This scope of work document outlines the requirements for rehabilitating a 1901 EMC diesel locomotive for Steamtown National Historic Site. Key requirements include removing and transporting the locomotive to the contractor's facility, performing a full evaluation and developing a rehabilitation workplan, upgrading all safety, electrical, and mechanical systems to modern standards, performing load and function testing, and delivering the refurbished locomotive. The contractor must overhaul components such as the engine, generators, air compressor, cooling system, electrical system, trucks, traction motors, and fuel tank. The contractor will also recondition the cab, paint the locomotive, and provide manuals. The period of performance is 730 days from award with a one-year warranty. The solicitation number is 140P4523Q0015 and involves the National Park Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
Facility Management Program
150 S. Washington Ave.
Scranton, Pa. 18503
Scope of Work Rehabilitate Diesel Locomotive #1901
Steamtown National Historic Site
150 S. Washington Ave.
Scranton, Pa. 18503
Prepared by:
Bruce Mowbray
Preservation Specialist COR Steamtown N.H.S.
November 17, 2022
Part I: General Information:
Steamtown NHS, located in Scranton, PA, has approximately 100,000 visitors annually and several visitors use areas. The Park normally offers mainline and short in-park excursions of various length for the visitor so they can see, feel, and smell what railroading was like back in the early 1900’s and how this great country of ours was built from coast to coast by the railroads.
Introduction:
The #1901 was built by the Electromotive Corporation (EMC) in 1939 which predates some of the steam locomotives in the Steamtown collection. There are times when switching movements of railroad cars are performed within the park and to use the #1901 for this would be authentic to the steam era for this type of operation. The restoration of this historic antique locomotive will provide the visitor with a good example of first-generation diesel locomotives that were present during the steam locomotive era. The #1901 is small which would provide greater fuel and maintenance economy when switching compared to the 16-cylinder diesel locomotive that is currently used for main line excursions and switching operations. The large cab windows and low hood allow for a large field of vision which makes switching cars in the park easier and safer.
Background:
The #1901 was originally a demonstration locomotive that was offered new to the Atlantic Coast Line railroad (ACL). It was determined that the locomotive was too small for the intended use and was sold to the Richmond Terminal Railroad. After that is was sold to various small railroads and finally ended up at the Monroeton Shippers Lifeline Railroad in Towanda, PA. and #26 in Lehigh Valley Railroad colors. The #1901 was donated to Steamtown by the owner of the railroad through a local chapter of the National Railroad Historical Society for use as a small switching locomotive from the steam locomotive era. The locomotive is mostly original and many of the components are worn out and not compliant with current safety standards.
Objectives:
Rehabilitation of Locomotive #1901 for in service use at Steamtown National Historic Site.
Basic Description:
The #1901 is an SW-1 class, diesel electric switching locomotive that was built to handle small trains at low speeds. The main engine is a V-6 configuration driving a 600-volt DC generator providing the electricity to turn 4 DC traction motors, 1 on each axle of the two power trucks. The locomotive weighs 196,000 pounds and has a pulling capacity of 44,000 pounds.
Part II: Work Requirements
Locomotive Transport
The locomotive shall be transported to and from the contractor’s place of performance to perform the entire rehabilitation.
Tasks:
Prepare locomotive for transport in desired mode of contractor Contractor shall supply all cranes and lifting equipment to load and unload locomotive at Steamtown NHS and at the contractor’s facility.
Contractor shall provide all transportation permits and pay all shipping costs Return-ship locomotive to Steamtown after the entire rehabilitation has been performed and accepted by Steamtown NHS Contracting Officer’s Representative (COR)
The Government will not be responsible for shipping fines or violations.
Locomotive Evaluation
The locomotive is mostly original and requires a full evaluation to determine the current condition and which components need to be rehabilitated or replaced.
Tasks:
Evaluate entire locomotive and systems Determine condition of all components Develop a workplan for rehabilitation Consult with Steamtown NHS for workplan approval
Note: Steamtown NHS to provide 4 (four) replacement wheels, axle, gear, roller bearing assemblies at no extra charge to the contractor.
Locomotive Rehabilitation
The locomotive is mostly original and requires a full rehabilitation and upgrade of all safety, electrical, and mechanical systems to provide a fully operational and dependable unit that is usable on the FRA general railroad system. This includes updating all systems with modern parts that are readily available through EMD locomotive parts suppliers.
Tasks:
Part III: Supporting Information
Place of performance: Contractors facility
Contractor Shall:
Have (2) years after contract award to complete the project.
Supply progress reports including photos and dialog of work being performed.
Expect at least 4 on site visits by Steamtown NHS representatives during the period of performance for quality assurance purposes.
Notify the Contracting Officer’s Representative (COR) 5 business days prior to the proposed Government Acceptance inspection date. The contractor, lead technician and the COR shall be in attendance during all acceptance inspections
Section A. Current Detail Locomotive Description Rebuild of EMC switcher locomotive Model SW-1, Built: 1936 Engine: 6-567-U old obsolete style engine block Main Generator: D-4, Aux gen: 10KW Brakes: 6-BL, Air Compressor: WXO Control Stand: Old drum style Trucks: Friction bearing, switcher style rigid
Section B. Information regarding the job
1. The locomotive is to be shipped off-site to the contractor’ facility per the contractor’s requirements
2. The SW-1 locomotive is to be reconditioned according to specs that begin on page 1 and end on page 12 per Sections / Items ‘B’ thru ‘U’, numbers 1 to 155.
3. Unit does not currently meet FRA / AAR standards for interchange and must be disassembled and shipped by truck off site for repairs.
4. Control stand - old drum style, with air brake stand – to be updated with new, modern components and reused.
5. If the unit becomes disabled or side-lined during return rail transit, it is at the sole responsibility of the customer to correct any defects at its own expense.
Section C. External Accessories Required for 567-C engine / SW1 locomotive
1. Rebuilt Peaker engine governor, (must be supplied by Peaker Services) newer style controlled by air. The air supply source to the governor shall be supplied by the control switch located at the bottom of the throttle lever rod under the control stand inside the operator’s cab.
2. Injector control linkage will be inspected, deburred, reworked as necessary
3. Replace load regulator with a reconditioned unit
4. A replacement engine oil cooler assembly is to be in used serviceable condition. It shall be cleaned, tested, and qualified to be reinstalled on the locomotive. The old-style engine oil cooler assembly is non-compatible with a “C” engine. A reconditioned replaced newer style compatible oil cooler assembly must be supplied.
5. Exhaust manifold is to be in used serviceable condition and will be cleaned tested and installed onto the 567-C engine with new gaskets. The old non-compatible exhaust stack must be replaced with a reconditioned newer-style exhaust stack.
6. The above supplied 567-C engine will be upgraded from the old 567-U engine that is currently installed in the SW1 locomotive, along with scrap components: piping, exhaust manifold, and heat exchanger, oil filter assembly, and other not used components, will become the property of the contractor.
7. The engineer’s side of the hood assembly doors shall be modified at the heat exchanger oil cooler assembly to allow access so new type oil filters can be changed.
Section D. Miscellaneous Belt Drives, Pulley and Couplings
8. All rotating equipment shall be aligned and doweled as specified by EMD specifications with any alignment readings documented and submitted to Steamtown NHS with the locomotive.
9. All couplings, pillow blocks, and line shaft for the air compressor, shall be cleaned and visually inspected, and repaired as necessary, and reconditioned with new bearings.
10. Replace all fan and accessory “V” belts with new belts.
Section E. Rebuild Gardner-Denver Air Compressor
11. Contractor shall supply one used air-cooled compressor that shall be reconditioned as listed:
12. Crankshaft shall be qualified to meet OEM specifications
13. New bearings, seals, gaskets and piston rings shall be installed
14. Rebuilt connecting rods shall be installed
15. Rebuilt oil pump installed
16. Rebuilt cylinders heads installed
17. Rebuilt cylinder liners installed
18. Intercooler reconditioned.
19. Installed air compressor is load tested and painted gray.
Section F. Basic Air Accessory Equipment
20. Air components that shall be rebuilt, 4 windshield wipers, 4 out board sander valves.
21. The control air piping if found to be defective shall be replaced with new push-on type fittings and hose.
22. Replace all steel and rubber hose air brake lines. Note: hose must be rated for 350PSI and DOT approved.
23. Supply two new AAR approved air tanks of original size and shape and install onto the locomotive using original mounts
24. Replace and or add 2 pop-off safety valves into main reservoir air system 90 lbs.
25. The old 1936 authentic 6 type air brake control stand shall be retained in the cab. The control stand shall be reconditioned as necessary. The automatic (train line) an independent (locomotive) air brake valves shall be replaced with reconditioned units per FRA / AAR standards.
26. The remaining air brake components shall be reconditioned per FRA / AAR standards.
27. Replace all air brake piping with new materials, fittings, cocks, hoses, and glad hands.
Section G. Cooling System
28. Replace engine cooling radiators with new units installed into the locomotive.
29. The missing or damaged sheet metal on the locomotive shroud around the radiators shall be replaced in kind with new materials.
30. Replace all radiator endcaps and manifolds with new units
31. The radiator fan assemblies and idler adjusting pulley assemblies shall be rebuilt to OEM specifications and include new bearings.
32. The radiator shutter assemblies shall be disassembled and reconditioned to fully operate.
33. The rubber hoses and dresser joint connections from the radiator to engine shall be replaced with new hose and connectors
34. All of the radiator steel couplings and steel piping, shall be check for defects and if any are found they shall be replaced.
Section H. Basic Overhaul for Main Generator
35. Generator must be completely disassembled, and all components are thoroughly cleaned
36. Each component shall be mechanically, electrically, and visually inspected to locate possible defects in electrical wiring or insulation
37. Armature assembly shall be inspected for loose bands, thrown solder, flashover burns, charred insulation, or cracks in steel core.
38. Armature shaft shall be given dimensional inspection on all exposed diameters.
new armature bearing shall be installed.
39. Armature shall be varnished coated and baked.
40. Mica shall be undercut; commutator shall be ground and deburred. All creepage surfaces shall be insulated, and clamping bolts are to be tightened where necessary.
41. Stator shall be electrically and visually inspected for defective ties, damaged insulation or parts and repaired
42. Stator shall be varnished, baked, and painted.
43. End housing shall be cleaned, dimensionally inspected for distortion or wear and interior surfaces shall be painted
44. Brush holders shall be disassembled, cleaned, inspected, burrs and burn marks shall be removed, brush slots sized, springs tension shall be adjusted, and brush holders reassembled.
45. Brush holder connector rings shall be cleaned, terminal lugs deburred and buffed, bus bar contact areas shall be tinned, and assembly shall be painted
46. End housing shall be reassembled, inspected, tested and exterior shall be painted
47. New (USA manufactured) roller bearing shall be applied
48. The main generator shall be reassembled, inspected, tested and exterior painted.
49. Note: the locomotives main generator maybe in failed condition. If so, the contractor shall supply a unit that is recondition per items 68 to 81 at no additional charge.
Section I. Overhaul of Auxiliary Generator
50. Remove and disassemble auxiliary generator
51. Each component is mechanically, electrically tested and shall be repaired if required
52. Stator shall be varnished treated and baked
53. Armature arm shall be turned and slotted to meet OEM Specs
54. New armature bearings shall be installed.
55. Stator and armature shall be painted with red insulating varnish
56. Rebuilt brush holders shall be installed with new brushes
57. Auxiliary generator shall be “hi pot” tested for any electrical leaks and repaired if necessary
58. Field coils shall be retorqued to OEM specs
59. New inspection covers shall be installed
60. Note: the locomotive auxiliary generator maybe in failed condition. If so, the contractor shall supply a replacement unit that is reconditioned per items 50 to 58 at no additional charge. Original auxiliary generator will become the property of the contractor for core replacement refund.
Section J. Electrical System
61. All old wiring, both low-voltage and high-voltage, shall be removed.
62. Install new solid-state battery charging system
63. Remove old-style drum reverser, and replace with new-style power contactors, and new-style reversing contactors, relays, reconditioned or new resistors.
64. Install new low-voltage electrical control wire with new TTHM material.
65. Replace high-voltage cabling with new material.
66. All 64-voltage wiring is upgraded with HTTM wire and all high 600-volt cable is replaced with 400 cable.
67. All electrical connections shall be new. All high voltage connectors shall be new manufactured by T&B (locomotive specific).
68. All resistors and other electrical components shall be new or reconditioned ****
69. Supply and install three new push button emergency fuel cut-out buttons. One is located in the operator’s cab, and one on each side of the locomotive, (this cuts the fuel to the engine) .
70. All low-voltage and high-voltage wiring shall be labeled on both ends per electrical print. All wire labels shall be covered with clear heat shrink tube.
71. Supply new (when necessary) and rebuilt electrical equipment that operates at 64 volts.
Note: The old EMD reversing drum system shall not be use and shall be replaced with new EMD style power contactors and EMD style reversing contactors with new 64-volt interlock operating coils and new interlock switches.
72. Rebuild or replace control switches on the operator’s control panel. Old appearance shall be maintained.
73. Install new wiring to both head lights at front and back of locomotive.
74. Install new seal-beam headlight mounted at each end of the top of engine hoods using original headlight housings.
75. Reconditioned or new resistors and supply replacements if necessary, for the main generator.
76. Install one running light at each mounting point of the locomotive with new electrical components (sockets)
77. New steel structure for mounting of modernized contactors (power and reversing) under floor shall be fabricated. The design shall be approved by Steamtown NHS qualified personnel.
78. New GPS speedometer with in-cab display shall be included and installed.
79. Install new battery amp shunts and two new paired gauges.
80. Install new battery voltage gauge.
81. Install new load amp gauges paired with reconditioned load shunts.
82. Install new gauge lights.
83. Install new power converters to add 12v power for radio, GPS speedometer, and lighting.
84. Install new onboard battery charger. This shall include a receptacle that accepts a regular 110volt extension cord.
85.The locomotive electrical system shall be set-up with transition, and is wired in Series / Parallel.
86. Install new fuse holders and fuses to accommodate new electrical system.
87. Install new terminal boards under hoods and in electrical cabinet.
88. Supply one new inside cab light and new wiring.
89. The old-style period control stand (retain) shall have a throttle switch installed at the bottom to control the electric engine speed governor to operate new style electrical components.
90. The old-style authentic period head light switches, and all other cab air or other type of control equipment / components, shall be reconditioned and reused.
91. Install one new stand-up style approved locomotive cab heater located between the fireman’s seat and door. Install one new approved electric baseboard heater located near the floor under the engineer’s window,
92. Install a reconditioned stand-up type load regulator for main generator output Model #8117013 with electrical resistors to control controller by an oil vane type stand-up type with resistors. The problematic pancake-style load regulator is not to be supplied.
Section K. - Reconditioning the cab and accessories.
93. The old cab will be removed from the locomotive frame deck to inspect, repair or replace all damaged or corroded steel.
94. The cab superstructure steel-tubing frame shall be replaced with new material to support the: interior cab walls, doors, electrical cabinet, air brake stand, component parts, and accessories.
95. New cab steel exterior walls shall be reconstructed from new 1/8” thickness.
96. New steel to support the wood floor shall be constructed from new 1/4” x 2” x 2” angle iron
97. New marine grade ¾ plywood double layered shall be used to construct new cab floor boards. This shall be painted red/brown (original colors) to seal it.
98. The cab interior walls shall be made from either new wood sheathing or steel sheathing (where applicable) and newly insulated per OEM standard specifications.
99. A rebuilt air brake stand shall be installed next to the engineer’s seat. All new air brake piping shall be supplied from the cab to air compressors and to the truck assemblies.
100. Apply two reconditioned windshield wiper motors for the engineer’s windows with new wiper blades. The wiper control valves shall be new, with connecting new rubber air lines, and new air supply piping.
101. Replace all windows with new OSHA approved safety glass with new rubber seals for industrial plant and tourist line FRA exempt operation. Note windows are not required to be FRA glazing per 49 CFR part 223.3.b.3.i
102. All sliding windows shall be working properly.
103. The cab doors shall be reconditioned and working properly.
104. The control panel shall be refurbished. The control panel shall have the following gauges: oil pressure - mechanical / new. Water temperature - mechanical / new. Main res. & brake pipe pressure - mechanical / new. Equalizing reservoir & brake cylinder pressure – mechanical / new. Battery charging - electrical / new. Load AMP - electrical / new.
105. New 64-volt battery bank supplied.
106. New battery box shall be constructed from new 1/4” steel with two lids at the top and have vents in the side panels.
107. The bell and horn on-off valves shall be rebuilt or new with new in line shut-off valves installed in case of failure or required maintenance.
108. A reconditioned operator’s seat will be located at control area, new cushion and covering.
109. A fireman’s seat shall also be supplied for a second person, it will be reconditioned with a new cushion and covering.
Section L. Fuel Tank
110. Remove fuel sight glasses from fuel tank and replace.
111. Fuel tank shall be removed, and pressure washed clean inside and out.
112. Fuel tank support brackets weldments that are under the frame of locomotive shall be inspected and repaired or replaced if necessary.
113. When the fuel tank is reinstalled new grade 8 bolts and nuts shall be supplied and welded to prevent loosening
114. Fuel tank fill piping shall be cleaned, inspected, and replaced if found defective or reused if suitable for service
115. Remove all fuel piping from tank to engine and return lines. Clean and inspect for defects, then reinstall with new pipe fitting tape. Replace piping if any is found to be defective.
116. Replace all steel and rubber hose fuel lines from tank to engines or to other accessories.
Note: Hose must be rated for 350PSI
Section M. Frame and Deck
117. The steps and handrails that were originally supplied by EMC shall be repaired as required.
118. All sheet metal on the engine hood shall be repaired or replaced as required.
119. All engine hood doors and cab access doors shall be refurbished so they operate properly.
120. At each end of the locomotive apply 1/2” plate bolted to the frame located below the couplers.
121. Install new angle cock and air hose to supply train line air Brakes at both ends per AAR standards for proper location.
122. Remove both draft gear assemblies and couplers from pockets. The draft gear and pocket shall be reconditioned. All wear areas that are worn on the coupler pocket and draft gear shall be welded and ground back to specifications. The draft gear and coupler shall have new bushings installed; a new connecting pin shall also be installed.
Section N. Truck assemblies, Axles, Journal boxes
123. The original friction bearing truck assemblies shall be completely disassembled. All components must be cleaned, blasted, inspected for defects, and repaired as necessary. The air brake cylinders, brake rigging, shall also be reconditioned and repaired or replaced as necessary. Both truck assemblies will be reassembled with reconditioned component parts as listed.
124. Remove the 8 friction-bearing journal boxes from the 4 friction-bearing axle wheel sets. Modify/convert all boxes to accept roller bearings. When the journal bearing boxes are disassembled and after being qualified, new pedestal wear liners shall be installed.
Equalizer seats on top of boxes shall be welded and machined to OEM specifications.
125. The 8 friction bearing boxes shall be converted to accept 6-1/2” x 12” roller bearing axle sets. The modified boxes shall have 6-1/2” x 12” adapter plates at the top to support the roller bearings. The original friction bearing cover lids are to remain on the boxes.
126. The four air brake cylinders on the truck assemblies shall be reconditioned per FRA / AAR standards and in-date.
127. The brake rigging shall be reconditioned to be in operating condition. The brake rigging shall have all new bushings installed with new cotter pins. Any brake rigging that is deemed defective or unrepairable shall be replaced in kind.
128. The brake shoes shall be new composite type with a flange running groove.
129. Supply and install 4 new gear cases to the axle / traction motors.
130. The center pin assembly of the draft trucks will have a lubrication line supplied to the bushing that will also be drilled to allow grease to be pumped by a grease gun to the center pin.
131. The 4 old scrap friction bearing axle wheel assemblies will become the property of the contractor.
132. 4 replacement roller bearing axle assemblies with new wheels and qualified axles and bull gears at Steamtown NHS that will be supplied at no charge to the contractor.
These 4-replacement roller bearing axle wheel assemblies shall be installed into the truck assemblies.
133. All of the truck assembly components and parts shall be primed and painted with black industrial enamel paint.
134. The two truck assemblies will be reassembled with the parts listed in items 124 to 132.
Section O. Traction Motors
135. The four original D-17 traction motors will not be re-used for this restoration and these scrap units will become the property of the contractor.
136. The contractor must supply as part of this restoration, 4 (four) reconditioned D-57 or better traction motors with 15 tooth pinion gears, that have been reconditioned to OEM specs.
137. The four D-57 traction motors shall be installed into the two reconditioned truck assemblies.
Section P. Locomotive Manuals
138. Contractor shall supply new simplified easy-to-read electrical drawing(s) showing the entire new wiring system with each wire shown separately. Each connection to every component shall be shown for ease of maintenance for both the 64-volt and 600-volt electrical systems, including all terminal board, contactors, relays, switches, shunts, lights, traction motors, generators, etc.… Electrical drawings that indicate a wire or wires, going into a bundle will not be accepted. This is to simplify maintenance for technicians so they will not have to try and determine where the other terminating end is located in the system.
139. Contractor shall supply one reprinted EMC/EMD SW-1 locomotive general service / maintenance manual – 1 hard copy, 1 in digital format.
140. Supply one reprinted EMC/EMD SW-1 locomotive operator’s manual – 1 hard copy, 1 in digital format.
Section Q. Load & Function Test
141. After the locomotive has been assembled at the contractor’s facility, the following tests will be performed.
142. Output (horsepower)
143. Engine speeds and governor operation
144. Settings of safety devices on diesel engine and test operation
145. Efficiency of cooling and lubricating system
146. Operation mechanical drives on main generator
147. Operation of load regulator
148. Operation of generator excitation circuits
149. Function test of all subsystems and components
150. Document records shall be supplied to Steamtown NHS at delivery of locomotive
Section R. Painting
151. Sand and blast entire exterior & interior of locomotive.
152. Primer coat interior and exterior with hi grade industrial epoxy enamel.
153. Interior cab color shall, EMC green color as when originally manufactured.
154. Engine room, gray color.
155. Painting and lettering scheme and possible new number of the exterior of locomotive will be determined by Steamtown NHS Final payment shall not be made until the rehabilitated #1901 locomotive has been delivered to Steamtown NHS and all work accepted by a qualified Steamtown NHS representative.
A site visit to Steamtown NHS is recommended to assess, evaluate, and estimate the scope of work and complexity of the project. Contractor shall be responsible to verify all field measurements for the amounts, size, and quantities of materials and tools required to complete the project including shipment to and from the contractor’s facility
Steamtown NHS will not be responsible for the theft or damage of the contractor’s equipment or supplies while on the park premises.
Steamtown NHS is monitored by the Scranton Police department. The Scranton Police Department is right next door to Steamtown at 100 S. Washington Ave. phone# (570) 348-4130 for emergencies call 911. The contractor shall be responsible for securing the work site, materials, equipment and tools during the duration of any work performed at Steamtown NHS. If a temporary secured staging is required, the contractor shall provide at its own expense. The government will take no responsibility for lost, stolen or damaged property.
Part IV: Warranty
Contractor shall guarantee all workmanship for a minimum period of one year from date of final acceptance.
All defective material and workmanship disclosed as the result of the acceptance inspection given herein shall be corrected at no cost to the Government. After all deficiencies have been corrected, a Letter of Acceptance will be issued. If only designated portions have been inspected, a letter of partial acceptance will be issued for that portion of the work. However, payment will be withheld until a Letter of Acceptance is issued.
Part V: Period of Performance
Contractor shall have 730 days (2 years) from the commencement of the contract to complete the full refurbishment that satisfies this scope of work including delivery and testing.
Part VI: Delivery
Contractor shall be responsible for delivery of the #1901 Locomotive to Scranton via truck or rail transport.
If locomotive is delivered by rail, contractor supplied “dummy” truck units without electrical connections shall be used. Contractor refurbished trucks will be installed using Steamtown drop table facility.
Locomotive shall be delivered to:
Steamtown National Historic Site.
150 South Washington Ave.
Scranton, PA 18503
On Steamtown owned track if possible.
Part VI: Instructions to Offerors
Contractor shall break down price quote and submit for requirements as follows:
1. Locomotive complete
2. Shipping from and to Steamtown NHS
Successful offeror must register in the System for Award Management (SAM.gov) database prior to award.
Part VII. Submittals: Submittals and Approval Procedures ***APPLICABLE
IN EVENT OF AWARD***
All submittals shall be transmitted using National Park Service DCC-1(CS), dated 11/95.
o No action will be taken on a submittal item unless accompanied by the transmittal form (included at the end of this section).
All submittals that pertain to products to be installed by the Contractor should go directly to the Contracting Officers Technical Representative. (Bruce Mowbray) of Steamtown, National Historic Site, for review.
Contractor shall submit enough copies for his/her needs plus three copies to Steamtown National Historic Site.
Contractor shall forward submittals at least 30 working days before need of approval.
Approved Equals; for each item proposed as an “approved equal,” submit supporting data, including:
o Drawings and samples as appropriate.
o Comparison of the characteristics of the proposed item with that specified.
o Changes required in other elements of the work because of the substitution.
o Name, address, and telephone number of vendor.
o Manufacture’s literature regarding installation, operation, and maintenance, including schematics for electrical systems, and parts lists.
o Describe availability of maintenance service, and state source of replacement materials.
A request for approval constitutes a representation that Contractor:
o Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
o Will provide the same warranties for the proposed item as for the item specified.
o Has determined that the proposed item is compatible with interfacing items.
o Will coordinate the instillation of an approved item and make changes required in other elements of the work because of the substitution.
o Waives all claims for additional expenses that may be incurred as a result of the substitution.
Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements.
o Forward submittals that are related to or affect one another as a package to facilitate coordinated review.
o Each transmittal shall contain data specific to that individual submittal
Submittal Identification:
o Contractor Officer will provide a project identification stamp which shall be applied by the Contractor. Identification shall include the park package number, project title, contract number, and transmittal number.
o All sets of shop drawings, manufacture’s catalog sheets, samples, and other documents submitted to the Contracting Officer must have the identification information stamped on the submittal.
o Identification information shall be applied to the bottom right margin on each page.
o Identification information on samples shall be applied to the most readily visible area on the sample or on tags attached to the sample.
Submittal Numbering:
o Number each submittal consecutively.
o For re-submittals use the original submittal number, plus a letter suffix beginning with A.
o Additional re-submittals of the same item shall contain the original number with the next consecutive letter.
Contracting Officer’s Review:
o Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on back of submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated; or do not show evidence of Contractor’s approval.
TRANSMITTAL - NATIONAL PARK SERVICE
Transmittal No.:
Sheet: 1 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification Section No.
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Contractor Signature
Recommended by
Title, Date
Title
Date
I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
Review Comments
Action By
Date
Contracting Officer’s Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00 (Formerly DSC-
1(CS)
TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification Section No.
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
Points of contact:
Contracting officer:
Contracting Officers Representative:
Bruce Mowbray
Preservation Specialist for National Park Service
Steamtown National Historic Site
150 south Washington Ave
Scranton, PA 18503
Phone: (570) 340-5325
Cell # (570) 877-2724
Fax: (570) 340-5310
Email: Bruce_Mowbray@nps.gov