This document is an Addendum to Bid 24-007 for the Well Building 1 & 3 Rehabilitation project issued by the City of Flowery Branch. The addendum provides answers to 21 questions submitted regarding the scope of work, which includes replacing the garage door, installing a roll-up door, and removing the skylight and center vent. The windows need to be functional to air out the building in case of a chemical spill, and insulation must be replaced. The contractor must provide a trash container, and all exterior doors must be replaced with mortise lock doors. Two fans will also be added, one on each side of the building. The building must remain completely secure, and any issues found during rehabilitation must be repaired.
The addendum indicates that the City of Flowery Branch will clean around the outside of the building before work begins and that the power may need to be suspended for up to 7-8 hours to coordinate with Georgia Power. The back hatch must remain as it is used for a crane, and the contractor cannot have the building power suspended for more than that time period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_007 NOIA (Notice of Intent to Award).pdf | ||
| BID 24_007 Well Building 1 _ 3 Rehabilitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: June 11, 2024
Owner: City of Flowery Branch
Project: Well Building 1 & 3 Rehabilitation
Project Number: BID 24-007
Addendum Number One
Submitted Questions with Answers
Questions: Answers:
1 Does the garage door need to be replaced? Yes.
Does the garage door need to have windows in it as the current door? No.
Would you like to make the garage door 12 feet and bring down the siding on the front? Yes.
Would you like to make the garage door a roll up door or sectional? Roll up door.
5 Do the windows need to be functional?
Yes, windows need to be able to air out building in case of chemical spill.
6 Does the insulation need to be replaced? Yes.
Will the contractor need to supply a trash container? Yes.
8 Do the sky lights need to remain? No, remove sky lights.
Does the center vent in the center of the building need to be removed? Yes.
10 Do any interior repairs need to be made? No.
11 What thickness of insulation is wanted in the roof? 3 inches.
12 Does the back hatch need to stay? Yes, opening is used for crane.
13 Will the power be suspended to the building? No.
Can the power be suspended to the building for any period of time?
Potentially, will need to get with Georgia Power and schedule but cannot be more than 7-8 hours.
15 Do all exterior doors need to be replaced? Yes.
16 How many exterior doors? 2 flush doors, 1 garage door.
17 What kind of door locks do you want? Mortise lock doors
18 Do any fans need to be added?
Yes, 1 fan on each side of the building to air out building in case of chemical spill. (2 total)
Who will clean around the outside of the building before work begins? City of Flowery Branch.
20 Does the building have to stay completely secure?
Yes, what is removed must be replaced in the same day.
Do you want repairs completed if issues are found during rehabilitation? Yes.
End of Addendum Number One