This is an invitation for bid for kitchen roof restoration and HVAC work at a VA medical center. The solicitation is set aside for service-disabled veteran-owned small businesses and requires bids to be submitted electronically by March 7, 2024. A pre-bid site visit is scheduled. Bids will be publicly opened on February 15, 2024.
The work includes kitchen roof restoration and HVAC installation. The wage determination is General Decision NH 20230021 09-29-2023. Bidders must provide documentation of safety record, environmental violations, insurance experience modification rating, and register in the System for Award Management and Contractor Performance Assessment Reporting System. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated Kitchen SOW 3-4-2024.pdf | ||
| 36C24124B0029 0003.docx | DOCX document | |
| Site visit Sign in sheet.pdf | ||
| 36C24124B0029 0002.docx | DOCX document | |
| 36C24124B0029 0001.docx | DOCX document | |
| 36C24124B0029.docx | DOCX document | |
| 608-24-108 kitchen roof drawing.pdf | ||
| Roof 8 IR scan results.pdf | ||
| 23_VARoof8a-IRStudy_09.04.pdf | ||
| first floor plan.pdf | ||
| SAM.gov NH WD 06302023.pdf | ||
| Building 1 first floor north.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
TO: (Contracting Officer) FROM: (Contractor) DATE
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
NEW RESUBMITTAL
PREVIOUS SUBMISSION NUMBER PROJECT NUMBER
TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY
ITEM
NO.
SPECIFICATION SECTION/
PARA NO./DRAWING NO.
DESCRIPTION OF MATERIAL
(Include Type, Model Number, Mfg., etc. & file name of attachments)
AP-
PROVED
DISAP-
PROVED
SEE
REVERSE INITIAL
BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
FOR GOVERNMENT USE ONLY
TO: (A/E)
For Evaluation and Action
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
TO: (VA Engineer / COR)
RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
TO: (Contracting)
APPROVED DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and completed end items that are to be incorporated into the work required by the contract.
2. This form is to be used by Contractors for submitting Shop Drawings (*.DWG or *.PDF format), Manufacturer's Literature and Certificates (scanned as * .PDF) to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared, signed, and E-mailed to the Contracting Officer with appropriate attachments. One paper format copy shall be submitted as well.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Allow reasonable time in accordance with the project specifications for review of the submittal(s) by the A/E and Government. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless it is signed by the Contracting Officer. This approval is required as called for by the Contracting Officer under the terms of this contract. One paper copy of the submittal is to be hand signed for Contracting Officers records.
6. The A/E and Government review is limited to checking for conformance with the information given and the design concept expressed in the contract documents. The Contractor and/or Construction Manager remains totally responsible for confirming all dimensions, quantities, fabrication, construction means and methods, techniques, sequences in the work, procedures, and coordination of the work for all trades.
7. This review does not relieve the Contractor of full responsibility for strict compliance with all requirements of contract plans and specifications. Provide and install all supplementary or miscellaneous items, appurtenances, devices and their available options incidental to or necessary for a functionally, sound, secure, complete, compatible and code compliant system.
11EER WA Series Wall Mount Air Conditioner
Models:
INSTALLATION INSTRUCTIONS
W42AC-A
W42AC-B
W42AC-C
W42ACRC
W48AC-A
W48AC-B
W48AC-C
W48ACRC
Bard Manufacturing Company, Inc.
Bryan, Ohio 43506 www.bardhvac.com
Manual: 2100-692G
Supersedes: 2100-692F
Date: 5-14-21
W60AC-A
W60AC-B
W60AC-C
W60ACRC
W72AC-A
W72AC-B
W72AC-C
W72ACRC
W42ACDA
W42ACDB
W42ACDC
W48ACDA
W48ACDB
W48ACDC
W60ACDA
W60ACDB
W60ACDC
W72ACDA
W72ACDB
W72ACDC
Manual 2100-692G
CONTENTS
Getting Other Information and Publications Wall Mount General Information
Air Conditioner Wall Mount Model Nomenclature
Shipping Damage
General
Duct Work
Filters
Filter Removal/Installation
Switching Filter Sizes
Fresh Air Intake
Condensate Drain
Installation Basic Installation Design and Application Planning .. 8
Wall Construction
Outdoor Area Inspection
Condensate Water Drainage
Indoor Ducted and Non-Ducted Applications
Indoor Supply Airflow
Indoor Return Airflow
Ducted Applications
Free Blow Applications
Thermostat or Indoor Temperature Sensor
Placement
Unit Installation
Materials/Tool List
Wall Preparation
Wall Mount Installation to Wall Surface
Wiring – Main Power
High Voltage Connections
Wiring – Low Voltage
Low Voltage (24VAC) Connections
Unit Shutdown Feature
Balanced ClimateTM Feature
Dehumidification Feature
Ventilation Features
Low Ambient Control (LAC)
Outdoor Temperature Switch and Freeze
Protection Thermostat
Alarm Relay Feature
DDC Controls Feature
Dirty Filter Switch Indicator (DFS)
Discharge Air Sensor
Airflow Switch
Compressor Current Sensor
Start Up General
Topping Off System Charge
Safety Practices
Important Installer Note
High Pressure Switch
Three Phase Scroll Compressor Start Up
Information
Phase Monitor
Condenser Fan Operation
Service Hints
Sequence of Operation
Balanced ClimateTM Mode
Vent Connection Plug
Compressor Control Module
Features
Delay-on-Make Timer
Short Cycle/Delay-on-Break
Low Pressure Detection
High Pressure Detection
Test Mode
Brownout Protection with Adjustment
Pressure Service Ports
Service Troubleshooting Nidec SelecTech Series ECM
Motors
If the Motor is Running
If the Motor is Not Running
Model SelecTech Communication Diagnostics ... 28
Fan Blade Setting Dimensions
R-410A Refrigerant Charge
Removal of Fan Shroud
Setting Unit Airflow
Blower Speeds
Speed Tap 1 – Vent/Blower Only
Speed Tap 2 – Balanced Climate
Speed Tap 3 – Default LO Cooling &
Heating
Speed Tap 4 – Optional MED Cooling &
Heating
Speed Tap 5 – Optional HI Cooling &
Heating
Dirty Filter Switch
Dirty Filter Switch Adjustment
FIGURES
Figure 1 Front Control Panel Cover
Figure 2 Removing Left Filter
Figure 3 Removing Second Filter
Figure 4 Filter Tabs in Up Position
Figure 5 Bend FIlter Tabs Down
Figure 6 Remove Four Screws
Figure 7 Re-Install Filter Support Brackets into
Lower Slots
Figure 8 Re-Install Screws and Bend Tabs Up
Figure 9 Install Right 2" Filter
Figure 10 Install Left 2" Filter
Figure 11 Fresh Air Damper
Figure 12 Vent Installation/Removal Clearance
Required
Figure 13 Unit Dimensions
Figure 14 Mounting Instructions
Figure 15 Electric Heat Clearance
Figure 16 Wall Mounting Instructions
Figure 17 Wall Mounting Instructions
Figure 18 Common Wall Mounting Installations
Figure 19 High Voltage Connections
Figure 20 Programmable Thermostat
Connections
GETTING OTHER INFORMATION AND PUBLICATIONS
These publications can help when installing the air conditioner. They can usually be found at the local library or purchased directly from the publisher. Be sure to consult the current edition of each standard.
National Electrical Code ......................ANSI/NFPA 70
Standard for the Installation of Air Conditioning and
Ventilating Systems
.......................................................ANSI/NFPA 90A
Standard for Warm Air Heating and Air Conditioning
Systems
.......................................................ANSI/NFPA 90B
Load Calculation for Winter and Summer Air
Conditioning
....................................... ACCA Manual J Residential
Duct Design for Residential Winter and Summer Air
Conditioning and Equipment Selection
....................................................... ACCA Manual D
For more information, contact these publishers:
ACCA Air Conditioning Contractors of America
1712 New Hampshire Ave. N.W.
Washington, DC 20009
Telephone: (202) 483-9370
Fax: (202) 234-4721
ANSI American National Standards Institute
11 West Street, 13th Floor
New York, NY 10036
Telephone: (212) 642-4900
Fax: (212) 302-1286
ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers, Inc.
1791 Tullie Circle, N.E.
Atlanta, GA 30329-2305
Telephone: (404) 636-8400
Fax: (404) 321-5478
NFPA National Fire Protection Association
Batterymarch Park
P.O. Box 9101
Quincy, MA 02269-9901
Telephone: (800) 344-3555
Fax: (617) 984-7057
Figure 21 Non-Programmable Thermostat
Connections
Figure 22 8201-169 Compressor Control Module ...26
Figure 23 Motor Connections
Figure 24 Motor Connections
Figure 25 Fan Blade Setting
Figure 26 Fan Shroud Removal
Figure 27 Speed Taps
Figure 28 Speed Taps
Figure 29 Dirty Filter Switch and Dirty Filter
Indicator Light/Reset Switch
Figure 30 Adjusting Filter Switch
TABLES
Table 1 Clearance Required for Service Access and Adequate Condenser Airflow
Table 2 Minimum Clearances Required to
Combustible Materials
Table 3 Additional Low Voltage Connections
(if applicable)
Table 4 Low Voltage Connections for
DDC Control
Table 5 Wall Thermostats
Table 6 Humidity Controls
Table 7 CO2 Controllers
Table 8 Thermostat Wire Size
Table 9 Fan Blade Dimensions
Table 10 Cooling Pressure – Standard Airflow
Table 11 Cooling Pressure – Balanced Climate
Airflow
Table 12A Electrical Specs W42AC, W48AC
Table 12B Electrical Specs W60AC, W72AC
Table 13 Recommended Airflow
Table 14 Blower Speeds for Unit Operational
Modes
Table 15 Indoor Blower Performance
Table 16 Maximum ESP Electric Heat Only
Table 17 Electric Heat
Table 18 Vent and Control Options
Table 19 Optional Accessories
GRAPHS
Graph 1 W42AC FAD-NE5 W/O Exhaust
Ventilation Delivery
Graph 2 W48AC FAD-NE5 W/O Exhaust
Ventilation Delivery
Graph 3 W60AC FAD-NE5 W/O Exhaust
Ventilation Delivery
Graph 4 W72AC FAD-NE5 W/O Exhaust
Ventilation Delivery
WALL MOUNT GENERAL INFORMATION
AIR CONDITIONER WALL MOUNT MODEL NOMENCLATURE
NOTE: Vent options X and B are without exhaust capability. May require separate field-supplied barometric relief in building.
Shipping Damage
Upon receipt of equipment, the carton should be checked for external signs of shipping damage. If damage is found, the receiving party must contact the last carrier immediately, preferably in writing, requesting inspection by the carrier’s agent.
General
The equipment covered in this manual is to be installed by trained, experienced service and installation technicians.
This appliance is not intended for use by persons
(including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
The refrigerant system is completely assembled and charged. All internal wiring is complete.
The unit is designed for use with or without duct work.
Flanges are provided for attaching the supply and return ducts.
These instructions explain the recommended method to install the air cooled self-contained unit and the electrical wiring connections to the unit.
These instructions and any instructions packaged with any separate equipment required to make up the entire air conditioning system should be carefully read before beginning the installation. Note particularly “Starting
Procedure” and any tags and/or labels attached to the equipment.
While these instructions are intended as a general recommended guide, they do not supersede any national and/or local codes in any way. Authorities having jurisdiction should be consulted before the installation is made. See page 3 for information on codes and standards.
Insert “D” for dehumidification with hot gas reheat. Reference Form 7960-811 for complete details. Insert "R" for units with isolation transformer for high resistance ground applications.
CONTROL MODULES
(See Spec. Sheet S3583)
COIL OPTIONS
X – Standard
1 – Phenolic Coated Evaporator
2 – Phenolic Coated Condenser
3 – Phenolic Coated Evaporator and Condenser
4 – Coated Coils and Condenser
Section
5 – Coated Coils, Inside and
Outside of UnitSPECIALTY PRODUCTS (Non-Standard)
W 42 A C – A 0Z X X X X X X
MODEL SERIES
REVISION
KW
A – Air Conditioner
PLACEHOLDER
X – Future Use
COLOR OPTIONS
X – Beige (Standard)
1 – White
4 – Buckeye Gray
5 – Desert Brown
8 – Dark Bronze
A – Aluminum
S – Stainless Steel
CAPACITY
42 – 3½ Ton
48 – 4 Ton
60 – 5 Ton
72 – 6 Ton
VENTILATION OPTIONS
X – Fresh Air Damper - No Exhaust (Standard)
A – Fresh Air Damper - With Barometric Exhaust
B – Blank-off Plate
D – DDC, 0-10V Economizer
M – Commercial Ventilator - ON/OFF Operation Only
R – Energy Recovery Ventilator - Motorized with Exhaust
V – Commercial Ventilator - No Hood with Exhaust
Y – Economizer - DB Full Flow
Z – Economizer - DB & WB, Full Flow
VOLTS & PHASE
A – 230/208/60/1
B – 230/208/60/3
C – 460/60/3
FILTER OPTIONS
X – 1" Throwaway (Standard) N – 2" MERV 13
W – 1" Washable B – NPBI TECH + 2" MERV 13
P – 2" Pleated A – UV-C + 2" MERV 13
M – 2" MERV 11
Size of unit for a proposed installation should be based on heat loss calculation made according to methods of
Air Conditioning Contractors of America (ACCA). The air duct should be installed in accordance with the
Standards of the National Fire Protection Association for the Installation of Air Conditioning and Ventilating
Systems of Other Than Residence Type, NFPA No.
90A, and Residence Type Warm Air Heating and Air
Conditioning Systems, NFPA No. 90B. Where local regulations are at a variance with instructions, installer should adhere to local codes.
Duct Work
All duct work, supply and return, must be properly sized for the design airflow requirement of the equipment. Air Conditioning Contractors of America
(ACCA) is an excellent guide to proper sizing. All duct work or portions thereof not in the conditioned space should be properly insulated in order to both conserve energy and prevent condensation or moisture damage.
Refer to Maximum ESP of Operation Electric Heat table on page 39.
Design the duct work according to methods given by the Air Conditioning Contractors of America (ACCA).
When duct runs through unheated spaces, it should be insulated with a minimum of 1" of insulation. Use insulation with a vapor barrier on the outside of the insulation. Flexible joints should be used to connect the duct work to the equipment in order to keep the noise transmission to a minimum.
All model series require a 1/4" clearance to combustible material for the first 3' of duct attached to the outlet air frame is required. See instructions on page 10 and Figures 14 − 18 (pages 13 – 16) for further details.
Ducts through the walls must be insulated and all joints taped or sealed to prevent air or moisture entering the wall cavity.
Some installations may not require a return air duct. A metallic return air grille is required with installations not requiring a return air duct. The spacing between louvers on the grille shall not be larger than 5/8".
Any grille that meets with 5/8" louver criteria may be used. It is recommended that Bard Return Air Grille
Kits RG5 or RFG5 be installed when no return duct is used. Contact distributor or factory for ordering information. If using a return air filter grille, filters must be of sufficient size to allow a maximum velocity of
400 fpm.
NOTE: If no return air duct is used, applicable installation codes may limit this cabinet to installation only in a single story structure.
Filters
The filters can be serviced from the outside by removing the front control panel cover (see Figure 1).
Two (2) 20" x 20" x 1" throwaway filters come standard with each unit. Additional 1" and 2" filter options are available as optional accessories. To be notified when filters need changed, a dirty filter switch option is available. See page 40 for the dirty filter switch kit.
2. Slide second filter to the left around the wires and pull the filter out (see Figure 3 on page 6).
FIGURE 1
Front Control Panel Cover
Front Control Panel
Cover
Filter Removal/Installation
1. Remove left filter first by pulling on filter removal slide (see Figure 2).
FIGURE 2
Removing Left Filter
Filter Removal
Slide
2. Locate the filter support brackets and remove the four (4) screws holding them to the top of the control panel (see Figure 6).
FIGURE 4
Filter Tabs in Up Position
FIGURE 5
Bend Filter Tabs Down
3. Pull the brackets out towards the front of the unit.
The back of the bracket will slip out of the upper slots at the back of the filter tray.
4. Re-install the filter support brackets into the lower slots at the back of the filter tray (see Figure 7).
FIGURE 6
Remove Four Screws
5. Re-install the four (4) screws into the upper screw holes on the filter support brackets. Then bend the tab up out of the way (see Figure 8).
FIGURE 7
Re-Install Filter Support Brackets into Lower Slots
FIGURE 8
Re-Install Screws and Bend Tabs Up
FIGURE 3
Removing Second Filter
3. Reverse the order for new filter installation.
NOTE: When installing new filters, make sure that airflow arrows on filters point up.
Switching Filter Sizes
1. To switch from 1" to 2" filters, start by removing the filter slide and bend the tabs down out of the way (see Figures 4 and 5).
Upper slots for
1" filters
Lower slots for
2" filters
6. Install the right 2" filter first followed by the left filter (see Figures 9 and 10).
NOTE: When installing new filters, make sure that airflow arrows on filters point up.
7. Reverse the steps above to switch from 2" to 1" filters.
Fresh Air Intake
All units are built with fresh air inlet louvers punched in the side grilles.
If the unit is equipped with a fresh air damper assembly, the assembly is shipped already attached to the unit.
The damper blade is locked in the closed position. To allow the damper to operate, remove the two (2) screws in the bottom of the blade (see Figure 11). Remove right side grille to access the damper blade.
FIGURE 9
Install Right 2" Filter
FIGURE 10
Install Left 2" Filter
There is an adjustable slide on the side of the fresh air intake that can be adjusted to limit how far the damper opens so that the amount of fresh air that enters the structure is regulated.
Graphs found on pages 42 and 43 give approximate fresh air amounts based on the slide adjustment setting.
All capacity, efficiency and cost of operation information is based upon the fresh air blank-off plate in place.
The blank-off plate is available upon request from the factory and is installed in place of the fresh air damper shipped with each unit.
MIS-3977
LOSED
OVE (2)
INTAKE
RATION.
Blade is screwed closed for shipping. Remove two (2) screws for fresh air intake during unit operation.
FIGURE 11
Fresh Air Damper
INSTALLATION
Basic Installation Design and Application Planning
Successful unit installations require proper planning and site inspection before installation begins. Before installing the wall mount unit, make sure that all service and airflow clearances are met and that the unit can meet all applicable code and regulation requirements. Provide an inspection of both the inside and outside of the structure by reviewing floorplans and/or visiting the installation site.
Wall Construction
The wall must be inspected to ensure that the weight of the unit can be supported. Be sure to review all applicable construction codes and regulations including seismic requirements. When inspecting wood frame walls, the wall construction must be strong and rigid enough to carry the weight of the unit without transmitting any unit vibration. It is important that the side unit wall mounting lags and optional bottom bracket are supported by structural members inside the wall cavity. Concrete block and brick walls must be thoroughly inspected to ensure that they are capable of carrying the weight of the installed unit. Metal buildings must contain structural components to support the unit weight. If heavily corrugated siding is present, it may need to be trimmed and flashed similar to a window to provide a flat, even surface to attach and seal the unit to the wall. Heavy gauge corrugations that would be present on shipping containers and blast-proof structures may require the installation of a metal plate over the corrugated area. It is important that the unit area is weatherized and sealed to avoid air and water infiltration into the area between the unit and the wall.
Outdoor Area Inspection
Inspect the outdoor area of the jobsite or review construction plans and locate the area where the wall mount is to be installed. The outdoor area must be free from obstructions including fences, bushes and walls that will hinder unit operation regarding outdoor condenser airflow and unit serviceability. Do not install units in enclosed areas that limit the amount of ambient temperature airflow. Warm air will exit the front condenser section of the unit, and outdoor ambient temperature air must be able to enter side intake condenser openings of the unit. Portable or modular building placement must be in a way that the wall mount units have a constant supply of outdoor air for proper unit operation. Make sure that the service panels of the unit are accessible. Inspect wall surfaces for obstructions that could hinder unit installation and servicing including outdoor electrical conduits, junction boxes, wall drains, vent hoods, windows, doors, overhangs and posts.
Condensate Water Drainage
Review all codes and requirements for unit condensate drainage. A clear, flexible PVC drain hose (3/4" ID, 1"
OD) extends from the drain pan in the upper section of the unit and extends down to the unit base. An opening is supplied towards the back of the unit base for the drain hose to pass through, and the hose extends 1" to 2" below the unit base. Water removed from the indoor air (condensate) will be expelled from the unit in large amounts during cooling operation through the hose. Units running in cooling operation in cold outdoor below freezing conditions can cause the condensate to freeze after leaving the drain hose. In the event the drain hose is connected to a drain system of some type, it must be an open or vented type system to ensure proper drainage throughout seasonal use.
Indoor Ducted and Non-Ducted Applications
Air distribution inside the structure being conditioned plays an important role in making sure the area is a consistent temperature. Improper air distribution can result in areas being cooler or warmer, electrical equipment not receiving sufficient airflow or occupancy discomfort felt inside an area. Thermostat or indoor temperature sensor placement inside the area being conditioned also plays an important role in indoor climate control.
Indoor Supply Airflow
Indoor installation areas must provide a non-restrictive path for the conditioned supply air to leave supply grilles and registers. Inspect the area to ensure that all indoor portions of the room or rooms will have access to supply air. Ductwork may be used to ensure proper air circulation and all provided ductwork guidelines and clearances must be followed. Non-ducted applications must use a supply louver grille installed over the supply opening inside the room. Be sure to adjust supply deflectors to properly disperse the conditioned supply air to all parts of the room. Avoid closing sections of the supply grilles which would cause unneeded supply duct pressurization.
Indoor Return Airflow
A non-restrictive path for room air returning to the center section of the unit must be provided inside the room. Avoid placing objects including furniture, electronics equipment, equipment racks and cabinets directly in front of the unit return grilles and registers.
Bard recommends at least 2' between solid objects and return grilles or registers. Ductwork may be used to ensure proper air circulation and all provided ductwork guidelines and clearances must be followed. Non-ducted applications must use a return louver grille installed over the return opening inside the room.
Ducted Applications
Field fabricated supply and return duct work may be installed inside the structure being conditioned. A short supply and/or return stub duct may be connected to the unit supply and return flanges before unit installation to help with duct connections inside the structure. Supply and return ducts must be properly sized for the design airflow requirement of the equipment. Air Conditioning
Contractors of America (ACCA) is an excellent guide to proper sizing. All duct work or portions thereof not in the conditioned space should be properly insulated in order to conserve energy, reduce heat conductivity, and prevent condensation or moisture damage. Refer to
Maximum External Static Pressure (ESP) of Operation
Table 16 on page 39. Design the duct work according to methods given by the Air Conditioning Contractors of America (ACCA). When duct work is installed in unheated spaces, it should be insulated with a minimum of 1" of insulation. Use insulation with a vapor barrier on the outside of the insulation. Flexible joints should be used to connect the duct work to the equipment in order to keep the noise transmission to a minimum. Ducts through the walls must be insulated and all joints taped or sealed to prevent air or moisture from entering the wall cavity.
All model series require a 1/4" clearance to combustible material for the first 3' of duct attached to the outlet air frame is required. See instructions on page 10 and Figures 14 − 18 (pages 13 – 16) for further details.
A non-restrictive metallic supply air grille with deflectors is required for free blow applications. Contact the local Bard distributor or visit www.bardhvac.com for ordering information.
A metallic return air grille is required for non-ducted applications. The spacing between louvers on the grille shall not be larger than 5/8". It is recommended that a
Bard Return Air Grille Kit is installed that is designed specifically for the wall mount product. Contact the local Bard distributor or visit www.bardhvac.com for ordering information. A field-supplied return grille that meets the 5/8" louver criteria and does not cause the unit to exceed the maximum specified external static pressure (ESP) may be used. If using a return air filter grille, filters must be of sufficient size to allow a maximum velocity of 400 fpm. Filter return air grilles do not filter air being brought into the structure through ventilation options including fresh air dampers, ventilators, economizers and energy recovery ventilators. Be sure to install the return grille with the louvers pointed downward towards the floor. This will help ensure return air is drawn upward from the floor and improve air circulation in the room.
NOTE: If no return air duct is used, applicable installation codes may limit this cabinet to installation only in a single story structure.
Thermostat or Indoor Temperature Sensor Placement
The location and installation of the thermostat or temperature sensor that monitors indoor temperature is very important regarding unit operation. Avoid placing the thermostat in an area exposed to direct sunlight or air from doorways leading outdoors. Use a piece of insulating material to close off conduit openings or holes in the wall surface for wire entry into the thermostat or temperature sensor. This will help avoid non-conditioned air from entering the thermostat and effecting temperature and/or humidity readings.
As common practice, the thermostat or temperature sensor should measure the temperature of the air being returned to the unit, and not the conditioned air being supplied by the unit. Placing the thermostat or temperature sensor near a return air opening will normally result in optimal unit performance.
Unit Installation
Make sure to have the proper tools at the work site that are needed for unit installation. The following steps are provided to ensure the unit is installed properly to the wall surface, and that the unit will provide years of service with minimal service requirements.
Materials/Tools List
Additional hardware and miscellaneous supplies are needed for installation. These items are field supplied and must be sourced before installation. This list also includes tools needed for installation.
Fire hazard.
Maintain minimum 1/4" clearance between the supply air duct and combustible materials in the first 3' of ducting.
Failure to do so could result in fire causing damage, injury or death.
! WARNI NG
Free Blow Applications
Some installations may not require extensive supply duct work throughout the structure and are referred to as free blow applications. A short field-fabricated supply duct must be used in the wall cavity to transition between the supply collar on the unit and the supply louver grille in the room. The duct must be properly insulated in order to conserve energy, reduce heat conductivity and prevent condensation or moisture damage. All joints must be taped or sealed to prevent air or moisture entering the wall cavity. Follow all clearances including distances to combustible materials and all instructions provided in this manual.
• Appropriate safety gear including gloves and safety glasses
• 5/16" hex bit with drill driver
• Phillips head screwdriver
• Small straight (thermostat) screwdriver
• Tape measure
• Leveling device
• Two (2) tubes of caulk and caulk gun
• Utility knife
• Tools for cutting holes in the wall surface (if needed)
• Electrical components and wiring along with electrical tools
• Multimeter
• Wall fasteners for side flanges, bottom mounting bracket and top rain flashing
• Duct tape and/or other duct sealing materials
Wall Preparation
1. Two holes for the supply and return air openings must be cut through the wall as shown in Figure
14 on page 13. Be sure the openings are square and level. Follow all clearances including distances to combustible materials and all instructions provided in this manual.
2. Review all electrical requirements provided in this manual and plan out electrical entrances into the building. Also plan electrical conduit routing and thermostat placement, if necessary.
3. Install necessary duct work and prepare the openings for unit installation.
4. Clean the exterior wall where the unit is to be installed and make sure it is able to provide a smooth, level, debris-free surface. Remove all construction debris from the supply, return and electrical hole cutting process.
Wall Mount Installation to Wall Surface
1. Remove packaging from unit and make sure the unit is not damaged before installation. A top rain flashing is supplied for field use and is mounted to the back of the unit for shipping. Remove the rain flashing before locating the unit against the wall.
Top rain flashing is required to avoid water entering the area behind the unit that is against the wall. A bottom mounting bracket, attached to the skid for shipping, is provided for ease of installation but is not required. Review all requirements listed on unit labels and on serial plate located on the side of the unit.
2. Locate and mark bolt hole locations and bottom mounting bracket location. Install bottom mounting bracket with field-supplied fasteners to wall if it is to be used (optional). Bracket must be level and installed in the correct location to help support the unit during the installation process
(see Figure 14).
3. Position the wall mount unit close to the wall surface where it will be installed. Install rain flashing at the top of the unit facing the wall by hooking the hem bend into the rear bend of the unit top (see Figure 14).
4. Apply a liberal amount of caulk on left and right cabinet side wall mount brackets and back of top rain flashing. Place unit back surface flush against wall. Unit must be level to ensure proper condensate drainage. Optional bottom bracket may be used to help support the unit.
5. Units are secured to the wall by using field-supplied fasteners along each side of the wall mount through the built-in wall mounting brackets.
It is the responsibility of the installer to select the proper fastener to secure the unit to the wall based on wall construction and applicable building codes. Typical installations may include 5/16" fasteners with 7/8" diameter flat washers. Be sure unit is securely mounted and all weight-bearing fasteners are attached to the weight supporting structural members of the wall.
6. Apply a bead of caulk between the back of the unit top and the front surface of the top rain flashing
(see Figure 14).
7. Connect unit duct work from the inside of the building following all clearances and instructions provided. For additional mounting rigidity, the return air and supply air frames or collars can be drilled and screwed or welded to the structural wall itself (depending upon wall construction). Be sure to use code approved duct tape or other sealing materials to seal the duct work to the unit.
8. On side-by-side installations, maintain a minimum of 20" clearance on both sides to allow access to heat strips and to provide proper airflow to the outdoor coil. Additional clearance may be required to meet local or national codes.
* For vent installation and removal, one side of the unit requires 45" clearance in the vent area. See Figure
12 for clarity.
See Specifications Sheet S3583.
TABLE 1
Clearance Required for Service Access and
Adequate Condenser Airflow
Model Left
Side
Right
Side
Discharge –
Front
W42AC
W48AC
W60AC
W72AC
20" 20" 10'
TABLE 2
Minimum Clearances Required to Combustible Materials
Model Supply Air Duct (1st 3') Cabinet
W42AC
W48AC
W60AC
W72AC
1/4" 0"
FIGURE 12
Vent Installation/Removal Clearance Required
4"
2"
4"
4"
45"
MIS-4042
KEEP AREA
CLEAR FOR 45"
IN FRONT OF
SIDE PANEL
OBJECT OR WALL
IN THIS SECTION OR ANY
OTHER OBSTRUCTION
OF UNIT
OR RIGHT SIDE OF UNIT
CLEARANCE NEEDED ON LEFT
VENT ASSEMBLY
SHOWN OUTSIDE
AVOID LOCATING UNIT DISCONNECT
VENTS CAN BE INSTALLED
FROM EITHER SIDE OF UNIT.
45"
Width
(W)
Depth
(D)
Height
(H)
Supply Return
A B C B E F G I J K L M N O R S T
W42AC
W48AC
42.00 25.52 84.75 9.88 29.88 15.88 29.88 43.88 12.63 39.06 30.06 43.25 26.94 55.59 52.59 8.82 43.00 1.44 16.00 1.88
W60AC
W72AC
42.00 25.52 92.88 9.88 29.88 15.88 29.88 43.88 12.63 45.00 30.06 49.25 35.06 61.72 58.72 8.82 43.00 1.44 16.00 10.00
FIGURE 13
Unit Dimensions
2.000
Return Air Opening
Supply Air Opening
MIS-3978 A
Condenser Air Outlet
Ventilation Air
Inlet
Cond. Air
Exhaust Air
Brackets
(Built In)
Mounting
Side Wall
Location
Shipping
Flashing
Top Rain
DO NOT PLACE ELECTRICAL
ENTRANCES IN SHADED AREAS
ABOVE DUE TO POTENTIAL
INTERFERENCE WITH COPPER TUBING
L
O
B
E
.375
M
N
T
S
S
S
S
S
R
.375
TYP.
Access Panel
(Lockable)
Disconnect
C. Breaker/
Filter Behind Control Panel Door
Optional
Electrical
Entrance
Drain
W
G
F
4° Pitch
Rain Hood
Electrical
Panel
High Voltage
Built In
Entrance
Heater Access
Electric Heat
Low Voltage
Electrical
Entrance
1.375
A
K
H
D
C
I
2.250
J
All dimensions are in inches. Dimensional drawings are not to scale.
FIGURE 14
Mounting Instructions
D
16"
16"
16"
16"
16"
2 " 6
2 "
4"
1"
3"
4" Typ.
4" Typ.
2 " 30"
E
F
G
CC
4 "
B
A
SEAL WITH BEAD
OF CAULKING ALONG
ENTIRE LENGTH OF
TOP.
WALL
WALL STRUCTURE
1/4" CLEARANCE ON ALL
FOUR SIDES OF SUPPLY
AIR DUCT IS REQUIRED
FROM COMBUSTABLE
MATERIALSHEATER ACCESS
PANEL
FOAM AIR SEAL
RAIN FLASHING
SUPPLIED
TOP
Right Side ViewWall Opening and Hole Location View
Supply Opening
Return Opening
UNITS REQUIRED DIMESIONS A B C D E F G
W42AC-W48AC
UNITS
REQUIRED DIMESIONS TO
MAINTAIN 1/4" MIN. CLEARANCE
FROM COMBUSTIBLE
MATERIALS
30 1/2 10 1/2 6 1/4 1 1/4 29 3/4 16 1 7/8
REQUIRED DIMENSIONS TO
MAINTAIN RECOMMENDED 1"
CLEARANCE FROM
COMBUSTIBLE MATERIALS
32 12 5 1/2 2 29 16 1 7/8
W60AC-W72AC
UNITS
REQUIRED DIMESIONS TO
MAINTAIN 1/4" MIN. CLEARANCE
FROM COMBUSTIBLE
MATERIALS
30 1/2 10 1/2 6 1/4 1 1/4 29 3/4 16 10
REQUIRED DIMENSIONS TO
MAINTAIN RECOMMENDED 1"
CLEARANCE FROM
COMBUSTIBLE MATERIALS
32 12 5 1/2 2 29 16 10
MIS-3980 B
FIGURE 15
Electric Heat Clearance
NOTE 1: SIDE SECTION VIEW OF SUPPLY AIR
DUCT FOR WALL MOUNTED UNIT SHOWING 1/4"
CLEARANCE TO COMBUSTIBLE SURFACES.
Fire hazard.
Maintain minimum 1/4" clearance between the supply air duct and combustible materials in the first 3' of ducting.
Failure to do so could result in fire causing damage, injury or death.
! WARNI NG
FIGURE 16
Wall Mounting Instructions
FIGURE 17
Wall Mounting Instructions
I
C
K
E + 1.000
B
1.000
A
2 x 4'S, 2 x 6'S &/OR
FRAMING MATERIAL
STRUCTURAL STEEL
1.000" CLEARANCE
INTERIOR FINISHED WALL
OVER FRAME
EXTERIOR FINISH WALL
OVER FRAME
ATTACH TO BOTTOM
PLATE OF WALL
1.000" CLEARANCE
ALL AROUND DUCT
ATTACH TO TOP
PLATE OF WALL
ALL AROUND DUCT
MIS-3982 A
THIS STRUCTURAL MEMBER
LOCATED TO MATCH STUD
SPACING FOR REST OF WALL.
A SECOND MEMBER MAY BE
REQUIRED FOR SOME WALLS.
SUPPY DUCT
OPENING
RETURN DUCT
OPENING
See Figure 14 Mounting Instructions
WALL BEFORE
CONCRETE BLOCK WALL INSTALLATION
OPENING
RETURN AIR
WALL STRUCTURE
INSTALLING UNIT.
OPENING
WOOD OR STEEL SIDING
MOUNT ON UNIT
BOTTOM MOUNTING
WOOD FRAME WALL INSTALLATION
BRACKET. MOUNT ON
BEFORE INSTALLATION
SIDE VIEW
FACTORY SUPPLIED
RAIN FLASHING.
SUPPLY AIR
MIS-3981 A
FIGURE 18
Common Wall Mounting Installations
FLASHING
RECOMMEND WALL SLEEVE
WALL
RAIN
SUPPLY DUCT MAYBE LOCATED IN AN ATTIC
SUPPLY AIR DUCT
FINISHED CEILING
RAFTERS
WALL
OPENING WITH
CEILING SURFACE
OUTSIDE
WALLWALL
WALL SLEEVE
SUPPLY DUCT MAY BE LOCATED IN AN ATTIC
FINISHED CEILING SURFACE
RAIN
CLOSET WALL
FINISHED CEILING SURFACE
RAIN
RECOMMEND WALL SLEEVE
RAFTERS
GRILLE
FLASHING
OR BELOW CEILING RAFTERS AS SHOWN
OR BELOW CEILING RAFTERS AS SHOWN
FLASHING
OUTSIDE
SURFACE
RAIN
FLASHING
SLEEVE
FINISHED
SUPPLY DUCT MAYBE LOCATED IN AN ATTIC
GRILLE
OUTSIDE
OR BELOW CEILING RAFTERS AS SHOWN
SUPPLY AIR DUCT
RAFTERS
RETURN AIR
RETURN AIR
RETURN AIR
OPENING WITH
GRILLE
FALSE WALL
SUPPLY AIR DUCT
OPENING WITH GRILLE
FALSE WALL INSTALLATION
CLOSET INSTALLATION
DUCTED SUPPLY
RETURN AT UNIT
FREE AIR
NO DUCT
MIS-4043 A
RAISED FLOOR
RETURN AIR
RETURN AIR
GRILLE
SUPPLY AIR
GRILLE
SUPPLY AIR DUCT
LOWERD
CEILING
OUTSIDE
WALL
RAFTERS
RETURN AIR
SPACE
Wiring – Main Power field wiring used must be sized to carry that amount of current. Depending on the installed KW of electric heat, there may be two field power circuits required. If this is the case, the unit serial plate will so indicate.
All models are suitable only for connection with copper wire. Each unit and/or wiring diagram will be marked
“Use Copper Conductors Only”. These instructions must be adhered to. Refer to the National Electrical
Code (NEC) for complete current carrying capacity data on the various insulation grades of wiring material. All wiring must conform to NEC and all local codes.
The electrical data on the serial plate, in the unit specifications and also in Table 12 on page 32 list fuse and wire sizes (75°C copper) for all models including the most commonly used heater sizes. Also shown are the number of field power circuits required for the various models with heaters. The unit rating plate lists a “Maximum Time Delay Relay Fuse” or circuit breaker that is to be used with the equipment. The correct type and size must be used for proper circuit protection and also to ensure that there will be no nuisance tripping due to the momentary high starting current of the compressor motor.
Three phase models must have proper phasing. A phase monitor is included in all three phase models, and will indicate improper phasing during a call for cooling
(24VAC at Y1 terminal). See provided information included in this document regarding the phase monitor.
High Voltage Connections
Route field wires under the field wire shield shown in
Figure 19. (The field wire shield can be removed for
WIRE SHIELD
FIELD HIGH OR LOW
VOLTAGE WIRE SHIELD
FRONT VIEW
FIGURE 19
High Voltage Connections
USE CONDUIT
WHEN FIELD WIRES
COME IN THROUGH
THE BACK
RIGHT SIDE VIEW
MIS-4044
Electrical shock hazard.
Do not operate this equipment without an earth ground attached and always disconnect the remote electric power supplies before servicing.
Electrical shock can result in serious injury or death.
! WARNI NG
Main electrical power must be supplied to the unit from a clean, reliable power source. Verify voltage being supplied to the unit is consistent during all times of the day and within the range specified for the unit in the unit specifications and on the unit serial plate. Voltage must be measured at the field power connection point in the unit and while the unit is operating at full load
(maximum amperage operating condition).
NOTE: In applications where a field-supplied transformer is used to step down a higher incoming voltage, the center leg must be grounded when high resistance grounding is used.
Refer to the unit serial plate and unit specifications for wire sizing information and maximum fuse or circuit breaker size. Each outdoor unit is marked with a “Minimum Circuit Ampacity”. This means that the wire installation.) If field power is supplied to the left side of the unit, run the high voltage wires under the shield and to the right of the wire shield next to the compressor contactor and up into the upper control panel where the connections are made. If field power is supplied to the right of side of the unit, the low voltage wires can be run under the field wire shield to access the low voltage terminal strip.
When field wires are supplied through the back of the unit, flexible conduit must be extended through the back of the unit and terminate into the knock-outs on the upper control panel (see Figure 19).
Wiring – Low Voltage
All 230/208V 1 phase and 3 phase equipment have dual primary voltage transformers. All equipment leaves the factory wired on 240V tap. For 208V operation, reconnect from 240V to 208V tap. The acceptable operating voltage range for the 240 and 208V taps are:
Tap: 240 Range: 253 – 216
Tap: 208 Range: 220 – 187
NOTE: The voltage should be measured at the field power connection point in the unit and while the unit is operating at full load (maximum amperage operating condition).
For low voltage wiring, an 18 gauge copper, color-coded cable is recommended. See Table 8 on page 20 for more information.
Low Voltage (24VAC) Connections
These units use a 24-volt AC low voltage circuit.
C terminal is the 24VAC common and is grounded.
G terminal is the indoor blower input.
Y1 terminal is the 1st Stage input for cooling.
Y2 terminal is the 2nd Stage compressor input for cooling (if equipped with an economizer) or Y2 disables
Balanced Climate mode if the Y1-Y2 jumper is removed
(see page 24).
B/W1 terminal is the 1st stage electric heat.
W2 terminal is the 2nd stage heat (if equipped).
A terminal is the ventilation input. This terminal energizes any factory-installed ventilation option and indoor blower.
D terminal is the dehumidification input. If installed, this terminal energizes any factory-installed dehumidification option.
L terminal is 24 volt alarm active output.
For units equipped with an alarm relay:
1 terminal is the normally closed contact on the relay.
2 terminal is the normally open contact on the relay.
3 terminal is the common contact on the relay.
See Table 3 for additional low voltage connections on auxiliary terminal strip.
Unit Shutdown Feature (Standard on All Models)
The RT terminal is the 24VAC transformer output, and the R terminal is the 24VAC hot terminal for the operation of the equipment. RT and R are connected with a brass jumper bar which can be removed and RT and R connected to an external NC (normally closed) contact such as a fire/smoke detector that will cause shutdown of the equipment upon activation.
Balanced Climate™ Feature (Standard on All Models)
All units are equipped with the capability of running in Balanced Climate mode. This mode is designed to enhance the comfort level by reducing the indoor airflow amount and extending the run time to help extract more humidity during cooling operation. The Y1 terminal is the 24VAC input for Balanced Climate compressor cooling operation. The Y2 terminal is the 24VAC input for compressor cooling standard operation. Y1 and Y2 are connected with a brass jumper bar which can be removed to enable Balanced Climate mode. Units with an economizer will not have the brass jumper installed.
Refer to vent manuals for instructions on how Balanced
Climate works with each vent.
NOTE: Units with mechanical dehumidification require an additional connection to be made when enabling Balanced Climate. Refer to dehumidification supplemental instructions for this step.
To operate in Balanced Climate mode, a 2-stage cooling thermostat is required. The lower indoor airflow operation is overridden by utilizing a 2-stage thermostat. If the call for cooling is not satisfied within a given time frame or temperature differential
(specified by the thermostat), the thermostat will send a signal to Y2 which then increases the blower speed
TABLE 3
Additional Low Voltage Connections (if applicable)
Terminal Unit Description
V Control
Option Only
Discharge Air Sensor, 10K Ohm
V Control
Option Only
Discharge Air Sensor, 10K Ohm
F, V Control
Options
Filter Switch, Normally Open Contact
F, V Control
Options
Filter Switch, Normally Open Contact
V Control
Option Only
Blower Airflow Switch, Normally Open Contact
V Control
Option Only
Blower Airflow Switch, Normally Open Contact
V Control
Option Only
Compressor Current Sensor, Normally Open Contact
V Control
Option Only
Compressor Current Sensor, Normally Open Contact back to the selected speed. See pages 33 – 35 for blower speed selection options.
Refer to page 24 for additional Balanced Climate requirements and limitations.
Dehumidification Feature (Optional)
The D terminal is the 24VAC input for dehumidification operation on dehumidification hot gas reheat equipped units. When 24VAC is applied to the D terminal, a
3-way valve solenoid is energized. The reheat coil located behind the evaporator coil is then active to reheat the supply air during cooling mode. This allows humidity to be removed from the air entering the unit without a large amount of sensible cooling capacity.
During dehumidification, the indoor blower speed is reduced to help with the humidity removal. A humidity sensing thermostat or humidistat is required to control dehumidification operation.
Ventilation Features (Optional)
See ventilation instructions provided with unit for low voltage wiring.
Low Ambient Control (LAC)
The low ambient control is a pressure switch that is attached to the liquid line of the system and monitors high side pressure. Operation of the LAC occurs as outdoor temperatures drop below 60°F. LAC operation cycles the condenser fan on/off based on pressure changes caused by outdoor temperature changes.
Outdoor Temperature Switch and Freeze Protection
Thermostat
An outdoor temperature switch and an evaporator freeze protection thermostat is supplied with all units that have a low ambient control. The outdoor switch disables Balanced Climate mode (if enabled) when the temperature drops below 50°F. This prevents potential evaporator coil freeze up issues. For units with mechanical dehumidification, this switch must remain disconnected when Balanced Climate mode is not being used. Refer to unit wiring diagram. The freeze thermostat cuts out compressor operation if the evaporator begins to freeze up.
Alarm Relay Feature (Controls Option)
The alarm relay provides a set of NO (normally open) and NC (normally closed) pilot duty contacts that operate when the compressor control module locks out compressor operation because of a high or low system refrigerant pressure event.
DDC Controls Feature (Controls Option)
The DDC controls option provides additional sensors that can be used with a field-supplied advanced logic controller. The DDC controls option contains the following installed components:
Dirty Filter Switch Indicator (DFS)
The switch is adjustable and measures pressure drop across the unit filter surface. When pressure drop is higher than the switch setting, NO contacts are provided to indicate the filter needs to be serviced.
Refer to page 34 for instructions on making switch adjustments.
Discharge Air Sensor
The discharge air sensor provides a temperature reading of the supply air leaving the unit. The sensor is a 10K OHM @ 77°F measuring device. It is installed in the supply airstream in the heater bracket.
Airflow Switch
The airflow switch measures the pressure differential between the blower inlet and outlet. It is located directly above the blower partition. Relay contacts (NO) are provided for the DDC controls option that indicates the indoor blower assembly needs to be serviced.
Compressor Current Sensor
The compressor current sensor indicates when the compressor is operational by measuring amp draw. It is located inside the unit control panel. Relay contacts
(NO) are provided to indicate the compressor is not operating.
See Table 4 for low voltage connections for DDC control.
Standard Units Units w/
Economizers
Fan Only Energize G Energize G
1st Stage
Cooling Mode/
Balanced Climate
Energize Y1, G Energize Y1, G
2nd Stage
Cooling Mode
Energize Y2 to overide Balanced
Climate mode when Y1-Y2 jumper is removed
Energize Y1, Y2, G
1st Stage Heating Energize B/W1 Energize B/W1
2nd Stage Heating (if employed) Energize B/W1, W2 Energize B/W1, W2
Ventilation Energize A Energize A
Dehumidification (if employed) Energize D Energize D
TABLE 4
Low Voltage Connections for DDC Control
TABLE 6
Humidity Controls
Part Number Predominate Features
8403-038
(H600A1014)
SPDT switching, pilot duty 50VA @ 24V;
Humidity range 20-80% RH
8403-047
(H200-10-21-10)
Electronic dehumidstat SPST closes-on-rise; Humidity range 10-90% with adjustable stops
TABLE 7
CO2 Controllers
Part Number Predominate Features
8403-096
Normally Open SPST relay closes-on-rise
24V dual wave length sensor. Default setting
950ppm, adjustable to 0-2000ppm
Default off setting 1000ppm, adjustable to
0-200 ppm can be calibrated
TABLE 8
Thermostat Wire Size
Transformer
VA
FLA Wire Gauge
Maximum
Distance
In Feet
55 2.3
18 gauge
16 gauge
14 gauge
12 gauge
TABLE 5
Wall Thermostats
Part Number Predominate Features
8403-060
(1120-445)
3 stage Cool; 3 stage Heat; Electronic Programmable/Non-Programmable; HP or Conventional; Auto or Manual changeover; Dehumidification Output
8403-089
(T4 Pro)
1 stage Cool, 1 stage Heat – Heat Pump; 1 stage Cool, 1 stage Heat – Conventional; Programmable/Non-
Programmable Electronic; Auto or Manual changeover
8403-090
(T6 Pro)
2 stage…