This itemized pricing sheet outlines the costs for overhauling the NR-1 reefer motor aboard the USS Ashland. The contractor will remove the motor from the pier, transport it to their shop for overhaul, and then return the overhauled and palletized motor back to the pier. The overhaul will include installing new bearings, seals, gaskets and other components, as well as refurbishing, balancing, and painting the motor. Additional machining hours are priced separately if needed. The performance period is from September 7th to October 6th, 2023, with key milestones for motor removal, overhaul, shop testing, and delivery. Pricing is provided for the labor costs for each task in the overhaul process.
The related federal contract opportunity is for the USS Ashland CIS P&M NR-1 reefer motor overhaul, issued by the Department of the Navy Naval Sea Systems Command under solicitation number N5523623Q0201. The itemized pricing sheet provides cost details for the contractor's bid to perform the overhaul outlined in this opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NR-1 REEFER MOTOR-4.jpg | JPG image | |
| NR-1 REEFER MOTOR-3.jpg | JPG image | |
| Template_Tech Request Form.pdf | ||
| NR-1 REEFER MOTOR NAME PLATE.jpg | JPG image | |
| 23Q0201_RFC.docx | DOCX document | |
| N5523623Q0201_SF18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ITEMIZED PRICING SHEET | |||||
| CONTRACT: | PUMP AND MOTOR CONTINGENCY | ||||
| CONTRACTOR: | |||||
| PURCHASE ORDER: | |||||
| SHIP: | USS ASHLAND (LSD-48) | ||||
| LOCATION: | NAVY REGION SOUTHWEST | ||||
| ITEM NO CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0001 | PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE NR-1 REEFER MOTOR FROM THE PIER TO THE SHOP FOR OVERHAUL AND DELIVER OVERHAULED NR-1 REEFER MOTOR BACK TO THE PIER IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK | 1 | LOT | ||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE NR-1 REEFER MOTOR FROM THE PIER TO THE SHOP FOR OVERHAUL AND DELIVER OVERHAULED AND PALLETIZED NR-1 REEFER MOTOR BACK TO THE PIER IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 4) | |||||
| ACCOMPLISH THE OVERHAUL OF THE NR-1 REEFER MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-33 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, THERMISTORS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, CONDUIT BOX, SHAFT BUILD-UP, BALANCING, IMPELLER HOUSING COVER REPAIR, REFURBISHMENT AND PAINTING FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK. |
ADDITIONAL WORK ALSO COVERS THE BUILD-UP AND MACHINING OF THE BEARING HOUSINGS OR MOTOR SHAFT WHEN REQUIRED.
(SEE NOTES 3)
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP OPERATION TEST OF THE OVERHAULED MOTOR |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE NR-1 REEFER MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEMS 009-32 |
| PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK |
(SEE NOTE 3)
NET AMT
| MILESTONE EVENT | |
| 1. Purchase Order Start Date | 07-Sep-23 |
| 2. Remove and transport to shop | 07-08-Sep-23 |
| 3. Overhaul and Shop Test | 07-Sep to 05-Oct-23 |
| 4. Delivery to ship | 05-06-Oct-23 |
| 5. Purchase Order End Date | 06-Oct-23 |
| NOTES: | |
| 1. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-33 to 009-17 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. The change in scope will require the Contractor to submit a revised estimated cost towards the performance of the new repair recommendation. | |
| 2. Refer to Technical Manual S6260-CE-MMA-010, Technical Manual for High Efficency A/C motor for detailed procedures on the overhaul of the NR-1 REEFER MOTOR to include shop operational testing. | |
| 3. If machining hours are required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6260-C3-MMA-010, Technical Manual for High Efficiency A/C Motor for detailed procedures on the overhaul of the NR-1 REEFER MOTOR to include shop operational testing. | |
| 4. Pick up existing NR-1, Reefer Motor from the pier and transport to the shop for overhaul and deliver palletized NR-1 Reefer Motor back to the pier. |