23Q0170_ATTACHMENT1_Itemized_Pricing.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
USS ABRAHAM LINCOLN (CVN-72) Commercial Industrial Services (CIS) Pipe Lagging Services for AC PLANT #8 & #10
Solicitation number
N5523623Q0170
Issued by

View the file

Other files

File Type Posted
23Q0170_ATTACHMENT2_RFC.docx DOCX document
23Q0170_ATTACHMENT3_SWT 077-001.docx DOCX document
23Q0170_SF18.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITEMIZED PRICING

CONTRACT:PIPE LAGGING SERVICES AC PLANT #8 & #10
CONTRACTOR:
PURCHASE ORDER:TBD
SHIP:USS ABRAHAM LINCOLN (CVN-72)
LOCATION:NAVY REGION SOUTHWEST
ITEM NO CLINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICEEXTENDED AMOUNT
0001COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS ABRAHAM LINCOLN (CVN-72) AC PLANTS # 8 & 10.1LOT$0.00
REMOVAL, DISPOSAL AND INSTALLATION REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the removal and disposal of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order. Removal and disposal requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

INSTALLATION REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order. The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas. The Installation and painting requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

CNAF-L155AC PLANT # 8 CHILL WATER SUPPY AND RETURN125 LFPipe size: Three and one-half (3 1/2) inch NPS and smaller TEMPERATURE OF 125 OR LOWER
CNAF-L155AC PLANT # 10 CHILL WATER SUPPY AND RETURN35 LF
CNAF-L155AC PLANT # 8 CHILL WATER SUPPY AND RETURN215 LFPipe size: Four (4) inch NPS to nine (9) inch NPS TEMPERATURE OF 125 OR LOWER
CNAF-L155AC PLANT # 10 CHILL WATER SUPPY AND RETURN155 LF
CNAF-L155AC PLANT # 8 HG & V415 SFPipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc. TEMPERATURE OF 125 OR LOWER
CNAF-L155AC PLANT # 10 H & V215 SF
NEW MILESTONE EVENTDATE
PURCHASE ORDER START DATE7-Jul-2023
PURCHASE ORDER END DATE7-Aug-2023
NOTES:
1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work.
2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work.

Sheet2

Sheet3

File details come from the government source that posted it. Updated .