234020 Bid Tabulation.pdf

PDF 48 KB Posted

Attached to
Bid No. 234020 Pipe Bursting and Sliplining Contractor of Record
Solicitation number
S-KS0043-00006221
Issued by
Marion County, Oregon

About this file

This document is a Bid Tabulation for Bid No. 234020 Pipe Bursting and Sliplining, which involves a contract opportunity for Marion County and the City of Salem, Oregon. The bid covers various labor categories, including Laborers, Truck Drivers, Power Equipment Operators, and Cement Masons, with specified quantities and unit prices. The bid close date is May 2, 2023, at 2:30 PM local time. The total bid amount is $792,713.91, which includes line items for labor, equipment, materials, bonding, and other related costs.

The bid tabulation provides detailed pricing for the labor categories, with a 30% markup over the BOLI (Bureau of Labor and Industries) wage rates. The bid also includes line items for subcontractors, other equipment, and materials, with set amounts and markups. Bidders are required to use the provided pricing for these items. The contract appears to be a first-tier contract, and the bidder has acknowledged Addendum No. 1.

View the file

Other files

File Type Posted
Zoom Bid Opening Instructions 5.2.23.docx DOCX document
General Conditions~6.pdf PDF
234020 Specials Pipe Burst JAC.pdf PDF
234020 Addendum 1.pdf PDF
234020 Supplemental Information Letter No. 1.pdf PDF
234020 Bid Manual.pdf PDF
6431 ML Houck signed~1.pdf PDF
234020 Notice Intent to Award.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Close: May 2, 2023 @ 2:30 PM (Local Time)

No. Item Quantity Unit of

Measure

BOLI Wage

Rate

(January 2023)

Percentage

Markup

Proposed Wage

Rate (BOLI Wage

Rate plus Mark-up)

1 Laborer, Group 1, Region #3 1 Hour(s) $51.53 30% 66.99$

2 Laborer, Group 2, Region #3 1 Hour(s) $52.80 30% 68.64$

3 Laborer, Group 3, Flagger, Region #3 1 Hour(s) $46.93 30% 61.01$

4 Truck Driver, Region #3 1 Hour(s) $46.82 30% 60.87$

5 Power Equipment Operation Group 4, Zone 1 1 Hour(s) $65.89 30% 85.66$

6 Power Equipment Operation Group 5, Zone 1 1 Hour(s) $64.65 30% 84.05$

7 Power Equipment Operation Group 6, Zone 1 1 Hour(s) $61.43 30% 79.86$

8 Cement Mason, Group 1, Region #3 1 Hour(s) $62.97 30% 81.86$

9 ALL OTHER LABOR CATEGORIES (a) 1 Hour(s) $50.00 (a) 30% 65.00$

No. Item Quantity Unit of

Measure

Total Amount

Quantity x Unit

Price

10 Laborer, Group 1, Region #3 1000 Hour(s) 66,990.00$

11 Laborer, Group 2, Region #3 750 Hour(s) 51,480.00$

12 Laborer, Group 3, Flagger, Region #3 250 Hour(s) 15,252.50$

13 Truck Driver, Region #3 700 Hour(s) 42,609.00$

14 Power Equipment Operation Group 4, Zone 1 600 Hour(s) 51,396.00$

15 Power Equipment Operation Group 5, Zone 1 400 Hour(s) 33,620.00$

Emery & Sons Construction

Group

Vendor Name:

USE "TABLE A" AS A WORKSHEET AND COPY THE PROPOSED WAGE RATE VALUES INTO TABLE B

Proposed Wage Rate (from

Table A)

60.87$

85.66$

84.05$

Table A

Bid No. 234020 Pipe Bursting and Sliplining

66.99$

68.64$

61.01$

Table B

Bid No. 234020 00410-3 ADD 1 Bid Form and Bid Supplements

16 Power Equipment Operation Group 6, Zone 1 450 Hour(s) 35,937.00$

17 Cement Mason, Group 1 150 Hour(s) 12,279.00$

18 ALL OTHER LABOR CATEGORIES 150 Hour(s) 9,750.00$

19 Foreman 700 Hour(s) 66,500.00$

Pipe Welding Equipment Including Generator for

6-inch to 12-inch Diameter HDPE Pipe 15 Day(s) 13,500.00$

Pipe Welding Equipment Including Generator for

14-inch to 18-inch Diameter HDPE Pipe 5 Day(s) 5,250.00$

Pipe Burst Equipment/Sliplining Equipment

Needed to Install 8-inch, 10-inch, and 12-inch

Diameter HDPE Pipe

15 Day(s) 18,000.00$

Storm Drainage Bypass Pumping With Up To 2-

Inch Submersible Bypass Pumps With Suction and Discharge Hose As Req'd

10.00 Day(s) 150.00$

Sanitary Sewer Bypass Pumping With One 4-Inch

Trash Bypass Pump With Suction Hose and Up

To 500 Linear Feet of Discharge Hose

10.00 Day(s) 4,300.00$

Subcontractors for T&M Work (All Bidders Shall

Use $31,500 - Includes 5% Mark-Up) All Req'd Lump Sum 31,500.00$

Other Equipment for T&M Work (All Bidders

Shall Use $184,000 - Includes 15% Mark-Up) All Req'd Lump Sum 184,000.00$

Materials for T&M Work (All Bidder Shall Use

$115,000 - Includes 15% Mark-Up) All Req'd Lump Sum 115,000.00$

Bonding for T&M Work (All Bidders Shall Use

$10,000 - No Mark-up) All Req'd Lump Sum 10,000.00$

767,513.50$

Calculation for Insurance and Taxes

29 Insurance and Taxes % Percent 25,200.41$

792,713.91$

First Tier Yes

YesAddendum No. 1 Acknowledged

Bid Bond Yes

15.00$

430.00$

31,500.00$

184,000.00$

115,000.00$

Bid Subtotal x Percentage

BID SUBTOTAL (Table B)

TOTAL BID "TABLE B" ITEMS 10 THRU 29

10,000.00$

65.00$

900.00$

1,050.00$

1,200.00$

79.86$

81.86$

95.00$

Bid No. 234020 00410-4 ADD 1 Bid Form and Bid Supplements