24-72004-000_Add_2_Q_A_Response.pdf
PDF 122 KB Posted
- Solicitation number
- 0000033185
About this file
This document is Addendum #2 to Invitation for Bid (IFB) 24-72004-000 issued by the Department of State Hospitals (DSH) for firestop installation services at the DSH-Atascadero facility. The addendum responds to bidder questions and provides revisions to the IFB, including clarification that a Class "B" General Building Contractor license is required, and that the pre-bid conference is mandatory. The contract is for a public works project, and the contractor and any subcontractors must be registered with the Department of Industrial Relations and pay prevailing wage.
The pricing terms and other salient details are not explicitly stated in this addendum document. The original IFB, which is not provided, would contain information on pricing, set-asides, incumbent contractors, funding requirements and sources, and other key commercial terms. This addendum is focused on addressing specific questions from potential bidders and revising the IFB requirements accordingly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-72004-000_IFB.pdf | ||
| 24-72004-000_Addendum_1_Key_Action_Dates.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“Caring Today for a Safe and Healthy Tomorrow” Rev. (11/2018)
Addendum #2, IFB 24-72004-000 DSH-Atascadero Firestop Installation Services
Procurement and Contracts Services Section 1215 O Street, MS-1 Sacramento, California 95814 www.dsh.ca.gov
November 13, 2024
ADDENDUM #2
Invitation for Bid 24-72004-000 DSH- Atascadero Firestop Installation Services
The Department of State Hospitals (DSH) is issuing this Addendum to respond to potential Bidders’ questions, and to provide a revised Invitation for Bid (deletions are in strikethrough and additions in bold italics). A clean IFB with all the changes accepted will also be provided.
*Any verbal statements made during the site walk do not hold legal validity. *
1. QUESTIONS AND ANSWERS:
Question 1: Per Item II. Minimum Qualifications (MQ) Item E
States that a class “B- General Building Contractor license is required.
Please note that “Firestop” is a specialty installation typically not done by General Contractors Typical licensing is the C-2 Insulation and Acoustical Contractor or C-61 Limited Specialty
Answer 1: Class “B” General Building Contractor license is required for this contract. It is anticipated that multiple trades will be required for preparing penetrated substrates, installing firestop systems, and remediating noncompliant UHC speaker installations.
Question 2: The pre-bid conference is listed as non-mandatory (N/A) on the CaleProcure site but mandatory in the IFB document. Can you please clarify?
Answer 2: Please see III. Bid Requirements and Information, section B. Mandatory Site Walk.
Question 3: For the Contractor’s License Requirements, can C16 - Fire Protection be included? C16 is the classification the CA Contractors State License Board instructed our company to obtain for passive fire protection services, such as firestopping, and has been a requirement for past State projects, including jobs with DSH.
Answer 3: C-16 license will not be required for this contract.
END OF ADDENDUM #2