23Q0125_Itemized Pricing.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- N5523623Q0125
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendement 0001.pdf | ||
| 23Q0125_ATTACHMENT2_RFC.docx | DOCX document | |
| USS Abraham Lincoln Pipe Lagging Package No. 5 Statement of Work.doc | DOC document | |
| 23Q0125_SF18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 ItEMIZED PRICING SHEET
| CONTRACT: | PIPE LAGGING SERVICES |
| CONTRACTOR: | |
| PURCHASE ORDER: | |
| SHIP: | USS Abraham Lincoln (CVN-72) |
| LOCATION: | NAVY REGION SOUTHWEST |
| ITEM NO CLIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | EXTENDED AMOUNT |
| 0001 | COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS ABRAHAM LINCOLN (CVN-72). | 1 | LOT | $0.00 | |
| MOLD REMEDIATION: |
Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements for insulation and lagging and/or covers on machinery, pipe unions, pipe hangers, entire chiller body, chiller framework, chiller FWD and AFT end caps, valve bodies and all NPS pipe sizes in accordance with the statement of work and references C.1.1.(a) through C.1.1.(aa).
| IM02-4141 (1-236-01-Q) FAN 1-236-1 IN COMPARTMENT | 24 | SF |
| IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1 | 446 | SF |
| IM02-4143 (1-236-01-Q) CHW RTN 1-236-1 | 48 | SF |
| IM02-4146 (1-236-01-Q) COOLING COIL UNIT 1-236-1 | 30 | SF |
| FIXED SCAFFOLDING |
Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
TEMPERATURE OF 125 DEGREES AND HIGHER
The Contractor shall provide labor, services, equipment, crane services, and materials for the on-load, assembly, certification, modification, disassembly, and offload of scaffolding materials to facilitate accomplishment of the work required herein IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
IM02-4141 (1-236-01-Q) FAN 1-236-1 IN COMPARTMENT
Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND HIGHER | 1 | SET | |
| IM02-4143 "(1-236-01-Q) CHW RTN 1-236-1 |
Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND HIGHER | 1 | SET | |
| REMOVAL AND DISPOSAL REQUIREMENTS: |
The Contractor shall remove and dispose of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1
Pipe size: Three and one-half (3 1/2) inch NPS and smaller
| TEMPERATURE OF 125 DEGREES AND LOWER | 380 | LF | |
| IM02-4143 (1-236-01-Q) CHW RTN 1-236-1 |
Pipe size: Four (4) inch NPS to nine (9) inch NPS
| TEMPERATURE OF 125 DEGREES AND HIGHER | 28 | LF | |
| IM02-4141 (1-236-01-Q) FAN 1-236-1 IN COMPARTMENT |
Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 24 | SF | |
| IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1 |
Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 66 | SF | |
| IM02-4143 (1-236-01-Q) CHW RTN 1-236-1 |
Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 20 | SF | |
| IM02-4146 (1-236-01-Q) COOLING COIL UNIT 1-236-1 |
Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 30 | SF | |
| INSTALLATION REQUIREMENTS: |
The Contractor shall accomplish the requirements for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa). The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1
Pipe size: Three and one-half (3 1/2) inch NPS and smaller
| TEMPERATURE OF 125 DEGREES AND LOWER | 380 | LF | |
| IM02-4143 (1-236-01-Q) CHW RTN 1-236-1 |
Pipe size: Four (4) inch NPS to nine (9) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 28 | LF | |
| IM02-4141 (1-236-01-Q) FAN 1-236-1 IN COMPARTMENT |
Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 24 | SF | |
| IM02-4142 (1-236-01-Q) CHW SUP PPG 1-236-1 |
Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 66 | SF | |
| IM02-4143 (1-236-01-Q) CHW RTN 1-236-1 |
Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 20 | SF | |
| IM02-4146 (1-236-01-Q) COOLING COIL UNIT 1-236-1 |
Machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.
TEMPERATURE OF 125 DEGREES AND LOWER 30 SF
TOTAL AMOUNT $0.00
| NEW MILESTONE EVENT | DATE |
| PURCHASE ORDER START DATE | 11-Jul-2023 |
| PURCHASE ORDER END DATE | 28-Jul-2023 |
| NOTES: |
| 1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work. |
| 2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work. |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .