24-19 Bid Tab, For Bid.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Syracuse Drainage Improvements
- Solicitation number
- 2024-19-PW
- Issued by
- Adams County, Colorado Springs City, Colorado
About this file
The document is a Unit Price Form for the Syracuse Drainage Improvements project (Project No. 2024-19-PW) issued by Commerce City, Colorado's Public Works Department. The bid tabulation details multiple construction-related line items for a drainage improvement project, including removal of existing infrastructure (pipe, sidewalk, curb and gutter), erosion control measures, road base and asphalt work, concrete installations, storm drainage components, traffic control, and surveying. The project encompasses 30 distinct line items with quantities specified, such as 4 linear feet of pipe removal, 28 square yards of sidewalk removal, 190 linear feet of curb and gutter removal, and 489 tons of aggregate base course.
The bid form indicates zero dollar amounts for all line items, suggesting this is a template or placeholder document for potential bidders. A notable administrative detail is the requirement for a Commerce City CIP ROW Permit, with a city user tax calculation method provided as an informational note. The tax is calculated by multiplying the total project cost by 0.6 and then by the city's 4.5% tax rate, which will be reimbursed on the first pay application. The project is located at 8602 Rosemary Street in Commerce City, Colorado, with contact information provided for the municipality's public works department.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-19 CCDrng, RFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unit Price Form Commerce City, Public Works, 8602 Rosemary Street, Commerce City, CO 80022 Tel: 303-289-8150 www.c3gov.com
| Syracuse Drainage Improvements | |
| C3 Project No.: 2024-19-PW | Contractor: |
| Address: | |
| UNIT PRICE FORM | Email: |
| Phone: |
| CONTRACT | |||||
| ITEM NO. | ITEM DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL COST |
| 202-00035 | REMOVAL OF PIPE | LF | 4.00 | $0.00 |
| 202-00200 | REMOVAL OF SIDEWALK | SY | 28.00 | $0.00 |
| 202-00203 | REMOVAL OF CURB AND GUTTER | LF | 190.00 | $0.00 |
| 202-00206 | REMOVAL OF CONCRETE CURB RAMP | SY | 12.00 | $0.00 |
| 202-00220 | REMOVAL OF ASPHALT MAT | SY | 815.00 | $0.00 |
| 208-00020 | SILT FENCE | LF | 40.00 | $0.00 |
| 208-00051 | STORM DRAIN INLET PROTECTION (TYPE 1) | LF | 30.00 | $0.00 |
| 208-00106 | SWEEPING (SEDIMENT REMOVAL) | HOUR | 2.00 | $0.00 |
| 208-00207 | EROSION CONTROL MANAGEMENT | DAY | 5.00 | $0.00 |
| 212-00100 | TREE RETENTION AND PROTECTION | LS | 1.00 | $0.00 |
| 304-06000 | AGGREGATE BASE COURSE (CLASS 6) | TON | 489.00 | $0.00 |
| 403-33851 | HOT MIX ASPHALT (GRADING S) (100) (PG 64-28) | TON | 94.00 | $0.00 |
| 403-34871 | HOT MIX ASPHALT (GRADING SX) (100) (PG 76-28) | TON | 188.00 | $0.00 |
| 603-01185 | 18 INCH REINFORCED CONCRETE PIPE | LF | 30.00 | $0.00 |
| 604-16005 | INLET TYPE 16 (5 FOOT) | EACH | 1.00 | $0.00 |
| 604-30005 | MANHOLE SLAB BASE (5 FOOT) | EACH | 1.00 | $0.00 |
| 608-00006 | CONCRETE SIDEWALK (6 INCH) | SY | 28.00 | $0.00 |
| 608-00010 | CONCRETE CURB RAMP | SY | 12.00 | $0.00 |
| 609-21020 | CURB AND GUTTER TYPE 2 (SECTION II-B) | LF | 190.00 | $0.00 |
| 625-00000 | CONSTRUCTION SURVEYING | LS | 1.00 | $0.00 |
| 626-00000 | MOBILIZATION | LS | 1.00 | $0.00 |
| 627-30210 | THERMOPLASTIC PAVEMENT MARKING (XWALK-STOP-LINE) | SF | 24.00 | $0.00 |
| 630-00000 | FLAGGING | HOUR | 120.00 | $0.00 |
| 630-00012 | TRAFFIC CONTROL MANAGEMENT | LS | 1.00 | $0.00 |
| 630-80341 | CONSTRUCTION TRAFFIC SIGN (PANEL SIZE A) | EACH | 6.00 | $0.00 |
| 630-80360 | DRUM CHANNELIZING DEVICE | EACH | 20.00 | $0.00 |
| 630-80335 | BARRICADE (TYPE 3 M-A) (TEMPORARY) | EACH | 2.00 | $0.00 |
| 630-80355 | PORTABLE MESSAE SIGN PANEL | EACH | 2.00 | $0.00 |
SUBTOTAL = $0.00
900-00201 CITY USER TAX (ROADWAY CONSTRUCTION PLANS - BASE BID) DOLLAR 0.00 $1.00 $0.00
| TOTAL COST = | $0.00 | |
| NOTE FOR INFORMATION ONLY: A Commerce City CIP ROW Permit is required for this project. City Use Tax is calculated by taking the TOTAL PROJECT COST multiplying it by 0.6 and then by the Cities Tax of 4.5% | ||
| This dollar amount will be reimbursed on first pay application |
| EXAMPLE: (1,000,000.00 x 0.6) 0.045= $27,000.00 |
| (1,500,000.00 x 0.6) 0.045= $40,500.00 |