24-25-03_Jaycee_Park_Admin__Building_Window_Replacement.cleaned.pdf

PDF 351 KB Posted

Attached to
Window Replacement and Repair Jaycee Park Administrative Building
Solicitation number
311-24-25-03
Issued by
Pitt County, Greensboro City, North Carolina

About this file

This document is an Informal Bid Request for the Window Replacement and Repair project at the Jaycee Park Administrative Building in Greenville, North Carolina. The City of Greenville's Recreation & Parks Department is seeking bids for the removal and replacement of a portion of the aluminum window frames, glazing, trim, and weather-proofing, as well as the repair of two other aluminum windows and replacement of three fogged insulated glazing units. A mandatory pre-bid meeting is scheduled for August 1, 2024, at 10:00 AM at the project site. Bids are due by 2:00 PM on August 15, 2024, and should be submitted via email to the Project Coordinator, Mike Watson. The successful bidder will have 30 days to complete the work once started, and liquidated damages will be assessed for any delays.

The bid form includes a Base Bid for the window replacement and repair on the Recreation & Parks portion of the building, as well as an Alternate #1 for the window replacement at the East Branch Library portion. Bidders must comply with the City's Minority and Women Business Enterprise (MWBE) program, which has established 10% MBE and 6% WBE goals for this project. Bidders must also provide the required insurance coverages and comply with the E-Verify and Iran Divestment Act requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COG 1196610 Page 1

Informal Bid Request

24-25-03

Project:

Window Replacement and Repair Jaycee Park Administrative Building

Greenville, NC

Scope of Work:

Provide material, equipment, and labor to remove and replace a portion of the aluminum window frames and glazing and repair of others located at the Jaycee Park Administration Building.

Special Conditions:

Work must comply with all OSHA safety guidelines.

Contractor responsible for all needed paperwork to obtain required permits. All permits must be posted prior to the commencement of work.

There will be a mandatory pre-bid meeting on August 1, 2024, at 10:00 AM at the site.

Site Location:

Jaycee Park Administrative Building (JCP) 2000 Cedar Lane Greenville, NC

Bid Submittal Deadline: Thursday, August 15, 2024 @ 2:00 PM Via email to: mwatson@greenvillenc.gov

COG 1196610 Page 2

INVITATION FOR INFORMAL BID ON

WINDOW REPLACEMENT AND REPAIR - JCP

INSTRUCTIONS FOR BIDDERS

The person, firm or corporation making a proposal shall submit a bid to Mike Watson, Project Coordinator, on or before the hour and day stated on the attached bid request form. The preferred method of delivery of the bid is by email to mwatson@greenvillenc.gov The bid may also be mailed or hand delivered to the Jaycee Park Administrative office located at 2000 Cedar Lane, Greenville, N.C., 27835 and must be received prior to the submittal deadline time and date stated and shall have the words Bid Enclosed, Window Replacement – JCP Attn: Mike Watson along with the company name on the outside of the envelope.

All mailed or hand delivered bids received in the office will be marked with the date and time they are received by reception staff. Bids will not be opened and read aloud. The bids will be opened and evaluated, and a tabulation sheet will be available upon request once the contract is awarded to the successful bidder.

The bidder shall include the required responses and supply all the information as indicated on the Bid Form, Attachment A. The prices inserted shall be net and shall be the full cost including all factors whatsoever. Any bids not submitted on such forms provided will be considered nonresponsive.

No bid may be changed or withdrawn after the time of the opening. Any modifications or withdrawals requested before this time shall be acceptable only when such request in writing is made to Mike Watson, Project Coordinator.

The City of Greenville reserves the right to reject any and all bids, to waive any formalities, and to accept the bid or any portion thereof that is deemed most advantageous to the City. Any bid submitted will be binding for sixty (60) days after the opening.

The scope of work attached represents the minimum specification or description of work to be purchased or contracted. These requirements are not intended to prevent fair responses or to eliminate competition, but they are intended for the protection of each and every proposer to insure, if possible, that all bids submitted shall be upon a fair and comparable basis.

It is expressly understood by the bidders that written notice of award and/or receipt of purchase order will constitute agreement by the City to consummate the transaction and will serve together with the proposal, scope of work, and these instructions as the entire form of contract between the parties except in cases where formal contracts are warranted.

All work shall be FOB, Greenville, N.C.

COG 1196610 Page 3

Each bidder shall affirm that no official or employee of the City of Greenville is directly or indirectly interested in this proposal for any reason of personal gain.

Sales taxes may be listed on the proposal, but as a separate item. No charge will be allowed for Federal Excise and Transportation tax from which the City is exempt.

New vendors must register with the City of Greenville’s online portal at the following web address: https://selfservice.greenvillenc.gov/vss/Vendors/default.aspx.

Minority and/or Women Business Enterprise (MWBE) Program:

It is the policy of the City of Greenville to provide minorities and women equal opportunity for participating in all aspects of the City’s contracting and procurement programs, including but not limited to, construction projects, supplies and materials purchases, and professional and personal service contracts. In accordance with this policy, the City has adopted a Minority and Women Business Enterprise (M/WBE) Plan and subsequent program, outlining verifiable goals.

The City has established a 10% Minority Business Enterprise (MBE) and 6% Women Business Enterprise (WBE) goal for the participation of MWBE firms in supplying goods and services for the completion of this project. All firms submitting bids agree to utilize minority and women-owned firms whenever possible.

Questions regarding the City’s MWBE Program should be directed to Wanda House, Financial Services Manager, at (252) 329-4862.

Equal Employment Opportunity Clause:

The City of Greenville, NC is an equal opportunity employer and strictly prohibits discrimination against any employee or applicant for employment because of the individual’s race, color, religion, age, gender, disability, national origin, genetic information, sexual orientation, gender identity/reassignment or expression, military or veteran status, marital status, or any characteristic protected by applicable law.

TITLE VI NONDISCRIMINATION NOTIFICATION:

The City of Greenville, NC in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby 1178814- v4 7 notifies all respondents that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this advertisement and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

INSURANCE: The Contractor agrees to purchase at its own expense insurance coverages to satisfy the following minimum requirements. Work under this contract shall

COG 1196610 Page 4 not commence until all insurance required as listed has been obtained. Insurance required shall remain in effect through the life of this contract.

1. Workers’ Compensation Insurance: No contractor or subcontractor may exclude executive officers. Workers Compensation must include all employees.

Limits: Workers Compensation: Statutory for the State of North Carolina.

Employers Liability: Bodily Injury by Accident $1,000,000 each accident.

Bodily Injury by Disease $1,000,000 policy limit.

Bodily Injury by Disease $1,000,000 each employee.

2. Commercial General Liability:

Limits: Each Occurrence: $1,000,000

Personal and Advertising Injury $1,000,000

General Aggregate Limit $2,000,000

Products and Completed Operations Aggregate $2,000,000

The aggregate limit must apply per project. The form of coverage must be the ISO CG 00 01 policy as approved by the State of North Carolina Department of Insurance. If a form of coverage other than the CG 00 01 is used it must be approved Contractor. Any endorsed exclusions or limitations from the standard policy must be clearly stated in writing and attached to the Certificate of Insurance. Completed Operations coverage must be maintained for the period of the applicable statute of limitations. Additionally, the Contractor must be added as an Additional Insured to the Commercial General Liability policy.

3. Commercial Automobile Liability:

Limits: $1,000,000 combined single limit.

4. Cancellation:

Each certificate of insurance shall bear the provision that the policy cannot be altered or canceled in less than ten (10) days after mailing written notice to the assured of such alteration or cancellation, sent registered mail.

5. Proof of Carriages:

COG 1196610 Page 5

A. The Contractor shall provide the City with insurance industry standard ACCORD form Certificate(s) of Insurance on all policies of insurance and renewals thereof in a form(s) acceptable to the City prior to the commencement of services. Said policies shall provide that the City be an additional named insured.

B. The City shall be notified in writing of any reduction, cancellation, or substantial change of policy or policies at least thirty (30) days prior to the effective date of said action.

C. All insurance policies shall be issued by responsible companies who are acceptable to the City and licensed and authorized to do business under the laws of North Carolina.

E-VERIFY COMPLIANCE: The Contractor shall comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Further, if the Contractor utilizes a Subcontractor, the Contractor shall require the Subcontractor to comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. By submitting a proposal, The Proposer represents that their firm and its Subcontractors are in compliance with the requirements of Article 2 Chapter 64 of the North Carolina General Statutes.

IRAN DIVESTMENT ACT: Vendor certifies that: (i) it is not on the Iran Final Divestment List created by the NC State treasurer pursuant to N.C.G.S. 147-86.58; (ii) it will not take any actions causing it to appear on said list during the term of any contract with the City, and (iii) it will not utilize any subcontractor to provide goods and services hereunder that is identified on said list.

LIQUIDATED DAMAGES: If the Contractor fails to complete the work within the time specified in the bid package, the Contractor shall pay liquidated damages to the City of Greenville in the amount of $100.00 for each calendar day of delay until the work is completed or accepted.

The City of Greenville has adopted a Local Preference Policy, Resolution No. 056-13, and a Professional and other Services Policy, Resolution No. 057-13 that may pertain to this project. For more information, please see the City of Greenville’s webpage at.

https://www.greenvillenc.gov/government/financial-services/purchasing.

Questions regarding any part of this proposal shall be directed via email to Mike Watson, Project Coordinator, at mwatson@greenvillenc.gov

All bids shall be submitted on the attached bid submittal form, Attachment A.

COG 1196610 Page 6

EXHIBIT B

Window Replacement and Repair Jaycee Park Administrative Building

Scope of Work

Scope Contractor shall supply all labor, equipment and material to remove and replace a portion of the aluminum window frames, glazing, trim, and weather-proof caulking. Repair two other aluminum windows by removing and reinstalling them with weather-proof caulking and replace three fogged up insulated glazing units.

The Base Bid will be for the window replacement and repair on the Recreations and Parks portion of the building and Alternate #1 will be for the window replacement at the East Branch Library portion. All work shall be to industry standards. All OSHA requirements and other safety guidelines associated with the work shall be followed.

Debris All debris associated with this project shall be removed and properly disposed of offsite.

General Requirements

1. Contractor is responsible for all measurements.

2. Remove the existing aluminum windows and clean up opening and prep for new window to be installed.

3. Install 2” x 4 ½” bronze anodized aluminum storefront with 8” bottom rail and

1” bronze tempered glazing. Two windows in the conference room shall have 35% tint.

4. Remove two existing windows that are leaking as directed. Clean and prep the openings and reinstall.

5. Replace three fogged up insulated glazing units in the Art Room. Glass shall match the existing.

6. All new and reinstalled windows shall have perimeter weather-proof caulking at the exterior and interior.

7. Contractor shall take care not to damage any concrete, landscaping, etc. Any damage caused by the contractor shall be repaired prior to the completion of the project and receiving the final payment.

8. Contractor shall comply with all OSHA requirements and safety guidelines associated with the work within the scope.

9. Once the on-site work starts, the Contractor shall work diligently and expeditiously to complete the project. The Contractor will have thirty (30) days to complete the work once it has started. Liquidated damages will be assessed if not completed within the time allotted.

10. The Contractor shall not leave any openings unattended during the day and all must be secure by the end of the workday.

COG 1196610 Page 7

Warranty Provide a standard manufacturer’s warranty on all material and a 1-year warranty from the contractor on all labor.

Notes Contractor will be able to use the building’s electrical, water, and restrooms to complete the work.

The facility will remain open to the public and staff, so the Contractor shall make allowances for this and be responsible for providing a safe work site at all times.

Time of work will be Monday through Friday from 7:00 AM to 5:00 PM.

Weekends and holidays do not count towards the thirty (30) days. The Contractor can request alternate times to work but must be approved prior to performing any work.

The laydown area, parking, access to the building, etc. will be discussed at a pre-construction meeting with the awarded contractor.

The Base Bid will be the area outlined in yellow and Alternate #1 is outlined in green.

COG 1196610 Page 8

ATTACHMENT A

Bid Form

Window Replacement and Repair - JCP

Contractor Name and Address:

Phone Number: _________________________ Date: __________________________

Base Bid Amount: $___________________________

Alternate #1 Bid Amount: $___________________________

Addenda: __________________

Submitted by: ________________________________

Signature: ____________________________________

BIDS ARE DUE BY 2:00 PM THURSDAY, AUGUST 15, 2024.