23Q0122_ATCH 1_Pricing_Technical_Prior Experience.xlsx
XLSX spreadsheet 143 KB Posted
- Attached to
- Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories Federal contract opportunity
- Solicitation number
- 47QSWC23Q0122
- Issued by
- GSA Federal Acquisition Service
About this file
This document contains a pricing spreadsheet, technical specifications matrix, and prior experience questionnaire for Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories. The solicitation is seeking two wet gap eddy current engine dynamometers rated at 275HP and 8,000RPM each, along with associated testing and measurement instrumentation including a data acquisition system, pressure and thermocouple input channels, interface accessories, and optional items. Responses are required in the provided templates which collect pricing, technical compliance, and descriptions of prior experience delivering similar equipment. The solicitation number is 47QSWC23Q0122 and is issued by GSA Federal Acquisition Service. Delivery and installation is required at Marine Corps Logistics Base Albany, GA within 30 weeks of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ 23Q0122 MDMC Dynamometers_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECT 1 Pricing Wksht 47QSWC23Q0122 - MDMC Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories Section 1: Pricing Spreadsheet
| Item # | Original Equipment Manufacturer | Product Number | Product Description | U/I | Qty | Country of Origin | MSRP | Historical Paid | Quoted Price | |
| Unit Price | ||||||||||
| (FOB Destination) | Unit Price | |||||||||
| (FOB Destination) | Unit Price | |||||||||
| (FOB Destination) | Extension Price |
(FOB Destination)
| 1 | Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories | EA | 2 | $ - 0 |
| Total Quoted Aggregate Price: | $ - 0 |
SECT 2 Technical Compliance
| 47QSWC23Q0122 - MDMC Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories | ||||
| Section 2: TECHNICAL COMPLIANCE MATRIX | ||||
| Quoter to complete responses within the blue fields | ||||
| SPECIFICATION / SALIENT CHARACTERISTICS | ||||
| (NOTE: CHANGING ANY INFORMATION IN THIS COLUMN WILL INVALIDATE YOUR OFFER!!!!!) | QUOTER'S SPECIFICATION / SALIENT CHARACTERISTIC (Select from Drop Down if proposed solution meets, does not meet, or exceeds required specifications) | QUOTER'S QUOTE REFERENCE (Provide Page Number, Section/Paragraph of quote that meets or exceeds required specifications) | COMMENTS (If proposing different specifications, provide a detailed explanation for how proposed speciifcation lacks or exceeds the Government's requirements. | |
| Scope of Work | ||||
| The contractor shall provide all labor, tools, materials, equipment, safety measures, supervision and all associated permits and services to complete the work to furnish, install, and start-up of two (2) fully functional dynamometer systems at MCLB Albany, GA. (B2224). | MEETS | |||
| Contractor will be responsible for connecting system to base power. (Customer will provide utilities (electrical power and plant air) within 50' of equipment. | DOES NOT MEET | |||
| Contractor shall be responsible for due diligence. Customer will provide basic building/shop layouts, site visits, other information as necessary upon request | EXCEEDS | |||
| Contractor will be responsible for System start-up and functions check. System start-up will include a check of the final connections as necessary, commissioning, |
calibration, and operator training on the equipment purchased. The training will cover basic system functionality including running pre-written automated tests (as applicable) and manual system operation. Connecting other devices, Service startup/training will be 40 hours per Dynamometer system
| Final inspection per government end user acceptance. |
| Equipment Description per Dynamometer |
| EDDY CURRENT ENGINE DYNAMOMETER, WET GAP, |
| 275HP (205KW), 8,000RPM, 110V COIL |
| Load cell and linkage |
| Speed sensor with 60-tooth tach gear |
| Coolant safety system |
| Calibration arm and weight hanger (no weights) |
| Dynamometer hub / companion flange: 1410 |
| Dynamometer shaft centerline height: 16in (406mm) |
| TESTING AND MEASUREMENT INSTRUMENTATION FOR ENGINE DYNAMOMETERS |
| Silver |
| A Data Acquisition & Control System that is customizable |
| Adaptable to meet our testing requirements |
| Sophisticated graphical and numerical data analysis tools |
| Convenient, centralized management of all test data, notes, documents and other information |
| Fully configurable, with built-in, full-featured programmable language |
| System Channel list |
| Eight (8), Pressure input channels with dual LCD display |
| 1 ea. 0-20psia |
| 1 ea. 0-75psia |
| 4 ea. 0-150psia |
| 1 ea. 0-200psia |
| 1 ea. 0-500psia |
| Sixteen (16), Thermocouple input channels (Type K) with dual LCD display Connections for: Dyno, Speed, Throttle, Digital Inputs, Analog Inputs, Frequency inputs, Fuel |
Measurement, Blow- by, Weather Station, Opacity, Network and Peripheral connections
| Instrumentation Accessories |
| JUNCTION BOX RETROFIT KIT, TANDEM ENGINE/CHASSIS, DP2 |
| EDDY CURRENT PAU,6 AMP, wall mount, STD TEMP, FUSED for 208 P, 240 S, 200VDC OUT, 1.5 KVA XFRMR, 60 HZ |
| PEDESTAL, 48IN TALL, 350 DEGREE SWIVEL, STATIONARY, DP2 |
| THROTTLE CONTROL INTERFACE, 0-20mA, DP2, 25 FT LG |
| THROTTLE CONTROL INTRFACE, 0-10 VDC, DP2, 25 FT LG LEADS |
| THROTTLE CONTROL INTERFACE, 100-2,000 HZ, DP2, 25 FT LONG |
| THROTTLE CONTROL INTERFACE, 0-500 HZ, DP2, 25FT LG |
| THROTTLE CONTROL INTERFACE, PWM, DP2, 25 FT LG (PULSE WIDTH MODULATION) |
| MPID INTERFACE, J1708, J1939, OBDII,25'ENG, DP2 Designed to work with testing and measurement system. This system provides electronic engine communications. |
| Supported communications protocols |
| SAE 1708/J1587 • SAE J1939 |
| SAE J1850 VPW • SAE J1850 PWM |
| SAE J2284 / ISO 15765(CAN) • ISO 9141-2 |
| ISO 14230-4 (KPW2000) |
| Provides a 25ft (7.6m) connecting cable |
| TEMP CHANNEL CABLE KIT, K TYPE TC, 4x 25’, ENG, DP2 Includes |
| Four (4), 25ft (7.62m) Extension cables |
| Four (4), Type K thermocouples |
| Four (4), Fittings with low and high temp ferrules |
| PRESSURE CHANNEL HOSE KIT, 25’, 3LO, 1HI TEMP, ENG, DP2 Includes |
| Three (3),25ft (7.62m) low temperature polymeric core tube with a fiber reinforcement and abrasion-resistant black urethane cover |
| One (1),25ft (7.62m) High temp stainless steel hoses with a Type 2 silicone rubber composite sleeve |
| HANDHELD, Tablet with i5 processor, 8GB RAM, 256GB SSD, Bluetooth, Dual Camera with Windows 10 & PROTECTIVE COVER |
| ESTOP BUTTON KIT, 4 BUTTONS, DP2 Includes |
| Four (4) E-Stop buttons |
| 1000ft (305m) of cable, connectors, cable tester and crimp tool |
| WEATHER STATION, NO CABLE, ENG, DP2 Includes |
| Mounts directly to testing and measurement instrumentation enclosure |
| Relative humidity |
| Ambient temperature |
| IGNITION POWER SUPPLY, 12VDC 24VDC ADDON, 30'CABLE (Not to be used as a power supply for electric starters) |
| ADVANCED CAL KIT NO WEIGHTS Includes |
| Pressure/ Vac Calibrator with Gauges |
| Thermocouple Simulator |
| Electrical requirements: 115VAC / 1ph / 60Hz and 208V / 3-ph / 60Hz AC voltage. |
| General Requirements |
| Contractor shall cleanup work sites daily and properly dispose of debris off Government property |
| The work shall be performed in such a manner as to cause the least interference with the normal functions of the Government activity. Work areas will be cleared/vacated for the period necessary for the Contractor to perform work; however, the building will be occupied during work. |
| Prior to beginning any work, the Contractor shall meet with the designated Government representative to discuss and develop mutual understandings relative to scheduling and administering work. All work shall be accomplished within 30 weeks after date of award. This completion time includes 14-day period for checking background of the contractor’s personnel prior to arrival to start work on Base. All asbestos abatement and removal shall be accomplished on weekends and holidays (only if asbestos is found during the project). All other work shall be accomplished between the hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday (excluding federal holidays) unless otherwise specified in the requirements section and specifically pre-arranged with the Contracting Officer. This requires a written request two (2) days prior to proposed work. |
| Work shall be accomplished by personnel experienced in their respective trades. The Contractor shall perform all work in accordance with acceptable industry standards and all federal, state, and local codes. |
| All work requiring energy (electrical, mechanical, hydraulic, pneumatic, chemical, thermal or other) removal shall be done in compliance with OSHA 29 CFR 1910.147 and 1910.333 lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist. NFPA 70E (current edition), Standard for Electrical Safety in the Workplace, shall also be utilized for worker safety compliance. |
| Except where specifically specified otherwise herein, all salvable materials and equipment disconnected or removed during the work and not indicated or specified for reuse on the new work shall remain the property of the Government. All recyclable materials such as metals, pipes, pumps, engines, motors, and certain electrical components, to include switch gear, MCCs, conduit, copper wire, distribution and control panels, nuts, bolts, washers, old motor starters, obsolete breakers, cable lugs, conduit, conduit fittings, connection boxes, etc. will be recycled in accordance with MCO 5090.2A through the base Qualified Recycling Program (QRP). Remaining material shall be removed from the Government property. Contractor will disassemble or cut recyclable material to fit into roll-off containers or on flat bed trailers. With no part of the items hanging off the trailers or protruding out of the top of the containers. |
| Prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame-producing/spark producing devices, a written permit shall be requested from the Fire Division. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. The Contractor will provide at least two (2) ten (10) pound 4A:80 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 1 Hour after completion of the task or as specified on the hot work permit. When starting work in the facility, Contractors shall require their personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the EMERGENCY FIRE phone number 229-639-5911. ANY FIRE, NO MATTER HOW SMALL, SHALL BE REPORTED TO 229-639-5911 IMMEDIATELY. |
| Note: Any deviation from the above described equipment, characteristics and requested delivery and installation shall be noted in the Quoter's Technical Discussion and equipment, specifications and delivery as well as detailed descriptions of any added value or benefit to the Government. |
SECT 3A Prior Exp Questions
| 47QSWC23Q0122 - MDMC Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories - Section 3A: Prior Experience Worksheet | ||
| Please complete this workbook in its entirety, to be submitted for consideration. Quoter to complete all blue cells. | ||
| Question No. | Prior Experience Questions | Prior Experience Responses |
| 1 | How long has your firm been in business? (Limit response to no more than 50 words.) |
2 How many contracts/task orders has your firm successfully performed within the past three (3) years? (Limit response to no more than 300 words)
3 How many contracts/task orders has your firm successfully performed within the past three (3) years that have involved Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories? Please list your five (5) largest contracts/task orders. (Limit response to no more than 300 words)
4a How many contracts/task orders has your firm successfully performed within the past three (3) years that have involved providing Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories? Please list the relevant performance location information. (Limit response to no more than 350 words)
4b Please describe any difficulties/constraints you encountered providing support for the contracts/task orders described in Question 4a and what steps your firm took to overcome those challenges. (Limit response to no more than 350 words)
5 Has your firm earned any industry awards? If so, please list and provide description of award and why your firm received this recognition. (Limit response to no more than 300 words. If necessary, limit list of awards to those that are most relevant to this requirement)
6 How would your firm's Prior Experience provide value to the Government for this requirement? (Limit response to no more than 350 words)
7 How would your firm's Prior Experience mitigate risks to the Government for this requirement? (Limit response to no more than 350 words)
SECT 3B Prior Exp Projects
| 47QSWC23Q0122 - MDMC Wet Gap Eddy Current Engine Dynamometers with Instrumentation Accessories - Section 3B: Prior Experience Worksheet | ||||
| Please complete this workbook in its entirety, to be submitted for consideration. Quoter to complete all blue cells. | ||||
| PE #1 | PE #2 | PE #3 | ||
| 1 | Quoter Name |
2 Quoter UEI Number
3 Contract Number
4 Task Order Number
5 SCHEDULE/GWAC/OASIS Name, if applicable
6 Contract Type
7 Title of Requirement
8 Customer/Agency that Requirement is for
9 Award Date
10 Client POC Name
11 Client POC Email Address
12 Within 3 years of this RFQ (Y/N)?
13 Period of Performance (PoP)
14 Does this project have at least one yearly CPARS assessment completed?
15 Total Contract $$ Value
16 Quoter's Role (Prime or Sub)
17 If Sub-contractor, what percent of project value was completed by your firm?
| 18 | Equipment |
| Did this experience include providing any of the equipment as stated in Section C of the RFQ? | |
| If yes, please describe equipment provided and how they are relevant to this requirement in no more than 350 words |
File details come from the government source that posted it. Updated .