About this file

This document is a comprehensive set of technical specifications for a Modular Trailer Replacement Project for the California Department of State Hospitals (DSH) at the Patton facility, prepared by J.C. Chang & Associates, Inc. The project involves replacing existing modular trailers with new modular units, including detailed technical requirements for site preparation, demolition, concrete work, electrical systems, communications infrastructure, irrigation, and site restoration. The specifications cover everything from selective demolition and asbestos abatement to installing new electrical, communication, and utility systems, with a focus on precise technical standards and installation requirements.

The project appears to be funded by the State of California, specifically the Department of State Hospitals, with a comprehensive approach to replacing aging infrastructure. The specifications indicate a thorough process for material selection, installation, testing, and documentation, including requirements for as-built drawings, manufacturer warranties, and a one-year guarantee period. The technical specifications are extensively detailed, covering multiple disciplines including electrical, communications, concrete, irrigation, and site work, suggesting a complex renovation project that requires precise coordination and high-quality implementation across various technical domains.

View the file

Other files

File Type Posted
24-30644-000_-_A1_(30A_Approved_Drawings).pdf PDF
24-30644-000_-_A3_(30A_PMI).pdf PDF
24-30644-000_-_IFB_(30A_Mod).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 February 2025

100% Submittal

JCCA #23791-3

MODULAR TRAILER REPLACEMENT PLANS, 30A

DSH-PATTON

SPECIFICATIONS

Prepared for:

DEPARTMENT OF STATE HOSPITALS

1215 O Street, 2nd Floor

Sacramento, California 95814

Phone: (916) 562-2314

Prepared by:

Architects • Engineers

385 Van Ness Avenue, Suite 208

Torrance, California 90501

Phone: (310) 212-7644 www.jccainc.com

OFFICE OF THE STATE FIRE MARSHAL

APPROVED FIRE AND PANIC ONLY

02/14/25

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans shall be available on the project site at all times.

23-6636 http://www.jccainc.com

J.C. Chang & Associates, Inc. Modular Trailer Replacement Plans JCCA No. 23791-3 DSH-Patton

TABLE OF CONTENTS 1

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

000105 Certifications Page 000115 List of Drawing Sheets

Contractor to obtain Division 00 from the Owner.

DIVISION 01 - GENERAL REQUIREMENTS

Contractor to obtain Division 01 from the Owner.

DIVISION 02 - EXISTING CONDITIONS

024119 Selective Demolition 028100 Transportation and Disposal of Hazardous Materials 028213 Asbestos Abatement

DIVISION 03 - CONCRETE

030130 Maintenance of Cast-In-Place Concrete 031000 Concrete Forming and Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

078413 Penetration Firestopping

DIVISION 22 - PLUMBING

221116 Domestic Water Piping 221316 Sanitary Waste and Vent Piping

DIVISION 26 - ELECTRICAL

260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceway and Boxes for Electrical Systems 260543 Underground Ducts and Raceways for Electrical Systems 260553 Identification for Electrical Systems 262816 Enclosed Switches and Circuit Breakers

TABLE OF CONTENTS 2

DIVISION 27 - COMMUNICATIONS

270526 Grounding and Bonding for Communications Systems 270528 Pathways for Communications Systems 270529 Hangers and Supports for Communications Systems 270553 Identification for Communications Systems 271100 Communications Equipment Room Fittings 271116 Communications Racks, Frames, and Enclosures 271323 Communications Optical Fiber Backbone Cabling 271513 Communications Copper Horizontal Cabling

DIVISION 31 - EARTHWORK

311000 Site Clearing 312000 Earth Moving 312333 Trenching and Backfilling 312500 Erosion and Sedimentation Controls

DIVISION 32 - EXTERIOR IMPROVEMENTS

321123 Aggregate Base Course 321216 Asphalt Paving 321313 Concrete Paving 321373 Concrete Paving Joint Sealants 328400 Planting Irrigation

DIVISION 33 - UTILITIES

330500 Common Work Results for Utilities 331415 Site Water Distribution Piping

APPENDIX

Appendix A TIO Program

END OF TABLE OF CONTENTS

CERTIFICATIONS PAGE 000105 - 1

DOCUMENT 000105

CERTIFICATIONS PAGE

PROJECT TITLE: Modular Trailer Replacement

CLIENT AGENCY: Department of State Hospitals

LOCATION: Department of State Hospitals - Patton

3102 E. Highland Ave Patton, California 92369

PROJECT DIRECTOR: Gene Lombardo Associate Construction Analyst

Department of State Hospitals

3102 E. Highland Ave.

Patton, CA 92369

909-742-5481 gene.lombardo@dsh.ca.gov

CONSULTANT: J.C. Chang & Associates, Inc.

James P. Redmond, PE, LEED AP

CIVIL ENGINEER

Sevag Avanessian, PE

ELECTRICAL ENGINEER

Myoungjin Kang, RA

ARCHITECT

Robert Onishi, SE

STRUCTURAL ENGINEER

DIVISION OF THE

STATE ARCHITECT

Date Signed: 11/1/2024 Date Signed: 11/1/2024 Date Signed: 11/1/2024

Date Signed: 11/1/2024

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

02-122117

FLS ACS ✔

02/24/2025 mailto:gene.lombardo@dsh.ca.gov

CERTIFICATIONS PAGE 000105 - 2

THIS PAGE IS INTENTIONALLY LEFT BLANK

LIST OF DRAWING SHEETS 000115 - 1

DOCUMENT 000115

LIST OF DRAWING SHEETS

1.1 LIST OF DRAWINGS

A. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:

GENERAL

T0.1 TITLE SHEET

T0.2 FIRE ACCESS SITE PLAN

T0.3 STATE FIRE MARSHAL TRIAGE LIST

T0.4 BUILDING INFORMATION

T0.5 DSA-1AMM

CIVIL

C0.1 GENERAL NOTES

C0.2 LANDSCAPING AND IRRIGATION NOTES

C0.3 OVERALL SITE PLAN

C1.1 DEMOLITIONPLAN

C2.1 NEW WORK SITE PLAN

C3.1 UTILITY PLAN

C4.1 GRADING PLAN

C8.1 DETAILS

C8.2 DETAILS

ARCHITECTURAL

A2.1 MODULAR TRAILER MB-30-A FLOOR PLANS

A3.1 ACCESSIBILITY REQUIREMENTS DETAILS

A3.2 ACCESSIBILITY REQUIREMENTS DETAILS

A4.1 ENLARGED FLOOR PLANS AND ELEVATIONS

STRUCTURAL

S0.1 STRUCTURAL NOTES, STRUCTURAL DETAILS, & FOUNDATION PLAN

ELECTRICAL

E0.1 ELECTRICAL COVER SHEET

E0.2 ELECTRICAL SINGLE LINE DIAGRAM

E0.3 ELECTRICAL DEMOLITION SITE PLAN

E0.4 ELECTRICAL NEW WORK SITE PLAN

E2.1 MODULAR TRAILER MB-30-A COMMUNICATIONS FLOOR PLAN

E2.2 ELECTRICAL BLDG 30 1ST FLOOR NEW WORK PLAN

LIST OF DRAWING SHEETS 000115 - 2

E2.3 ELECTRICAL BLDG 30 ROOF NEW WORK PLAN

E3.1 ELECTRICAL DETAILS

E5.1 ELECTRICAL SPECIFICATION NOTES

REFERENCE

RE1 STAIR/RAMP PRE-APPROVED REFERENCE DRAWING

RE2 STAIR/RAMP PRE-APPROVED REFERENCE DRAWING

RE3 STAIR/RAMP PRE-APPROVED REFERENCE DRAWING

RE4 STAIR/RAMP PRE-APPROVED REFERENCE DRAWING

RE5 STAIR/RAMP PRE-APPROVED REFERENCE DRAWING

RE6 STAIR/RAMP PRE-APPROVED REFERENCE DRAWING

RE7 STAIR/RAMP PRE-APPROVED REFERENCE DRAWING

RE8 STAIR/RAMP PRE-APPROVED REFERENCE DRAWING

END OF DOCUMENT 000115

SELECTIVE DEMOLITION 024119 - 1

SECTION 024119

SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

3. Salvage of existing items to be reused or recycled.

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.

B. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.

C. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.

D. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.

1.3 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.4 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

SELECTIVE DEMOLITION 024119 - 2

3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For refrigerant recovery technician.

B. Engineering Survey: Submit engineering survey of condition of building.

C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.

D. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's building manager's on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Use of elevator and stairs.

5. Coordination of Owner's continuing occupancy of portions of existing building and of

Owner's partial occupancy of completed Work.

E. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations. Comply with Section 013233 "Photographic Documentation." Submit before Work begins.

F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

G. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.

1.6 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

SELECTIVE DEMOLITION 024119 - 3

1.7 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.

1.8 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

1. Before selective demolition, Owner will remove the following items:

a. Existing Modulars 70A, 70B & 70C.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. Hazardous materials will be removed by Owner before start of the Work.

2. If suspected hazardous materials are encountered, do not disturb; immediately notify

Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

E. Hazardous Materials: Present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents.

2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

3. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.

F. Storage or sale of removed items or materials on-site is not permitted.

G. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

SELECTIVE DEMOLITION 024119 - 4

1.9 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding. Existing warranties include the following:

B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

1.10 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

D. Steel Tendons: Locate tensioned steel tendons and include recommendations for de-tensioning.

SELECTIVE DEMOLITION 024119 - 5

E. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

F. Survey of Existing Conditions: Record existing conditions by use of measured drawings, preconstruction photographs or video, and templates.

1. Inventory and record the condition of items to be removed and salvaged.

2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.

3.2 PREPARATION

A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Arrange to shut off utilities with utility companies.

2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment.

d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

SELECTIVE DEMOLITION 024119 - 6

3.4 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

C. Remove temporary barricades and protections where hazards no longer exist.

3.5 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain fire watch during and for at least 2 hours after flame-cutting operations.

6. Maintain adequate ventilation when using cutting torches.

7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

SELECTIVE DEMOLITION 024119 - 7

8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.

9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

10. Dispose of demolished items and materials promptly. Comply with requirements per Department of State Hospital "Construction Waste Management and Disposal" requirements.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area designated by Owner.

5. Protect items from damage during transport and storage.

D. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch (19 mm) at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.

B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.

C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.

D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.

SELECTIVE DEMOLITION 024119 - 8

3.7 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

3.8 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS 028100 - 1

SECTION 028100

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Classification, testing, and handling of hazardous materials for removal and disposal.

1.2 UNIT PRICES

A. This Work may involve removal of the following:

1. Asbestos-Containing Material (ACM): Determined by quantity of ACM in the existing debris piles.

2. Solid Waste: Determined by quantity of solid waste in existing debris piles.

3. Hazardous Waste: Determined by quantity of hazardous waste in existing debris piles.

B. The cost of classification, excavation, sorting, handling, removal, and disposal of ACM, solid waste, and hazardous waste must be included in the Contractor’s lump-sum base bid, for the estimated quantities indicated above. Increases or decreases from the estimated quantities will be paid at the unit price indicated in the Contractor’s Proposal. Should the actual quantity of ACM, solid waste, or hazardous waste encountered exceed the estimated quantity in the contract by more than 25 percent, the quantity of material in excess of 125 percent of the estimated quantity will be paid as a change to the contract for non-unit price items.

C. Determination of Unit Measurement: It is the primary duty of the Contractor to ensure that the quantities of material removed and disposed are accurately measured. The quantity of material removed and disposed must be approved by the Owner’s Representative at the site during loading and as measured on platform scales that have been inspected, tested, and certified by the State of California within the past year. Provide the Owner’s Representative with a certified weight slip for each load. The Owner’s Representative may adjust the weight from the load slips by the amount of inert material which, in his opinion, the Contractor has placed in the load and by the amount of water added to the material during handling.

1.3 REFERENCES

A. 40 CFR 260 Hazardous Waste Management System: General.

B. 40 CFR 261 Identification and Listing of Hazardous Waste.

C. 40 CFR 263 Standards Applicable to Transporters of Hazardous Waste.

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS 028100 - 2

D. 40 CFR 268 Land Disposal Restrictions.

E. Resource Conservation and Recovery Act of 1976 (RCRA) and Amendments.

F. Occupational Exposure to Asbestos, Tremolite, Anthrophyllite, and Actinolite; Final Rules, Title 29, Part 1910, Section 1001 (29 CFR 1910.1001) and Part 1926, Section 58 (29 CFR 1910.58) of the Code of Federal Regulations (CFR).

G. 40 CFR 61 Part B pertaining to the National Emission Standard for Asbestos.

H. California Health and Safety Code, Division 20, Hazardous Waste Control Act.

I. California Code of Regulations, Title 22, Division 4.5, Environmental Health Standards for the Management of Hazardous Waste.

J. California Code of Regulations, Title 8, Industrial Regulations.

K. 29 CFR 1910.120 Hazardous Waste Operations and Emergency Response.

L. State and Local Requirements governing handling, hauling and disposal of asbestos containing materials and hazardous waste.

M. Test Methods for Evaluating Solid Waste--Physical/Chemical Methods. U.S. EPA. 1986.

SW846, 3rd Edition.

1.4 DEFINITIONS

A. Asbestos Containing Material (ACM): Naturally occurring asbestos or any manufactured material containing asbestos fiber.

B. Solid Waste: Debris, metal, organics and other waste that is not classified as ACM hazardous waste or inert material.

C. Hazardous Waste: A material that meets the requirements of 40 CFR 261 and/or the California Code of Regulations, Title 22, 66261.

D. Inert Material: Portland cement concrete rubble, asphaltic concrete rubble, and soil.

1.5 DESCRIPTION

A. Provide materials, services, labor, and equipment required for classification, excavation, sorting, handling, removal, and disposal of debris piles located on the site consisting of asbestos containing materials, solid waste, hazardous waste, and inert material as specified herein.

B. Material contained in the piles must be identified by the Contractor as material that can either be handled and disposed as asbestos containing material in an appropriate landfill, be handled and disposed as a solid waste, be characterized and possibly treated and disposed as a hazardous waste, and/or be incorporated in the construction onsite as inert materials.

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS 028100 - 3

C. Work must be done only under the full-time observation of the Owner’s Representative.

1.6 GENERAL REQUIREMENTS

A. This Work includes the classification, excavation, sorting, handling, removal and disposal of materials that may include asbestos containing material, solid waste, hazardous waste, and inert material. This Work may require the use of special equipment, procedures, and trained personnel to perform the work in accordance with Local, State, and Federal regulations.

B. It is the responsibility of the Contractor to be familiar with the appropriate regulations and to perform the Work in accordance with all Local, State, and Federal occupational safety and environmental regulations.

1.7 SUBMITTALS

A. Submit under provisions of 01 33 00.

B. Submit an asbestos/hazardous waste removal, handling, transports, treatment, and disposal plan 15 working days prior to starting the Work. This plan must include:

1. Name of the Subcontractor(s).

2. Methods for determining debris classification.

3. Description of methods for excavation, handling or temporary storage, dust suppression (if needed), transporting, disposal, and landfill(s) name and location.

4. Submit notices required by Federal, State, and Local regulations together with proof of timely transmittal to agency requiring notice.

5. Submit copies of current valid permits required by State and Local regulations.

6. Submit copies of all state and local licenses and permits necessary to carry out the Work of this Contract.

C. Submit Characterization Sampling Report within three weeks of sampling completion.

D. Submit Confirmation Sampling Report within three weeks of sampling completion.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.1 DEBRIS CLASSIFICATION

A. Material contained in the existing debris piles must be classified and sorted by the Contractor prior to excavation into one or more of the following classes:

1. ACM.

2. Solid waste.

3. Hazardous waste.

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS 028100 - 4

B. The Owner’s Representative must be informed by the Contractor of the classification of materials prior to excavation. The Owner’s Representative may reclassify the material as appropriate. Failure of Owner’s Representative to reclassify the material must not constitute a waiver of any errors in classification by the Contractor.

3.2 DEBRIS HANDLING AND DISPOSAL

A. General handling and disposal requirements:

1. Handling of debris must be performed in a manner to avoid generation of dust and contamination of adjacent areas. Segregation and temporary storage of materials must be performed in a manner to avoid contamination of other materials and to avoid mixing between material classifications.

2. ACM and hazardous waste must be hauled by manifest system. Five working days before the transport of contaminated soil, the Contractor must submit in writing to the

Owner’s Representative a request for a representative to be present on-site to sign manifests.

3. The Contractor must be responsible for health and safety in the Work area at all times.

The Contractor must be prepared for encountering unknown substances that may be considered hazardous material.

4. Perform Work in accordance with all the referenced regulations and requirements.

B. Material classified as ACM must be handled, transported and disposed in accordance with all Federal, State, and Local regulations regarding this type of waste.

1. ACM must be disposed in an appropriate class landfill that is permitted to accept ACM.

2. All handling of asbestos-containing debris should be conducted in a manner to maintain nonfriable conditions unless information indicates otherwise.

C. Material classified as solid waste must be handled, transported, and disposed in accordance with all Federal, State, and Local regulations pertaining to this type of waste.

D. Material that is suspected to be hazardous waste must be brought to the attention of the Owner’s

Representative.

1. The Owner’s Representative may do the following:

a. Direct the Contractor to perform Characterization Sampling (Part 3.3).

b. Direct the Contractor to dispose as ACM.

c. Direct the Contractor to dispose as solid waste.

d. Reclassify the material as inert material.

2. If the material is suspected to be hazardous, the suspect material must be left in place, and the area must be clearly marked or staked and covered with plastic sheeting to prevent the spread of contamination. None of the suspected hazardous material must be characterized until all of the debris has been segregated and classified. Characterization of all suspected hazardous waste must be conducted at the same time.

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS 028100 - 5

3. Do not move a suspected hazardous material and avoid mixing contaminated material with uncontaminated material. Willful mixing of hazardous material with other material is in direct violation of state and federal environmental regulations.

4. The volume of hazardous material to be removed must be determined by the Contractor and confirmed by the Owner’s Representative prior to excavation.

5. Material that is classified as hazardous waste must be treated and disposed at a facility permitted to treat and accept such waste.

6. After removal of hazardous waste, confirmation sampling must be performed.

3.3 CHARACTERIZATION SAMPLING AND REPORT

A. Characterization sampling of all suspected hazardous waste must be conducted by the Contractor after completion of the debris segregation and classification. The sampling and analysis must be performed under the direction of a licensed professional engineer or geologist that has performed similar Work.

1. The sampling and analysis procedures must be in accordance with EPA’s Test Methods for Evaluating Solid Waste--Physical/Chemical Methods, 3rd Edition, August 1, 2005.

2. Five samples must be collected from locations specified by the Owner’s Representative.

The locations will be spatially distributed over the suspected area of contamination. The samples must be collected with the intent to obtain representative samples.

3. All samples must be analyzed for the following:

a. The inorganic Total Threshold Limit Concentration list using SW6010.

b. Volatile organic compounds SW8240.

c. Semi-volatile organic compounds SW8270.

d. Polychlorinated biphenyls SW8080.

e. Moisture content.

4. Analytical results must be reported on dry weight basis.

B. After the Owner’s Representative has reviewed the Characterization Sampling Report, the Owner’s Representative will reconfirm the classification of the waste and the Contractor must dispose of the material in accordance with all regulations.

C. A summary report must be prepared by the licensed professional performing the sampling and analysis. The Characterization Sampling Report must include sampling procedures, sample locations, analytical results a discussion of the results, recommended material classification, recommended treatment (if necessary), and recommended disposal. The Characterization Sampling Report must be stamped by the licensed professional. The report must be submitted to the Owner’s Representative within three weeks of sampling.

3.4 CONFIRMATION SAMPLING AND REPORT

A. Confirmation sampling must be conducted at all areas where hazardous waste was removed.

Sampling and analysis must be performed under the direction of a licensed professional engineer or geologist that has performed similar work.

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS 028100 - 6

1. The sampling and analysis procedures must be in accordance with EPA’s Test Methods for Evaluating Solid Waste--Physical/Chemical Methods, 3rd Edition, August 1, 2005.

2. Five samples must be collected from locations specified by the Owner’s Representative.

The locations will be spatially distributed over the suspected area(s) of contamination.

The samples must be collected with the intent to obtain representative samples.

3. All samples must be analyzed for the following:

a. The inorganic Total Threshold Limit Concentration list using SW6010.

b. Volatile organic compounds SW8240.

c. Semi-volatile organic compounds SW8270.

d. Polychlorinated biphenyls SW8080.

e. Moisture content.

4. Analytical results must be reported on dry weight basis.

B. A summary report must be prepared by the licensed professional performing the sampling and analysis. The Confirmation Sampling Report must include sampling procedures, sample locations, analytical results, a discussion of the results, recommended additional excavation (if necessary), recommend treatment (if necessary), and recommended disposal. The Confirmation Sampling Report must be stamped be the licensed professional. The report must be submitted to the Owner’s Representative within three weeks of sampling.

3.5 DECONTAMINATION

A. Decontaminate equipment prior to moving from contaminated material to inert material.

Provide proper decontamination of all materials which may have been contaminated. Dispose of all incident residuals and materials used for decontamination in accordance with all regulations.

3.6 SCHEDULE

A. Debris Classification: Complete prior to excavation of debris piles.

B. Debris Excavation, Sorting, Handling, Removal and Disposal: Complete prior to general earthwork under and around debris pile area.

END OF SECTION 028100

ASBESTOS ABATEMENT 028213 - 1

SECTION 028213

ASBESTOS ABATEMENT

GENERAL

1.1 SECTION INCLUDES

A. This section specifies requirements for asbestos abatement.

B. The work to be conducted at the project site includes the removal, transport, and disposal of the following asbestos contaminated materials:

1. All materials used for Work Area preparation.

2. All discarded personnel protective equipment.

3. All other potentially contaminated materials.

4. All asbestos materials and contaminated waste and debris discovered during demolition.

Dispose of properly per the regulatory classifications as listed in Table 1.

C. Contractor must provide cleaning, removal, transport and disposal of Asbestos Containing Material (ACM), Regulated ACM (RACM), Presumed ACM (PACM) and Asbestos Containing Construction Material (ACCM) from the project site.

D. Removal and disposal of non–asbestos containing materials:

1. Any non-asbestos equipment, fixtures and furniture removed incidental to abatement activities and stored at the work site, must be free of asbestos contamination and stowed in a safe manner as to avoid pedestrian/equipment/vehicle traffic obstruction, and staged as to mitigate slips, trips and/or falls.

E. Replacement of removed asbestos materials:

1. This specification generally applies to the impaction of the identified ACM within the scope of this project, including such materials that may be impacted by new construction.

1.2 REFERENCES

A. The following referenced documents form part of the specifications and the applicable requirements of those documents are incorporated by reference. Conflicts between these Specifications and the referenced documents should be brought to the attention of the Owner, in writing, for resolution before taking any related action. Where differences exist between codes and standards, the one affording the greatest protection must apply.

1. Code of Federal Regulations (CFR):

a. 29 CFR 1926.1101, Asbestos (including all mandatory appendices).

ASBESTOS ABATEMENT 028213 - 2

b. 40 CFR 61, Subpart A and Subpart M, USEPA National Emission Standards for Hazardous Air Pollutants (NESHAP).

c. 40 CFR Parts 261, 265, and 268, Hazardous Waste Management.

d. 40 CFR Part 763 – Asbestos Emergency Hazard Emergency Response Act

(AHERA).

e. 49 CFR Parts 172, 173, 178, 179, Hazardous Material Transportation.

2. California Code of Regulations (CCR):

a. 8 CCR Division 1, Chapter 4, Construction Safety Orders.

b. 8 CCR Article 2.5, Registration of Asbestos Work, Sections 341.6–341.14.

c. 8 CCR Section 1529, Asbestos.

d. 8 CCR Section 5144 Respiratory Protection.

e. 22 CCR Division 4.5, Environmental Health Standards for Management of

Hazardous Waste.

f. California Environmental Protection Agency (Cal/EPA), California Air Resource

Board (CARB), Final Regulation Order, Section 93105, Asbestos Airborne Toxic Control Measures for Construction, Grading, Quarrying, and Surface Mining Operations.

3. Appropriate Air Quality Management District/Air Pollution Control District:

a. The Rules and Regulations of the Air Quality Management District/Air Pollution Control District, including Rule # 1403 - Asbestos.

4. Fire, Life & Safety Regulatory Authority:

a. Applicable rules and regulations issued by the California State Fire Marshal.

5. American National Standards Institute (ANSI) publications:

a. Z9.2, Design and Operation of Local Exhaust Systems.

b. Z87.1, Occupational and Educational Eye and Face Protection.

c. Z88.2, Practices for Respiratory Protection.

d. Z41, Personal Protection – Protective Footwear.

e. E 1494, Practice for Encapsulants for Spray or Trowel–Applied Friable Asbestos–

Containing Building Materials.

6. Compressed Gas Association, Inc.:

a. G–7.1, Commodity Specification for Air.

7. National Fire Protection Association (NFPA).

a. NFPA No. 70, National Electrical Code.

8. Underwriters Laboratories (UL):

a. UL 586, High Efficiency Particulate Air Filter Units.

ASBESTOS ABATEMENT 028213 - 3

9. National Institute for Occupational Safety and Health (NIOSH):

a. Manual of Analytical Methods, Method 7400, Asbestos and Other Fibers by PCM.

1.3 DEFINITIONS

A. Abatement: Work impacting material(s) containing asbestos that is undertaken for the purpose of removing such asbestos material(s) and/or reducing associated asbestos-related hazards from the project site.

B. Airlock: A system for permitting ingress or egress with minimum air movement between a contaminated area and an uncontaminated area, typically consisting of two curtained doorways at least three feet apart.

C. Air Monitoring: The process of measuring the air contaminant (e.g. asbestos) content of a specified volume of air in a stated period of time. The purpose of air monitoring is to determine compliance with regulatory occupational and specified environmental exposure limits for airborne contaminates.

D. Asbestos-Containing Material (ACM): Any material containing more than one percent asbestos.

E. Asbestos Containing Construction Material (ACCM): Any manufactured construction material which contains more than one tenth of one percent asbestos by weight.

F. Asbestos-related work: Any activity that disturbs ACCM and may release fibers into the air.

G. Cal/OSHA: The California Department of Industrial Relations, Division of Occupational Safety and Health (Cal/OSHA).

H. Class I Asbestos Work: Activities involving the removal of ACM thermal system insulation (TSI), ACM surfacing material, or presumed ACM (PACM). TSI includes pipe, pipe fitting, duct, boiler and flue ACM insulation. Surfacing material includes sprayed-on or troweled-on ACM fire proofing, or acoustical plaster or decorative plaster. PACM is TSI or surfacing material installed prior to 1981 unless proven otherwise.

I. Class II Asbestos Work: Activities involving the removal of ACM which is not TSI, or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing, siding shingles and construction mastics.

J. Class III Asbestos Work: Activities involving the repair and maintenance operations, where ACM, including TSI, surfacing ACM and/or PACM, is likely to be disturbed. Class III work is limited to operations that generate no more waste then what can fit into one 60 inch by 60 inch (60”x60”) waste bag.

K. Clean Room: An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment.

L. Competent Person: An onsite supervisor who has been formally trained in asbestos work and who is capable of identifying existing and predictable asbestos and non-asbestos hazards in the

ASBESTOS ABATEMENT 028213 - 4

surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate such hazards. In addition, a competent person is one who is specially trained in accordance with the USEPA Model Accreditation Plan (40 CFR part 763) for supervisor, or its equivalent, and who is capable of selecting the appropriate control strategy for asbestos exposure and/or asbestos-related hazards.

M. Containment: Protective physical barriers and associated means and methods used to contain airborne contaminant dust within the Work Area and prevent contamination of surfaces and grounds below and adjacent to areas where a hazardous material is being disturbed.

N. Contractor: The company, or individual, that enters into a contract with the Owner to perform the hazardous material impaction and/or work as described by this specification.

O. Critical Barrier: One or more layers of plastic sealed over all openings into a work area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a work area from migrating to an adjacent area.

P. Decontamination Area: An enclosed area adjacent and connected to the regulated area and consisting of an equipment room, shower area, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.

Q. Demolition: The wrecking or taking out of any load- supporting structural member and any related razing, removing, or stripping of asbestos products.

R. Disturbance: Activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM. Disturbance includes cutting away small amounts of ACM and PACM, no greater than the amount which can be contained in one standard sized glove bag or waste bag in order to access a building component. In no event must the amount of ACM or PACM so disturbed exceed that which can be contained in one glove bag or waste bag which must not exceed 60 inches in length and width.

S. Employee Exposure: Exposure to airborne asbestos that would occur if the employee were not using respiratory protective equipment.

T. Equipment Room (Change Room): A contaminated room located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment.

U. Hazardous Materials: Substances with properties that can cause injury or illness to humans or adversely impact living organisms in the environment under certain conditions. Hazardous materials include both organic and inorganic chemicals and chemical compounds. Includes any substance on the list of hazardous substances prepared by the Director of the California Department of Industrial Relations, pursuant to Labor Code Section 6382 and also known as the Director’s List. For this project, hazardous materials include but are not limited to asbestos, lead, chromium, hexavalent chromium, PCB, and mercury compounds.

V. Hazardous Waste: Waste material that is listed or meets the criteria for hazardous waste as set forth in California Code of Regulations (CCR), Title 22, Division 4.5 and Article 9. At minimum, the following must be considered to be hazardous wastes with respect to this section:

ASBESTOS ABATEMENT 028213 - 5

1. Friable Asbestos Containing Material (RACM), or nonfriable ACM rendered friable during work or demolition.

W. Heavy Metals: Toxic metals, including but not limited to lead, arsenic, cadmium, chromium including chromium (VI), mercury and others that have toxic properties to humans and the environment.

X. HEPA Filter: A High Efficiency Particulate Air (HEPA) filter capable of trapping and retaining

99.97 percent of particles greater than 0.3 microns in diameter.

Y. HEPA Vacuum Equipment: HEPA-filtered vacuuming equipment with a filter system capable of collecting and retaining dust. Filters must be certified to be of 99.97 percent efficiency for retaining particles of 0.3 microns diameter or larger.

Z. Mini-containment or Mini-enclosure: A small temporary enclosure constructed of impervious material (such as plastic sheeting). The entire Work Area is contained or enclosed by this system to prevent the escape of contamination outside the Work Area. Except when used on man lifts, mini–containments are typically required to have an air lock at the point of entry/egress.

AA. Permissible Exposure Limit (PEL): The highest level of a regulated contaminant in air that an employee can be permitted to be exposed to in an eight hour work day without respiratory protection. Asbestos PEL – An exposure to airborne asbestos fibers of 0.1 fibers per cubic centimeter of air), averaged over an 8–hour workday (0.1 f/cc TWA).

BB. Personal Protective Equipment (PPE): Coveralls, respirators, gloves, eye and hearing protection, hardhats and/or other personal equipment worn by individuals for the purpose of shielding the wearer from exposure to potentially hazardous materials or site conditions.

CC. Presumed Asbestos Containing Material (PACM): Thermal system insulation and surfacing material found in buildings constructed no later than 1980.

DD. Qualified Person: The specially trained individual to be responsible for conducting air sampling, calibration of air sampling pumps, evaluating sampling results, and conducting respirator fit tests. This role is often assigned to the Competent Person.

EE. Regulated Area/Work Area: An area established by the employer to demarcate areas where Class I, II, and III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work accumulate; and a work area within which airborne concentrations of asbestos, exceed or there is a reasonable possibility they may exceed the permissible exposure limit.

FF. Removal: Procedures specified as necessary to remove and clean-up hazardous materials, paint and debris with heavy metal contamination or components with heavy metal containing coatings from the designated areas and to dispose of these materials at an acceptable site in accordance with federal, state and local regulations.

GG. State: The State of California.

ASBESTOS ABATEMENT 028213 - 6

HH. Surfacing material: Surfacing material means material that is sprayed, troweled-on or otherwise applied to surfaces (such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, and other purposes).

II. Surfacing ACM: Surfacing ACM means surfacing material which contains more than 1% asbestos.

JJ. Thermal system insulation (TSI): ACM applied to pipes, fittings, boilers, breeching, tanks, ducts or other structural components to prevent heat loss or gain.

KK. Transportation Storage Disposal (TSD) Facility: USEPA or State-permitted facility for transportation, storage, and disposal of hazardous wastes.

LL. Unclassified Abatement Work/Unclassified Operations: Activities involving the disturbance and/or removal of ACCM and/or other material which contains less than one percent asbestos.

MM. Universal Waste: Certain common designated hazardous wastes that are required to be handled and disposed of or recycled in accordance with special rules. Includes fluorescent light tubes, high intensity discharge (HID) lamps, sodium vapor lamps, mercury switches, mercury thermostats, nickel-cadmium (NiCad), Silver, Mercury and other batteries (often used in building alarms and emergency systems), and other items.

NN. USEPA: United States Environmental Protection Agency.

OO. Visually Clean: Free of visible dust, dirt, debris, or films removable by vacuuming or wet cleaning methods specified.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .