This bid document pertains to the Jasper County Dixie Resource Center GLO CDBG Regional Mitigation Infrastructure Project (GLO Contract No. 24-065-033-E488) in Texas. The project involves construction of a 3,175 square foot pre-engineered metal building designed to serve as a community resource center. The facility will include a community resource room, kitchen, restrooms, and various other operational spaces, constructed as slab-on-grade wood frame construction. The scope of work encompasses mechanical, electrical, plumbing, and site work/paving. The bid documents establish the formal requirements for contractors to submit proposals for this construction project, including detailed specifications, technical requirements, and submission procedures necessary for competitive bidding.

The project is funded through GLO CDBG (Community Development Block Grant) Regional Mitigation Infrastructure funding. Interested bidders must review all technical specifications, site conditions, and project requirements outlined in the bid documents to prepare accurate and compliant proposals. The documents establish the baseline for contractor qualification, pricing submissions, and project delivery expectations for this regional infrastructure improvement initiative in Jasper County, Texas.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS

AND

TECHNICAL SPECIFICATIONS

FOR

JASPER COUNTY

ON

GLO CDBG REGIONAL MITIGATION

INFRASTRUCTURE PROJECT

DIXIE COMMUNITY RESOURCE CENTER

GLO CONTRACT NO. 24-065-033-E488

JUNE 2025

GLS No. 234106

1609 S CHESTNUT • SUITE 202 • LUFKIN, TEXAS • 75901

(936) 637-4900 • FAX (936) 637-6330 • hhhenderson@glstexas.com

TBPE FIRM REGISTRATION #413

PROJECT MANUAL FOR:

DIXIE RESOURCE CENTER

GLS No. 234106

OWNER:

Jasper County 121 N. Austin St.

Jasper, TX 75951

(409) 384-2612

ARCHITECT/ENGINEER/

INTERIOR DESIGNER:

GLS

1609 South Chestnut, Ste. 202 Lufkin, Texas 75901

(936) 637-4900 TBPE Firm Registration No. 413

CONSTRUCTION MANAGER:

INTERIOR DESIGNER ARCHITECT

STRUCTURAL ENGINEER CIVIL ENGINEER

ELECTRICAL ENGINEER

MECHANICAL &

PLUMBING ENGINEER

C C 02/28/2025

03/03/2025

02/28/2025

02/28/2025

03/03/2025

MECHHANICAL &

03/13/2025

234106 Page 1 TABLE OF CONTENTS

GLO CDBG MITIGATION INFRASTRUCTURE PROJECT

DIXIE COMMUNITY RESOURCE CENTER

GLO CONTRACT NO. 24-065-033-E488

TABLE OF CONTENTS

No. Pages TITLE

1 ADVERTISEMENT AND INVITATION FOR BIDS

4 INSTRUCTIONS TO BIDDERS

2 BID FOR UNIT PRICE OR LUMP SUM CONTRACTS

1 BID SUMMARY

5 BID SCHEDULE

2 BID BOND

3 STATEMENT OF BIDDER’S QUALIFICATIONS

1 SAMPLE ATTORNEY’S REVIEW CERTIFICATION

2 CONTRACT (GLO)

1 NOTICE OF AWARD

1 NOTICE TO PROCEED

2 PERFORMANCE AND PAYMENT BOND (OR BONDS) / BONDING

REQUIREMENTS

2 PERFORMANCE BOND

2 PAYMENT BOND

1 CERTIFICATE OF INSURANCE

6 WORKER’S COMPENSATION REQUIREMENTS

30 GENERAL CONTRACT CONDITIONS FOR CONSTRUCTION

5 FEDERAL PREVAILING WAGE RATE DETERMINATION

10 FEDERAL LABOR STANDARDS PROVISIONS (HUD-4010)

6 TITLE 29

1 SECTION 3 CLAUSE

1 NON-COLLUSION AFFIDAVIT OF PRIME BIDDER

2 CONTRACTOR’S CERTIFICATION CONCERNING LABOR STANDARDS

AND PREVAILING WAGE REQUIREMENTS

1 CONTRACTOR CERTIFICATIONS – CERTIFICATION OF CONTRACTOR

REGARDING CIVIL RIGHTS LAWS AND REGULATIONS

1 CERTIFICATION REGARDING SECTION 3 & SEGREGATED FACILITIES OF

SUBCONTRACTOR

234106 Page 2 TABLE OF CONTENTS

No. Pages TITLE

3 LOCAL OPPURTUNITY PLAN WITH TABLES A & B

1 CERTIFICATION REGARDING LOBBYING

5 COUNTY OF JASPER, TEXAS SECTION 3 PLAN

1 SAMPLE SECTION 3 POLICY

2 EEO GUIDELINES WITH QUESTIONS AND ANSWERS

2 MINORITY & FEMALE GOALS

1 CONTRACTOR’S CERTIFICATE OF RECOVERED MATERIAL

AKNOWLEDGEMENT

9 EXHIBIT J, HUD COMPLAIN REGISTER

2 EXIBIT A, SECTION 3 RESIDENT EMPLOYMENT OPPORTUNITY DATA

1 CERTIFICATION FOR BUSINESS WITH INCOME LIMITS

4 EXHIBIT L – POSTING JOB VACANCIES WITH ATTACHMENTS

1 NEW EMPLOYEE INFORMATON FORM

1 SECTION 3 RESIDENT SELF-CERTIFICATION

1 EXHIBIT C – CONTRACTORS CERTIFICATIONS OF EFFORTS TO FULLY

COMPLY

2 EXHIBIT D – EXAMPLES OF EFFORTS

1 PROJECT SIGN WORDING

2 CONFLICT OF INTEREST QUESTIONNAIRE

EXHIBIT A (PROVISIONS) MINORITY BUSINESS OPPORTUNITIES,

DOMESTIC PREFERENCE-RECOVERED MATERIALS/SOLID WASTE

DISPOSAL

1 SECTION 3 SERVICE AREA MAP

1 SECTION 3 EMPLOYER CERTIFICATION FORM (A-1022)

1 SECTION 3 CERTIFICATION AS BUSINESS CONCERN (A-1023)

4 GENERAL SPECIFICATIONS – SPECIAL CONDITIONS – PART III

2 GENERAL SPECIFICATIONS – SCHEDULE OF DRAWINGS

3 SPECIAL CONDITIONS

1 PROJECT SIGN

2 CONTRACT CHANGE ORDER

TECHNICAL SPECIFICATIONS

234106 Page 1 ADVERTISEMENT AND

INVITATION TO BID

ADVERTISEMENT AND INVITATION FOR BIDS

The County of Jasper Texas will receive bids for the Jasper County GLO CDBG Regional Mitigation Infrastructure Project Dixie Resource Center GLO Project No. 24-065-033-E488 until 2:00 PM on July 30, 2026 at the Jasper County Judge’s office located at 121 North Austin St. Room #106, Jasper, Texas 75951. The bids will be publicly opened and read aloud at this time.

Bids are invited for several items and quantities of work as follows:

A 3,175 square foot pre-engineered metal building to include a community resource room, kitchen, restrooms, and various other spaces. The building is slab on grade, wood frame construction.

Mechanical, electrical, plumbing, and site work/paving are included in the scope of work.

Bid/Contract Documents, including Drawings and Technical Specifications are on file and may be reviewed at GLS, 1609 S. Chestnut, Suite 202, Lufkin, Texas 75901 (936) 637-4900.

Bid/Contract Documents may be viewed and downloaded free of charge (with the option to purchase hard copies) at civcast.com.

A bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid.

A certified check or bank draft payable to Jasper County or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. Cash currency is not acceptable as bid surety and is not to be submitted in lieu of the Bid Bond.

Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Granting Agency, Texas General Land Office (GLO) and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex age or national origin.

Funding for this project is covered under Section 3 of the Housing and Urban Development Act of 1968. All eligible bidders must comply with Section 3 requirements in regards to meeting or exceeding the required objectives for both hiring and subcontracting. In accordance with these objectives, contractors are required to direct their newly created employment and/or subcontracting opportunities to Section 3 Residents and Business Concerns.

Jasper County reserves the right to reject any or all bids or to waive any informalities in the bidding.

Bids may be held by Jasper County for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder’s qualifications prior to the contract award.

All Contractors/Subcontractors that are disbarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project. All Contractors/Subcontractors whose ‘System for Award Management (SAM.gov) registration is not active may not undertake any activity in part or in full under this project. Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, and labor surplus area firms are encouraged to submit bids.

Jasper County Mark Allen, County Judge July 1, 2026 (Locality) (Contracting Officer) (Date)

234106 Page 1 of 4 INSTRUCTIONS TO BIDDERS

INSTRUCTION TO BIDDERS

FOR CONSTRUCTION

1. Use of Separate Bid Forms

These contract documents include a complete set of bid and contract forms which are for the convenience of the bidders and are not to be detached from the contract document, completed or executed. Separate bid forms are provided for your use.

2. Interpretations or Addenda

No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than seven (7) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than five

(5) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders.

3. Inspection of Site

Each bidder should visit the site of the proposed work and should become acquainted with the existing conditions and facilities, the difficulties and restrictions pertaining the performance of the contract. The bidder should thoroughly examine and become familiar with the drawings, technical specifications and all other contract documents. The contractor by the execution of the contract shall in no way be relieved of any obligation under it due to failure to receive or examine any form or legal document or to visit the site or the conditions there existing. The Owner will be justified in rejecting any claim based on lack of inspection of the site prior to the bid.

4. Alternate bid items

No alternate bids or bid items will be considered unless they are specifically requested by the technical specifications.

5. Bids

a. All bids must be submitted on the forms provided and are subject to all requirements of the Contract Documents, including the Drawings.

b. All bids must be regular in every respect and no interlineation, excisions or special conditions may be made or included by the bidder.

c. Bid documents, including the Bid Form, Bid Summary, Bid Schedule, Bid Bond, Certification of Efforts to Fully Comply with Section 3, and the Statement of Bidders' Qualifications shall be sealed in an envelope and clearly labeled with the words "Bid Documents", the project number, name of bidder and the date and time of bid opening.

d. The locality may consider as irregular any bid on which there is an alteration of or departure from the bid form and, at its option, may reject any irregular bid.

234106 Page 2 of 4 INSTRUCTIONS TO BIDDERS

e. If a contract is awarded, it will be awarded to a responsible bidder on the basis of the lowest/best bid and the selected alternate bid items, if any. The contract will require the completion of the work in accordance with the contract documents.

6. Bid Modifications Prior to Bid Opening

a. Any bidder may modify its bid in writing at any time prior to the scheduled closing time for receipt of bids, provided such modification is received by the locality prior to the closing time. The modification should not reveal the bid price but should provide the addition, subtractions or other modifications so that the final prices or terms will not be known by the locality until the sealed bid is open.

b. Likewise, any bidder may modify a bid by submitting a supplemental bid in person prior to the scheduled closing time for receipt of bids. Such supplemental bid should mention only additions or subtractions to the original bid so as to not reveal the final prices or terms to the locality until the sealed bid is open.

7. Bid Bond

a. A bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the locality or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

b. The bid bond or its comparable, will be returned to the bidder as soon as practical after the opening of the bids.

8. Statement of Bidders Qualifications

Each bidder shall submit on the form furnished for that purpose a statement of the bidder's qualifications. The Grant Recipient shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform his obligations under the contract, and the bidder shall furnish the Grant Recipient all such information and data for this purpose as it may request. The right is reserved to reject any bid where an investigation of the available data does not satisfy the Grant Recipient that the bidder is qualified to carry out properly the terms of the contract.

10. Unit Price

The unit price for each of the several items in the bid shall include its pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the total bid. Any bid not conforming to this requirement may be rejected as informal. Special attention is drawn to this condition, as the unit prices will be used to determine the amount of any change orders resulting from an increase or decrease in quantities.

11. Corrections:

Erasures or other corrections in the bid must be noted over the signature of the bidder.

12. Time for Receiving Bids

Bids received prior to the advertised hour of opening shall be kept securely sealed. The officer appointed to open the bids shall decide when the specified time has arrived and no

234106 Page 3 of 4 INSTRUCTIONS TO BIDDERS bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the Grant Recipient that the late arrival of the bid was solely due to delay in the mail for which the bidder was not responsible, such bid will be received and considered.

13. Opening of Bids

The locality shall, at the time and place fixed for the opening of bids, open each bid and publicly read it aloud, irrespective of any irregularities therein. Bidders and other interested individuals may be present.

14. Withdrawal of Bids

Bidder may withdraw the bid before the time fixed for the opening of bids, by communicating his purpose in writing to the Grant Recipient. Upon receipt of such notice, the unopened bid will be returned to the bidder. The bid guaranty of any bidder withdrawing his bid will be returned promptly.

15. Award of Contract/Rejection of Bids

a. The contract will be awarded to the responsive, responsible Bidder submitting the lowest/best bid. The bidder selected will be notified at the earliest possible date. The locality reserves the right to reject any or all bids and to waive any informality in bids received where such rejection or waiver is in its interest.

b. The Grant Recipient reserves the right to consider as unqualified to do the work any bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this contract.

16. Execution of Agreement/Performance and Payment Bonds

a. Performance and Payment Bonds, requires all prime contractors which enter into a formal contract in excess of $25,000 with the State, any department, board, agency, municipality, county, school district or any division or subdivision thereof, to obtain a Payment Bond in the amount of the contract before commencing with work and a performance bond for public works contracts in excess of $100,000.

b. The failure of the successful bidder to execute the agreement and supply the required bonds within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the locality may grant, shall constitute a default and the locality may, at its option either award the contract to the next lowest responsible bidder, or re-advertise for bids. In either case, the locality may charge against the bidder the difference between the amount of the bid, and the amount for which a contract is subsequently executed irrespective of whether this difference exceeds the amount of the bid bond. If a more favorable bid is received through re-advertisement, the defaulting bidder shall have no claim against the locality for a refund.

234106 Page 4 of 4 INSTRUCTIONS TO BIDDERS

17. Wages and Salaries

Attention is particularly called to the requirement of paying not less than the prevailing Davis Bacon Related Acts (DBRA) wage rates specified in the Contract Documents. These rates are minimums to be paid during the life of the contract. It is therefore the responsibility of the Bidder to inform themselves as to local labor conditions.

18. Section 3

Attention is called to the Required Section 3 contracting and hiring objectives specified in the Contract Documents. These minimum objectives for hiring and contracting must be enforced. It is therefore the responsibility of the Bidder to inform themselves as to these requirements.

19. Equal Employment Opportunity

Attention is called to the requirements for ensuring that employees and applicants for employment are not discriminated against because of their race, color, creed, sex, or national origin.

20. Restrictions for Lobbying

No Federal or non-federal funds have been paid or will be paid by or on behalf of the Contractor to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, grant, loan or cooperative agreement. The Contractor agrees to provide a “Certification Regarding Lobbying” and if applicable, a “Disclosure of Lobbying Activities” form regarding the use of any nonfederal funds for lobbying. The Contractor further agrees that he shall require each subcontractor he employs in the course of this work be subject to the Certificate and Disclosure provision of this part.

234106 Page 1 of 2 BID FOR UNIT PRICE OR LUMP SUM CONTRACTS

BID FOR UNIT PRICE OR LUMP SUM CONTRACTS

Place Jasper County Date Project No. GLO No. 24-065-033-E488

Proposal of (hereinafter called Bidder) a corporation, organized and existing under the laws of the State of Texas/a partnership/an individual doing business as

(cross out non-applicable references).

To JASPER COUNTY (hereinafter called Owner).

To Whom it May Concern:

The Bidder, in compliance with your invitation for bids for the construction of a Jasper County GLO CDBG Regional Mitigation Infrastructure Project Dixie Resource Center GLO Project No. 24-065-033-E488, having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the contract documents, within the time set forth therein, and at the prices stated below.

These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this proposal is a part.

Bidder hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within consecutive calendar days (Bidder to Circle Applicable Package(s)) thereafter as stipulated in the specifications. Bidder further agrees to pay as liquidated damages, the sum of $ for each consecutive calendar day thereafter as hereinafter provided in the General Conditions.

Bidder acknowledges receipt of the following addenda:

Bidder agrees to perform all the Jasper County GLO CDBG Regional Mitigation Infrastructure Project Dixie Resource Center GLO Project No. 24-065-033-E488 work described in the specifications and shown on the plans, for the prices as bid in the BID SCHEDULE/SECTION 00320.

(Amounts are to be shown in both words and figures. In case of discrepancy between words and figures, the amount shown in words will govern. In case of discrepancy between written amount and correct product of quantity and unit price, the correct product will govern. In case of discrepancy between the written sum and correct sum, the correct sum will govern)

The prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.

Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.

The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 days after the scheduled closing time for receiving bids.

Upon receipt of written notice of the acceptance of this bid, Bidder will execute the formal contract attached within 10 days and deliver a Surety Bond or Bonds as required under the GENERAL CONDITIONS.

The bid security attached in the sum of ($ ) is to become the property of the Owner in the event the contract and bond are not executed with in

234106 Page 2 of 2 BID FOR UNIT PRICE OR LUMP SUM CONTRACTS the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.

Respectfully submitted, By

(SEAL - if bid is by a corporation) Title Address

234106 BID SUMMARY

SECTION 00315

BID SUMMARY

OWNER: City of Jasper ENGINEER: GLS

121 N. Austin, Room 106 1609 South Chestnut, Suite 202 Jasper, Texas 75951 Lufkin, Texas 75901

(409) 384-2612 (936) 637-4900

PROJECT: Jasper County GLO CDBG Mitigation Infrastructure Project Dixie Resource Center

GLO Contract No. 24-065-033-E488

BASE BID – JASPER COUNTY DIXIE RESOURCE CENTER PROJECT IN WORDS

_________________________________________________ DOLLARS ($______________________)

Alternate No. 1 ECS1 (Add / Deduct) $ ___________________

Add Days _________________________

IN WORDS ________________________________________________________________________

Alternate No. 2 R Panel (Add / Deduct) $ ____________________

Alternate No. 3 Walk-In Cooler (Add / Deduct) $ ____________________

Note: Circle either Add or Deduct.

BIDDER:

SIGNED:

ADDRESS: BY:

TITLE:

DATE:

TELEPHONE

NO: ( ) - ATTEST:

SECTION 00415

BID SCHEDULE

Item Description Total

1 Contractor Fee $

2 Contractor General Conditions $

1 Temporary project signage, including related items and appurtenances, complete in place $

2 Permanent project signage, including related items and appurtenances, complete in place $

3 Cut and/or fill existing site as required by the grading plan and in accordance with geotech report, including related items and appurtenances, complete in place $

4 Site concrete paving, including related items and appurtenances, complete in place $

5 Site flexible paving, including related items and appurtenances, complete in place $

6 Site utilities, including related items and appurtenances, complete in place $

7 Traffic control, including related items and appurtenances, complete in place $

8 Testing Services

1 Concrete foundation construction , including related items and appurtenances, complete in place. $

1 All brick masonry, including related items and appurtenances, complete in place $

1 Miscellaneous metals, including related items and appurtenances, complete in place $

TOTAL

DIVISION 5 - METALS

TOTAL

BASE BID

DIVISION 4 - MASONRY

TOTAL

DIVISION 1 - GENERAL ITEMS

DIVISION 2 - SITE CONSTRUCTION & EARTHWORK

TOTAL

TOTAL

DIVISION 3 - CONCRETE

234106 00415-1 BID SCHEDULE

1 Rough Carpentry, including related items and appurtenances, complete in place $

2 Finish Carpentry, including related items and appurtenances, complete in place $

3 Millwork, countertops and Shelving, including related items and appurtenances, complete in place $

4 Fiberglass reinforced panels, including related items and appurtenances, complete in place

2 Spray insulation, including related items and appurtenances, complete in place $

3 Waterproofing and Sealants, including related items and appurtenances, complete in place $

5 Flashing and sheet metal, including related items and appurtenances, complete in place $

6 Sealants and caulking, including related items and appurtenances, complete in place $

1 Interior doors, including related items and appurtenances, complete in place $

2 Exterior doors, including related items and appurtenances, complete in place $

3 Aluminum windows & storefronts, including related items and appurtenances, complete in place $

4 Rolling service door, including related items and appurtenances, complete in place $

TOTAL

TOTAL

DIVISION 6 - WOOD AND PLASTICS

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

DIVISION 8 - DOORS AND WINDOWS

TOTAL

234106 00415-2 BID SCHEDULE

1 Acoustical suspended ceiling, including related items and appetences, complete in place

2 Painting, including related items and appurtenances, complete in place $

3 Gyp board assemblies, including related items and appurtenances, complete in place $

4 Ceramic tile, including related items and appurtenances, complete in place $

5 Resilient accessories, including related items and appurtenances, complete in place

6 Finish hardware, including related items and appurtenances, complete in place $

1 Toilet accessories, including related items and appurtenances, complete in place $

2 Install extinguisher cabinet and extinguisher in accordance with plans, include related items and appurtenances, complete in place $

3 Install identifying devices in accordance with plans, include related items and appurtenances, complete in place $

4 Corner guards, including related items and appurtenances, complete in place $

5 Exterior sign, including related items and appurtenances, complete in place $

6 Aluminum Architectural Canopy, including related items and appurtenances, complete in place

7 Finish hardware, including related items and appurtenances, complete in place

1 Restroom Accessories, including related items and appurtenances, complete in place $

2 Appliances, including related items and appurtenances, complete in place

1 Louver blinds, including related items and appurtenances, complete in place $

DIVISION 11 - EQUIPMENT

TOTAL

DIVISION 9 - FINISHES

TOTAL

DIVISION 10 SPECIALTIES

TOTAL

DIVISION 12 - FURNISHINGS

TOTAL

234106 00415-3 BID SCHEDULE

1 Pre-engineered metal building, including related items and appurtenances, complete in place $

1 NOT APPLICABLE $

1 Rough Plumbing, Plumbing Topout and Plumbing trim, including related items and appurtenances, complete in place $

2 Heating, Venting and Air conditioning, including related items and appurtenances, complete in place $

3 Site Sewer Services, including related items and appurtenances, complete in place

1 Electrical Entrance, Rough Electrical, Lighting and Electrical trim, including related items and appurtenances, complete in place $

2 Data installation including related items and appurtenances, complete in place $

3 Phone system installation, including related items and appurtenances, complete in place $

4 Emergency generator, including related items and appurtenances, complete in place $

5 Electrical Connection to Provider Services between existing service and owner meter

1 Provide ECS1 in lieu of PFC1 $

2 Provide cost savings to provide a R-panel profile in lieu of the specified standing seam architectural roof. $

3 Provide walk-in cooler in Hallway 110, RE: project specification 11 40 00

Alternates:

TOTAL

DIVISION 14 - CONVEYING SYSTEMS

TOTAL

DIVISION 15 - PLUMBING & MECHANICAL

TOTAL

DIVISION 16 - ELECTRICAL

TOTAL

TOTAL BASE BID

TOTAL

TOTAL BASE BID and ALTERNATES

DIVISION 13 - SPECIAL CONSTRUCTION

234106 00415-4 BID SCHEDULE

234106 Page 1 of 2 BID BOND

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we the undersigned, as PRINCIPAL, and , as SURETY are held and firmly bound unto Jasper County hereinafter called the "Local Public Agency”, in the penal sum of

Dollars, ($ ), lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the

Accompanying Bid, dated , for

NOW, THEREFORE, the Principal shall not withdraw said Bid within the period specified therein after the opening of the same, or, if no period be specified, within thirty (30) days after the said opening, and shall within the period specified therefor, or if no period be specified, within ten (10) days after the prescribed forms are presented to him for signature, enter into a written contract with the Local Public

Agency in accordance with the Bid as accepted, and give bond with good and sufficient surety or sureties, as may be required, for the faithful performance and proper fulfillment of such contract; or in the event of the withdrawal of said Bid within the period specified, or the failure to enter into such

Contract and give such bond within the time specified, if the Principal shall pay the Local Public Agency the difference between the amount specified in said Bid and the amount for which the local Public

Agency may procure the required work or supplies or both, if the latter be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue.

IN WITNESS THEREOF, the above parties have executed this instrument this day of

, the name and corporate seal of each corporate party being hereto affixed and these present signed by its undersigned representative, pursuant to authority of its governing body.

(SEAL)

(SEAL)

Attest: By:

Affix Corporate

Seal

234106 Page 2 of 2 BID BOND

Affix

Countersigned

* Attorney-in-Fact, State of

CERTIFICATE AS TO CORPORATE PRINCIPAL

, , certify that I am the , , Secretary of the Corporation named as Principal in the within bond; that , who signed the said bond on behalf of the Principal was then of said corporation;

that I know his/her signature, and his/her signature thereto is genuine; and that said bond was duly signed, sealed, and attested to, for and in behalf of said corporation by authority of this governing body.

Corporate Seal

Title:

*Power-of-attorney for person signing for surety company must be attached to bond.

234106 Page - 1 -of 3 STATEMENT OF

BIDDER’S QUALIFICATIONS

STATEMENT OF BIDDER'S QUALIFICATIONS

All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information it desires.

Date: ________________________________

Bidder (Legal Name of Firm):

Date Organized:

Address :

Date Incorporated

Federal ID Number: ____________________________

Number of Years in contracting business under present name

List all other names under which your business has operated in the last 10 years:

Work Presently Under Contract:

Contract Amount $ Completion Date

Type of work performed by your company:

Total Staff employed by Firm (Break down by Managers and Trades on separate sheet):

Have you ever failed to complete any work awarded to you? Yes No (If yes, please attach summary of details on a separate sheet. Include brief explanation of cause and resolution)

Have you ever defaulted on a contract? Yes No (If yes, please attach summary of details on a separate sheet.)

Has your organization had any disbarments or suspensions that have been imposed in the past five years or that was still in effect during the five year period or is still in effect? Yes No

234106 Page - 2 -of 3 STATEMENT OF

(If yes, list and explain; such list must include disbarments and suspensions of officers, principals, partners, members, and employees of your organization.)

List the projects most recently completed by your firm (include project of similar importance):

Project Amount $ Mo/Yr Completed

Major equipment available for this contract:

Are you in compliance with all applicable EEO requirements? Yes No (If no, please attach summary of details on a separate sheet.))

Bank References

Address: __________________________________ Contact Name: _______________

City & State: _____________________Zip: ____________________Phone Number: _______________

Credit available: $

Has the firm or predecessor firm been involved in a bankruptcy or reorganization? Yes No (If yes, please attach summary of details on a separate sheet.)

List on a sheet attached hereto all judgements, claims, arbitration proceedings, or suits pending or outstanding against bidder over the last five (5) years with amount of claim and brief description.

List on a sheet attached hereto all lawsuits or requested arbitration with regard to construction contracts which bidder has initiated within the last five (5) years and brief explanation of claim and outcome.

Attach resume(s) for the principal member(s) of your organization, including the officers as well as the proposed superintendent for the project.

Signed this ______ day of _______________________, 20____.

Signature

Printed Name and Title

Company Name

234106 Page - 3 -of 3 STATEMENT OF

Notary Statement:

______________________________. being duly sworn, says that he/she is the _________Position/Title____________of________________________ (Firm Name), and hereby swears that the answers to the foregoing questions and all statements therein contained are true and correct. He/she hereby authorizes and requests any person, firm, or corporation to furnish any information requested City of _____________________ in verification of the recitals comprising this Statement of Bidder's Qualifications.

Subscribed and sworn before me this _________day of __________, 20____.

Notary Public

Signature

Printed Name

My Commission Expires: _______________, The penalty for making false statements is prescribed in the U. S. Criminal Code, 18 U.S.C. 1001.

234106 SAMPLE ATTORNEY’S REVIEW CERTIFICATION

SAMPLE

ATTORNEY’S REVIEW CERTIFICATION

I, the undersigned, , and the duly authorized and acting legal representative of the, do hereby certify as follows:

I have examined the attached contract(s) and surety bonds and am of the opinion that each of the agreements may be duly executed by the proper parties, acting through their duly authorized representatives; that said representatives have full power and authority to execute said agreement on behalf of the respective parties;

and that the agreements shall constitute valid and legally binding obligations upon the parties executing the same in accordance with terms, conditions and provisions thereof.

Attorney’s

Signature: Date:

Attorney’s

Printed Name:

234106 Page 1 of 2 CONTRACT (GLO)

CONTRACT (GLO)

THIS AGREEMENT MADE THIS ___ day of , 2026 , by and between _ , a corporation organized and existing under the laws of the State of Texas, hereinafter called the "Contractor", and the Jasper County, hereinafter called the "Local Public Agency".

WITNESSETH, that the Contractor and the Local Public Agency for the considerations stated herein mutually agree as follows:

ARTICLE 1. STATEMENT OF WORK

The Contractor shall furnish all supervision, technical personnel, labor, materials, machinery, tools, equipment and services, including utility and transportation services, and perform and complete all work required for the construction of the Improvements embraced in the Project; namely, Jasper County GLO CDBG Regional Mitigation Infrastructure Project Dixie Resource Center GLO Project No. 24-065-033- E488 and required supplemental work for the Jasper County GLO CDBG Regional Mitigation Infrastructure Project Dixie Resource Center GLO Project No. 24-065-033-E488 all in strict accordance with the Contract Documents including all addenda thereto, numbered , dated , all as prepared by GLS, acting and in these Contract documents preparation, referred to as the "Engineer".

ARTICLE 2. THE CONTRACT PRICE

The Local Public Agency will pay the Contractor for the performance of the Contract in current funds, for the total quantities of work performed at the unit prices stipulated in the Bid for the several respective items of work completed subject to additions and deductions as approved by the GLO (Grantor Agency) and the Local Public Agency, and as provided in Section 109 hereof.

ARTICLE 3. CONTRACT

The executed Contract documents shall consist of the following:

a) This Agreement f) General Conditions, Parts I and II

b) Addenda g) Special Conditions

c) Invitation for Bids h) Technical Specifications

d) Instructions to Bidders i) Drawings (as listed in the

e) Signed copy of Bid Schedule of Drawings)

This Agreement, together with other documents enumerated in this ARTICLE 3, which said other documents are fully a part of the Contract as if hereto attached or herein repeated, forms the Contract between the parties hereto. In the event that any provision in any component part of this Contract conflicts with any provision of any other component part, the provision of the component part first enumerated in this ARTICLE 3 shall govern, except as otherwise specifically stated.

*Strike out inapplicable terms

234106 Page 2 of 2 CONTRACT (GLO)

IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be executed in Four

(4) original copies on the day and year first above written.

By: Mark Allen By:

Title: County Judge Title:

Signed: Signed:

Jasper County 121 N. Austin St.

Jasper, Texas 75951

Attested by:

Attested by:

Title: Title:

Signed: Signed:

CERTIFICATIONS

I, , certify that I am the of the corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor, was then of said corporation, that said Agreement was duly signed for and in behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.

234106 00 51 00-1 NOTICE OF AWARD

SECTION 00 51 00

NOTICE OF AWARD

To: Date:

Project Description: Jasper County GLO CDBG Regional Mitigation Infrastructure Project Dixie Resource Center GLO Project No. 24-065-033-E488

The OWNER has considered the BID submitted by you for the above described WORK in response to its Advertisement for Bids dated , and Information for Bidders.

You are hereby notified that your BID has been accepted for items in the amount of $

You are required by the Information for Bidders to execute the Agreement and furnish the required CONTRACTOR'S Performance BOND, Payment BOND and certificate of insurance within ten (10) calendar days from the date of this Notice to you.

If you fail to execute said Agreement and to furnish said BONDS within ten (10) days from the date of this Notice, said OWNER will be entitled to consider all your rights arising out of the OWNER'S acceptance of your BID as abandoned and as a forfeiture of your BID BOND. The OWNER will be entitled to such other rights as may be granted by law.

You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER.

Dated this day of , 20 .

OWNER: Jasper County BY: Mark Allen TITLE: County Judge

ACCEPTANCE OF NOTICE

Receipt of the above NOTICE OF AWARD is hereby acknowledged by , this the day of , 20 .

BY: TITLE:

234106 00 51 00-2 NOTICE OF AWARD

234106 00 55 00 -- 1 - NOTICE TO PROCEED

SECTION 00 55 00

NOTICE TO PROCEED

To: Date:

Project Description: Jasper County GLO CDBG Regional Mitigation Infrastructure Project Dixie Resource Center GLO Project No. 24-065-033-E488

You are hereby notified to commence WORK in accordance with the Agreement dated

, 20 , on or before , 20 , and you are to complete the WORK within

__________(____) consecutive calendar days thereafter.

The date of completion of all WORK is therefore , 20 .

Executed Contract between the OWNER and CONTRACTOR is dated , 20 .

OWNER: Jasper County BY: Mark Allen TITLE: County Judge

ACCEPTANCE OF NOTICE

Receipt of the above NOTICE TO PROCEED is hereby acknowledged by , this the day of , 20 .

BY: TITLE:

234106

PERFORMANCE AND PAYMENT BOND (OR BONDS)

Following the Contract cover sheets, insert the approved form of the statutory surety bond or bonds to ensure the performance of the Contract and payment of labor and materials. In addition to the corporation signatures of the surety company (ies) on the bond(s), each bond should be countersigned by the surety company’s attorney-in-fact, authorized to act within the State in which the Project is situated.

*NOTE: This Document is provided for sample purposes only. Contracts and agreements have important legal consequences. It is imperative that you consult with your City/County attorney concerning the proper drafting, completion, or modification of such documents.

PERFORMANCE AND PAYMENT BONDING REQUIREMENTS

a) A performance bond on the part of the contractor for 100 percent of the contract price. A performance bond is one executed in connection with a contract in excess of $100,000 to secure fulfillment of all the contractor’s obligations under the contract.

b) A payment bond on the part of the contractor for 100 percent of the contract price.

A payment bond is one executed in connection with a contract in excess of $25,000 to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the contract.

234106 00 61 13.13-1 PERFORMANCE BOND

SECTION 00 61 13.13

PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS: That

(Name of Contractor)

(Address of Contractor) a (Corporation, Partnership, Individual), hereinafter called Principal, and

(Name of Surety)

(Address of Surety)

Hereinafter called Surety, and held and firmly bound unto

(Name of Owner)

(Address of Owner) hereinafter called OWNER in the total aggregate penal sum of

Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER, dated the day of 2025, a copy of which is hereto attached and made a part hereof for the construction of:

234106 00 61 13.13-2 PERFORMANCE BOND

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Contract and shall in all duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said contract agreed and covenanted by the Principal to be observed and performed, and according to the true intent and meaning of said Contract and the Plans and Specifications hereto annexed, then this obligation shall be void; otherwise to remain in full force and effect;

PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein.

Surety for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder.

IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of , 2025.

PRINCIPAL SURETY

By: By:

Address: Address:

Attest: Attest:

The name and address of the Resident Agent of Surety is:

NOTE: DATE OF PERFORMANCE BOND MUST NOT BE PRIOR TO DATE OF CONTRACT.

234106 00 61 13.16-1 PAYMENT BOND

SECTION 00 61 13.16

PAYMENT BOND

KNOW ALL PERSONS BY THESE PRESENTS: That

(Name of Contractor)

(Address of Contractor) a (Corporation, Partnership, Individual), hereinafter called Principal, and

(Name of Surety)

(Address of Surety) hereinafter called Surety, and held and firmly bound unto

(Name of Owner)

(Address of Owner) hereinafter called OWNER, and unto all persons, firms and corporations who or which may furnish labor, or who furnish materials to perform as described under the contract and to their successors and assigns in the total aggregate penal sum of Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION is such that whereas, the PRINCIPAL entered into a certain contract with the OWNER, dated the day of , 2025 a copy of which is hereto attached and made a part hereof for the construction of:

234106 00 61 13.16-2 PAYMENT BOND

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise, to remain in full force and effect:

PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein.

Surety for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder.

IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of , 2025.

PRINCIPAL SURETY

By: By:

Attest: Attest:

The name and address of the Resident Agent of Surety is:

NOTE: DATE OF PAYMENT BOND MUST NOT BE PRIOR TO DATE OF CONTRACT.

234106 00 62 00-1 CERTIFICATE OF INSURANCE

SECTION 00 62 00

CERTIFICATE OF INSURANCE

To:

Jasper County

Date:

OWNER

Project No.: GLO 24-065-033-E488

121 N. Austin St.

Type of Project: Jasper County Dixie Resource Center

Jasper, Texas 75951

ADDRESS

THIS IS TO CERTIFY THAT

(Name and address of insured) is, at the date of this certificate, insured by this Company with respect to the business operations hereinafter described, for the types of Insurance and in accordance with the provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof.

TYPE OF INSURANCE

Policy No.

Effective

Expires

Limits of Liability

Workmen's Compensation

Public Liability

1 Person $ 1 Accident $

Contingent Liability

1 Person $ 1 Accident $

Property Damage

Builder's Risk

Automobile

Other

The foregoing Policies (do) (do not) cover all sub-contractors.

Locations Covered:

Descriptions of Operations Covered:

The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or cancelled by the insurer in less than five days after the insured has received written notice of such change or cancellation.

When applicable local laws or regulations require more than five days actual notice of change or cancellation to the assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached.

Should any of the above described policies be cancelled before the expiration date thereof, the issuing insurer will contact the owner prior to cancellation within no less than 10 business days (Name of Insurer)

Title

WORKERS’ COMPENSATION REQUIREMENTS

I. MANDATORY LANGUAGE FROM TEXAS WORKERS’ COMPENSATION

COMMISSION REGULATIONS

WORKER’S COMPENSATION – INSURANCE COVERAGE

A. Definitions:

Certificate of coverage (“certificate”) – A copy of a certificate of insurance, a Certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC- 83, or TWCC-84), showing statutory workers’ compensation insurance coverage for the person’s or entity’s employees providing services on a project, for the duration of the project.

Duration of the project – includes the time from the beginning of the work on the project until the contractor’s/person’s work on the project has been completed and accepted by the governmental entity.

Person providing services on the project (“subcontractor” in §406.096) – includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity which furnishes persons to provide services on the project. “Services” include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. “Services” does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets.

B. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirement of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project.

C. The Contractor must provide a Certificate of coverage to the governmental entity prior to being awarded the contract.

D. If the coverage period shown on the contractor’s current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new Certificate of coverage with the governmental entity showing that coverage has been extended.

E. The contractor shall obtain from each person providing services on a project, and provide to the governmental entity:

(1) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and

(2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project.

F. The contractor shall retain all required certificates of coverage for the duration of the project and one year thereafter.

G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project.

H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers’ Compensation Commission, informing all person providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage.

I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to:

(1) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees’ providing services on the project, for the duration of the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .