23Q0118_Itemized_Pricing.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
USS ABRAHAM LINCOLN (CVN-72) Commercial Industrial Services (CIS) PIPE INSULATION AND LAGGING SERVICES (Package No. 4)
Solicitation number
N5523623Q0118
Issued by

View the file

Other files

File Type Posted
USS Abraham Lincoln Pipe lagging Package No. 4, SWT 077-001.docx DOCX document
23Q0118_RFC.docx DOCX document
23Q0118_SF18.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITEMIZED PRICING SHEET

CONTRACT:PIPE LAGGING SERVICES PACKAGE NO. 4
CONTRACTOR:
PURCHASE ORDER:
SHIP:USS ABRAHAM LINCOLN (CVN-72)
LOCATION:NAVY REGION SOUTHWEST
ITEM NO CLINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICEEXTENDED AMOUNT
0001PACKAGE NO. 4
COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS ABRAHAM LINCOLN (CVN-72).1LOT$0.00
MOLD REMEDIATION:

Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements for insulation and lagging and/or covers on machinery, pipe unions, pipe hangers, valve bodies and all NPS pipe sizes in accordance with the statement of work and references C.1.1.(a) through C.1.1.(aa).

EA03-7262 (7-25-0-E) AC PLANT 9 SYSTEM 30 SF Mold Remediation for different A/C Piping syatems and all NPS pipe sizes

TEMPERATURE OF 125 DEGREES AND LOWER

VB00-0112(02-21-2-L) OVERHEAD PIPPING60 SF
FIXED SCAFFOLDING:

Provide labor, services, equipment, and materials for the on-load, assembly, certification, modification, disassembly, and offload of scaffolding materials required for the removal and installation of insulation and lagging and/or covers on machinery, pipe unions, pipe hangers, valve bodies and all NPS pipe sizes in accordance with the statement of work and references C.1.1.(a) through C.1.1.(aa).

VC01-3505 (1-127-0-Q) PPG-STM LAGGING 1 SET Fixed Scaffolding:

Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc.

TEMPERATURE OF 125 DEGREES AND HIGHER

REMOVAL AND DISPOSAL REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the removal and disposal of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order. Removal and disposal requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

EA03-7262(7-25-0-E) AC PLANT 9 SYSTEM15 LFPipe size: Three and one-half (3 1/2) inch NPS and smaller TEMPERATURE OF 125 DEGREES AND LOWER
VB00-0112(02-21-2-L) OVERHEAD PIPPING45 LF
VC01-3505(1-127-0-Q) PPG-STM LAGGING50 LFPipe size: Four (4) inch NPS to nine (9) inch NPS TEMPERATURE OF 126 DEGREES AND HIGHER
EA03-7262(7-25-0-E) AC PLANT 9 SYSTEM10 LFPipe size: Ten (10) inch NPS to twenty-four (24) inch NPS TEMPERATURE OF 125 DEGREES AND LOWER
VB00-0112(02-21-2-L) OVERHEAD PIPPING20 SFPipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc. TEMPERATURE OF 125 DEGREES AND LOWER
VC01-3505(1-127-0-Q) PPG-STM LAGGING80 SFPipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc. TEMPERATURE OF 125 DEGREES AND LOWER
INSTALLATION REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order. The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas. The Installation and painting requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

EA03-7262(7-25-0-E) AC PLANT 9 SYSTEM15 LFPipe size: Three and one-half (3 1/2) inch NPS and smaller TEMPERATURE OF 125 DEGREES AND LOWER
VB00-0112(02-21-2-L) OVERHEAD PIPPING45 LF
VC01-3505(1-127-0-Q) PPG-STM LAGGING50 LFPipe size: Four (4) inch NPS to nine (9) inch NPS TEMPERATURE OF 126 DEGREES AND HIGHER
EA03-7262(7-25-0-E) AC PLANT 9 SYSTEM10 LFPipe size: Ten (10) inch NPS to twenty-four (24) inch NPS TEMPERATURE OF 125 DEGREES AND LOWER
VB00-0112(02-21-2-L) OVERHEAD PIPPING20 SFPipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc. TEMPERATURE OF 125 DEGREES AND LOWER
VC01-3505(1-127-0-Q) PPG-STM LAGGING80 SFPipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc. TEMPERATURE OF 125 DEGREES AND HIGHER

TOTAL AMOUNT $0.00

NEW MILESTONE EVENTDATE
PURCHASE ORDER START DATE20-Jun-2023
PURCHASE ORDER END DATE7-Jul-2023
NOTES:
1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work.
2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work.