24-309-14A-Final-1 (002).pdf
PDF 32 MB Posted
- Solicitation number
- 24-309-14A
- Issued by
- Suffolk County, Boston City, Massachusetts
About this file
This is a proposal, contract, and specifications document issued by the Boston Water and Sewer Commission (BWSC) for drainage and sewerage works improvements. The project involves the lining and replacement of approximately 49,000 linear feet of sewer pipes and storm drains, rehabilitation of approximately 26 manholes, and 52-point repairs across five neighborhoods: Dorchester, Hyde Park, Mattapan, Roslindale, and Roxbury in Boston, Massachusetts. The work addresses sewers and drains identified through Sanitary Sewer Overflow (SSO) and Capacity, Management, Operations, and Maintenance (CMOM) closed-circuit television (CCTV) investigation as critical and requiring lining and/or replacement. Bidders must submit sealed proposals by Thursday, August 6, 2026, at 10:00 AM to the BWSC Procurement Department at 980 Harrison Avenue, Boston, Massachusetts 02119. The contract specifies a completion timeline of 280 working days from the date of order to commence work. Bidders are required to thoroughly examine contract documents, visit the site to familiarize themselves with local conditions, and fully understand applicable federal, state, and local laws and regulations. The contract will be awarded to the lowest responsible and eligible bidder within thirty days of proposal opening, excluding Saturdays, Sundays, and legal holidays.
The bid deposit required is five percent of the total bid amount in the form of a bid bond, certified check, or treasurer's check payable to the Boston Water and Sewer Commission. Performance and payment bonds equal to 100 percent of the total contract price are required from the selected bidder. The contract includes price adjustment provisions for diesel fuel, gasoline, liquid asphalt, and Portland cement based on monthly prices from the Massachusetts Department of Transportation, with adjustments applied only when monthly variance exceeds plus or minus five percent. Bidders must comply with minority employee utilization requirements as specified in Article VIII, minority-owned and women-owned business enterprise (M/WBE) requirements of not less than 9.0 percent for M/WBEs and 6.0 percent for WBEs as detailed in Article X, and residents job policy requirements per Article IX. Special duty police costs are included as bid items with estimated quantities provided. Liquidated damages of $750.00 per calendar day are assessed for failure to complete work within the stipulated timeframe. Progress payments are made monthly with five percent retainage, and final payment is made upon substantial completion and acceptance of all work. The Commission retains responsibility for obtaining all permits from the City of Boston and paying associated fees.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL, CONTRACT
AND SPECIFICATIONS
CONTRACT NO. 24-309-14A
FOR
REPLACEMENT AND REHABILITATION OF
DRAIN AND SEWER PIPES
IN
DORCHESTER, HYDE PARK, MATTAPAN, ROSLINDALE, AND ROXBURY
BOSTON WATER AND SEWER COMMISSION
ENGINEERING: DESIGN DEPARTMENT
980 HARRISON AVENUE, BOSTON, MASSACHUSETTS 02119
i
TABLE OF CONTENTS
ITEM
Purchasing Department Bid Information 1
Information for Bidders 2
IB.1 General Description and Location of Work 2
IB.2 Bidding Information 2-5
IB.3 Use and Calculation of Unit Prices 5
IB.4 Permits and Fees to be Responsibility of Commission 5-6
IB.5 Substitution of Equal Items for Specified Items 6
IB.6 Determination of Equality 6-7
IB.7 Retail Sales Act Exemption 7
IB.8 Special Duty Police 7
IB.9 Time for Commencement and Completion of Work 7
IB.10 Minority Employee Utilization Requirement 8
IB.11 Minority Business Enterprise/Women Business Enterprise
Requirements 8-9
IB.12 CDL Drug and Alcohol Testing Requirements 9
IB.13 Price Adjustment – Diesel Fuel; Gasoline and Liquid
Asphalt and Portland 9-12
IB.14 Large Vehicle Protective Devices, Convex Mirrors, Convex Cross-Over Mirrors and Safety Devices 12-13
Proposal and Contract 14
I. Proposal 14
1.1 Interested Persons 14
1.2 Execution and Delivery of Contract, Performance Bond
and Payment Bond 14-15
1.3 Bid Deposit 15-16
1.4 Documents Included in Contract 16
1.4.1 Labor 16
1.5 Time of the Essence, Liquidated Damages 16-17
1.6 Contract Price 17
1.7 Bidder's Certification Statement 17
1.8 Bidder's M/WBE Certification Statement 18
Identification of Bidder 19-20
Certificate of Authority 21
II. Contract 22 ii
Article I - The Contract Documents 22
Article II - The Work 23
Article III - The Contract Price 23
Article IV - Payment of the Contract Sum 23
4.1 Progress Payments 23
4.2 Final Payments 24
Article V– Obligation of Contractor to Perform 24
5.1 Responsibility of Contractor for Errors;
Indemnification by Contractor 24-25
5.1.1 Indemnification 25-27
5.2 Performance in Accordance with Specifications 27
5.3 Change Orders 27-28
5.4 Variation in Specified Amounts of Materials 28-29
5.5 Claims for Loss, Damage, Extra Cost or Injury
and Extensions of Time 29
5.6 Materially Different Subsurface and Latent
Physical Conditions 29-30
5.7 Full Compliance with Specifications 30
5.8 Function of Commission Engineers 30-31
5.9 Employment of Commission Personnel 31
Article VI-Authority of Executive Director 31
6.1 Contract Interpretation 31-32
6.2 Duties and Authority of Commission Engineers 32
and Inspectors
6.3 Access to Construction Site 32
6.4 Inspection of Off-Site Materials 33
6.5 Supervision by Contractor 33-34
Article VII- Requirements of Department of Labor
And Industries and MCAD 34
7.1 Compliance with Labor Laws 34
7.2 Employment Preference 34
7.3 Maximum Hours 34-35
7.4 Minimum Wage Rates 35
7.5 Payment of Health and Welfare Wage Rates 35
iii
Article VIII- Minority Participation 35
8.1 Definitions 35-36
8.2 Minority Employee Utilization (Labor) 36-40
Article IX – Residents Job Policy 40
9.1 Definitions 40-41
9.2 General Policy Statement 41
9.3 The BWSC Residents Job Policy 41
9.4 Organizational Procedures 41-43
Article X – Utilization of Minority-Owned Business
Enterprises and Women-Owned Business Enterprises 43
10.1 Definitions 43-44
10.2 Goals 44
10.3 Indemnification of M/WBEs 44-45
10.4 Material Breach 45
10.5 Waiver of Modification 46
Article XI- Department of Telecommunications and Energy
Department of Labor and Industries 46
11.1 Transportation Charges 46
Article XII – Subcontractors 46
12.1 Payment of Subcontractors 46-49
12.2 Payment for Labor and Materials by Contractor 49-50
Article XIII – Insurance 50
13.1 Liability Insurance 50
13.2 Workman’s Compensation and Employer’s Liability Insurance 51
13.3 Certificate of Compliance 51
13.4 Effect of Failure to Continue Insurance in Force 51
13.5 Authorized Insurers 52
13.6 Identification of Insurance Carrier 52
Article XIV- Satisfactory Performance; Remedy for
Defective Work 52
14.1 Defective and Unauthorized Work 52-53
iv
14.2 Termination by the Commission for Cause 53-54
14.3 Payment Following Termination 54
Article XV – Final Inspection and Acceptance;
Method of Payment 54
15.1 Final Inspection 54
15.2 Unacceptable Performance 54
15.3 Satisfactory Performance 54-55
15.4 Final Estimate 55
Article XVI – Discharge of Bonds 55
Article XVII – Liability Under Contract 56
17.1 General Release and Discharge by Contractors 56
17.2 Acts of God 56-57
Article XVIII – Record Keeping, Internal Accounting Controls, Financial Statement – M.G.L., CH.30, Section 39R 57
18.1 Record Keeping 57
18.2 Examination of Records 57
18.3 Change in Record Keeping 57
18.4 Filing Requirements 58
18.5 Financial Statements 58
18.6 Statement of Management 58
18.7 Public Accountant’s Statement 58
18.8 Filing Financial Statement 59
Article XIX – Right to Know Act 59
Article XX - Compliance with Laws 59
Article XXI- Provisions Required by Law Deemed Inserted 59-60
Article XXII – CDL License Requirement 60
Article XXIII – Authority of the Commission 60-61
Article XXIV – State Tax Compliance Certificate 61-62
Performance Bond 63-64
Payment Bond 65-66
Certificate 67 v
General Conditions
GC.1 Definitions GC-2
GC.2 Abbreviations GC-3
GC.3 Time for Commencement and Completion of Work GC-4
GC.4 Interpretation of Specifications GC-4
GC.5 Project Meetings GC-5
GC.6 Construction Schedule and Order of Work GC-5
GC.7 Submittals GC-5
GC.8 Pipe Locations GC-7
GC.9 Lines, Grades and Measurements GC-7
GC.10 Responsibility for Materials GC-7
GC.11 Non-Interference with Other Work GC-8
GC.12 Changes in Work and Extras GC-8
GC.13 Orderly and Competent Employees GC-9
GC.14 Employ Sufficient Labor and Equipment GC-9
GC.15 Work to Conform GC-9
GC.16 Traffic Control GC-10
GC.17 Precautions and Restoration of Property GC-12
GC.18 Emergency Street Openings GC-13
GC.19 Sanitary Regulations GC-13
GC.20 Compliance with Laws GC-13
GC.21 Cleaning Up GC-13
GC.22 Standard Drawings GC-14
GC.23 Excess Paving Deductions GC-14
GC.24 Periodic Payments GC-14
GC.25 By-pass System GC-15
GC.26 Maintenance Period of Roadway Surface GC-15
GC.27 Daily Scheduling of Work GC-16
GC.28 Contractor's Emergency Contact and Response
Requirements GC-16
GC.29 BWSC Project Sign Requirements GC-17
GC.30 Winter Work Shut Down GC-17
GC.31 Utility Company Notifications GC-17
GC.32 Use of BWSC Hydrants GC-19
GC.33 Pavingstones and Cobblestones GC-19
GC.34 Liquidated Damages GC-19
GC.35 Noise Control GC-20
GC.36 BPWD Requirements GC-20
GC.37 ADA Requirements GC-20
GC.38 Delays in Obtaining Permits GC-21
GC.39 Post Hydrants Supplied by Commission GC-21
GC.40 BPWD Construction Sign Requirements GC-22
GC.41 Edgestone GC-22
GC.42 Sidewalks GC-23 vi
GC.43 Temporary By-Pass/Flow Diversion of
Sewers/Storm Drains GC-23
GC.44 Bid Items for Sewer and Drain Pipe GC-24
GC.45 Don’t Dump Signs GC-25
GC.46 Method of Cutting Pavement GC-25
GC.47 Work Outside of Permitted Time GC-26
GC.48 Lead Free Products GC-26
9/23/2014 vii
Special Conditions
SC1. Location and General Description of Work SC-2
SC2. Time for Commencement and Completion of Work SC-7
SC3. Construction Schedule Requirements SC-7
SC4. Required Submittals SC-7
SC5. Coordination of Work with other Contracts SC-10
SC6. Rodent Control SC-10
SC7. Trench Support SC-10
SC8. Delays in Obtaining Permits SC-11
SC9. Contractor’s Community Relations Responsibility SC-11
SC10. Water Use by Contractor SC-11
SC11. By-Pass of Flows SC-12
SC12. Massachusetts Bay Transportation Authority (MBTA) Requirements SC-12
SC13. Massachusetts Department of Transportation (MassDOT) Requirements SC-13
SC14. Department of Conservation and Recreation (DCR) Requirements SC-14
SC15. Test Pit Excavation and Location Verification SC-14
SC16. Miscellaneous Utility Requirements SC-15
SC17. Eversource Requirements SC-15
SC18. National Grid Requirements SC-16
SC19. Verizon Requirements SC-16
SC20. Comcast Requirements SC-17
SC21. Boston Transportation Department (BTD) Requirements SC-17
SC22. Boston Public Works Department Street Lighting
Division Requirements SC-18
SC23. Boston Public Works Department Requirements SC-19
SC24. Massachusetts Water Resources Authority (MWRA) Requirements SC-20
SC25. Boston Fire Department (BFD) SC-20
SC26. Pre-Construction and Post-Construction Video of Work Site SC-20
SC27. Sidewalks and Edgestone SC-21
SC28. Landscaping SC-21
SC29. Protruding Lateral Removal in Conduits SC-22
SC30. Obstructions in Conduits SC-22
SC31. Buried Manhole Covers SC-22
SC32. Manholes on Private Property SC-23
SC33. Point Repairs SC-23
SC34. Common Manholes SC-23
SC35. Manhole Rehabilitation SC-24
SC36. Proposed New Manhole SC-24
SC37. Available CCTV Video SC-24
SC38. Discharge of Process Water from Lining Work SC-25
SC39. Cleaning of Conduits Prior to Lining Work SC-25
SC40. Method for Sediment Disposal SC-25
SC41. Private Ways SC-26
SC42. Easements SC-27
SC43. Filter Fabric Requirements SC-27
SC44. Environmental Protection SC-27
SC45. Infiltration in Pipelines SC-27
SC46. Standard Details SC-28
SC47. City of Boston Large Vehicle Safeguards Ordinance SC-28
SC48. Manhole and Pipe Feature Identification SC-28
SC49. Question Submissions SC-28
SC50. Price Adjustment SC-28 viii
III. Specifications
Description of Drain Works
Description of Sewerage Works
A1-1 MISC. TRENCH EXCAVATION SC-2
A1-2 BELOW GRADE EXCAVATION SC-2
A1-3 ROCK EXCAVATION SC-2
A1-4 RAILS AND WOOD TIES SC-2
A10-1 CONTROLLED DENSITY FILLED (F+E) SC-2
A2-1 GRAVEL SC-2
A3-1 SCREENED GRAVEL SC-2
A7-2 TRENCH SUPPORT SC-2
B1-1 TEMORARY PAVING SC-2
B6-1 RESET EDGESTONE SC-2
D1-04 CHIMNEY CONNECTION SC-2
D1-06 MINOR DRAIN SC-2
D1-12P LAY 12” PVC SEWER/DRAIN SC-2
D1-18P LAY 18” PVC SEWER/DRAIN SC-2
D1-20DD LAY 20” DI DRAIN SC-2
D18-1 PEDESTRIAN RAMP SC-2
D2-01 MANHOLE BASE SC-2
D2-02 MANHOLE WALL SC-2
D2-03 MANHOLE FRAME WITH COVER SC-2
D2-04 CATCH BASIN SC-2
D2-04A C.B., TYPE 13 MODIFICATION SC-2
D2-05 NEW HOOD IN EX. CB SC-2
D2-07 BRICKWORK IN EX. STRUCT. SC-2
D2-12A MANHOLE MODIFICATION SC-2
D3-1 RAISE SEWER/DRAIN CASTING SC-2
D3-1A ADJ. SEWER/DRAIN CASTING SC-2
D4-01 CEMENT CONCRETE SC-2
D4-02A CEMENT CONC. SIDEWALK[6IN] SC-2
D6-01 MANHOLE REHABILITATION SC-2
F1-02 REC SERV CONN. (W/O EXCAV.) SC-2
F1-03 PROTRUDING LATERAL REMOVE SC-2
F1-04 REC. SERV CONN (W/EXCAV.) SC-2
F1-08ST STR. LINING 8” SEWER/DRAIN SC-2
F1-10ST STR. LINING 10” SEWER/DRAIN SC-2
F1-12ST STR. LINING 12” SEWER/DRAIN SC-2
F1-15ST STR. LINING 15” SEWER/DRAIN SC-2
F1-16ST STR. LINING 16” SEWER/DRAIN SC-2
F1-18ST STR. LINING 18” SEWER/DRAIN SC-2
F1-20 C.I.P. LINING 20” SEWER/DRAIN SC-2
F1-24AST STR. LINING 24” X 36” SEWER SC-2
F1-24DST STR. LINING 24” X 30” SEWER/DRAIN SC-2
F1-24ST STR. LINING 24” SEWER/DRAIN SC-2
F1-30ST STR. LINING 30” SEWER/DRAIN SC-2
F1-42ST STR. LINING 42” SEWER/DRAIN SC-2
F1-51ST STR. LINING 51” SEWER/DRAIN SC-2
F8-2 DIESEL FUEL PRICE ADJUSTMENT SC-2
F8-3 GASOLINE FUEL PRICE ADJ. SC-2
ix
F8-4 LIQUID ASPHALT PRICE ADJ. SC-2
F8-5 PORTLAND CEMENT PRICE ADJ. SC-2
G1-01 POINT REPAIR SC-2
G1-01A POINT REPAIR “A” SC-2
G1-01B POINT REPAIR “B” SC-2
G1-01C POINT REPAIR “C” SC-2
G1-01D POINT REPAIR “C” SC-2
G1-01E POINT REPAIR “D” SC-2
G1-01F POINT REPAIR “F” SC-2
G1-01G POINT REPAIR “G” SC-2
L1-1 LANDSCAPING SC-2
L2-1 LANDSCAPING SPECIAL SC-2
P1-1 SPEC. DUTY BOSTON POLICE SC-2
P1-1R SPEC. DUTY BOSTON POLICE, R.L. SC-2
P1-2 SPEC. DUTY POLICE SERG. SC-2
P1-2R SPEC. DUTY POLICE SERG., R.L. SC-2
P1-3 SPECIAL DUTY STATE POLICE SC-2
P1-5 SPEC. DUTY POLICE LT. SC-2
P1-5R SPEC. DUTY POLICE LT., R.L. SC-2
P1-6 SPEC. DUTY POLICE CAPT. SC-2
P1-6R SPEC. DUTY POLICE CAPT., R.L. SC-2
R1-1 RODENT CONTROL SC-2
T1-01 2” PVC CONDUIT SC-2
T1-02 3” PVC CONDUIT SC-2
T1-03 TRAFFIC SIGNAL CABLE SC-2
T1-04 LOOP DET. LEAD-IN CABLE SC-2
T1-05 INTERCONNECT CABLE SC-2
T1-06 WIRE LOOP INST IN RDWY. SC-2
T1-08A 12” WHITE THERMO. REFL. LINE SC-2
T1-10A 4” WHITE THERMO. REFL. LINE SC-2
T1-11A 4” YELLOW THERMO. REFL. LINE SC-2
T1-32 BDWD HANDHOLE SC-2
T1-33 REMOVE + RESET ST.LT. BASE SC-2
T1-34 REMOVE + RESET BPWD ST.LT. SC-2
T1-35 REMOVE + RESET SIGN POST SC-2
T1-36 REMOVE + RESET PARKING METER SC-2
TV-1 CL&TV CONDUIT = > 8” < 18” SC-2
TV-2 CL&TV CONDUIT = > 18” < 30” SC-2
TV-3 CL&TV CONDUIT = > 30” < 48” SC-2
TV-4 CL&TV CONDUIT = > 48” < 60” SC-2
DRAINAGE AND SEWERAGE WORKS IMPROVEMENTS
BOSTON WATER AND SEWER COMMISSION
PROCUREMENT DEPARTMENT
BID INFORMATION
(Not to be filled in by Contractor)
Day, Date and Time of Bid Opening... Thursday August 6, 2026 at 10:00 AM
Amount of Bid Bond or Certified Check...5% of Total Bid Amount
Amount of Surety (Performance Bond)... 100% of Total Contract Price
Specified Time of Completion ... Within 280 working days from
. Date of Order to Commence Work
Total Amount of Bid... $
INFORMATION FOR BIDDERS
IB.1 General Description and Location of Work
IB.2 Bidding Information
IB.3 Use and Calculation of Unit Prices
IB.4 Permits and Fees
IB.5 Substitution of Equal Items for Specified Items
IB.6 Determination of Equality
IB.7 Retail Sales Act Exemption
IB.8 Special Duty Police
IB.9 Time of Commencement and Completion of Work
IB.10 Minority Employee Utilization Requirement
IB.11 MBE/WBE Requirements
IB.12 CDL Drug and Alcohol Testing Requirements
IB.13 Price Adjustment – Diesel Fuel; Gasoline; Liquid Asphalt and Portland Cement
IB.14 Large Vehicle Protective Devices, Convex Mirrors, Convex
Cross-over Mirrors and Safety Device Requirements
IB.1 GENERAL DESCRIPTION AND LOCATION OF WORK
The location and general description of work is listed in the Special
Conditions, Page SC.-1.
IB.2 BIDDING INFORMATION
The Boston Water and Sewer Commission, hereinafter designated as “the
Commission", 3rd floor, 980 Harrison Avenue, Boston, Massachusetts 02119 invites proposals for the doing of the work described in the contract and specifications annexed hereto (the "Contract").
Proposals shall be submitted to the Commission at the above address, on the accompanying forms. The proposal shall be properly filled out, with all pages intact, signed, enclosed in the sealed bid envelope provided, sealed and plainly marked with a descriptive title of the work to be done. The Proposal shall be filed in the office of the
Procurement Department of the Commission prior to the time designated in the advertisement for the opening of proposals.
A bid deposit in the form of a bid bond, or a certified check drawn on, or a treasurer's or cashier's check issued by, a responsible bank or trust company, payable to the order of the "Boston Water and Sewer
Commission" in the sum specified in the advertisement shall accompany the copy of the proposal filed with the Commission. The bid deposit shall be submitted in a separate sealed envelope stapled to the sealed envelope containing the proposal. The bid deposit shall become and be the property of the Commission as liquidated damages if, after a proposal is accepted, the bidder shall fail to execute the Contract annexed hereto in accordance with the terms of this proposal and the
Contract annexed hereto, and to furnish a performance bond and a labor and materials or payment bond as provided in the Contract within five days, excluding Saturdays, Sundays and legal holidays, after notice of such acceptance is mailed or delivered to him. Provided however that the amount of the bid deposit that becomes property of the Commission shall not exceed the difference between the bid price of such general bidder and the bid price of the next lowest responsible and eligible bidder.
The Contract shall be awarded within thirty (30) days, Saturdays, Sundays and legal holidays excluded, after the opening of the proposals provided, however, that 1) the Contractor's bid is approved by Boston
Water and Sewer Commissioners or 2) if the award of the Contract requires the approval of an officer, board or agency of the Federal government, the award shall be made within thirty (30) days, Saturdays, Sundays and legal holidays excluded, after such approval.
The Contract shall be awarded to the lowest responsible and eligible bidder complying with the conditions and requirements provided in this
Information for Bidders and the other bid documents. The successful bidder will be notified in writing that his bid has been accepted and that he has been awarded the contract. The successful bidder shall execute the contract and furnish the required bonds, and any other documents required in the Proposal and Contract, at the offices of the
Commission, if requested within five days, Saturdays and Sundays and legal holidays excluded, after presentation of the contract to him or notice to him that the contract is ready for execution. If the bidder selected fails to execute the contract, and furnish the required bonds, or any other documents required in the Proposal and Contract, the award will be made to the next lowest responsible and eligible bidder.
All bid deposits, except those of the three lowest responsible and eligible bidders, shall be returned within five (5) days, Saturdays, Sundays and legal holidays excluded, after the opening of the proposals. The remaining bid deposits shall be returned upon the execution and delivery of the Contract.
Before submitting his proposal each bidder shall (a) thoroughly examine the contract documents, video tapes, and other reports prepared during design (b) visit the site to fully familiarize himself with local conditions that may in any manner affect cost, progress or performance of the work, and (c) fully familiarize himself with federal, state and local laws and ordinances, rules and regulations that may in any manner affect cost, progress or performance of the work. Failure of a bidder to fully acquaint himself with all contract requirements and statutory regulations, and to examine the site in detail shall not relieve the bidder from any obligation to perform the work at his bid price. The submission of a bid shall constitute a representation by the bidder that he has complied with every requirement of this section and that the contract documents are sufficient in scope and detail to complete performance of the work of this contract.
At a preconstruction meeting, the bidder will be required to furnish without expense to the Commission, a complete statement of the origin, composition and manufacture of any or all materials proposed to be used in the construction of the work, which may include samples, which samples may be subjected to the tests required by the Commission to determine their quality and fitness for the work.
Each bidder shall promptly notify the Chief Engineer of the Commission in writing of any ambiguity, inconsistency, or error they may discover upon examination of the contract documents, the site or other local conditions. All questions as to the interpretation of the plans and specifications shall be submitted in writing to the Chief Engineer and written answers to such questions will be sent by the Chief Engineer to every individual or firm on record as having taken a set of specifications. No questions will be answered unless received at least ten (10) days prior to the expiration of the time set for filing bids.
Oral clarifications or interpretations will be of no legal effect. The
Commission will not be responsible for, and no bidder may rely upon or use as a basis of a claim against the Commission, any information, explanation or interpretation of the contract documents rendered in any fashion except as provided above.
All proposals shall also be accompanied by evidence satisfactory to the
Executive Director that the bidder has the ability and experience in the class of work required to perform the Contract, and that he has sufficient capital and plant to enable him to perform the same successfully, and to complete it within the time named in the contract.
It is the policy of the Commission not to award the attached contract to any bidder who does not furnish such evidence. The Commission reserves the right to reject the bid of any bidder when its investigation raises any significant doubt as to the bidder's competency, responsibility, experience or capacity to successfully complete the project within contract requirements.
The Commission reserves the right to reject any or all proposals if it be in the public interest to do so. Every proposal which is not accompanied by the required bid deposit, or which otherwise does not conform to statutory bid requirements, or which is on a form not fully completed, or which is conditional, incomplete or obscure, or which contains any additions unless requested, shall be considered invalid, and the Commission shall reject any such bid. In addition the
Commission may consider as informal and may reject any proposal which is not prepared and submitted in accordance with all requirements of the bid documents or which contains erasures, alterations, additions, errors or irregularities of any kind, or which contains proposed prices for any class or item of work which are, in the Commission's judgment, substantially less or more than the actual cost to complete the work;
provided, however, the Commission reserves the right to waive any and all informalities as to form. Matters of substance shall not be waived. The determination of the Commission in this regard is final.
IB.3 USE AND CALCULATION OF UNIT PRICES
Every bidder shall submit his proposal using the form which constitutes
Part I of the attached Proposal and Contract. The bidder shall supply a contract price, in both words and figures, and shall specify a unit price, in both words and figures, for each item for which a quantity is given, and shall also show the products of the respective unit prices and quantities written in figures in the column provided for that purpose, and the total amount of the proposal obtained by adding the amounts of the several items.
All words and figures shall be in ink. In case of a discrepancy between the prices written in words and those written in figures, the written words shall govern. In the event there is a discrepancy between the unit prices and the total sum of all the items, the unit prices shall govern. Failure to bid on each and every item may lead to the rejection of the proposal.
IB.4 PERMITS AND FEES TO BE RESPONSIBILITY OF COMMISSION
The Commission shall have the responsibility for obtaining all permits from the City of Boston and any Department thereof and for paying all fees, which may be required in connection with the work to be performed pursuant to this Contract. The contract price shall not include the cost of any such permits issued by the City of Boston or fees or bonds payable thereto. It shall be the responsibility of the Contractor to advise the Commission in a timely manner, a minimum of fifteen working days prior to start date, of the need for permits, the date as of which permits are needed, their duration, and all other necessary information. There will be no additional payment for delays caused by the inability of the Commission to obtain permits. The Contractor is required to keep a copy of all permits on each job site.
Permits issued by the City of Boston are issued on terms and conditions upon which the Contractor herein agrees to comply, and to indemnify and defend Commission for any claim based upon the Contractor’s failure to do so.
IB.5 SUBSTITUTION OF EQUAL ITEMS FOR SPECIFIED ITEMS
Except where otherwise specifically provided in the specifications, due to the proprietary nature of a particular item of material or for any other sound reason in the public interest, a Contractor shall be permitted to substitute an item of material for any item of material named or described in this Contract, or in the specifications, plans, addenda, or other documents incorporated in and made a part of the
Contract, provided that such substituted item of material shall be considered equal, by the Commission, to the item of material so-named or described. The word "material" as used herein shall mean and include any article, assembly or system, or any component part thereof.
The Commission shall consider any item of material equal to the item of material named or described in this Contract if (1)it is at least equal in quality, durability, appearance, strength and design, (2) it will perform at least equally the function imposed by the general design for the work to be performed pursuant hereto, and (3) it performs substantially, even with deviations, to the detailed requirements for such named items in the specifications attached to the contract.
IB.6 DETERMINATION OF EQUALITY
The Bidder selected as the general contractor is required to submit to the Executive Director for consideration as to its equality, a written notice containing the name and full particulars, pertaining to any item
(or items) of material other than the specific or specifics named or described therefore in the Contract or in documents incorporated in and made part thereof in advance of the time of its incorporation in the work to be performed pursuant to the Contract by submitting the aforesaid written notice to the Executive Director, immediately following the execution of the Contract by the Commission. An item shall be considered equal to the item so named or described if (1) it is at least equal in quality, durability, appearance, strength and design, (2) it will perform at least equally the function imposed by the general design for the public work being contracted for or the material being purchased and (3) it conforms substantially, even with deviations, to the detailed requirements for the item in the said specifications.
Forthwith upon receipt of such written notice, the Executive Director, or designee, shall conduct or cause to be conducted a reasonable investigation to determine whether the item (or items) in question shall be considered equal to the item(s) named or described therefore in the Contract or in the documents incorporated in and made a part of the Contract. Upon conclusion of the investigation, the Executive
Director, or designee, shall, in writing, promptly advise the contractor that the item(s) of material in question is, or is not, considered the equal of the item(s) of material or described as aforesaid, and that said item(s) of material may, or may not, be incorporated in the work to be performed pursuant to the Contract. If a substitute/alternate item is allowed and is less expensive than the item originally proposed, upon the request of the Chief Engineer, a credit shall be given to the Commission.
In no case may an item other than that specifically described in the
Contract be incorporated into work to be performed pursuant to the
Contract unless the Executive Director shall consider the item as the equal of the item so named or described, as provided by law.
IB.7 RETAIL SALES ACT EXEMPTION
The exemption certificate number assigned to the Commission by the
Commissioner of Corporations and Taxation under Section 6, Chapter 14 of the Act of 1966 commonly referred to as the Retail Sales Act is E-
042-621-990.
IB.8 SPECIAL DUTY POLICE
The Executive Director shall require the selected bidder to maintain at the expense of the selected bidder such police officers on special duty
(outside their regular tour of duty) as the Police Commissioner or his designee may deem necessary to avoid, so far as reasonably possible, danger to the safety of persons and substantial interference with the free circulation of traffic. This clause shall not prohibit reimbursement of the selected bidder for such expenses if a Contract between such person and the City or any other person provides for such reimbursement.
The selected bidder is required to carry in its bid the items for special duty police at the rates set by the City of Boston or
Commonwealth of Massachusetts for the estimated quantities. The
Commission does not guarantee the estimated quantities for each special duty police item. The selected bidder will be reimbursed only for those items and will not be entitled to overhead, administrative costs or profits associated with said reimbursement.
IB.9 TIME FOR COMMENCEMENT AND COMPLETION OF WORK
See Special Conditions, Page SC-1.
IB. 10 MINORITY EMPLOYEE UTILIZATION REQUIREMENT
No bid for the award of this project will be considered acceptable unless the Contractor agrees to comply fully with the provisions of
Article VIII, Minority Participation, of the Contract.
Included with the Contract Documents, Appendices, are copies of the
Contractor’s Certification Statement, Minority Employee Participation and the Minority Employee Weekly Utilization Report.
By signing this proposal the Contractor understands, acknowledges and agrees to the terms and conditions of this Section, Section 1.7 and
Article VIII of the Contract.
The Minority Employee Weekly Utilization Reports shall be submitted in accordance with section 8.2(d)(ii) and 8.2(d)(iii) of the Contract.
Failure to comply with the Minority Employee Utilization Requirements may result in imposition of sanctions set forth in section 8.2(f) and
(g) of the Contract.
No bid for the award of this project will be considered acceptable
Article IX, Residents Job Policy, of the Contract.
Included with the Contract Documents, Appendices, are copies of the
Contractor’s Certification Statement, Residents Job Policy and the
Boston Resident Employee Weekly Utilization Report. By signing this proposal the Contractor understands, acknowledges and agrees to the terms and conditions of this section and Article IX of the Contract.
The Boston Resident Employee Utilization Report shall be submitted in accordance with Section 9.4.C ii of the Contract. Failure to comply with the Boston Resident Employee Utilization Requirements may result in imposition of sanctions as set forth in the Contract.
IB.11 MINORITY BUSINESS ENTERPRISE/WOMEN BUSINESS ENTERPRISE
REQUIREMENTS
No bid for the award of this contract will be considered acceptable
Article X of the Contract, Utilization of Minority-Owned Business
Enterprises and Women-Owned Business Enterprises.
Included with the Contract Documents, Appendices, are copies of forms relating to the Utilization of Minority Business Enterprises and Women
Business Enterprises (MBEs and WBEs). Form BWSC-M/WBE-001 is a Notice to Contractors regarding the Commission M/WBE requirements which the
Contractor must sign as part of the Contract Documents, and Form BWSC-
M/WBE-002 is a report on the use of M/WBEs which the Contractor must file on a monthly basis with the Commission. By signing this proposal, the Contractor understands, acknowledges and agrees to the terms and conditions of this section, section 1.8 and Article X of the Contract.
The Contractor shall submit each month a breakdown of MBE and WBEs used in the current project, as set forth in the forms identified as “BWSC-
M/WBE-001 and BWSC-M/WBE-002”. These reporting forms can be found in the APPENDICES Section of this contract. Pay estimates will not be processed for payment unless contractors comply with this reporting requirement.
By signing this proposal, the Contractor understands, acknowledges and agrees to utilize certified minority-owned business enterprises as defined in Article X for not less than 9.0% of the cost of the bid, and certified women-owned business enterprises as defined in Article X for not less than 6.0% of the cost of the bid. If the Contractor wishes to have the provisions of Article X waived or modified, the Contractor shall apply to the Commission's Director of Organizational Diversity ten (10) days prior to bid opening for a determination of waiver or of modification in accordance with Article X. The Director of
Organizational Diversity will render a decision on the application for waiver or modification five (5) days prior to bid opening.
IB.12 CDL DRUG AND ALCOHOL TESTING COMPLIANCE
No bid for the award of this contract will be deemed acceptable unless the undersigned has provided assurance to the Commission that he is in compliance with applicable federal regulations for drug and alcohol testing when services involving the following are provided:
the driving of commercial vehicles with a gross vehicle weight of more than 26,000 pounds (inclusive of a towed unit with a gross vehicle weight of over the 10,000 pounds) the transportation of hazardous material in a quantity requiring "placarding"; or vehicles rated to carry more than 15 passengers, including the driver. In addition, the undersigned must assure the Commission that all proposed subcontractors providing like services are in compliance. Assurance of compliance must be satisfactory to the Commission.
IB. 13 PRICE ADJUSTMENT – DIESAL FUEL; GASOLINE AND LIQUID
ASPHALT AND PORTLAND CEMENT
Pursuant to Chapter 150 of the Acts of 2013 and M.G.L. Chapter 30, section 38A, this contract contains a price adjustment clause that will provide for either additional compensation to the Contractor or repayment to the Commission, depending on an increase or a decrease in the average price of Diesel Fuel; Gasoline; Liquid Asphalt and Portland
Cement Contained in Cast-in Place Cement.
The Base Price for each category, as set by the Commission from the
Massachusetts Department of Transportation Highway Department web site
(www.mhd.state.ma.us), is specified below. A copy of the Massachusetts
Department of Transportation Highway Price Adjustment Page from which the Base Prices are set is attached as an addendum.
The Period Price will be the average of prices charged to the State, including state tax for the bulk purchases made during each month as indicated on the Massachusetts Department of Transportation Highway
Department web site (www.mhd.state.ma.us).
A price adjustment will be made on a monthly basis but only when the monthly cost change or variance between the Base Price and Period Price exceeds plus or minus five percent (5%). The complete adjustment will be paid in all cases with no deduction of the 5% from either upward or downward price adjustments. Failure to provide documentation will delay process of the pay estimate.
The Contractor will be compensated through monthly payments after the work has been performed using the monthly period price for the month during which the work was performed. The set price Payment Items F8-2, F8-3, F8-4, F8-5, will be used as necessary to generate the appropriate adjustment(s). The Unit Quantity(s) will be adjusted to provide the appropriate total amount.
The Commission is authorized to deduct out of monies which may be due to the Contractor under this contract the amounts owed for a price adjustment.
No price adjustments will be allowed beyond the Completion date of this
Contract unless there is an approved extension of time.
Failure to provide required documentation will delay and/or prevent the processing of pay estimates.
Diesel Fuel and Gasoline
Diesel Fuel – Base Price: _3.911__ per gallon (including State Tax)
(__JUNE____, _2026_)
Month Year
Gasoline – Base Price: _ 3.136__ per gallon (including State Tax))
(__JUNE____, _2026_)
http://www.mhd.state.ma.us/
The price adjustment will be based on the Period Price of Gasoline and
Diesel Fuel for each monthly period as it appears on the Massachusetts
Department of Transportation website (www.massdot.state.ma.us)
The price adjustment only applies to actual fuel usage during each month for site dedicated equipment requiring gasoline or diesel fuel including but not limited to construction equipment, trucks and bypass pumps. It shall not include transportation, idling or other charges.
The price adjustment will be determined by multiplying the number of gallons used during the applicable monthly period times the difference between the Base Price and the Period Price of Diesel Fuel or Gasoline.
The Contractor shall supply to the Commission, on a monthly basis, the certified fuel usage for each vehicle or piece of equipment on the applicable worksheet. Failure to provide the required documentation will delay and/or prevent the processing of pay estimates
Liquid Asphalt
Liquid Asphalt – Base Price: __712.50___ per ton (___JUNE____, __2026___) Month
Year
The price adjustment will apply only to the following items:
Item B1-1 Temporary Paving Boston Streets S.Y.
Item B1-2 Permanent Trench Repair in Boston Streets S.Y.
Item B1-3 Permanent Trench Repair DCR Streets S.Y.
Item B1-3A Temporary Pavement DCR Streets S.Y.
Item B1-4 Permanent Pavement State Highway S.Y.
Item B1-5 Bituminous Concrete Overlay Paving S.Y.
The price adjustment will be based on the Liquid Asphalt Period Price as it appears on the Massachusetts Department of Transportation Highway
Department site (www.mhd.state.ma.us).
The price adjustment only applies to the actual virgin liquid asphalt content in the mixture placed in accordance with the Commission’s specifications. It shall not include transportation or other charges.
The price adjustment will be determined by multiplying the number of tons of hot mix asphalt mixture placed during each monthly period times the liquid asphalt content percentage times the difference between the
Base Price and the Period Price for Liquid Asphalt.
The Contractor shall supply required information on the applicable worksheet. Failure to provide the required documentation will delay and/or prevent the processing of pay estimates
Portland Cement Contained in Cast-in-Place Concrete
Portland Cement Contained in Case-Place-Concrete – Base Price: _452.13_ per ton (___JULY___, _2026__)
This provision applies to all projects using greater than 100 Cubic
Yards of Portland Cement concrete containing Portland Cement. The
Price adjustment will apply only to the following items:
Item D4-02A Cement Concrete Sidewalks S.F.
Item D5-10 Plain Concrete C.Y.
Item D5-11 Reinforced Concrete C.Y.
The price adjustment will be based on the variance in price for the
Portland Cement Component only from the Base Price to the Period Price as it appears on the Massachusetts Department of Transportation Highway
Department site (www.mhd.state.ma.us).
The price adjustment applies only to the actual Portland Cement content in the mix placed on the job in accordance with the specifications. No adjustments will be made for any cement replacement materials such as fly ash or ground granulated blast furnace slag. It shall not include transportation or other charges.
The price adjustment for Portland Cement concrete mixes will be paid for per cubic yard under this item. It will be determined by multiplying the number of cubic yards of Portland Cement concrete placed during each monthly period times the Portland Cement content percentage times the difference between the Base Price and Period price of Portland Cement. The Contractor shall supply required information on the applicable worksheet for the concrete placed on a monthly basis.
Failure to provide the required documentation will delay and/or prevent the processing of pay estimates
Note: For items that are not paid on a per cubic yard basis the Price
Adjustment will be calculated per cubic yard from the actual volume used based on information submitted to or gathered by the Commission.
IB. 14 LARGE VEHICLE PROTECTIVE DEVICES, CONVEX MIRRORS, CONVEX
CROSS-OVER MIRRORS AND SAFETY DEVICES COMPLIANCE
No bid for the award of this contract will be deemed acceptable unless the undersigned has provided assurance to the Commission the he is in compliance with the requirements of City of Boston Code, Ordinance
Chapter IV, Section 4-8 which requires vendors to safeguard unprotected road users. See appendices which contain a copy of the City of Boston
Ordinance and the City of Boston’s Inspectional Services Commissioner’s
Bulletin setting forth relevant guidelines. In addition the undersigned must assure the commission that all proposed subcontractors are in compliance. Assurance of compliance must be satisfactory to the
Commission.
The terms and conditions of this Notice to Bidders are hereby made a part of and incorporated in the Proposal and Contract attached hereto.
Date:_____________ __________________________________
Henry F. Vitale
Executive Director
Boston Water and Sewer Commission
PROPOSAL AND CONTRACT
I
This Proposal and Contract consists of three parts:
Part I (the "Proposal"), a proposal submitted to the Boston Water and
Sewer Commission by the Bidder whose name is set forth below to perform the work identified below, pursuant to the terms and conditions of this
Proposal and Contract; Part II, the general contract terms and Part
III, the specifications, plans, and addenda relating to the work proposed to be performed hereto.
I. Proposal
The undersigned bidder proposes to rehabilitate approximately 49,000 linear feet of sewer pipes and storm drains, the rehabilitation of 26 manholes and 52-point repairs and all other incidental work as shown on the plans and specified herein.
1.1 Interested Persons
The undersigned, declares that it is the only person interested in this
Proposal, or in any Contract which be made under it, or in any expected profits to arise therefrom that this proposal is made in good faith without fraud, collusion, or connection of any kind with any other bidder for the same work, that it is bidding in its own behalf without connection or obligation to any undisclosed person, and that no other person has any interest in the profits of the general Contract; that it has carefully examined the Contract and Specifications and informed himself fully in regard to all conditions pertaining to the work and the place where it is to be done; that it has made its own examinations and estimates and from them makes this Proposal; and that it understands and agrees to all the reporting requirements in the
Contract.
1.2 Execution and Delivery of Contract, Performance Bond, and
Payment Bond
The undersigned proposes and agrees that if, within thirty days, Saturdays, Sundays, and legal holidays excluded, after the opening of the proposal, or, if the award requires federal approval, within thirty days, Saturdays, Sundays and legal holidays excluded, after such approval, notice that this Proposal will be accepted for the Commission shall be mailed to it at the business address given below, or shall be delivered to it, it shall within five (5) succeeding days excluding
Saturdays, Sundays and legal holidays, after the date of such mailing or delivery, whichever is later, deliver to the office of the Executive
Director of the Commission (the "Executive Director"), the Contract, accompanied by (i) a Performance Bond, in the form appearing herein as
Exhibit "A" to Part II of the Proposal and Contract, for the full amount of the Contract Price (ii) a Payment Bond, in the form appearing herein as Exhibit "B" to Part II of the Proposal and Contract for the full amount of the Contract Price (such Performance Bond and Payment
Bond being herein collectively referred to as the "Bonds"), (iii) the certificate as to proper corporate authorization in the form appearing herein as Exhibit "C" to Part II of the Proposal and Contract, and (iv) such other documentation, including but not limited to the documents required to comply with the requirements of Articles VIII, IX and X of the Contract, as may be requested by the Commission at the time of notification of acceptance by the Commission, all properly executed in their respective forms.
Performance Bonds and Payment Bonds shall be (a) in a form satisfactory to the Commission and (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Commission.
Place of Business in Massachusetts of Surety Company is
Street Address City Zip Code
Contact Person:____________________ Telephone No.:___________
1.3 Bid Deposit
The undersigned Bidder agrees that the certified check for_______________________________dollars ( ), or Bid
Bond, payable to the Commission, and deposited herewith, is the property of the Commission, and the maximum amount thereof is the amount of the damages which the Commission will sustain by failure of the undersigned Bidder to carry out the Proposal, but if this Proposal is not accepted, or if notice is mailed or delivered and the undersigned executes and delivers said Contract and Bonds as aforesaid, the check, or its amount, is to be paid to him on receipt therefore.
Such bid deposit shall be in an amount not less than five percent of the value of the bid. A Bid Bond shall be (a) in a form satisfactory to the Commission, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Commission and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid.
Place of Business in Massachusetts of Surety Company is
Street Address City Zip Code
Contact Person:____________________ Telephone No.:___________
1.4 Documents Included in Contract
The undersigned Bidder agrees to be bound by the detailed specifications constituting Part III of this Proposal and Contract, all exhibits, appendices, schedules, attachments and plans which accompany the same, each of which shall be deemed supplementary to the other and in case of any item not being specifically mentioned in detail and yet shown on the plan or conversely, the necessary work or materials shall be supplied and installed to the satisfaction of the Executive
Director.
1.4.1 Labor
The undersigned Bidder hereby certifies that he is able to furnish labor that can work in harmony with all elements of labor employed or to be employed in the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and
Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee.
1.5 Time of the Essence, Liquidated Damages
The undersigned Bidder hereby offers to provide all necessary machinery, tools and apparatus and to do all the work, and furnish all the materials called for by said specifications in the manner and time herein prescribed and according to the requirements of the Executive
Director, including all the incidental work, and to complete the work within the time specified.
Delay in completion of the work required under this Contact will cause interference with the Commission's construction schedules, will result in increased costs including, but not limited to, planning, engineering, police and inspection costs and will cause other tangible and intangible losses. If the Contractor fails to complete the work within the stipulated time, the Contractor and his sureties shall be liable for and shall pay the Commission the sum of $750.00 as fixed, agreed and liquidated damage for each calendar day of delay after the date stipulated in this Contract. Such damages have been fixed and agreed on because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Commission would sustain in the event of delayed completion. The Commission is authorized to deduct out of the monies, which may be due to the Contractor under this
Contract the liquidated damages referred to in this section.
The Commission's right to recover liquidated damages is for consequential damages and is not a substitute for any right of recovery for additional costs incurred to complete the work should the contractor fail to do so.
1.6 Contract Price
The undersigned Bidder proposes to perform the work specified in this
Proposal and Contract for a contract price of ________________________ dollars. (___________________), which amount consists of the specified items beginning on Page 14A-1:
1.7 Bidder's Certification Statement
The undersigned bidder does hereby certify, pursuant to the Invitation for Proposals to perform this contract by and between the undersigned and the Boston Water and Sewer Commission, (the "Contract") as follows:
1. The undersigned has read Article VIII of the contract regarding the requirements with respect to the use of Minority Employees in the performance of the Contract; and
2. The undersigned understands that failure to comply with the provisions of the Contract set forth in said Article VIII may subject the undersigned to the sanctions set forth in Article
VIII, Section 8.2 (f) and (g) of the Contract.
The undersigned further certifies that within seven (7) days prior to the pre-construction meeting described in Section 8.2(c)(iii) of this
Contract, the Contractor shall send to the Contract Compliance Officer a list of persons who are presently employed and their job classification or will be employed by the undersigned in the performance of the Contract in order to comply with the provisions of
Article VIII of the Contract.
1.8 Bidder's M/WBE Certification Statement
The undersigned Bidder does hereby certify as follows:
1. The undersigned has read Article X of the Contract regarding the requirement to utilize minority-owned and women-owned business enterprises (M/WBEs) in the performance of this Contract;
2. The undersigned understands that failure to comply with the requirements of Article X constitutes a material breach of the
Contract;
3. The undersigned certifies that Bidder will submit with his bid the names of M/WBEs that he will utilize in the performance of this
Contract, and the tasks that said M/WBEs will perform and/or the materials they will supply. In the alternative, if the undersigned wishes to have the provisions of Article X waived or modified, the
Contractor shall apply, in writing, to the Commission's Director of
Organizational Diversity ten (10) days prior to bid opening. The undersigned understands that he must demonstrate that he has made good faith efforts to secure participation of M/WBEs, and that the burden of proof rests on him. The Director of Organizational Diversity will render a decision on the application for waiver or modification five
(5) days prior to bid opening.
The Contractor shall submit each month a breakdown of MBE and WBEs used in the current project, as set forth in the forms identified as “BWSC-
M/WBE-001 and BWSC-M/WBE-002”. These reporting forms can be found in the APPENDICES Section of this contract. Pay estimates will not be processed for payment unless contractors comply with this reporting requirement.
The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person.
This is the start of the file's text. The full file is on GovTribe.