs at this stage, suggesting that bidders will need to provide pricing during the formal bidding process. Prospective bidders are required to register on the Collier County procurement portal at https://procurement.opengov.com/portal/collier-county-fl to access complete project documents. The project appears to be a public infrastructure improvement initiative focused on sidewalk construction in the Immokalee area, with specific quantities outlined for various construction elements, including 320 cubic yards of commercial material for driveway maintenance, 562 square yards of concrete pavement removal, and 885 square yards of Class I concrete for driveways.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
| Immokalee Sidewalks Phase III | |||||
| Construction ITB 24-8233 | |||||
| BID SCHEDULE | |||||
| ITEM NO. | DESCRIPTION | UNIT | QTY | UNIT COST | TOTAL COST |
| ROADWAY | |||||
| 1 | MOBILIZATION (Not to Exceed 10% of Total Bid Amount) | LS | 1 | $0.00 | |
| 2 | PROVIDE CONSTRUCTION SURVEYING AND LAYOUT | LS | 1 | $0.00 | |
| 3 | MAINTENANCE OF TRAFFIC | LS | 1 | $0.00 | |
| 4 | COMMERCIAL MATERIAL FOR DRIVEWAY MAINTENANCE | CY | 320 | $0.00 | |
| 5 | PRECONSTRUCTION VIDEO OF PROJECT LIMITS | LS | 1 | $0.00 | |
| 6 | EROSION CONTROL | LS | 1 | $0.00 | |
| 7 | CLEARING AND GRUBBING (2.36 AC) | LS | 1 | $0.00 | |
| 8 | REMOVAL OF CONCRETE PAVEMENT | SY | 562 | $0.00 | |
| 9 | MAILBOX (RELOCATE) | EA | 15 | $0.00 | |
| 10 | DITCH GRADING | LS | 1 | $0.00 | |
| 11 | CLASS I CONCRETE (DRIVEWAYS)(6" THICK) | SY | 885 | $0.00 | |
| 12 | MITERED END SECION (15" RCP) | EA | 1 | $0.00 | |
| 13 | INLETS (DITCH BOTTOM TYPE C)(<10') | EA | 6 | $0.00 | |
| 14 | INLETS (DITCH BOTTOM TYPE C)(3:1 MODIFY)(<10') | EA | 4 | $0.00 | |
| 15 | INLETS (DITCH BOTTOM TYPE C)(<10') - TOP ONLY | EA | 14 | $0.00 | |
| 16 | INLETS (DITCH BOTTOM TYPE D)(<10') - TOP ONLY | EA | 15 | $0.00 | |
| 17 | MANHOLES (P-8) (<10') | EA | 2 | $0.00 | |
| 18 | PIPE CULVERT (CLASS III CONCRETE)(STORM SEWER)(ROUND SHAPE)(18") | LF | 341 | $0.00 | |
| 19 | CONCRETE PIPE COLLAR (18" PIPE) | EA | 1 | $0.00 | |
| 20 | CONCRETE SIDEWALK, 6" THICK | SY | 2,850 | $0.00 | |
| 21 | DETECTABLE WARNING STRIPS (CAST INTO CONCRETE SIDEWALK) | SF | 527 | $0.00 | |
| 22 | PERFORMANCE TURF (BAHIA SOD)(INCLUDES WATER, FERTILIZER & MOWING) | SY | 5,634 | $0.00 | |
| 23 | CHAIN LINK FENCE (4' TALL) | LF | 188 | $0.00 | |
| 24 | DUAL-LEAF GATE (12' WIDE TOTAL) (4' TALL) | EA | 1 | $0.00 | |
| 25 | SINGLE POST SIGN | AS | 2 | $0.00 | |
| 26 | SINGLE POST SIGN (RELOCATE/ADJUST) | EA | 5 | $0.00 | |
| 27 | SINGLE POST SIGN (REMOVE) | EA | 2 | $0.00 | |
| 28 | RETRO-REFLECTIVE PAVEMENT MARKERS | EA | 54 | $0.00 | |
| 29 | 8" RAISED CERAMIC PAVEMENT MARKERS | EA | 15 | $0.00 | |
| 30 | THERMOPLASTIC (STANDARD)(WHITE)(SOLID)(12") | LF | 1,107 | $0.00 | |
| 31 | THERMOPLASTIC (STANDARD)(WHITE)(SOLID)(24") | LF | 215 | $0.00 | |
| 32 | THERMOPLASTIC (STANDARD)(YELLOW)(SOLID)(6") | LF | 887 | $0.00 | |
| 33 | THERMOPLASTIC (REMOVAL) | SF | 1,002 | $0.00 | |
| SUB-TOTAL: | $0.00 | ||||
| DRAINAGE | |||||
| 36 | 6" PVC C-900 DR-18 WATERMAIN | LF | 93 | $0.00 | |
| 37 | REMOVE/DISPOSE 6" ASBESTOS WATERMAIN | LF | 93 | $0.00 | |
| 38 | RELOCATE FIRE HYDRANT ASSEMBLY | EA | 4 | $0.00 | |
| 39 | ADJUST WATERMAIN VALVE TO GRADE | EA | 23 | $0.00 | |
| 40 | ADJUST WATER SERVICE | EA | 2 | $0.00 | |
| 41 | CONNECT WATER SERVICE TO WATERMAIN | EA | 4 | $0.00 | |
| 42 | 6" WATERMAIN DEFLECTION | EA | 2 | $0.00 | |
| 43 | ADJUST WATER METER | EA | 20 | $0.00 | |
| 44 | RELOCATE BACKFLOW PREVENTION | EA | 9 | $0.00 | |
| 45 | ADJUST MANHOLE | EA | 1 | $0.00 | |
| 46 | ADJUST SANITARY LATERAL | EA | 2 | $0.00 | |
| 47 | ADJUST CLEANOUT | EA | 2 | $0.00 | |
| 48 | RELOCATE BOLLARD | EA | 8 | $0.00 | |
| SUB-TOTAL: | $0.00 | ||||
| TOTAL BID AMOUNT: | $0.00 | ||||
| *Staff has allocated $85,000.00 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change |