23Q0049 Itemized Price Sheet.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
USS BOXER (LHD-4) NR 04 FIRE PUMP & MOTOR UNIT
Solicitation number
N5523623Q0049
Issued by

View the file

Other files

File Type Posted
N5523623Q0049 solicitation.pdf PDF
RFC - N5523623Q0049.docx DOCX document
USS BOXER NR 4 AUX SW CIRC PUMP AND MOTOR Statement of Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Itemized Price Sheet
CONTRACT:PUMP AND MOTOR CONTINGENCY
CONTRACTOR:
DELIVERY ORDER:
SHIP:USS BOXER (LHD-4)
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-8530UPPER VEHICLE STOWAGE, AFT PORT SIDE FWD OF WELLDECK1
ELIN 0001
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE NR-4 AUX SW CIRC PUMP AND MOTOR UNIT FROM THE SHIP TO THE SHOP FOR REPAIRS AND DELIVER REPAIRED NR-4 AUX SW CIRC PUMP AND MOTOR UNIT BACK TO THE SHIP IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 4)1$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-8530UPPER VEHICLE STOWAGE, AFT PORT SIDE FWD OF WELLDECK1
ELIN 0001

PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE NR-4 AUX SW CIRC PUMP AND MOTOR IN ACCORDANCE WITH TECH MANUAL S6226-CF-MMA-010 TO INCLUDE REPLACEMENT OF THE SHAFT SLEEVES, BEARINGS, LUBRICATION FITTINGS, O-RINGS, GASKETS, SLINGERS, MECHANICAL SEAL, CASE AND WEARING RINGS.

ACCOMPLISH THE OVERHAUL OF THE NR-4 AUX SW CIRC PUMP AND MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, THERMISTORS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK

(SEE NOTES 1 AND 2) 1 $0.00

JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-8530UPPER VEHICLE STOWAGE, AFT PORT SIDE FWD OF WELLDECK1
ELIN 0002 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP TEST OPERATIONAL THE OVERHAULED NR-4 AUX SW CIRC PUMP AND MOTOR1$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-8530UPPER VEHICLE STOWAGE, AFT PORT SIDE FWD OF WELLDECK1
ELIN 0003
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE NR-4 AUX SW CIRC PUMP MOTOR IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-321$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-8530UPPER VEHICLE STOWAGE, AFT PORT SIDE FWD OF WELLDECK1
ELIN 0004

PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK

(SEE NOTE 3) 1 $0.00

TOTAL $0.00

OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of a modification to the purchase order.ESTIMATED AMOUNTUNIT OF ISSUEFBLR for ELIN 0009. MATERIAL HANDLING RATE FOR ELIN 0010TOTAL
ELIN 0009ADDITIONAL WORK - LABOR Estimated Straight Time (ST) Man-hours - 100 HRS

ST Fully Burdened Labor Hour Rate $________

NOTE: The offeror’s proposed fully burdened labor rate (FBLR) is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.100HR$0.00
ELIN 0010ADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a purchase order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor.60,000.00DOLLARS, US0%
MILESTONE EVENTDATE
1. Delivery Order Start Date9-Jan-23
2. Remove and transport to shop9 TO 13 JAN 2023
3. Overhaul, Shop Test and delivery to ship13 JAN TO 9 FEB 2023
4. Delivery Order End Date9-Feb-2023
NOTES:
1. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-113 to 009-17 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. The change in scope will require the Contractor to submit a revised estimated cost towards the performance of the new repair recommendation.
2. Refer to Technical Manual S6226-CF-MMA-010, Technical Manual for Auxiliary Sea Water Circulating Pump for detailed procedures overhaul of the Aux SW CIRC Pump and Motor to include shop operational testing. Buffalo Pump and Reliance Electric Motor
3. If machining hours is required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6226-CF-MMA-010, Technical Manual for Auxiliary Sea Water Circulating Pump
4. Pick up existing NR-4 Aux Circ Pump and Motor from the Upper Vehicle Stowage, Port side AFT forward of Welldeck and deliver repaired Pump and Motor back onto the Upper-V on the ship.