Sheet1
ITEMIZED PRICING
| CONTRACT: | PIPE LAGGING SERVICES AC PLANT #8 & #10 |
| CONTRACTOR: | |
| PURCHASE ORDER: | TBD |
| SHIP: | USS ABRAHAM LINCOLN (CVN-72) |
| LOCATION: | NAVY REGION SOUTHWEST |
| ITEM NO CLIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | EXTENDED AMOUNT |
| 0001 | COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS ABRAHAM LINCOLN (CVN-72) AC PLANTS # 8 & 10. | 1 | LOT | $0.00 | |
| REMOVAL, DISPOSAL AND INSTALLATION REQUIREMENTS: |
The Contractor shall provide labor services, equipment, laboratory testing, and materials for the removal and disposal of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order. Removal and disposal requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
INSTALLATION REQUIREMENTS:
The Contractor shall provide labor services, equipment, laboratory testing, and materials for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order. The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas. The Installation and painting requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
| CNAF-L155 | AC PLANT # 8 CHILL WATER SUPPY AND RETURN | 125 LF | Pipe size: Three and one-half (3 1/2) inch NPS and smaller TEMPERATURE OF 125 OR LOWER |
| CNAF-L155 | AC PLANT # 10 CHILL WATER SUPPY AND RETURN | 35 LF | |
| CNAF-L155 | AC PLANT # 8 CHILL WATER SUPPY AND RETURN | 215 LF | Pipe size: Four (4) inch NPS to nine (9) inch NPS TEMPERATURE OF 125 OR LOWER |
| CNAF-L155 | AC PLANT # 10 CHILL WATER SUPPY AND RETURN | 155 LF | |
| CNAF-L155 | AC PLANT # 8 HG & V | 415 SF | Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc. TEMPERATURE OF 125 OR LOWER |
| CNAF-L155 | AC PLANT # 10 H & V | 215 SF |
| NEW MILESTONE EVENT | DATE |
| PURCHASE ORDER START DATE | 7-Jul-2023 |
| PURCHASE ORDER END DATE | 7-Aug-2023 |
| NOTES: |
| 1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work. |
| 2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work. |
Sheet2
Sheet3