The document is a bid sheet for Invitation for Bid (IFB) 24-2548 issued by Muskegon County Board of Public Works for the Pump Station L and Force Main Replacement project in Michigan. The project involves comprehensive infrastructure replacement, including removing existing pavements, constructing a new pump station, installing force main, and performing various site restoration activities. The bid sheet details 45 line items covering mobilization, traffic control, material removal, surface restoration, force main installation, concrete work, and utility connections, with quantities specified for each item such as 610 linear feet of 8" HDPE force main, 1,450 square yards of concrete base course, and 150 tons of hot mix asphalt.

The project's estimated total construction cost is $2,296,500, with a construction cost of $1,726,500 and additional engineering, legal, administration, and contingency expenses of $570,000. The bid includes several pre-determined allowance items totaling $69,000, covering unforeseen buried conditions, railroad protective liability insurance, temporary signage, pump station signage, water service, natural gas service upgrades, and electrical service modifications. The pump station will be a new duplex submersible station with a capacity of 150 gallons per minute at 100 feet total dynamic head, featuring precast polymer concrete wet well, valve chamber, pumps, control panel, electrical instrumentation, and associated infrastructure components.

View the file

Other files

File Type Posted
24-2548 Pump Station L and Force Main Replacement.pdf PDF
W9 BLANK.pdf PDF
24-2548 Pump Station L _ FM Addendum #1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overall

IFB 24-2548 Pump Station L & Force Main Replacement
Company Name
Instructions for using Bid Sheet

Fill in Company information.

Complete the Unit cost portion, the Extended Price will calculate.Street
City/State
Contact Name
Phone #
Email Address
Line #ProductQuantityUnit of MeasureUnit CostExtended Price
1Mobilization, Max 10%1LS$ - 0
2Traffic Control1LS$ - 0
3Clearing, Brushing, and Tree Removal1LS$ - 0
4Soil Erosion and Sedimentation Control1LS$ - 0
5Contaminated Materials Disposal1,500TON$ - 0
6HMA Surface, Rem1,700SY$ - 0
7Pavt, Rem11,450SY$ - 0
8Curb and Gutter, Rem90FT$ - 0
9Sidewalk, Rem60SY$ - 0
10Force Main Abandonment1LS$ - 0
11Subbase/Subgrade Undercut50CY$ - 0
12Aggregate Base, 6" (21AA)140SY$ - 0
13Aggregate Base, 10" (21AA)1100SY$ - 0
14Conc Base Cse, Nonreinf, 8"11450SY$ - 0
15HMA, 4EML150TON$ - 0
16HMA, 5EML150TON$ - 0
17Curb and Gutter, Conc, Det F490FT$ - 0
18Conc Sidewalk, 4"450SF$ - 0
19Conc Sidewalk, 6"90SF$ - 0
20Conc Driveway, Nonreinf, 6"90SY$ - 0
21Restoration1LS$ - 0
22Pavt Mrkg, Waterborne, 4", White150FT$ - 0
23Pavt Mrkg, Waterborne, 4", Yellow1,300FT$ - 0
24Pavt Mrkg, Waterborne, 24", Stop Bar26FT$ - 0
25Pavt Mrkg, Waterborne, Lt Turn Arrow Sym4EA$ - 0
26Pavt Mrkg, Waterborne, Railroad Sym1EA$ - 0
27Sanitary Sewer, 12"50FT$ - 0
28Connect to Existing Manhole #1176, Sta. 53+341LS$ - 0
298" IPS DR-11 HDPE Force Main610FT$ - 0
308" 3-Piece Segmented 45° Bend (HDPE)22EA$ - 0
318" MJ Adapter21EA$ - 0
328" Restraint Collar2EA$ - 0
334' Dia. Force Main Discharge Manhole1EA$ - 0
34Marking Post and Test Station1EA$ - 0
35Trenchless Casing Installation, Mobilization1LS$ - 0
36Trenchless Casing Installation, 16" x 0.375" W.T. Steel Casing90FT$ - 0
37Construction Bypass Operation1LS$ - 0
38Pump Station L, Complete1LS$ - 0
39Unforeseen Buried Conditions Allowance1LS$ 30,000.00$ 30,000.00
40Railroad Protective Liability Insurance Allowance1LS$ 5,000.00$ 5,000.00
41Temporary Signage Allowance1LS$ 5,000.00$ 5,000.00
42Pump Station Signage Allowance1LS$ 2,000.00$ 2,000.00
43Pump Station Water Service Allowance1LS$ 4,500.00$ 4,500.00
44Pump Station Natural Gas Service Upgrades Allowance1LS$ 2,500.00$ 2,500.00
45Pump Station Electrical Service Modifications Allowance1LS$ 20,000.00$ 20,000.00
Total$ 69,000.00
1. Proposal quantities assume existing Sherman Boulevard base course is mostly concrete pavement. Actual existing conditions are unknown. Aggregate Base, 10" (21AA) will be required where existing aggregate base course is encountered within Sherman Boulevard.
2. See Project Specifications for HDPE fitting requirements.

Pump Station

Estimate of Probable Cost
Pump Station LNew duplex submersible station (150 gpm @ 100 ft TDH, HDPE 6" FM)
original estimate saved in 2200283

Item Description Quantity Unit Unit Price Amount

1.Dewatering1lsum$50,000$50,000WT @ 14', bottom of wet well @ 23', 5' sand layer (based on 2190237 bid in 2022)
2.Excavation & Backfill1lsum$145,000$145,00021' depth, 725 cy, $200/cy
3.Precast Polymer Concrete Wet Well1lsum$75,000$75,0007' diameter, $50k per US composite + cost of fillets, anti-flotation collar, and hatches
4.Precast Concrete Valve Chamber1lsum$40,000$40,0009' x 6', compare to 2190237 9'x9' meter chamber
5.Pumps, Valves, Piping1lsum$150,000$150,000$60k per Kennedy in August 2023 + tax, markup, install; $20k for valves (2 4" rubber lined plug, 2 4" rubber lined check), $50K SS piping (2220902)
6.Control Panel1lsum$100,000$100,000per CAE estimate for 2221194Other HDPE FM Jobs
7.Electrical & Instrumentation1lsum$40,000$40,000per CAE estimate for 2221194$65/ft for 6" horizontal drilling - 2180034
8.Automatic Sampler & Enclosure1lsum$35,000$35,000$35k in 2016 (2140419), $10k for 2130343 (also 2016); split the difference and added 5% inflation$85-100/ft for 12" trenching - PS 17 HCT
9.Generator & ATS1lsum$45,000$45,00040 kW based on 2240256, pad included in Concrete below$51, $92, $135/ft for 10" trenching - PS 21-23
10.Gravity Sewer1lsum$25,000$25,000includes (2) 4' manholes ($12k), 50 ft of 8" @ $200/ft, gravity drains; excavation included aboveCalculated Linear Price
11.Bypass Connection1lsum$15,000$15,000includes (2) 6" valves ($6k), MJ adapters, wyeProduction Rate (ft/day)150
12.Lift Station Concrete1lsum$30,000$30,000based on 2220902
13.Force Main1lsum$845,000$845,000S:\2022\2220857 Muskegon County RRC\DNC\6-Swanson\Cost Estimate\2024-02-29 Cost Estimate\Estimate of Probable Cost.xlsx (includes unforeseen conditions allowance)
14.Natural Gas Service Allowance1lsum$3,500$3,500Total Production Days52
15.Electrical Service Allowance1lsum$15,000$15,000Labor & Equipment ($/day)$6,000- from 5,000 - 10,000
16.General Conditions1lsum$113,000$113,00015%Total Labor & Equipment Cost$312,000
HDPE Material cost ($/ft)$6.50- From Taplin
HDPE Material Cost$50,700.00
TOTAL CONSTRUCTION:$1,726,500Embedment Material (Sand) ($/cyd)$45- From internet, conservative
Backfill Material (native soil)0- Assuming we can use native sands because it will be running though fields
Engineering, Legal, Administration, Contingencies$570,000Embedment Material (cyd/ft)0.1481481481- 2' x 2' Cross Sectional Area, Did not remove pipe volume to be conservative
TOTAL:$2,296,500Embedment Material (CYD)$52,000.00
Total Cost$414,700.00
Costs estimated in 2024 Dollars
Price per foot$53.17

&"-,Regular"&11MUSKEGON COUNTY WMS 2200283 &"-,Regular"&11SWANSON PICKLE LIFT STATION COST ESTIMATE