234020 Bid Tabulation.pdf
PDF 48 KB Posted
- Solicitation number
- S-KS0043-00006221
- Issued by
- Marion County, Oregon
About this file
This document is a Bid Tabulation for Bid No. 234020 Pipe Bursting and Sliplining, which involves a contract opportunity for Marion County and the City of Salem, Oregon. The bid covers various labor categories, including Laborers, Truck Drivers, Power Equipment Operators, and Cement Masons, with specified quantities and unit prices. The bid close date is May 2, 2023, at 2:30 PM local time. The total bid amount is $792,713.91, which includes line items for labor, equipment, materials, bonding, and other related costs.
The bid tabulation provides detailed pricing for the labor categories, with a 30% markup over the BOLI (Bureau of Labor and Industries) wage rates. The bid also includes line items for subcontractors, other equipment, and materials, with set amounts and markups. Bidders are required to use the provided pricing for these items. The contract appears to be a first-tier contract, and the bidder has acknowledged Addendum No. 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Zoom Bid Opening Instructions 5.2.23.docx | DOCX document | |
| General Conditions~6.pdf | ||
| 234020 Specials Pipe Burst JAC.pdf | ||
| 234020 Addendum 1.pdf | ||
| 234020 Supplemental Information Letter No. 1.pdf | ||
| 234020 Bid Manual.pdf | ||
| 6431 ML Houck signed~1.pdf | ||
| 234020 Notice Intent to Award.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Close: May 2, 2023 @ 2:30 PM (Local Time)
No. Item Quantity Unit of
Measure
BOLI Wage
Rate
(January 2023)
Percentage
Markup
Proposed Wage
Rate (BOLI Wage
Rate plus Mark-up)
1 Laborer, Group 1, Region #3 1 Hour(s) $51.53 30% 66.99$
2 Laborer, Group 2, Region #3 1 Hour(s) $52.80 30% 68.64$
3 Laborer, Group 3, Flagger, Region #3 1 Hour(s) $46.93 30% 61.01$
4 Truck Driver, Region #3 1 Hour(s) $46.82 30% 60.87$
5 Power Equipment Operation Group 4, Zone 1 1 Hour(s) $65.89 30% 85.66$
6 Power Equipment Operation Group 5, Zone 1 1 Hour(s) $64.65 30% 84.05$
7 Power Equipment Operation Group 6, Zone 1 1 Hour(s) $61.43 30% 79.86$
8 Cement Mason, Group 1, Region #3 1 Hour(s) $62.97 30% 81.86$
9 ALL OTHER LABOR CATEGORIES (a) 1 Hour(s) $50.00 (a) 30% 65.00$
No. Item Quantity Unit of
Measure
Total Amount
Quantity x Unit
Price
10 Laborer, Group 1, Region #3 1000 Hour(s) 66,990.00$
11 Laborer, Group 2, Region #3 750 Hour(s) 51,480.00$
12 Laborer, Group 3, Flagger, Region #3 250 Hour(s) 15,252.50$
13 Truck Driver, Region #3 700 Hour(s) 42,609.00$
14 Power Equipment Operation Group 4, Zone 1 600 Hour(s) 51,396.00$
15 Power Equipment Operation Group 5, Zone 1 400 Hour(s) 33,620.00$
Emery & Sons Construction
Group
Vendor Name:
USE "TABLE A" AS A WORKSHEET AND COPY THE PROPOSED WAGE RATE VALUES INTO TABLE B
Proposed Wage Rate (from
Table A)
60.87$
85.66$
84.05$
Table A
Bid No. 234020 Pipe Bursting and Sliplining
66.99$
68.64$
61.01$
Table B
Bid No. 234020 00410-3 ADD 1 Bid Form and Bid Supplements
16 Power Equipment Operation Group 6, Zone 1 450 Hour(s) 35,937.00$
17 Cement Mason, Group 1 150 Hour(s) 12,279.00$
18 ALL OTHER LABOR CATEGORIES 150 Hour(s) 9,750.00$
19 Foreman 700 Hour(s) 66,500.00$
Pipe Welding Equipment Including Generator for
6-inch to 12-inch Diameter HDPE Pipe 15 Day(s) 13,500.00$
Pipe Welding Equipment Including Generator for
14-inch to 18-inch Diameter HDPE Pipe 5 Day(s) 5,250.00$
Pipe Burst Equipment/Sliplining Equipment
Needed to Install 8-inch, 10-inch, and 12-inch
Diameter HDPE Pipe
15 Day(s) 18,000.00$
Storm Drainage Bypass Pumping With Up To 2-
Inch Submersible Bypass Pumps With Suction and Discharge Hose As Req'd
10.00 Day(s) 150.00$
Sanitary Sewer Bypass Pumping With One 4-Inch
Trash Bypass Pump With Suction Hose and Up
To 500 Linear Feet of Discharge Hose
10.00 Day(s) 4,300.00$
Subcontractors for T&M Work (All Bidders Shall
Use $31,500 - Includes 5% Mark-Up) All Req'd Lump Sum 31,500.00$
Other Equipment for T&M Work (All Bidders
Shall Use $184,000 - Includes 15% Mark-Up) All Req'd Lump Sum 184,000.00$
Materials for T&M Work (All Bidder Shall Use
$115,000 - Includes 15% Mark-Up) All Req'd Lump Sum 115,000.00$
Bonding for T&M Work (All Bidders Shall Use
$10,000 - No Mark-up) All Req'd Lump Sum 10,000.00$
767,513.50$
Calculation for Insurance and Taxes
29 Insurance and Taxes % Percent 25,200.41$
792,713.91$
First Tier Yes
YesAddendum No. 1 Acknowledged
Bid Bond Yes
15.00$
430.00$
31,500.00$
184,000.00$
115,000.00$
Bid Subtotal x Percentage
BID SUBTOTAL (Table B)
TOTAL BID "TABLE B" ITEMS 10 THRU 29
10,000.00$
65.00$
900.00$
1,050.00$
1,200.00$
79.86$
81.86$
95.00$
Bid No. 234020 00410-4 ADD 1 Bid Form and Bid Supplements