24-08-35 PLANS-Narrows Lane Final Design Stream Restoration.pdf
PDF 28 MB Posted
- Attached to
- ITB 24-08-35 Narrows Lane Stream Restoration
- Solicitation number
- 53180
- Issued by
- Roanoke City, Virginia
About this file
This document appears to be plans and specifications for the Narrows Lane Stream Restoration project, an Invitation to Bid (ITB) issued by the City of Roanoke, Virginia. The project involves the final design for stream restoration work along Narrows Lane. The solicitation is open to firms interested in providing construction services for this project within the jurisdictions of Roanoke City. Key details include response due dates, site visit information, and the contract term.
The solicitation does not provide specific pricing details, set-asides, incumbent information, or funding sources. However, it indicates the City of Roanoke is seeking qualified firms to bid on the construction services required for the Narrows Lane Stream Restoration project as outlined in the plans and specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-08-35 Narrows Lane Stream Restoration Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W et la nd
S tu di es a nd
S ol ut io ns , I nc
P et er s
C re ek R oa d, S ui te
(5
)7
.6
N at ha n A.
S ta le y ns ta le y@ w et la nd s.
co m
R oa no ke
, V A
(7
)6
.5
STREAM RESTORATION DESIGN
CITY SW PLAN #1038.2
CITY PLANNING #CP23-0002
MARCH 22, 2023
Wetland Studies and Solutions, Inc.R companyaDAVEY R
5450 Peters Creek Road • Suite 110 Roanoke, Virginia 24019
Phone: 540-795-6180 www.wetlands.com
OH UTILITY LINE
±16.5' CLEARANCELATERAL SEWER LINE
K
OH UTILITY LINE
±18' CLEARANCE
OH UTILITY LINE
±13.9' CLEARANCE
OH UTILITY LINE
±16.5' CLEARANCE
OH UTILITY LINE
±13.1' CLEARANCE
OH UTILITY LINE
±15.5' CLEARANCE
OH UTILITY LINE
±15.8' CLEARANCE
PARCEL BOUNDARIES
EX. CONTOURS (1' C.I.)
EX. SANITARY
EX. STORM DRAINAGE
EX. WATER LINE
EX. EDGE OF PAVEMENT
EX. DITCH
EX. OVERHEAD TELEPHONE LINE
EX. GAS LINE
EX OVERHEAD UTILITIES
EX OVERHEAD ELECTRIC
EX , UG TELEPHONE
BNDRY 2015 TOPO. (SUPPLEMENTED
WITH ADDITIONAL SHOTS)
EX. GUARD RAIL
NEW (2022) WSSI SURVEYED TOPO.
EX. STORMWATER EASEMENTS
EX. RIPRAP
EX. TREELINE
EX. CHAINLINK FENCE
WATER METER, WATER MANHOLE,
HYDRANT, GAS VALVE, MAIL BOX
BUSH, DECIDUOUS TREE, TREE TO BE
REMOVED (SCALED BY SIZE)
FOUND IRON ROD PROPERTY MARKER
EXISTING CONDITIONS LEGEND
M A
R , 2
1"
0'
SMN JAB NAS
02 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
EXISTING CONDITIONS PLAN.dwg
Ex is tin g
C on di tio ns P la n
VCS NAD 83
WSSI and Roanoke City Digital Data
NGVD 29
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
C W et la nd S tu di es a nd S ol ut io ns
, I nc
C op yr ig ht
W et la nd
St ud ie s a nd S ol ut io ns
, I nc
.R co m p an y a
DA
VE
Y
R
P et er s C re ek
R o ad
S u it e
R o an o k e, V ir gi n ia
P h o n e:
-7
-6 w w w .w et la n d s.
co m
M
ATC
H
LIN
E SEE TH
IS SH
EET
M
AT
C H
LI
N
E
SE
E
TH
IS
S
H
EE
T
SURVEY NOTES:
1. This existing conditions survey has been horizontally oriented to The Virginia Coordinate System of 1983, South Zone, and vertically referenced to the North American Vertical Datum of 1988 (NAVD88) by field locations of monumentation shown on this drawing provided by The City of Roanoke - Stormwater Division. Wetland Studies and Solutions, Inc. (WSSI) used a Real Time Network (RTN) GPS to field verify the coordinate systems. Horizontal and vertical data is expressed in U.S. Survey Feet. Field locations of the supplemental existing conditions were completed on 08/16/2022.
2. The majority of survey data was collected by WW Associates in 2015 and provided to WSSI by the City of Roanoke. This included property information, utility infrastructure, 2-foot contour interval topography, roadways, and isolated tree locations.
WSSI performed a supplemental existing conditions site survey to augment existing 2-foot contour interval topography and utility survey information. The supplemental data will be used to aid in the proposed stream restoration design.
3. The methodology required and requested for this survey precludes the depiction of all physical improvements, man-made structures and underground features.
4. Contour interval = 1.0 feet
SUPPLEMENTAL TOPO
COLLECTED BY WSSI,
JULY 2022
SUPPLEMENTAL TOPO
COLLECTED BY WSSI,
JULY 2022
VAN WINKLE ROAD
EXISTING STORMWATER
EASEMENTS 15 FT
OFFSET FROM
PROPERTY LINES
APPROXIMATE
LOCATION OF
EXISTING SANITARY
LINE AND MANHOLE
M A
R , 2
N /A
JTS JAB NAS
03 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
DESIGN NARRATIVE.dwg
D es ig n
N ar ra tiv e
N/A
N/A
N/A
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
C W et la nd S tu di es a nd S ol ut io ns
, I nc
C op yr ig ht
W et la nd
St ud ie s a nd S ol ut io ns
, I nc
.R co m p an y a
DA
VE
Y
R
P et er s C re ek
R o ad
S u it e
R o an o k e, V ir gi n ia
P h o n e:
-7
-6 w w w .w et la n d s.
co m
Design Narrative I. Background
The Narrows Lane drainage improvement and channel restoration project is located between Old Rocky Mountain Road and Narrows Lane SW east of Route 220. The project begins at the existing roadside ditch/driveway culvert on 4521 Narrows Lane and continues downstream for approximately 700 linear feet before entering into the existing 5-ft diameter road culvert under Narrows Lane near the intersection with Old Rocky Mount Road.
The project is designed to address erosion seen along the south side of the Narrows Lane right-of-way, and includes improvements to storm drain infrastructure along Narrows Lane to address minor flooding associated with driveway culverts. The upstream portion of the project area will remove existing driveway culverts and install approximately 200 linear feet of continuous culvert along the edge of the right-of-way to reduce flooding associated with constrictions and blockages at individual driveway culverts. Additional modifications to the storm drainage network will be necessary to eliminate discontinuous piped channel areas and allow for improved outlet configurations for two (2) storm drainage pipes conveying flow into the project area from the north side of Narrows Lane near the intersection with Van Winkle Road.
Overall topography for the design reach is gently to moderately sloping, with steeper areas associated with the adjacent roadway embankment. The project area encompasses much of the confined floodplain area, bounded tightly by Old Rocky Mount Road and Narrows Lane. Channel slope varies widely, from 1% at the upstream and downstream tie-outs, to 5% in limited areas within the project reach.
II. Preliminary Hydrologic Analysis
A total drainage area for the upstream project boundary of approximately 65 acres was determined by Lumsden Associates, P.C. as part of a 2021 “Channel Analysis Calculations” report prepared for Rockydale Quarries and provided to WSSI by City staff (figure 4, next page).
Hydrologic computations for the upper drainage area were based on the Rational Method, utilizing AutoCAD Civil 3D 2009 Hydraflow Hydrographs extension. Peak flows were computed for the 2- and 10-yr recurrence interval SCS Type II storm, with flows of 75 cfs and 102 cfs, respectively. Additional drainage from along Narrows Lane and Van Winkle Road enters the project reach through two (2) existing 24-in culverts under Narrows Lane, adding an estimated 50 acres of contributing drainage area when taken to the downstream end of the design reach.
The previous hydrologic analysis for the upstream drainage area (65 acres) was supplemented by consideration of the published USGS Non-Urban Regional Curves for the Valley and Ridge Physiographic Province of Virginia (Figure 1). These curves were developed to predict bankfull characteristics for streams with low watershed imperviousness (typically less than 5%) and should be adjusted to consider development in the project watershed. This may be achieved through application of an urban channel enlargement factor. The Center for Watershed Protection published a report on the impact of watershed development on channel enlargement. From this study, it is estimated that ultimate channel enlargement can take 50-75 yrs or longer from the time the watershed is fully developed. A plot depicting the ultimate channel size vs. watershed impervious area is presented in the article and given as Figure 2. The imperviousness in the Narrows Lane watershed (conservatively estimated at 20% for the 115 ac drainage) yields a resulting enlargement factor of approximately 2.0.
Bankfull Channel Geometry as Predicted by the Valley and Ridge Non-Urban Regional Curves:
(For an estimated 115-acre or 0.179 mile drainage area)
Cross-sectional Area = 3.6 sf Bankfull Width = 5.9 ft
Bankfull Flow = 11.04 cfs
III. Channel Sizing To accommodate the expected discharge from the upstream developed and piped watershed the channel was sized using a discharge of 22 cfs, which yielded a channel with a width of 12 ft and depth of 1.2 ft (at a slope of 2%). This yielded a channel with a cross section of
9.36 square feet. While this cross section is slightly larger than that predicted by the Valley and Ridge Regional Curve with an enlargement factor (3.6 sf x 2 EF = 7.2), the additional size allows for added drainage from Tributaries 1 and 2 and a factor of safety when considering the atypical watershed condition (large quarry with pumped discharge). Appropriate dimensions were determined by iteratively solving Manning's open channel flow equation with various geometric configurations.
IV. Discussion of Design Alternatives and Design Narrative When considering the Narrows Lane design reach in the context of Rosgen's channel classification system, the channel exhibits characteristics of a B-type (moderately entrenched, confined valley). The existing channel shows signs of downcutting and ongoing bank erosion. It is anticipated that as the channel evolves the stream will widen to reform a floodplain within the widened entrenched channel.
Left unchecked, the design reach is likely to see continued erosion as the stream widens, impacting the adjacent roadway and potentially the 8" sanitary sewer passing under the stream.
Implementation of a Priority 1 (P1) restoration (Figure 3) would involve reconstructing the stream channel with a size appropriate for the current and predicted watershed conditions, but at an elevation which allows better connection with the adjacent floodplain. A P1 restoration provides the highest degree of channel stability and ecological benefit while limiting disturbance to the existing floodplain corridor. This design option can result in adverse effects on adjacent infrastructure due to elevated floodplain flows. This is not a major concern on this site, as structures previously affected by nuisance flooding have been razed. This approach typically involves significant quantities of fill and/or excavation and installation of grade control structures to establish a stable channel pattern and profile.
A Priority 2 (P2) restoration involves excavation of floodplain material in order to create a bankfull floodplain at a lower elevation where good floodplain connectivity is not otherwise seen. This approach often involves major excavation and haul off, as well as significant disturbance to the surrounding riparian vegetation/trees. Project costs for this strategy can approach those of a P1 design.
A Priority 3 restoration involves the creation of a limited bankfull bench and isolated bank grading to reduce shear stresses and bank erosion. This approach does not seek to achieve long-term stability for the entire reach, but rather focuses resources on areas of highest erosion, thus presenting a more cost-sensitive alternative. However, this strategy is inconsistent with stated project goals and is not applicable on this site.
The goals of this project necessitate use of a design strategy that achieves long-term stability, improves floodplain connectivity to maximize water quality benefits, and enhances stream habitat. Design channel size is based natural channel design principles, with application of the USGS regional curves with an urban channel enlargement factor applied. When sizing the channel, WSSI engineers compared regional curves against flow rates from the Lumsden hydrologic analysis (2021). Based on previous experience with small headwater streams, WSSI has found that traditional hydrologic approaches tend to significantly overestimate flows. Thus, the 75 cfs flow predicted for the 2-yr recurrence interval storm through application of the rational method was considered an upper bound for the design flow. Conversely, strict application of the USGS regional curves without acknowledging watershed development may result in an undersized channel and floodplain scour/instability. WSSI chose to size the channel using Mannings' open channel flow equation based on the adjusted regional curves. Lower slopes in the upper portion of the reach will help to slow velocities exiting the stormwater pipe, while encouraging floodplain access. As the channel profile steepens mid-way through the reach, conveyance capacity increases, while further flow contributions from additional outfalls along Narrows Lane increase the contributing drainage area. The selected design utilizes natural channel design principles to create a channel that is well connected to the surrounding floodplain, yet large enough to promote riparian corridor stability.This channel sizing approach is consistent with the stated design goals of long-term stability and strong floodplain connectivity. Long term stability was confirmed via hydraulic modeling in HEC-RAS, which indicated that overbank velocities in the 2-year (75 cfs) and 10-year storms (102 cfs) do not exceed 2 feet per second (flows from Lumsden study).
The design profile incorporates a degree of channel reconnection (elevating the invert above the currently incised channel), while increasing planform sinuosity, hence it most resembles a priority 1 restoration. These planform adjustments will shift the channel away from Narrows Lane, enhance floodplain connectivity, and allow for stronger pool formation. This approach utilizes various rock and wood grade control structures to maintain a stable planform geometry and profile, while limiting channel erosion through incorporation of an appropriately sized reinforced bed material. Likewise additional channel stability will be afforded via native riparian plantings (including black willow live stakes at the stream edge). These plantings will also provide stream shading and enhance nutrient uptake.
Figure 1. Non-Urban Valley and Ridge Regional Curves for Select Geomorphic Parameters in Maryland, Virginia, and West Virginia
Adapted from: Keaton, Messinger, and Doheny. 2005, Development and Analysis of Regional Curves for Streams in the Non-Urban Valley and Ridge Physiographic Province, Maryland, Virginia, and West Virginia. U.S. Geological Survey Scientific Investigations Report 2005–5076, p. 14-15.
"Ultimate" Channel Enlargement as a Function of Impervious Cover in Alluvial Streams in Maryland, Vermont and Texas (MacRae and DeAndrea, 1999; Brown and Claytor, 2000)
Figure 2. Urban Channel Enlargement Factor
Figure 3. Stream Restoration Design Priority
V. Floodplain Analysis
The proposed design reach does not lie within a FEMA-mapped floodplain and is contained solely within City-owned property.
Thus, formal floodplain modeling was not performed.
Source: Wetland Studies and Solutions, Inc. Graphic
Priority 1 Restoration - Raise and Reconnect to Floodplain
Width of Disturbance
Balanced cut/fill
Lesser Tree Impacts
Priority 2 Restoration - Excavate Floodplain at Lower Elevation
Width of Disturbance
High Cut Volume
Increased Impacts to Existing Riparian Corridor
Priority 3 Restoration - Bankfull Bench (Confined Valley)
Bankfull Bench Limited Disturbance
-Limited Disturbance, higher post-restoration stress, lower ecological lift
DA=0.179 SQ MI
UNADJUSTED
CSA= 3.64 SQ FT
DA=0.179 SQ MI
UNADJUSTED
W= 5.88 FT
DA=0.179 SQ MI
UNADJUSTED
Q= 11.04 CFS
20% IMPERVIOUSNESS
ASSUMED
ENLARGED CSA = 7.2 SQ FT
R , 2
N /A
JTS JAB NAS
04 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
DESIGN NARRATIVE.dwg
W at er sh ed E xh ib it an d Se qu en ce o f C on st ru ct io n
N/A
N/A
N/A
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
C W et la nd S tu di es a nd S ol ut io ns
, I nc
C op yr ig ht
W et la nd
St ud ie s a nd S ol ut io ns
, I nc
.R co m p an y a
DA
VE
Y
R
P et er s C re ek
R o ad
S u it e
R o an o k e, V ir gi n ia
P h o n e:
-7
-6 w w w .w et la n d s.
co m
APPROXIMATE DRAINAGE AREA TO DOWNSTREAM PROJECT BOUNDARY
(DELINEATION INFORMATION PROVIDED BY CITY STAFF)
SEQUENCE OF CONSTRUCTION
1. NO IN-STREAM WORK SHALL BEGIN UNTIL ALL E&S CONTROLS HAVE BEEN PROPERLY INSTALLED (PERIMETER SILT FENCE AND CONSTRUCTION ENTRANCES, ETC.; SEE E&S PLAN FOR INFORMATION REGARDING PRE CONSTRUCTION MEETING) AND THE SPECIFIED STABILIZATION SEED MIXES AND NATURAL FIBER EROSION CONTROL MATTING ARE ON SITE. ADDITIONALLY, STREAM CENTERLINE AND LIMITS OF DISTURBANCE SHALL BE SURVEYED AND STAKED-OUT PRIOR TO BEGINNING OF WORK.
2. INITIAL SITE ACCESS AND MOBILIZATION SHALL BE FROM NARROWS LANE. SEE SHEET 06.
3. ACCESS WITHIN THE STREAM CORRIDOR SHALL BE VIA THE SOUTH SIDE OF THE STREAM, ALONG THE
PROPOSED ALIGNMENT. SITE ACCESS WILL BE GAINED ACROSS THE EXISTING CULVERT.
4. WORK SHALL PROGRESS FROM DOWNSTREAM TO UPSTREAM (UNLESS OTHERWISE AUTHORIZED BY CITY STAFF), TO ALLOW FOR UTILIZATION OF THE PROPOSED CHANNEL CORRIDOR AS AN ACCESS
PATH.
5. ALL WORK SHALL OCCUR IN THE DRY. THE CONTRACTOR SHALL WORK TO CONSTRUCT THE
PROPOSED CHANNEL WHILE ALLOWING FLOW TO CONTINUE THROUGH THE UNDISTURBED EXISTING
DITCH LINE. WHERE PROPOSED AND EXISTING CHANNELS OVERLAP, WORK AREAS SHALL BE
PROTECTED BY A PUMP AROUND DIVERSION.
6. THE CONTRACTOR SHALL BEGIN BY CUTTING ONLY THOSE TREES NECESSARY FOR PROPOSED
GRADING AS INDICATED ON SHEET 16. ANY TREES NOT INDICATED TO BE REMOVED THAT ARE 6" + IN
DIAMETER SHALL BE APPROVED BY OWNER PRIOR TO REMOVAL.TREES SHOULD BE FELLED SUCH
THAT DAMAGE TO SURROUNDING TREES IS MINIMIZED. IN AREAS WHERE GRADING IS NOT REQUIRED BUT TREES ARE SIGNIFICANTLY IMPACTED, TREES SHOULD BE FLUSH CUT AND THE ROOT BALL LEFT
IN PLACE. LOGS SHALL BE CAREFULLY STOCKPILED DURING CLEARING.
7. ONCE TREES HAVE BEEN REMOVED THE CONTRACTOR SHALL BEGIN BY WORKING ON DOWNSTREAM AREAS, GRADING BANKS BACK AS INDICATED WHILE MINIMIZING DISTURBANCE TO ACCESS AREAS WHEN ADJACENT TO MATURE TREES TO BE LEFT UNDISTURBED. DECK MATS SHALL BE USED NEAR
TREES AND AS NECESSARY TO PREVENT RUTTING IN WET AREAS.
8. FINAL GRADES SHALL BE ACHIEVED THROUGH THE PLACEMENT OF 4 INCHES OF TOPSOIL (SALVAGED OR IMPORTED, SEE SPECIFICATIONS FOR TOPSOIL SALVAGING AND STOCKPILING PROCEDURE). THE
CONTRACTOR SHALL ONLY CLEAR AND GRUB AS MUCH OF THE PROPOSED CHANNEL AND
GRADING AREAS THAT THE CONTRACTOR CAN COMPLETE THE CONSTRUCTION ON AND HAVE
STABILIZED IN THE SAME DAY AS THE CLEARING AND GRUBBING. WHERE SOILS HAVE BEEN
COMPACTED BY CONSTRUCTION TRAFFIC THE CONTRACTOR SHALL SCARIFY SUBGRADE PRIOR TO
TOPSOIL PLACEMENT TO PROMOTE GOOD VEGETATIVE ESTABLISHMENT.
9. CONTRACTOR SHALL WORK PROGRESSIVELY, FINISH GRADING, SPREADING NATIVE SEED, AND
INSTALLING MATTING ALONG PROPOSED CHANNEL AREAS IMMEDIATELY UPON ACHIEVING FINAL
GRADE. THIS WILL MINIMIZE THE AMOUNT OF DISTURBED AREA IN THE EVENT OF A HIGH FLOW EVENT.
10. ALL DISTURBED AREAS SHALL BE SEEDED WITH RIPARIAN SEED MIX UNLESS OTHERWISE SPECIFIED IN THE PLANTING PLAN. NATURAL FIBER MATTING SHALL BE PLACED PER THE TYPICAL RIFFLE DETAIL AND AS OTHERWISE INDICATED IN THE PLAN, STAKED TO MANUFACTURERS SPECIFICATIONS USING
BIODEGRADABLE STAKES. (NOTE: SEED MUST BE SOWN IMMEDIATELY PRIOR TO MATTING
PLACEMENT.)
11. ONCE ALL PROPOSED GRADING IS COMPLETE THE CONTRACTOR SHALL RESTORE UNLESS
OTHERWISE INDICATED BY PLANS ALL STAGING/STOCKPILE AND ACCESS AREAS TO PRE-EXISTING CONDITIONS USING THE APPROPRIATE SEED MIX WHERE INDICATED AS WELL AS STRAW MULCH OR
MATTING PER LOCAL REQUIREMENTS AND THE VIRGINIA E&S HANDBOOK.
12. PLANTINGS SHALL BE INSTALLED PER THE PLANTING PLAN AND SPECIFICATIONS AND ADHERING TO
THE SPECIFIED TIME OF YEAR PLANTING WINDOWS.
13. THE CONTRACTOR SHALL ASSESS THE POST-CONSTRUCTION CONDITIONS OF EXISTING
INFRASTRUCTURE, REPAIRING ANY DAMAGE NOT OTHERWISE SPECIFIED IN THESE PLANS TO
PRE-EXISTING CONDITIONS OR BETTER.
14. CONTRACTOR SHALL REMOVE E&S MEASURES AND RETURN ANY REMAINING DISTURBED AREAS TO A
PRE-CONSTRUCTION CONDITION.
15. CONTRACTOR TO FOLLOW ALL APPLICABLE OSHA REQUIREMENTS.
APPROX.
PROJECT
AREA
R , 2
N /A
JTS JTS NAS
05 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
SEDIMENT SIZING.dwg
Se di m en t S iz in g
C al cu la tio ns
VCS NAD 83
WSSI and Roanoke City Digital Data
NGVD 29
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
C W et la nd S tu di es a nd S ol ut io ns
, I nc
C op yr ig ht
W et la nd
St ud ie s a nd S ol ut io ns
, I nc
.R co m p an y a
DA
VE
Y
R
N
C o u rt h o u se
R o ad
S u it e
R ic h m o n d V ir gi n ia
P h o n e:
-2
-9 w w w .w et la n d s.
co m
Utilization of Fine Particles
The shear stress computations presented on this sheet represent the force required to initiate movement of non-imbricated particles. The reinforced bed mix used in this project shall have fine-grained particles (i.e.
gravel, sand, and topsoil) mixed with the “armor” material to fill the void spaces in the rocks (see the reinforced bed mixture specifications on the Design Narrative sheet). The mixing of the fine grain substrate material with the armor rock will promote imbrication, further enhancing the reinforced bed material stability. In addition to providing enhanced stability, this smaller substrate material will encourage water to flow along the surface of the stream bed as it would in a naturally occurring stream system. Without fines flow would be primarily subsurface until natural detritus buildup could replace the smaller particle size fractions. Further, the variety of substrate particle sizes will increase species diversity by providing aquatic macroinvertebrates, fish, and amphibians with a larger number of niches to colonize. Finally, the smaller bed material fractions will improve the aesthetic properties of the restored stream by allowing "sorting" to occur during the significant flow events following construction. Smaller particles may move out of the riffles and deposit on or form point bars (and other depositional features) and/or deposit in pools. The result is a variety of stream facets and natural gradation of particle sizes created by varying energy environments of the stream system. This creates a more natural appearance than could be practicably graded during construction.
STEP 2: CONSERVATIVE ESTIMATE OF STABLE "ARMOR"
ROCK (CALCULATE THE BOUNDARY SHEAR
STRESS USING THE MAXIMUM RIFFLE DEPTH)An analysis of shear stress is necessary to understand bed mobility. To achieve the desired threshold condition, the size (D50) of the large rock (“armor”) portion of the reinforced bed mix is determined by first calculating the "mean depth" boundary shear stress (i.e. Shield's Equation) for the proposed channel using the hydraulic radius (approximately the mean depth, Equation 1). The "mean depth" boundary shear stress value is then inserted into a regression equation developed by Rosgen (2006) using data from Leopold et. al. (1964) to determine the particle size D50 needed to achieve a stable stream bed (Equation 2). A Factor of Safety greater than or equal to 1.3 is desired and is based on the ratio of the computed rock size versus provided rock size (Equation 3). As a check, the above process is repeated using the "maximum" boundary shear stress (Equation 4). The term “maximum” boundary shear stress is used because typically, boundary shear stress calculations are performed using the hydraulic radius (approximately the mean riffle depth, refer to Equations 1 and 2). Using the "maximum" boundary shear stress as a check of the initial calculation provides a conservative estimate of the required D50 for the "armor" rock. For this conservative estimate, a Factor of Safety greater than or equal to 1.0 is desired and is based on the ratio of the computed rock size versus provided rock size (Equation 6). Calculations are presented for a range of riffle slopes used in the Narrows Lane restoration design.
STEP 1: "ARMOR" SIZE DETERMINATION
Based on the calculations herein (at right), the D50 particle size needed to achieve a stable stream channel for the Narrows Lane stream restoration project is 1.4, 5.1, and 8.3 inches, for the minimum, average, and maximum riffle slopes in this design, respectively. This indicates bed mobility in areas not founded on bedrock and highlights the potential for continued and severe bank erosion. These calculations show the need for import of an appropriately sized reinforced bed mixture, one which will resist erosion while riparian vegetation is reestablished on channel banks. Class 1 rock (D50 = 13.2 in) exceeds the target Factor of Safety and is therefore of sufficient size to be used as the stable armor component in the reinforced bed mixture. The reinforced bed mixture shall be prepared as specified in the Reinforced Bed Mixture Specifications provided in the construction details sheets (Sheet 11).
SEDIMENT SIZING CALCULATIONS
Literature Cited
Leopold, Luna B., Wolman, Gordon M., and Miller, John P. Fluvial Processes In Geomorphology. Dover Publications, New York, 169 - 172, 1964.
Maidment, David R., ed. Handbook of Hydrology. McGraw-Hill, Washington D.C., 12.16 - 12.20, 1993.
Rosgen, Dave. Watershed Assessment of River Stability and Sediment Supply (WARSSS). Wildland Hydrology, Fort Collins, 5-129 - 5-136, 2006.
SECTION OF 5.5% SLOPE IS BOUNDED ON
UPSTREAM AND DOWNSTREAM END BY
GRADE CONTROL STRUCTURES,
SIGNIFICANT EROSION NOT ANTICIPATED.
±16.5' CLEARANCE
LATERAL SEWER LINE
PARCEL BOUNDARIES
EX. CONTOURS (1' C.I.)
EX. SANITARY
EX. STORM DRAINAGE
EX. WATER LINE
EX. EDGE OF PAVEMENT
EX. DITCH
EX. OVERHEAD TELEPHONE LINE
EX. GAS LINE
EX OVERHEAD UTILITIES
EX OVERHEAD ELECTRIC
EX , UG TELEPHONE
BNDRY 2015 TOPO. (SUPPLEMENTED
WITH ADDITIONAL SHOTS)
EX. GUARD RAIL
NEW (2022) WSSI SURVEYED TOPO.
EX. STORMWATER EASEMENTS
EX. RIPRAP
EX. TREELINE
EX. CHAINLINK FENCE
WATER METER, WATER MANHOLE,
HYDRANT, GAS VALVE, MAIL BOX
BUSH, DECIDUOUS TREE, TREE TO BE
REMOVED (SCALED BY SIZE)
FOUND IRON ROD PROPERTY MARKER
EXISTING CONDITIONS LEGEND
PROPOSED GRADING (1' C.I.)
TEMPORARY STOCKPILE
CONSTRUCTION ENTRANCE
LIMIT OF DISTURBANCE
BOULDER POOL WITH
DOWNSTREAM ROCK SILL
PROPOSED CENTERLINE
PROPOSED BANKFULL
IN-STREAM HABITAT LOG SILL
GRADING LEGEND
M
AT
C H
LI
N
E
SE
E
TH
IS
S
H
EE
T
M A
R , 2
1"
0'
JAB JAB NAS
06 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
GRADING PLAN.dwg
G ra di ng
P la n
VCS NAD 83
WSSI and Roanoke City Digital Data
NGVD 29
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
C W et la nd S tu di es a nd S ol ut io ns
, I nc
C op yr ig ht
W et la nd
St ud ie s a nd S ol ut io ns
, I nc
.R co m p an y a
DA
VE
Y
R
P et er s C re ek
R o ad
S u it e
R o an o k e, V ir gi n ia
P h o n e:
-7
-6 w w w .w et la n d s.
co m
M
AT
C H
LI
N
E
SE
E
TH
IS
S
H
EE
T
STONE CONSTRUCTION ENTRANCE
TO REMAIN IN PLACE AS
MAINTENANCE ACCESS.
CLASS II OUTLET PROTECTION
TOP-DRESSED WITH
SALVAGED BED MATERIAL
~17 LF OF IMBRICATED ROCK WALL
AT 0.5:1 SLOPE (MAX). MAX WALL
HEIGHT OF 42". CONTRACTOR TO
COORDINATE EXACT WALL
PLACEMENT WITH CITY PROJECT
ENGINEER
LOG VANE WITH
ROCK SILL
PROPOSED PIPE INVERT
OUT = 1253.65', STA.
12+35.56' (OUTFALL 1)
GRADING NOTES
1. PROPOSED CONTOURS ARE INTENDED TO DEPICT OVERALL GRADING CONCEPT. DUE TO IRREGULARITY OF ROCK SHAPES, CONTOURS DEPICTING POOL GRADING WITHIN STRUCTURES ARE APPROXIMATE. SPECIFICATIONS FOR GRADING IN VICINITY OF STRUCTURES ARE PROVIDED IN TYPICAL SECTIONS AND CONSTRUCTION DETAILS. THE SPECIFICATIONS IN THE CONSTRUCTION DETAILS TAKE PRECEDENCE OVER THE CONTOURS DEPICTED ON THE
GRADING PLAN.
2. ALL STREAM BEDS REQUIRE 18" OF CLASS I REINFORCED BED MATERIAL EXCEPT WHERE OTHERWISE NOTED. FOR CLARITY, IT IS NOT SHOWN IN THE PLAN VIEW WHERE GRADING IS DEPICTED. FOR ADDITIONAL DETAILS ON
REINFORCED BED MATERIAL PLACEMENT REFER TO THE PROFILE AND DETAILS.
3. ALL PLACED FILL MATERIAL AND REINFORCED BED MATERIAL SHALL BE COMPACTED WITH THE TRACK HOE BUCKET OR TRACKED IN TO A REASONABLE COMPACTION (85% COMPACTION). CITY PROJECT MANAGER MAY REQUEST THE
USE OF TRENCH ROLLER COMPACTION EQUIPMENT FOR THE PLACEMENT OF FILL.
4. FOLLOWING CONSTRUCTION, ALL GRADES (OUTSIDE OF SPECIFIED STREAM RESTORATION AREAS) SHALL BE RETURNED TO EXISTING CONDITIONS AND ANY OTHER DAMAGE TO EXISTING STRUCTURES SHALL BE REPAIRED BY
THE CONTRACTOR.
5. PROPOSED STRUCTURES SHALL BE CHINKED FROM THE UPSTREAM SIDE, SUCH THAT THERE ARE NO SPACES
LARGER THAN 3" X 3".
6. STREAM PROFILE VIEW ON SHEET 07. PROPOSED PIPE PROFILES ON SHEET 08.
EXISTING SANITARY CROSSING,
PROPOSED DESIGN ADDS
APPROXIMATELY 4' OF COVER
END RESTORATION AT EXISTING
48" CULVERT, 1233.55'
LOG VANE
~220 LF EXISTING 24" PIPE
AND ENDWALLS TO BE
REMOVED AND DISPOSED
OF OFF-SITE.
STONE CONSTRUCTION
ENTRANCE TO REMAIN IN
PLACE AS MAINTENANCE
ACCESS.
OUTFALL 2
OUTFALL 3
VAN WINKLE ROAD
SEE SHEET 08 FOR
ADDITIONAL OUTFALL #2
PIPE INFORMATION.
SEE SHEET 08 FOR
ADDITIONAL OUTFALL #1
PIPE INFORMATION.
SEE SHEET 08 FOR
ADDITIONAL OUTFALL #3
PIPE INFORMATION.
MATCHLINE SEE SHEET 8
T.B.R.
T.B.R.
T.B.R. T.B.R. T.B.R.
NOTE - T.B.R. INDICATES FEATURE "TO BE REMOVED"
EXISTING STORMWATER
EASEMENTS 15 FT
OFFSET FROM
PROPERTY LINES
APPROXIMATE
LOCATION OF
EXISTING SANITARY
LINE AND MANHOLE
EXISTING STREAM INVERT
PROJECTED TO PROPOSED
CENTERLINE
PROPOSED STREAM INVERT ALONG
PROPOSED CENTERLINE
STRUCTURE ROCK
(P) POOL
(R) RIFFLE
(W) WEIR
PROFILE LEGEND
EARTH FILL/SALVAGED BED
CLASS I BED MIX
IN-STREAM HABITAT LOG
SILL
M A
R , 2
A S
N O
TE
D
JAB JAB NAS
07 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
GRADING PLAN.dwg
Lo ng itu di na l P ro fil e
VCS NAD 83
WSSI and Roanoke City Digital Data
NGVD 29
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
C W et la nd S tu di es a nd S ol ut io ns
, I nc
C op yr ig ht
W e tl a n d S tu d ie s a n d
S o lu ti o n s, I n c .R co m p an y a
DA
VE
Y
R
P et er s C re ek
R o ad
S u it e
R o an o k e, V ir gi n ia
P h o n e:
-7
-6 w w w .w et la n d s.
co m
/1 8/
Si ll la be lin g fo r b ou ld er p oo ls N
S
±16.5' CLEARANCELATERAL SEWER LINE
L2
C2
L3
S4 6°
'53
.1 3"
W
2.
TRAV 3
ELEV = 1258.49
N 3606928.9665 E 11058160.8695
PC
2+
.0
PT = 12+85.78
R2
K
OH UTILITY LINE
±18' CLEARANCE
OH UTILITY LINE
±13.9' CLEARANCE
OH UTILITY LINE
±16.5' CLEARANCE
OH UTILITY LINE
±13.1' CLEARANCE
OH UTILITY LINE
±15.5' CLEARANCE
OH UTILITY LINE
±15.8' CLEARANCE
L2
C2
L3
C3
L4
C4
L5
C5
L6 C6
L7
C7 L8
C8
L9
C9 L10
S4 6°
'53
.1 3"
W
2.
S07°06'32.22"E
86.94'
N64°41'54.88"W 35.08'
N59°38'33.29"E 22.43'
TRAV 2
ELEV = 1251.38
N 3607011.1729 E 11057899.7493
TRAV 1
ELEV = 1239.65
N 3607075.5818 E 11057580.6169
S38°03'02.61"E 105.24'
S73°16'18.48"W
147.78'
S88°08'10.77"E
133.97'
PC
2+
.0
PT = 12+85.78
R2
PC = 13+26.71 PT
3+
.1
R3
PC
4+
.0
PT = 14+58.29
R4
PC
= 15+04.19 PT
5+
.0
R5
PC
5+
.5
PT = 16+26.77
R6
PC = 16+64.75 PT
6+
.1
R7
PC
7+
.5
PT = 17+45.46
R8
PC = 17+76.23
PT = 17+93.29
R9
S66°43'04.33"E 119.88'
PARCEL BOUNDARIES
EX. CONTOURS (1' C.I.)
EX. SANITARY
EX. STORM DRAINAGE
EX. WATER LINE
EX. EDGE OF PAVEMENT
EX. DITCH
EX. OVERHEAD TELEPHONE LINE
EX. GAS LINE
EX OVERHEAD UTILITIES
EX OVERHEAD ELECTRIC
EX , UG TELEPHONE
BNDRY 2015 TOPO. (SUPPLEMENTED
WITH ADDITIONAL SHOTS)
EX. GUARD RAIL
NEW (2022) WSSI SURVEYED TOPO.
EX. STORMWATER EASEMENTS
EX. RIPRAP
EX. TREELINE
EX. CHAINLINK FENCE
WATER METER, WATER MANHOLE,
HYDRANT, GAS VALVE, MAIL BOX
BUSH, DECIDUOUS TREE, TREE TO BE
REMOVED (SCALED BY SIZE)
FOUND IRON ROD PROPERTY MARKER
EXISTING CONDITIONS LEGEND
GEOMETRY TABLE
NO. LENGTH RADIUS BEARING/DELTA TANGENT CHORD BEARING CHORD
L2 12.50' -- N 74°31'17" W -- -- -- C2 37.72' 75.00' 28°49'04" 19.27' N 88°55'49" W 37.33' L3 40.93' -- S 76°39'39" W -- -- -- C3 53.40' 50.00' 61°11'49" 29.57' S 72°44'26" E 50.90' L4 37.97' -- N 42°08'32" W -- -- -- C4 40.21' 50.00' 46°04'44" 21.26' N 65°10'54" W 39.14' L5 45.91' -- N 88°13'16" W -- -- -- C5 24.88' 50.00' 28°30'21" 12.70' S 73°58'05" E 24.62' L6 65.50' -- N 59°42'55" W -- -- -- C6 32.21' 55.00' 33°32'58" 16.58' N 76°29'24" W 31.75' L7 37.98' -- S 86°44'07" W -- -- -- C7 17.35' 50.00' 19°53'03" 8.76' S 83°19'21" E 17.27' L8 43.48' -- N 73°22'50" W -- -- -- C8 19.87' 45.00' 25°18'15" 10.10' N 86°01'57" W 19.71' L9 30.77' -- S 81°18'55" W -- -- -- C9 17.06' 55.00' 17°46'37" 8.60' S 89°47'46" E 17.00' L10 28.38' -- N 80°54'28" W -- -- --
RADIUS POINT LOCATION TABLE
NO. NORTHING EASTING
R2 3606851.6609 11058078.7924 R3 3606963.8463 11058010.1308 R4 3606924.8995 11057910.5089 R5 3607026.2764 11057867.7296 R6 3606968.6359 11057758.2193 R7 3607071.3027 11057714.3219 R8 3606992.7083 11057645.4830 R9 3607086.9160 11057599.9685
PROPOSED PIPE OUTFALL LOCATION TABLE
NO. NORTHING EASTING
P1 3606920.62 11058110.89 P2 3606966.46 11057981.08 P3 3607015.04 11057839.71
ELEVATION
1253.65 1250.30 1244.07
M A R
, 2
1"
0'
JAB JAB NAS
09 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
GEOMETRY PLAN.dwg
G eo m et ry P la n
VCS NAD 83
WSSI and Roanoke City Digital Data
NGVD 29
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
C W et la nd S tu di es a nd S ol ut io ns
, I nc
C op yr ig ht
W et la nd
St ud ie s a nd S ol ut io ns
, I nc
.R co m p an y a
DA
VE
Y
R
P et er s C re ek
R o ad
S u it e
R o an o k e, V ir gi n ia
P h o n e:
-7
-6 w w w .w et la n d s.
co m
M
ATC
H
LIN
E SEE TH
IS SH
EET
M
AT
C H
LI
N
E
SE
E
TH
IS
S
H
EE
T
SUPPLEMENTAL TOPO
COLLECTED BY WSSI,
JULY 2022
SUPPLEMENTAL TOPO
COLLECTED BY WSSI,
JULY 2022
PROPOSED BANKFULL
CHANNEL ALIGNMENT
OUTFALL 1 (P1)
OUTFALL 2 (P2)
OUTFALL 3 (P3)
ALIGNMENT AND
STATIONING FOR
REFERENCE ONLY
BOULDER POOL STAKEOUT TABLE
REACH ID
MAIN
W
*POINT
LA
RA
S
E.
11058082.1117'
STATION
START
12+65.00'
15+00.00'
15+60.00'
16+05.00'
16+70.00'
17+75.00'
SEEOUTFALL 2
N. ELEV.
1253.37'
ANGLE
ARM
N/A
N/A
3606926.5874' 11058077.7214'3606920.6525'
3606932.6090' 3606925.7533'
11058075.8934' 11058067.1600'
1254.48' 1254.45' 1253.07'
11057870.3700'3606976.1703' 11057863.3675'3606970.4465' 11057866.5582'3606982.2915' 11057855.4972'3606977.7958'
1246.55' 1247.58' 1247.64' 1246.05'
N/A
N/A 11057815.8062'3606998.6975' 11057807.8475'3606996.3972' 11057813.8990'3607006.7595' 11057802.8533'3607006.2619'
1243.67' 1245.25' 1245.25' 1243.37'
N/A
N/A 11057776.5039'3607020.5076' 11057771.2063'3607015.8836' 11057772.3961'3607027.9657' 11057761.8560'3607023.5156'
1242.36' 1243.35' 1243.23' 1241.46'
N/A
N/A 11057711.9244'3607021.3602' 11057705.3507'3607016.0259' 11057709.3536'3607027.5841' 11057697.2470'3607024.2194'
1239.52' 1240.54' 1240.62' 1239.02'
N/A
N/A 11057609.4896'3607032.7324' 11057603.9067'3607026.0433' 11057604.5348'3607038.1292' 11057594.5444'3607032.1841'
1235.93' 1236.86' 1236.93' 1235.23'
N/A
N/A
11057973.0760'3606966.3405' 11057969.5675'3606962.2861' 11057969.4446'3606970.2852' 11057963.0180'3606966.1860'
1250.22' 1250.98' 1250.98' 1250.12'
N/A
N/A
STRUCTURE
DROP OVER
0.30'
0.30'
0.90'
0.50'
0.70'
0.00'
0.50'
*W = WEIR, LA = LEFT ARM, RA = RIGHT ARM, S = SILL (ROCK OR LOG)
CHANNEL
W
LA
RA
S W
LA
RA
S W
LA
RA
S W
LA
RA
S W
LA
RA
S
W
LA
RA
S
PLAN
(OUTFALL 1)
LA
LA
LA
LA
LA
LA
RA
RA
RA
RA
RA
RA
W
LA
RA
S W
S
W S
W S
W S
W S
W S
M A
R , 2
A s N ot ed
JTS JTS NAS
10 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
CONSTRUCTION DETAILS.dwg
N/A
N/A
N/A
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
St ak eo ut
P la n
C
W et la nd
S tu di es a nd
S ol ut io ns , I nc
C op yr ig ht
W et la nd
St ud ie s a nd S ol ut io ns
, I nc
.R co m p an y a
DA
VE
Y
R
P et er s C re ek
R o ad
S u it e
R o an o k e, V ir gi n ia
P h o n e:
-7
-6 w w w .w et la n d s.
co m
RIFFLE NOTES:
REFER TO THE GRADING PLAN AND LONGITUDINAL PROFILE SHEETS FOR PLACEMENT OF ROCK STRUCTURES WITHIN THE RIFFLE SECTIONS SPECIFIED ABOVE.
THE "SUMMARY OF STREAM RESTORATION FEATURES ALONG BASELINE" IS PROVIDED ON THE GRADING AND LONGITUDINAL PROFILE SHEETS. THIS SUMMARY SPECIFIES THE TYPE OF
CROSS-SECTIONS AND STRUCTURES THAT SHALL BE CONSTRUCTED ALONG THE PROFILE.
J IS THE SLOPE OF THE SALVAGED SUBSTRATE. VARIABLES "H" & "J" ARE SLOPES EXPRESSED AS HORIZONTAL:VERTICAL (H:V).
TYPICAL VALUES GIVEN IN TABLE ABOVE. VARIABLES MAY BE ADJUSTED TO MINIMIZE DISTURBANCE TO TREES, BUT THE SPECIFIED SUM OF K AND L MUST BE MET OR EXCEEDED. IF BENCH WIDTHS ARE NOT SPECIFIED OVERBANK AREAS SHOULD BE GRADED WITH A 2% CROSS SLOPE EXTENDING AS FAR AS POSSIBLE WHILE STILL ALLOWING
3:1 (MAX.) TIE OUT SLOPES.
RIFFLE
ORIENTATION LOOKING DOWNSTREAM
BLRIFFLE
NOT TO SCALE
STREAM
INVERT
BANKFULL
A - (BANKFULL WIDTH)
F - (MAX BANKFULL
DEPTH) H - S
LOPE
J - SLOPE J - SLOPE
B - (1/2 BANKFULL WIDTH)
C D
G
K - (RIGHT BANKFULL
BENCH WIDTH)
H - SLOPE E -
(LOW FLOW DEPTH)
SEE REINFORCED
BED MIXTURE
SPECIFICATIONS
BL
2 G
IMPORTANT
CONTRACTOR TO ENSURE
THAT TOPSOIL AND FABRIC
ARE INSTALLED TO ACHIEVE
FINAL GRADE AND CHANNEL
DIMENSIONS. COIR FABRIC
AND TOPSOIL SHALL NOT
BULGE OUT INTO PROPOSED
CHANNEL CONVEYANCE AREA.
IN-SITU MATERIAL
REINFORCED BED MATERIAL
TO EXTEND HALF-WAY UP
SLOPE "H" TO HEIGHT 12 G
SALVAGED COBBLE/GRAVEL/SAND
SUBSTRATE FROM EXISTING STREAM
(4" DEEP IN THALWEG, TAPERED TO
LOW FLOW CHANNEL EDGE)
EARTH FILL
(AS NECESSARY)
COIR FABRIC (ECO MESH CM700 OR EQUIVALENT)
IS PLACED FROM TOP OF REINFORCED BED
MATERIAL TO 12 INCHES BEYOND BANKFULL OR
THROUGH FULL WIDTH OF BENCH TO THE TIE OUT
WITH EXISTING GRADE , WHICHEVER IS GREATER,
AND IS KEYED IN 6 INCHES AT ENDS WITH RIPARIAN
SEED MIX UNDERNEATH. COIR FABRIC TO BE
SECURED WITH WOODEN STAKES.
(ECO-STAKES OR APPROVED EQUIVALENT).
EX. GRADE
TOPSOIL, 4" DEPTH
MINIMUM
TIE OUT TO EXISTING
GRADE AT A MAXIMUM
GRADE OF 2:1
L - (LEFT BANKFULL
BENCH WIDTH)
IN-STREAM HABITAT LOG SILL NOTES:
1. THIS FEATURE IS TO BE PLACED WITHIN A TYPICAL RIFFLE SECTION. CHANNEL SHAPE DEVIATES FROM
THE RIFFLE ONLY WITHIN THE LOW STORM FLOW WIDTH, WHERE THE LOG IS SLOPED ALONG THE BED (MAX SLOPE OF 2%) AND THE STREAM INVERT MAY BE SHIFTED FROM BASELINE. REFER TO THE TYPICAL
RIFFLE CROSS SECTION DETAIL FOR RIFFLE DIMENSIONS.
2. THE IN-STREAM HABITAT LOG SILL MAY INCLUDE AN OPTIONAL LOW FLOW POOL TO BE CONSTRUCTED IMMEDIATELY DOWNSTREAM OF THE LOG. REFER TO GRADING PLAN AND PROFILE SHEETS AND LOW
FLOW POOL DETAIL FOR POOL SPECIFICATIONS.
3. SEE "STRUCTURE NOTES" FOR ADDITIONAL INFORMATION CONCERNING ALL STRUCTURES.
4. SEE GRADING PLAN AND LONGITUDINAL PROFILE FOR STATION AND INVERT ELEVATION.
5. CONTRACTOR SHALL SKEW LOG (5-20°) FROM FLOW DIRECTION. SEE GRADING PLAN FOR STRUCTURE
ORIENTATION.
6. LOG SHALL BE INSTALLED WITH A MAXIMUM SLOPE OF 2%. DIRECTION OF SLOPE SHALL CORRESPOND
WITH PLACEMENT OF LOW FLOW POOL (OPTIONAL).
BL
BL
STREAM
INVERT
EXTEND LOG A MINIMUM OF
2' BEYOND BANKFULL WIDTH
IN-STREAM HABITAT LOG SILL
NOT TO SCALE
TIE OUT TO EXISTING
GRADE AT A MAXIMUM
GRADE OF 2:1
COIR FABRIC (ECO MESH CM700
OR EQUIVALENT) IS PLACED FROM
TOP OF LOW FLOW CHANNEL,
THROUGH FULL WIDTH OF BENCH
TO 12" BEYOND BANKFULL AND IS
KEYED IN 6" AT ENDS WITH
RIPARIAN SEED MIX UNDERNEATH
BANKFULL WIDTH
FLOW
MAX LOW STORM
FLOW WIDTH
NOT TO SCALE
SEE BED
MIXTURE SPECS.
CROSS SECTION VIEW
NOT TO SCALE
30" MINIMUM
DIAMETER
ANCHOR ROCK
MAX 2% SLOPE
FLOW
PROFILE VIEW
NOT TO SCALE
12" MIN.
DIA. LOG
LOG INSTALLED
FLUSH WITH
INVERT
PROP.
STREAMBED
12" MIN.
DIA. LOG
PROFILE VIEW - WITH
LOW FLOW POOL
EX. GRADE
EX. GRADE
EX. GRADE
30" MINIMUM
DIAMETER
ANCHOR ROCK
MAX SCOUR DEPTH
HALF OF LOG DIAMETER
FLOW
NOT TO SCALE
PROP.
STREAMBED
12" MIN.
DIA. LOG
PROFILE VIEW - WITH
SPLASH LOG
EX. GRADE
12" MIN.
DIA. LOG
STRUCTURE DETAIL LEGEND
REINFORCED BED
IN-SITU MATERIAL
FILL MATERIAL
TOPSOIL (4 INCH MIN.)
FILTER FABRIC
COIR MATTING
STAKEOUT/WEIR POINT
HEADER (TOP) ROCK
WEIR ROCK
FOOTER ROCK
SPLASH ROCK
1. ALL HEADER AND FOOTER ROCKS USED IN THE MAIN CHANNEL
SHALL HAVE AN INTERMEDIATE DIMENSION OF AT LEAST 30
INCHES.
2. SILL ROCKS (OUTSIDE OF CHANNEL) SHALL HAVE AN
INTERMEDIATE DIMENSION OF AT LEAST 12 INCHES.
3. THE BOTTOM OF ALL FOOTER ROCKS SHALL BE A MINIMUM OF 18
INCHES BELOW MAX POOL ELEVATION.
4. FOR NARROW STREAMS, THE VANE HEADER ROCKS MAY BE
CONFIGURED TO TAKE THE PLACE OF THE CENTER HEADER ROCK
AS LONG AS ALL DIMENSIONS OF THE STRUCTURE ARE
MAINTAINED.
5. MORE THAN 2 ROWS OF ROCKS MAY BE NECESSARY TO ACHIEVE
PROPER DIMENSIONS.
STRUCTURE ROCK NOTES
6. STRUCTURE ROCKS SHOULD BE PLACED SO AS TO MINIMIZE GAPS BETWEEN ROCKS. (THIS MAY REQUIRE MISSHAPEN ROCKS BE SET ASIDE FOR USE ELSEWHERE.) PRIORITY SHOULD BE GIVEN TO FORMING TIGHT JOINTS AT THE TOP OF ROCKS. ANY GAPS LARGER THAN FIST-SIZED MUST BE CHINKED
ON THE UPSTREAM (BACK SIDE) OF THE STRUCTURE PRIOR TO PLACING FILTER FABRIC AND
BACKFILLING.
1. SEE LONGITUDINAL PROFILE AND STAKEOUT SHEETS FOR ADDITIONAL INFORMATION INCLUDING ELEVATIONS AND SPECIFICS REGARDING POOL ARMORING AND BED MATERIAL THICKNESS. (ANY PORTIONS OF THE CHANNEL WITH SLOPES GREATER THAN 2.0% SHALL HAVE A MINIMUM REINFORCED BED MATERIAL THICKNESS OF 1.5x THE BED MATERIAL ROCK FRACTION D50, UNLESS OTHERWISE SPECIFIED IN
THE PROFILE.)
2. REFER TO THE TYPICAL RIFFLE CROSS-SECTION FOR PLACEMENT OF COIR FABRIC ALONG THE STREAM.
3. STRUCTURES SHALL BE UNDERLAIN WITH WOVEN OR NON-WOVEN POLYPROPYLENE GEOTEXTILE AS
NOTED IN TECHNICAL SPECIFICATIONS.
4. BACKFILL BETWEEN VANES AND BANKS WITH REINFORCED BED USED IN CHANNEL.
5. ALL STRUCTURES SHALL BE KEYED INTO THE BANK, VIA SILL OR STRUCTURE ROCK PLACEMENT, A
MINIMUM OF 3 FT BEYOND BANKFULL AND COMPLETELY ACROSS ANY PLACED FILL (SEE PLAN VIEW FOR
DETAILS).
6. THE PLAN VIEWS OF ALL STRUCTURES LOCATED IN MEANDER BENDS ARE SHOWN AS LEFT MEANDERS (THE OUTER BANK SITUATED ON THE RIGHT LOOKING DOWNSTREAM). FOR A RIGHT MEANDER STRUCTURE (THE OUTER BANK SITUATED ON THE LEFT), THE PLAN VIEW SHOWN IS A MIRROR IMAGE OF WHAT SHOULD
BE CONSTRUCTED. SEE STRUCTURE STAKEOUT SHEETS FOR STAKEOUT POINT INFORMATION.
GENERAL STRUCTURE NOTES
3 PRIMARY DIMENSIONS OF ROCK:
x = LONGEST DIMENSION y = INTERMEDIATE DIMENSION z = SHORTEST DIMENSION
ROCK
MATERIAL
ROCK
GRAVEL
COARSE SAND4
TOPSOIL
BANK RUN3
THE ROCK PORTION OF THE MIXTURE SHALL CONSIST OF RIVER COBBLE (MIN. ALLOWABLE D50 = 12 INCHES) OF COLOR WHITE, TAN, YELLOW, OR BROWN. THE VOIDS WILL BE FILLED WITH A MIXTURE OF SAND, GRAVEL, AND TOPSOIL. THIS COMPOSITION WILL RESULT IN A VERY RESISTANT, ARMORED SUBSTRATE THAT WILL BE CAPABLE OF WITHSTANDING MUCH GREATER SHEAR STRESS THAN THE COMPUTATION OF THE REQUIRED D50 WOULD SUGGEST. CLASS 1 RIPRAP SHALL BE AN ACCEPTABLE ALTERNATE, SUBJECT TO CITY APPROVAL, AS LONG AS IT MEETS THE SPECIFIED SIZE
REQUIREMENTS.
BANK RUN GRAVEL MAY INCLUDE UP TO 5% CLAY, SILT, AND/OR SAND, AND UP TO 25% COBBLE (D50 = 3" TO 8").
GRAVEL MUST HAVE NATURAL COLOR (WHITE, TAN, YELLOW, OR BROWN).
"REINFORCED BED"1 MIXTURE SPECIFICATIONS
SIZE (D )50 PORTION PERCENT (%)
0.04 - 0.08 in (1 - 2 mm)
0.5 BUCKET
0.75 BUCKET
2 BUCKETS
2 BUCKETS
ORGANIC CONTENT
LOAM OR SILT LOAM WITH 3-5%
0.08 - 2.5 in (2 - 64 mm)
13 in (330 mm)
7 - 12%
35 - 40%
35 - 40%
12 - 17%
THE REINFORCED BED SHALL BE A MINIMUM OF 18" IN DEPTH. PORTIONS OF THE STREAM WITH SLOPES GREATER THAN 2.0% SHALL HAVE A MINIMUM REINFORCED BED MATERIAL THICKNESS OF 1.5X THE ROCK FRACTION D50. SEE
LONGITUDINAL PROFILE FOR LOCATIONS AND THICKNESS.
THE SAND PORTION OF THE MIXTURE SHALL CONSIST OF A WELL MIXED SAND PREDOMINANTLY 1.0 MILLIMETERS TO
2.0 MILLIMETERS IN SIZE, SUBJECT TO ENGINEER APPROVAL (I.E. WASHED CONCRETE SAND IS NOT REQUIRED). SAND
MUST BE WHITE, TAN, YELLOW, OR BROWN IN COLOR.
THE REINFORCED BED MIXTURE SPECIFIED BELOW MUST BE APPROVED BY THE PROJECT ENGINEER PRIOR TO BEING
PLACED IN THE STREAM CHANNEL.
THE TOPSOIL PORTION OF THE MIXTURE SHALL CONSIST OF 50% SIFTED, UNWASHED COARSE SAND (WITH FINES ALLOWED), 25% COMPOSTED LEAF/BARK MULCH, 25% MINERAL SILT OR FINER MATERIAL (STONE DUST FROM ROCK
CRUSHING OPERATIONS OR ANY SILT/CLAY).
1. TOPSOIL SHALL BE PLACED ON DESIGNATED AREAS WITHIN THE LOD TO A MINIMUM DEPTH OF 4 INCHES, ON TOP OF 3"
(MINIMUM) OF LOOSENED SUBGRADE.
2. ALL SALVAGED SOIL SHALL BE FROM THE "O" OR "A" HORIZONS (SEE TYPICAL SOIL HORIZON DETAIL - THIS SHEET).
HORIZONS "B" AND "C" SHALL ONLY BE USED FOR FILL MATERIAL.
3. SALVAGED SOIL SHALL ONLY BE HARVESTED FROM AREAS DESIGNATED TO BE GRADED. NO TOPSOIL SHALL BE REMOVED FROM THE SITE AND A SOIL HARVEST CAN HAPPEN AT ANY GIVEN TIME DURING CONSTRUCTION.
4. ALL HARVESTED SOIL MUST BE PROPERLY STORED IN A DESIGNATED STOCKPILE/STAGING AREA WITH APPROPRIATE E&S CONTROLS IN ACCORDANCE WITH THE CONSTRUCTION PLANS AND THE VIRGINIA EROSION AND SEDIMENT
CONTROL HANDBOOK (VESCH).
5. THE TOPSOIL MIXTURE SHALL BE WELL MIXED AND SEEDED PER THE PLANTING PLAN IMMEDIATELY FOLLOWING
INSTALLATION AND PRIOR TO STRAW AND MATTING PLACEMENT.
6. IMPORTED TOPSOIL SHALL MEET THE REQUIREMENTS SPECIFIED IN THE CONSTRUCTION SPECIFICATIONS.
TOPSOIL SPECIFICATIONS
TYPICAL SOIL HORIZON PROFILE
O HORIZON – THE TOP LAYER OF SOIL IS
COMPOSED PRIMARILY OF ORGANIC
MATERIAL, INCLUDING LEAF LITTER,
HERBACEOUS PLANTS, INSECTS, AND
MICROORGANISMS.
A HORIZON – REFERRED TO AS TOPSOIL, WHERE
SEEDS GERMINATE AND PLANT ROOTS THRIVE.
THROUGH ELUVIATION, MINERALS AND CLAYS
HAVE BEEN REMOVED, LEAVING THIS LAYER OF
SAND AND SILT.
B HORIZON – REFERRED TO AS SUBSOIL.
THROUGH PROCESS OF ILLUVIATION, SUBSOIL
CONTAINS MINERAL DEPOSITS THAT HAVE
MIGRATED FROM ABOVE SOIL HORIZON.
C HORIZON – THIS WEATHERING ROCK LAYER
IS REFERRED TO AS REGOLITH AND CONSISTS
OF UNCONSOLIDATED ROCKS AND LITTLE
ORGANIC MATERIAL THAT INHIBIT THE
GROWTH OF PLANT ROOTS
R HORIZON – THE “R” STANDS FOR ROCK AND
IT REFERS TO THE UNCONSOLIDATED ROCK OR
SOLID BEDROCK OF THIS HORIZON.
BEDROCK - R
SUBSTRATUM - C
SUBSOIL - B
SURFACE - A
ORGANIC LAYER - O
SECOND SPLASH LOG
OPTIONAL, PLACEMENT PER
GRADING PLAN AND PROFILE.
SECOND SPLASH LOG
OPTIONAL, PLACEMENT PER
GRADING PLAN AND PROFILE.
TOPSOIL (SEE TYPICAL
RIFFLE DETAIL)
LOW FLOW POOL
NOT TO SCALE
EX. GRADE
CENTER OF LOW
FLOW POOL
EARTH FILL
BANKFULL
LOW FLOW
POOL WIDTH
BL
BL
CROSS SECTION - LOW FLOW POOL
NOT TO SCALE
POOL SHIFT
LOW FLOW
POOL DEPTH
SEE GRADING AND
PROFILE FOR LOW FLOW
POOL LENGTH AND
SPECIFIC ELEVATIONS.
M A
R , 2
A s N ot ed
JTS JTS NAS
11 20
N A
R R
O W
S
LA
N E
R oa no ke
, V irg in ia
CONSTRUCTION DETAILS.dwg
N/A
N/A
N/A
ST
R
EA
M
R
ES
TO
R
A
TI
O N
FI
N A
L D
ES
IG
N
Sheet #
Design Draft Approved
D A
TE
SC
A
LE
N o.
D at e D es cr ip tio n R ev
B y
A pp
B y
R
EV
IS
IO
N S of
Computer File Name:
Horizontal Datum:
Boundary and Topo Source:
Vertical Datum:
L:\32000s\32200\32299.01\CADD\04-ENGR\11-Final
C on st ru ct io n D et ai ls 20
C W et la nd S tu di es a nd S ol ut io ns
, I nc
C op yr ig ht
W et la nd
St ud ie s a nd S ol ut io ns
, I nc
.R co m p an y a
DA
VE
Y
R
P et er s C re ek
R o ad
S u it e
R o an o k e, V ir gi n ia
P h o n e:
-7
-6 w w w .w et la n d s.
LOG VANE
NOT TO SCALE
NOT TO SCALE
PLAN VIEW
FL
O
W
B C
XS3
D
(E
XP
O
SE
D V
AN
E
LE
N
G
TH
FOOTER LOG
XS2
A1 - (BANKFULL WIDTH)
G
- (BASELIN
E LEN
G
TH
E
BU
R
IE
D
V
AN
E
LE
N G
TH
LOW FLOW
POOL
F
D
EP
AR
TU
R E
AN
G
LE
INNER BANK
VANE
HEADER LOG
ANCHOR ROCK
(TOP FLUSH WITH
CHANNEL GRADE
AT THIS POINT)
BL
BL
BK
F
TAN
G
EN
T
RADIAL LINE
RADIAL LINE
RADIAL LINE
BKF
BAR
XS1
XS1
BANKFULL ELEVATION
L1
SECTION XS1
NOT TO SCALE
B
MM
K - (BOTTOM WIDTH OF CHANNEL)
N1N2
C
A1 - (BANKFULL WIDTH)
INNER BANK OUTER BANKBL
BL
A2 - (POOL BANKFULL WIDTH)
J - MAX
POOL
DEPTH
L2
REFER TO PROFILE AND
STAKEOUT SHEETS FOR
ADDITIONAL INFORMATION
LOG J-HOOK NOTES:
VARIABLE "A1" IS THE BANKFULL WIDTH AT SECTION XS1, AND VARIABLE "A2" IS THE BANKFULL WIDTH AT SECTION XS2.
THE BANKFULL WIDTH CHANGES CONTINUOUSLY THROUGHOUT THE STRUCTURE BASED ON GRADING OF THE BAR.
VARIABLE "E" SHALL BE A MINIMUM OF 50% OF THE EXPOSED LENGTH (VARIABLE "D").
VARIABLE "F" IS IN UNITS OF DEGREES. VARIABLE "V" IS A SLOPE EXPRESSED AS HORIZONTAL:VERTICAL (H:V) AND IN
UNITS OF FT/FT.
SEE PLANVIEW FOR VARIABLE "H" SILL LENGTH AND PLACEMENT.
VARIABLES "L1" AND "J" ARE DEPTHS RELATIVE TO BANKFULL.
VARIABLES "M", "N1", "N2", "R1", & "R2" ARE SLOPES EXPRESSED AS HORIZONTAL:VERTICAL (H:V).
FOOTER LOG
NOT TO SCALE
SECTION XS3
FLOW
BANKFULL ELEVATION
D - (EXPOSED VANE LENGTH)
V - (INCLINE SLOPE OF VANE)
PROJECTED BASELINE
INVERT OF STREAMBED
J
VANE HEADER
LOG
ANCHOR ROCK (TOP
FLUSH WITH CHANNEL
GRADE AT THIS POINT)
E - (BURIED VANE LENGTH)
U
SECTION XS2
NOT TO SCALE
BANKFULL ELEVATION
A2 - (POOL BANKFULL WIDTH)
J
Q
R2
P
S - (BOTTOM
WIDTH OF POOL)
T - MINIMUM
LOG DIAMETER
R1
OUTER BANKINNER BANK
PROPOSED
STREAMBED
U
BL
BL
EXTEND LOG 3'
(MIN) INTO BANK
USE 5/16" STAINLESS STEEL
CABLE AND TWO (2) STAINLESS
CABLE CLAMPS TO BIND LOGS
TOGETHER. THREE (3) CABLE
WRAPS PER LOG STRUCTURE.
FILTER FABRIC
12" DIAM SILL ROCKS
SET AT GRADE
EXTENDING 3' (MIN)
BEYOND BANKFULL.
SEE PLANVIEW.
XS3
XS2
EXTEND LOG 3'
(MIN) INTO BANK
OUTER BANK
VANE
HEADER
LOG
FOOTER LOG
PROPOSED
STREAMBED
FILTER
FABRIC
LOG VANE WITH ROCK SILL
NOT TO SCALE
NOT TO SCALE
PLAN VIEW
12" DIAM SILL ROCKS
SET AT GRADE
EXTENDING 3' (MIN)
BEYOND BANKFULL.
SEE PLANVIEW.
FL
O
W
B
C
XS3
XS3
D
(E
XP
O
SE
D V
AN
E
LE
N
G
TH
FOOTER LOG
XS2
XS2
A1 - (BANKFULL WIDTH)
G
(B
AS
EL
IN
E
LE
N G
TH
E
BU
R
IE
D
V
AN
E
LE
N G
TH
LOW FLOW
POOL
F
D
EP
AR
TU
R E
AN
G
LE
INNER BANK
VANE
HEADER LOG
ANCHOR ROCK
(TOP FLUSH WITH
CHANNEL GRADE
AT THIS POINT)
BL
BL
BK
F
TA
N
G
EN
T
RADIAL LINE
RADIAL LINE
RADIAL LINE
BK
F
BAR
XS1
XS1
A2 - (POOL BANKFULL WIDTH)
J - MAX
POOL
DEPTH
NOT TO SCALE
SECTION XS3
FLOW
BANKFULL ELEVATION
D - (EXPOSED VANE LENGTH)
V - (INCLINE SLOPE OF VANE)
PROJECTED BASELINE
INVERT OF STREAMBED
J
VANE HEADER
LOG
ANCHOR ROCK (TOP
FLUSH WITH CHANNEL
GRADE AT THIS POINT)
E - (BURIED VANE LENGTH)
U
SECTION XS2
NOT TO SCALE
BANKFULL ELEVATION
A2 - (POOL BANKFULL WIDTH)
J
Q
R2
P
S - (BOTTOM
WIDTH OF POOL)
T - AVG. LOG
DIAMETER (MIN.)
R1
OUTER BANK
INNER BANK
PROPOSED
STREAMBED
U
BL
BL
LOG VANE WITH ROCK SILL NOTES:
VARIABLE "A1" IS THE BANKFULL WIDTH AT SECTION XS1, AND VARIABLE "A2" IS THE BANKFULL WIDTH AT SECTION XS2.
THE BANKFULL WIDTH CHANGES CONTINUOUSLY THROUGHOUT THE STRUCTURE BASED ON GRADING OF THE BAR.
VARIABLE "E" SHALL BE A MINIMUM OF 50% OF THE EXPOSED LENGTH (VARIABLE "D").
VARIABLE "F" IS IN UNITS OF DEGREES. VARIABLE "V" IS A SLOPE EXPRESSED AS VERTICAL:HORIZONTAL (V:H) AND IN
UNITS OF FT/FT.
SEE PLAN VIEW FOR VARIABLE "H" (SILL LENGTH AND PLACEMENT).
VARIABLES "L1" AND "J" ARE DEPTHS RELATIVE TO BANKFULL.
VARIABLES "M", "N1", "N2", "R1", & "R2" ARE SLOPES EXPRESSED AS HORIZONTAL:VERTICAL (H:V).
PLAN VIEW DEPICTS A STRUCTURE IN A LEFT MEANDER (WITH
THE OUTER BANK SITUATED ON THE RIGHT LOOKING
DOWNSTREAM). FOR A RIGHT MEANDER STRUCTURE (WITH
THE OUTER BANK ON THE LEFT), THE PLAN VIEW IS A MIRROR
IMAGE OF WHAT SHOULD BE CONSTRUCTED. **THE VANE IS
ALWAYS SITUATED ON THE OUTER BANK.
REFER TO PROFILE AND
STAKEOUT SHEETS FOR
ADDITIONAL INFORMATION
EXTEND FOOTER
LOGS 3' (MIN)
INTO BANK
OUTER BANK
USE 5/16" STAINLESS STEEL
CABLE AND TWO (2) STAINLESS
CABLE CLAMPS TO BIND LOGS
TOGETHER. THREE (3) CABLE
WRAPS PER LOG STRUCTURE.
FOOTER LOG
(MIN. LENGTH = D X 1.25)
FILTER
FABRIC
6BAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .