USS ABRAHAM LINCOLN (CVN-72) Commercial Industrial Services (CIS) PIPE INSULATION AND LAGGING SERVICES (Package No. 5)
Solicitation number
N5523623Q0125
Issued by

View the file

Other files

File Type Posted
Amendement 0001.pdf PDF
23Q0125_ATTACHMENT2_RFC.docx DOCX document
USS Abraham Lincoln Pipe Lagging Package No. 5 Statement of Work.doc DOC document
23Q0125_SF18.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 ItEMIZED PRICING SHEET

CONTRACT:PIPE LAGGING SERVICES
CONTRACTOR:
PURCHASE ORDER:
SHIP:USS Abraham Lincoln (CVN-72)
LOCATION:NAVY REGION SOUTHWEST
ITEM NO CLINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICEEXTENDED AMOUNT
0001COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS ABRAHAM LINCOLN (CVN-72).1LOT$0.00
MOLD REMEDIATION:

Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements for insulation and lagging and/or covers on machinery, pipe unions, pipe hangers, entire chiller body, chiller framework, chiller FWD and AFT end caps, valve bodies and all NPS pipe sizes in accordance with the statement of work and references C.1.1.(a) through C.1.1.(aa).

IM02-4141 (1-236-01-Q) FAN 1-236-1 IN COMPARTMENT24SF
IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1446SF
IM02-4143 (1-236-01-Q) CHW RTN 1-236-148SF
IM02-4146 (1-236-01-Q) COOLING COIL UNIT 1-236-130SF
FIXED SCAFFOLDING

Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND HIGHER

The Contractor shall provide labor, services, equipment, crane services, and materials for the on-load, assembly, certification, modification, disassembly, and offload of scaffolding materials to facilitate accomplishment of the work required herein IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

IM02-4141 (1-236-01-Q) FAN 1-236-1 IN COMPARTMENT

Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND HIGHER1SET
IM02-4143 "(1-236-01-Q) CHW RTN 1-236-1

Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND HIGHER1SET
REMOVAL AND DISPOSAL REQUIREMENTS:

The Contractor shall remove and dispose of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1

Pipe size: Three and one-half (3 1/2) inch NPS and smaller

TEMPERATURE OF 125 DEGREES AND LOWER380LF
IM02-4143 (1-236-01-Q) CHW RTN 1-236-1

Pipe size: Four (4) inch NPS to nine (9) inch NPS

TEMPERATURE OF 125 DEGREES AND HIGHER28LF
IM02-4141 (1-236-01-Q) FAN 1-236-1 IN COMPARTMENT

Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND LOWER24SF
IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1

Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND LOWER66SF
IM02-4143 (1-236-01-Q) CHW RTN 1-236-1

Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND LOWER20SF
IM02-4146 (1-236-01-Q) COOLING COIL UNIT 1-236-1

Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND LOWER30SF
INSTALLATION REQUIREMENTS:

The Contractor shall accomplish the requirements for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa). The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1

Pipe size: Three and one-half (3 1/2) inch NPS and smaller

TEMPERATURE OF 125 DEGREES AND LOWER380LF
IM02-4143 (1-236-01-Q) CHW RTN 1-236-1

Pipe size: Four (4) inch NPS to nine (9) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER28LF
IM02-4141 (1-236-01-Q) FAN 1-236-1 IN COMPARTMENT

Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND LOWER24SF
IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1

Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND LOWER66SF
IM02-4143 (1-236-01-Q) CHW RTN 1-236-1

Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND LOWER20SF
IM02-4146 (1-236-01-Q) COOLING COIL UNIT 1-236-1

Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND LOWER 30 SF

TOTAL AMOUNT $0.00

NEW MILESTONE EVENTDATE
PURCHASE ORDER START DATE11-Jul-2023
PURCHASE ORDER END DATE28-Jul-2023
NOTES:
1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work.
2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work.

Sheet2

Sheet3