About this file

This document is an Addendum to Bid Ref. #24-014 for the Well No. 19 & 24 Rehabilitation & Upgrades project issued by the City of Albany, Georgia. The addendum adds additional drawings, specifications, and an updated bid sheet, which are available for download via a Dropbox link. Bidders must acknowledge receipt of the addendum on the Bid Form when submitting their bids. The bid opening date and time remain October 06, 2023 at 2:30 p.m.

The addendum does not provide any additional details on pricing, set-asides, incumbents, funding sources or amounts, or other salient information beyond the changes to the bidding documents. Bidders should review the Dropbox link for the latest project materials.

View the file

Other files

File Type Posted
24_014_ITB_Well_19_20_Rehab.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F I N A N C E

P.O. BOX 447 ALBANY, GA 31702 | PHONE: 229.431.3211 | FAX: 229.431.2184 | www.albanyga.gov

09/18/2023

TO: All Potential Bidders

SUBJECT: Well No. 19 & 24 Rehabilitation & Upgrades

Bid Ref. #24-014

Bid Opening Date & Time: October 06, 2023 @ 2:30 p.m.

ADDENDUM NO. 1

The items contained in this addendum are added to and/or deleted from and become part of the specifications and proposal documents for the above-referenced Invitation to Bid. Bidders must acknowledge receipt of the Addendum on the Bid Form, located in the invitation to bid, when the bids are submitted.

ADD/DELETE:

ADD:

Additional drawings, specifications, and updated bid sheet are available here:

https://www.dropbox.com/scl/fo/i5yli2axyxnjrih4oy034/h?rlkey=oa6gtx8sycvsrpiu9pgmtvw32&dl=0

End of Addendum 1

Ricky Gladney Ricky Gladney, Buyer

Cc:

Kurt Anthony, Water System Superintendent David Apperson, Water System Manager Justin Wright, Water System Foreman Brian Henderson, Stillwater Engineering http://www.albanyga.gov/ https://www.dropbox.com/scl/fo/i5yli2axyxnjrih4oy034/h?rlkey=oa6gtx8sycvsrpiu9pgmtvw32&dl=0

09/18/2023
ADDENDUM NO. 1
ADD/DELETE:
Ricky Gladney, Buyer