This document is an Addendum for a local government contract opportunity issued by the City of Albany, Georgia. The contract is for the Lift Station No. 1 Rehabilitation project, Bid Ref. #24-060. Key details include:

The addendum provides clarification and modifications to the front-end documents, technical specifications, and drawings. It addresses issues such as the approval process for "or equal" products, contract time and long lead items, items to be provided with the bid, handling of wetwell debris, bypass pumping requirements, and revisions to payment items and the surface rehabilitation schedule. The bid opening date is June 25, 2024 at 2:30 p.m. The contract time will commence upon the Notice to Proceed, after coordinating with the winning bidder on obtaining necessary materials.

The bid form has been revised to add a pay item for wetwell debris removal, with payment at a unit price per cubic yard of material removed. An allowance is included for concrete surface restoration in the wetwell area. The addendum also provides additional details on concrete specifications, bypass monitoring requirements, and painting/coating requirements for the project.

View the file

Other files

File Type Posted
24_060_ITB_Lift_Station_No_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F I N A N C E

P.O. BOX 447 ALBANY, GA 31702 | PHONE: 229.431.3211 | FAX: 229.431.2184 | www.albanyga.gov

06/20/2024

TO: All Potential Bidders

SUBJECT: Lift Station No. 1 Rehabilitation

Bid Ref. #24-060

Bid Opening Date & Time: June 25, 2024 @ 2:30 p.m.

ADDENDUM NO. 1

The items contained in this addendum are added to and/or deleted from and become part of the specifications and proposal documents for the above-referenced Invitation to Bid.

Bidders must acknowledge receipt of the Addendum on the Bid Form, located in the invitation to bid, when the bids are submitted.

PERTAINING TO THE FRONT-END DOCUMENTS

ITEM 1 Regarding the approvals of “or equals” or substitutions prior to bid.

Standard General Conditions of the Construction Contract, Articles 7.05 and 7.06 – the following clarification is made:

Several manufacturers, suppliers and vendors have requested approval of “or equals” and/or “substitute products” prior to bid. Bidders are referred to the above articles that address the procedure for approvals of “or equal” or “substitute” materials. Materials and products not specifically named in the specifications will not be pre-approved prior to bidding. Bidders are also reminded that named manufacturers or products are so named in the technical specifications to establish a standard of quality expected for the project. Equal and/or substitute products may be considered for approval during construction. Bidders should therefore base their bids on named products and manufacturers.

ITEM 2 Regarding the issue of contract time and long lead items.

Special Instructions to Bidder; Add the following language to Item No. 4 – Contract Time: “The contract time will commence on the date established in the issued Notice to Proceed and such commencement date will be determined after coordinating with the winning bidder upon receipt of a verifiable schedule to obtain the necessary materials to complete the work.”

http://www.albanyga.gov/

Subsequent references to the 180-day contract time in the bidding documents will be understood to include the above provision.

ITEM 3 Regarding items to be provided with the bid:

Special Instructions to Bidder, Item Nos. 36 and 37 regarding items to be submitted with the bid.

For purposes of the bid, please provide with the bid all items listed in both No. 36 and 37.

Also, Item No. 29 indicates that references are to be provided. These may be provided later upon request by the City of Albany.

ITEM 4 Regarding the handling of wetwell debris of undetermined volume:

Bid Form – The bid form has been revised to add a pay item to the base bid to account for solid debris removal from the wetwell after dewatering. The total cost should be based on 20 CY of material removed and disposed of in a legal manner. The total cost will be adjusted (increased or decreased) based on the unit quantity of material removed. The unit price to be used for this adjustment will be determined by dividing the total cost provided in the bid by the 20 CY of unit quantity on the bid form.

The bid form attached to this addendum should be used for the preparation and submittal of the bid.

ITEM 5 Question related to By-pass Pumping Alternate Bid Item on the Bid Form.

Question: The project bid form is set up for Bypass Pumping to be an additive alternate (Alternate

Item No. 1). However, the drawings, project sequencing, and work summary are such that the bypass pumping for the project is among the first things installed for the project and is necessary for the construction of the project. If Alternate No. 1 (Bypass Pumping) is not taken by the Owner, it is unclear how the project will be built. It is thought that the Owner may decide to manage the bypass pumping themselves in lieu of the contractor for the project but that is just an assumption. Please clarify intent for project sequencing and scope of work changes if Bypass Bumping additive alternate is not take by the Owner.

Response: It was stated during the pre-bid meeting the Owner will perform the bypass pumping in the event the additive alternate for bypass pumping is not accepted. Bidders are reminded that all pay items, including alternates, must include pro-rata share of overhead and profit. Bids should not be imbalanced. Bidders are also reminded the cost of the permanent bypass riser connected to the existing forcemain is to be included in the base bid.

PERTAINING TO THE TECHNICAL SPECIFICATIONS

ITEM 1 Section 01 20 00 – Measurement and Payment, replace paragraph 1.2.B with the following:

Item No. 2 – Lift Station Improvements Payment under this item shall consist of all labor, materials, equipment, tools, and incidentals required to renovate the existing Lift Station 1 as shown on the drawings and specified herein. Surface preparation and painting of all exposed pipe, valves, and fittings, both new and existing, shall also be included in this pay item.

This pay item includes any miscellaneous site work and erosion control primarily related to sediment control in disturbed areas and lay down areas.

The installation of the permanent by-pass riser and connection to the force main is included in this pay item. Furnishing and installing the temporary bypass system is paid for under an alternate bid item and will be added to the base contract amount at Owner’s discretion.

Demolition of existing structural components, equipment, piping and valves indicated on the drawings and removal of the two pumps and motors.

Furnishing and installing new pumps; furnishing, piping, valves, flanged spool pieces, wall penetration, flanged fittings, air release valve, and piping supports.

Furnishing and installing all outside piping and valves.

Contractor shall dewater the existing wetwell when the by-pass pumping system is in place. Contractor shall remove any accumulated debris from the wetwell and dispose of in a legal manner.

Work under this pay item includes pressure spray washing the interior concrete surfaces of the wetwell and performing a condition inspection of the surfaces to determine the amount of surface concrete restoration is required. Concrete surface repair and restoration inside the wetwell will be paid for under a separate allowance item. For purposes of this pay item, the wetwell is defined as the lower part of the wetwell area below the last and lowest platform accessible by the staircase and the volume that usually always contains wastewater. The wetwell surfaces under the lowest platform (including the underside of the lowest platform) are also included herein.

Furnishing and installing lining system in the wetwell area after concrete restoration (See No. 8 above, allowance item and rehabilitation schedule on the drawings), and other coating systems in other areas as called out on the drawings.

Spray washing and other surface preparation required for surface coatings and painting as required by Section 09 90 00 in all interior and exterior areas indicated on the drawings and in the Surface Rehabilitation Schedule (Sheet S1.03 and revised schedule attached to this addendum).

Furnishing and installing new exterior doors, frames and hardware.

Structural restoration of items that are identified on the drawings shall be paid for under this pay item.

Furnishing and installing all electrical equipment, panels, cables and conduit shall be paid for under this pay item.

Payment shall be at the lump sum price as stated in the Bid Form.

Add the following Paragraph C to Section 01 20 00 – Measurement and Payment:

C. Item No. 3 – Debris Removal

1. Payment under this item shall consist of all labor, materials, equipment, tools, and incidentals required to remove accumulated debris from the wetwell and disposal of same in a legal manner.

2. Payment shall be at the unit price per cubic yard of material to be removed. The contractor shall maintain records of the amount of disposed solids material and these are to be provided with the payment application. In lieu of records, the volume may be measured in-situ after the wetwell has been dewatered. Measurements are to be agreed to and approved by the Engineer or Owner prior to proceeding with the work.

PERTAINING TO THE DRAWINGS

ITEM 1 Drawing Sheet C1.01

Question: On C1.01 I’ve assumed the markings around the laydown/disturbed area is silt fence, because there is a detail for silt fence on C1.04; is this correct, or is it meant to be tree protection fencing?

Response: Yes, silt fencing is correct. The symbology in the legend on G0.01 shows tree barricade.

This is to be changed to silt fence.

ITEM 2 Drawing Sheet C1.02

Question: For the concrete pads/piers, is there a concrete specification we can reference?

Specifically, I’m looking to see what strength/concrete mix those should be, and if there is any rebar/WWF required.

Response: Concrete pads/pipe supports are incidental and a specification section was not included. The following notes and details are therefore provided:

1. The pads indicated on C1.02 are to be of dimensions shown on the drawings.

2. Use 3,000 psi concrete.

3. Use welded wire fabric.

4. For the concrete piers, use 3,000 psi concrete and #4 rebar as shown on this detail. This is a standard detail and the dimensions vary depending on the location. Rebar should be cored into the existing floor and anchored with epoxy resin.

ITEM 3 Drawing Sheet C1.02

Question: Referencing drawing C1.02. I do not find mention of bypass monitoring or manning for the bypass system while it is in operation during construction off-hours (typically nights and weekends). Please clarify if remote monitoring within the local area is an acceptable manner to monitor bypass pumping during off-hours of the construction crew or otherwise provide Owner’s requirement for monitoring of bypass pumping system during off-hours.

Response: Add the following note to Sheet C1.02

“Contractor shall be responsible for monitoring the operation of the by-pass pumping system both during construction hours and off hours. Monitoring may be done either remotely with an electronic monitoring system or locally by staffing the project site off hours. For remote monitoring, the monitoring system is to be independent of the Owner’s monitoring system.”

ITEM 4 Drawing Sheet S1.03

Question: On S1.03, I’m a bit confused on quantities. There are callouts for the items below, but no dimensions for quantities to be calculated as far as I am able to find.

• Replace stair nosings in areas 1&2. There is a callout for Area 1 but no stairs shown and stairs only partially shown for the callout in Area 2.

• Handrail repair & replacement. Are there dimensions you are able to provide for the Repair/Repaint/Replacement of handrail for the callouts in Areas 1-5?

Response: Refer to the attached revised surface rehabilitation schedule. No additional dimensions and/or quantities will be provided except what is shown in the revised attached schedule.

Notwithstanding any indicated dimensions, it is the bidder’s responsibility to confirm all quantities and dimensions from the drawings and/or by site investigation. Refer also to ITEM 2 under “Pertaining to General Questions”.

PERTAINING TO GENERAL QUESTIONS

ITEM 1 Question: Spec section 01 21 00-3.3A says that the allowance is 500 SF of repair for walls, floor and underneath top concrete slab. Is the “remove/repair torn ceiling” in Area 5 on S1.03 a part of the concrete repair allowance, or is it work that needs to be done in addition to the allowance?

Response: The ceiling repair in Area 5 is to be paid for under the base bid, not the allowance. The allowance is only for concrete surface restoration in Area 1 in the immediate vicinity of the wetwell, submerged surfaces in the wetwell and the underneath lower platform slab at the wetwell.

ITEM 2 Question: It looks like all the concrete walls/floors/ceilings/stairs need repainted in Areas 1-5. Are you able to provide dimensions for these? (I’ve scaled the wall heights on page S1.03 and scaled R1.03 as a double check, since there is no drawn dimension to verify against on either page. And the dimensions come out slightly different on each page.)

Response: After reviewing the drawings, the R sheets and the S sheets, with the exception of S1.03 scale within conformance to the dimensions shown on reprints of the original drawings from 1960. The original upper floor elevation and sections were not available. The perimeter wall height is 8 ft at the upper floor elevation. S1.03 is hereby revised and re-issued under this addendum to show correct scale. Specific dimensions and quantities are provided in the attached revised surface rehabilitation schedule. These should be considered for reference only. Notwithstanding any indicated dimensions and quantities, it is the bidder’s responsibility to confirm all quantities and dimensions from the drawings and site investigation.

ITEM 3 Question: Spec section 09 90 00-3.5E specifies how to paint new wood surfaces. Areas 3&5 on S1.03 require painting for wood surfaces. What new wood surfaces are required to be in these areas? Or if it is existing wood surfaces that need to be painted, can you provide dimensions for those?

Response: There are no new wood surfaces to be painted, except for any new wood used in the incidental repair of the ceiling on the dry well side of the pump station. Refer to revised surface rehabilitation schedule.

ITEM 4 Question: Spec sections 09 90 00-3.6 F & G require existing exterior concrete & masonry to be painted. Are the exterior masonry and concrete of the existing building required to be repainted, and if so are there dimensions you are able to provide for our painters to do their quantity calculations there as well?

Response: Refer to revised surface rehabilitation schedule updated to address exterior finishes.

ITEM 5 Question: Spec section 09 90 00-1.1D1 requires painting conduits, but it is not in the painting schedule. Do conduits need to be painted?

Response: Electrical conduits do not require painting.

ITEM 6 Question: Spec section 09 90 00-3.7B requires painting for existing metals. Do the existing metal columns, or any other existing metals in the lift station need to be painted per this section? If so, can you provide dimensions for these existing metals to be painted?

Response: All existing metal surfaces should be repainted. Dimensions for all surfaces are not provided except as indicated in the revised surface rehabilitation schedule.

ITEM 7 Question: In drawing C 1.02 it states bypass piping can be HDPE pipe or flex tube. I would like to confirm if high pressure composite flanged Wilcox hose will be allowed for discharge and if standard black rubber hose can be used for suction? This would eliminate any need for fusing.

Response: The design, performance and choice of materials used to comprise the bypass system is the responsibility of the contractor, based on the flow rate and dynamic head requirements provided in the contract documents. Various piping materials may be proposed in accordance with suppliers best practices for similar installations.

*COMPLETE AND SUBMIT*

BID FORM

Lift Staton 1 Rehabilitation Bid Reference No. 24-060

ARTICLE 1 – BID RECIPIENT

This Bid is submitted to:

City of Albany, Procurement Division, 222 Pine Avenue, Suite 260 Albany, Georgia 31701-2531

The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

ARTICLE 3 – BIDDER’S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:

Addendum No. Addendum Date

B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. Bidder has carefully studied all:

1. reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, specially with respect to Technical Data in such reports and drawings, and

2. reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the

Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.

E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on

1. the cost, progress, and performance of the Work;

2. the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and

3. Bidder’s safety precautions and programs.

F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and confirms that the written resolution thereof by Engineer is acceptable to Bidder.

I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.

J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 4 – BIDDER’S CERTIFICATION

4.01 Bidder certifies that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:

1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.

ARTICLE 5 – BASIS OF BID

5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s) listed on the attached Bid Tabulation Sheet.

Bidder acknowledges that

1. each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and

2. estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids. Final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.

ARTICLE 6 – TIME OF COMPLETION

6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.

ARTICLE 7 – ATTACHMENTS TO THIS BID

7.01 The following documents are submitted with and made a condition of this Bid:

A. Bid Tabulation Sheet(s)

B. Required Bid security;

C. List of Proposed Subcontractors;

D. List of Proposed Suppliers;

E. List of Project References

F. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids;

G. Contractor’s License No.: [or] Evidence of Bidder’s ability to obtain a State Contractor’s License and a covenant by Bidder to obtain said license within the time for acceptance of Bids;

H. Required Bidder Qualification Statement with supporting data; and

I. Documents as enumerated in Special Instructions to Bidders Nos. 36 and 37

ARTICLE 8 – DEFINED TERMS

8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 9 – BID SUBMITTAL

BIDDER: [Indicate correct name of bidding entity]

By:

[Signature]

[Printed name] (If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)

Attest:

[Signature]

[Printed name]

Title:

Submittal Date:

Address for giving notices:

Telephone Number:

Fax Number:

Contact Name and e-mail address:

Bidder’s License No.:

*COMPLETE AND SUBMIT*

LIFT STATION NO. 1 REHABILITATION BID REFERENCE NO. 24-060

ALBANY, DOUGHERTY COUNTY, GEORGIA

BID TABULATON FORM / UNIT COST SCHEDULE

Base Bid - Lift Station Rehabilitation

Item Item Description Quantity Unit TOTAL COST

1 Mobilization 1 LS $

2 Lift Station Improvements 1 LS $

3 Wetwell Debris Removal 20 CY $

TOTAL COST BASE BID: $

Alternates – LS 1

Bypass Pumping Equipment, Installation and Operation 1 LS

Allowances – LS 1

1 Concrete Surface Restoration in Wetwell Area 500 SF $ 50,000

The TOTAL BID AMOUNT for the Lift Station 1 Rehabilitation (the sum of all the items listed above) is as follows:

(Words)

(Figures)

Bid submitted by:

Ar ea

Ar ea

Lo ca tio n/

De sc rip tio n Re pa ir/

Re ha b Su rfa ce s Ap pr ox

Di me ns ion /C ou nt

Su rfa ce Pr ep Su rfa ce

Co ati ng

/F ini sh

Re pla ce ha nd rai l a ro un d w etw ell

St ee l ft.

Pe r 0 9 9

0 0

Pa int

(S ec

Re pla ce St air Tr ea d N os ing s N/

A ea ch

Re pa ir H an dr ail

Em be dm en ts at ste ps

Re pa ir G ro ut 2 e ac h

Re pa ir H an dr ail at st ep s

St ee l 6 f t.

Pe r 0 9 9

0 0

Pa int

(S ec

Pa int

Ex ist ing H an dr ail s

St ee l ft.

Pe r 0 9 9

0 0

Pa int

(S ec

Su bm erg ed

Co nc ret e R ep air

W all s/F loo rs/ ca no pie s/l an din gs

Su bm erg ed nc ret e a nd lan din g un de rsi de

SF

Sp ray pr es su re wa sh an d co nc ret e s ur fac e r ep air mo rta r s ys tem as req uir ed

Ep ox y L ini ng Sy ste m

No n s ub me rg ed co nc ret e s ur fac es wa lls

/flo or s/c an op ies

/st ep s

No n S ub me rg ret e su rfa ce s

SF

Sp ray pr es su re wa sh mi no r s ur fac e r ep air if ne ed ed

Ep ox y L ini ng Sy ste m

Re pla ce St air Tr ea d N os ing s N/

A ea ch

Re pa ir r ail s a nd re pa int St ee l ft.

Pe r 0

9 0 0 0

Pa int (S ec

Re pa ir H an dr ail Em be dm en ts at ste ps Re pa ir G ro ut

2 e ac h

No n s ub me rg ed co nc ret e s ur lls

/flo or s/c an op ies

/st ep s

No n S ub me rg ret e su rfa ce s

SF

Sp ray pr es su re wa sh

Pa int

(S ec

Re pa ir r ail s a nd re pa int St ee l ft.

Pe r 0

9 0 0 0

Pa int (S ec

Co nc ret e a nd M as on ry su rfa ce s Co nc ret e/M as on r y

0 S F

Sp ray pr es su re wa sh

Pa int

(S ec

Ce ilin g W oo d

0 S

F Sp ray pr es su re wa sh Pa int (S ec

Mi sc ell an eo us m eta ls

St ee l Un kn ow n Sp ray pr es su re wa sh Pa int (S ec

Re pa ir r ail s a nd re pa int

St ee l

0 f t.

Pe r 0

9 0 0 0

Pa int (S ec

Co nc ret e s ur ll/f loo rs/ ce ilin gs

/st ep s/l an din gs

Co nc ret e

SF

Sp ray pr es su re wa sh Pa int (S ec

Re pa ir r ail s a nd re pa int St ee l ft.

Pe r 0

9 0 0 0

Pa int (S ec

Re mo ve an d r ep lac e t or n c eil ing W oo d

SF

Pe r 0

9 0 0 0

Pa int (S ec

Ce ilin g

W oo d

0 S F

Sp ray pr es su re wa sh

Pa int

(S ec

Co nc ret e a nd m as on ry su rfa ce s wa ll/f loo rs Co nc ret e/M as on r y

SF

Sp ray pr es su re wa sh

Pa int

(S ec

Ma so nr y

Br ick

No ne

No ne

No ne

Co nc ret e G rad e B ea m

(ex po se d fro nt/ sid es on ly)

Co nc ret e

0 S

F Sp ray pr es su re wa sh Pa int (S ec

Ra ils

St ee l ft.

Sp ray pr es su re wa sh Pa int (S ec

Ne w Do or s a nd Fr am es

Me tal

2 e ac h Pe r 0 9 0

0 0

Pa int

(S ec

W etw ell an d L an din g

Int erm ed iat e W etw ell La nd ing

Up pe r L ev el W etw ell

En tra nc e

Dr y W ell In ter me dia te an d L ow er

Le ve ls

Up pe r L ev el Dr yw ell

/El ec tri ca l En tra nc e

Ex ter ior

Revised Surface Rehabilitation Schedule Replaces Schedule on Sheet S1.03

Revised Plan Sheet S1.03 ATTACHED

End of Addendum 1

Ricky Gladney Ricky Gladney, Buyer

Cc:

Jeff Hughes, Public Works Jeff Duplantis, Ardurra Keith Overstreet, Ardurra Scott Tennison, Public Works

24-060_Addendum_1.pdf
06/20/2024
ADDENDUM NO. 1
PERTAINING TO THE FRONT-END DOCUMENTS
ITEM 1 Regarding the approvals of “or equals” or substitutions prior to bid.
Standard General Conditions of the Construction Contract, Articles 7.05 and 7.06 – the following clarification is made:
Several manufacturers, suppliers and vendors have requested approval of “or equals” and/or “substitute products” prior to bid. Bidders are referred to the above articles that address the procedure for approvals of “or equal” or “substitute” materials....
ITEM 2 Regarding the issue of contract time and long lead items.
Special Instructions to Bidder; Add the following language to Item No. 4 – Contract Time: “The contract time will commence on the date established in the issued Notice to Proceed and such commencement date will be determined after coordinating with th...
Subsequent references to the 180-day contract time in the bidding documents will be understood to include the above provision.
ITEM 3 Regarding items to be provided with the bid:
Special Instructions to Bidder, Item Nos. 36 and 37 regarding items to be submitted with the bid. For purposes of the bid, please provide with the bid all items listed in both No. 36 and 37.
Also, Item No. 29 indicates that references are to be provided. These may be provided later upon request by the City of Albany.
ITEM 4 Regarding the handling of wetwell debris of undetermined volume:
Bid Form – The bid form has been revised to add a pay item to the base bid to account for solid debris removal from the wetwell after dewatering. The total cost should be based on 20 CY of material removed and disposed of in a legal manner. The total ...
The bid form attached to this addendum should be used for the preparation and submittal of the bid.
ITEM 5 Question related to By-pass Pumping Alternate Bid Item on the Bid Form.
Question: The project bid form is set up for Bypass Pumping to be an additive alternate (Alternate Item No. 1). However, the drawings, project sequencing, and work summary are such that the bypass pumping for the project is among the first things in...
Response: It was stated during the pre-bid meeting the Owner will perform the bypass pumping in the event the additive alternate for bypass pumping is not accepted. Bidders are reminded that all pay items, including alternates, must include pro-rata...
PERTAINING TO THE TECHNICAL SPECIFICATIONS
ITEM 1 Section 01 20 00 – Measurement and Payment, replace paragraph 1.2.B with the following:
Item No. 2 – Lift Station Improvements
Payment under this item shall consist of all labor, materials, equipment, tools, and incidentals required to renovate the existing Lift Station 1 as shown on the drawings and specified herein. Surface preparation and painting of all exposed pipe, valv...
This pay item includes any miscellaneous site work and erosion control primarily related to sediment control in disturbed areas and lay down areas.
The installation of the permanent by-pass riser and connection to the force main is included in this pay item. Furnishing and installing the temporary bypass system is paid for under an alternate bid item and will be added to the base contract amount ...
Demolition of existing structural components, equipment, piping and valves indicated on the drawings and removal of the two pumps and motors.
Furnishing and installing new pumps; furnishing, piping, valves, flanged spool pieces, wall penetration, flanged fittings, air release valve, and piping supports.
Furnishing and installing all outside piping and valves.
Contractor shall dewater the existing wetwell when the by-pass pumping system is in place. Contractor shall remove any accumulated debris from the wetwell and dispose of in a legal manner.
Work under this pay item includes pressure spray washing the interior concrete surfaces of the wetwell and performing a condition inspection of the surfaces to determine the amount of surface concrete restoration is required. Concrete surface repair a...
Furnishing and installing lining system in the wetwell area after concrete restoration (See No. 8 above, allowance item and rehabilitation schedule on the drawings), and other coating systems in other areas as called out on the drawings.
Spray washing and other surface preparation required for surface coatings and painting as required by Section 09 90 00 in all interior and exterior areas indicated on the drawings and in the Surface Rehabilitation Schedule (Sheet S1.03 and revised sch...
Furnishing and installing new exterior doors, frames and hardware.
Structural restoration of items that are identified on the drawings shall be paid for under this pay item.
Furnishing and installing all electrical equipment, panels, cables and conduit shall be paid for under this pay item.
Payment shall be at the lump sum price as stated in the Bid Form.
Add the following Paragraph C to Section 01 20 00 – Measurement and Payment:
C. Item No. 3 – Debris Removal
1. Payment under this item shall consist of all labor, materials, equipment, tools, and incidentals required to remove accumulated debris from the wetwell and disposal of same in a legal manner.
2. Payment shall be at the unit price per cubic yard of material to be removed. The contractor shall maintain records of the amount of disposed solids material and these are to be provided with the payment application. In lieu of records, the volume ...
PERTAINING TO THE DRAWINGS
ITEM 1 Drawing Sheet C1.01
Question: On C1.01 I’ve assumed the markings around the laydown/disturbed area is silt fence, because there is a detail for silt fence on C1.04; is this correct, or is it meant to be tree protection fencing?
Response: Yes, silt fencing is correct. The symbology in the legend on G0.01 shows tree barricade. This is to be changed to silt fence.
ITEM 2 Drawing Sheet C1.02
Question: For the concrete pads/piers, is there a concrete specification we can reference? Specifically, I’m looking to see what strength/concrete mix those should be, and if there is any rebar/WWF required.
Response: Concrete pads/pipe supports are incidental and a specification section was not included. The following notes and details are therefore provided:
1. The pads indicated on C1.02 are to be of dimensions shown on the drawings.
2. Use 3,000 psi concrete.
3. Use welded wire fabric.
4. For the concrete piers, use 3,000 psi concrete and #4 rebar as shown on this detail. This is a standard detail and the dimensions vary depending on the location. Rebar should be cored into the existing floor and anchored with epoxy resin.
ITEM 3 Drawing Sheet C1.02
Question: Referencing drawing C1.02. I do not find mention of bypass monitoring or manning for the bypass system while it is in operation during construction off-hours (typically nights and weekends). Please clarify if remote monitoring within the l...
Response: Add the following note to Sheet C1.02
“Contractor shall be responsible for monitoring the operation of the by-pass pumping system both during construction hours and off hours. Monitoring may be done either remotely with an electronic monitoring system or locally by staffing the project si...
ITEM 4 Drawing Sheet S1.03
Question: On S1.03, I’m a bit confused on quantities. There are callouts for the items below, but no dimensions for quantities to be calculated as far as I am able to find.
Replace stair nosings in areas 1&2. There is a callout for Area 1 but no stairs shown and stairs only partially shown for the callout in Area 2.
Handrail repair & replacement. Are there dimensions you are able to provide for the Repair/Repaint/Replacement of handrail for the callouts in Areas 1-5?
Response: Refer to the attached revised surface rehabilitation schedule. No additional dimensions and/or quantities will be provided except what is shown in the revised attached schedule. Notwithstanding any indicated dimensions, it is the bidder’s ...
PERTAINING TO GENERAL QUESTIONS
ITEM 1 Question: Spec section 01 21 00-3.3A says that the allowance is 500 SF of repair for walls, floor and underneath top concrete slab. Is the “remove/repair torn ceiling” in Area 5 on S1.03 a part of the concrete repair allowance, or is it work t...
Response: The ceiling repair in Area 5 is to be paid for under the base bid, not the allowance. The allowance is only for concrete surface restoration in Area 1 in the immediate vicinity of the wetwell, submerged surfaces in the wetwell and the under...
ITEM 2 Question: It looks like all the concrete walls/floors/ceilings/stairs need repainted in Areas 1-5. Are you able to provide dimensions for these? (I’ve scaled the wall heights on page S1.03 and scaled R1.03 as a double check, since there is no ...
Response: After reviewing the drawings, the R sheets and the S sheets, with the exception of S1.03 scale within conformance to the dimensions shown on reprints of the original drawings from 1960. The original upper floor elevation and sections were ...
ITEM 3 Question: Spec section 09 90 00-3.5E specifies how to paint new wood surfaces. Areas 3&5 on S1.03 require painting for wood surfaces. What new wood surfaces are required to be in these areas? Or if it is existing wood surfaces that need to be ...
Response: There are no new wood surfaces to be painted, except for any new wood used in the incidental repair of the ceiling on the dry well side of the pump station. Refer to revised surface rehabilitation schedule.
ITEM 4 Question: Spec sections 09 90 00-3.6 F & G require existing exterior concrete & masonry to be painted. Are the exterior masonry and concrete of the existing building required to be repainted, and if so are there dimensions you are able to prov...
Response: Refer to revised surface rehabilitation schedule updated to address exterior finishes.
ITEM 5 Question: Spec section 09 90 00-1.1D1 requires painting conduits, but it is not in the painting schedule. Do conduits need to be painted?
Response: Electrical conduits do not require painting.
ITEM 6 Question: Spec section 09 90 00-3.7B requires painting for existing metals. Do the existing metal columns, or any other existing metals in the lift station need to be painted per this section? If so, can you provide dimensions for these existi...
Response: All existing metal surfaces should be repainted. Dimensions for all surfaces are not provided except as indicated in the revised surface rehabilitation schedule.
ITEM 7 Question: In drawing C 1.02 it states bypass piping can be HDPE pipe or flex tube. I would like to confirm if high pressure composite flanged Wilcox hose will be allowed for discharge and if standard black rubber hose can be used for suction? ...
Response: The design, performance and choice of materials used to comprise the bypass system is the responsibility of the contractor, based on the flow rate and dynamic head requirements provided in the contract documents. Various piping materials m...
*COMPLETE AND SUBMIT*
ARTICLE 1 – BID RECIPIENT
This Bid is submitted to:
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within t...
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for s...
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance ...
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all:
1. reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Condition...
2. reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-r...
1. the cost, progress, and performance of the Work;
2. the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and
3. Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of ...
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furni...
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of ...
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s) listed on the attached Bid Tabulation Sheet.
1. each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and
2. estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids. Final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in th...
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Bid Tabulation Sheet(s)
B. Required Bid security;
C. List of Proposed Subcontractors;
D. List of Proposed Suppliers;
E. List of Project References
F. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids;
G. Contractor’s License No.: [or] Evidence of Bidder’s ability to obtain a State Contractor’s License and a covenant by Bidder to obtain said license within the time for acceptance of Bids;
H. Required Bidder Qualification Statement with supporting data; and
I. Documents as enumerated in Special Instructions to Bidders Nos. 36 and 37
ARTICLE 8 – DEFINED TERMS
ARTICLE 9 – BID SUBMITTAL
Revised Surface Rehabilitation Schedule
Replaces Schedule on Sheet S1.03
Revised Plan Sheet S1.03
Ricky Gladney, Buyer