This is Addendum No. 2 for Request for Proposals (RFP) #2339 for Digital E-Paper Real-Time Information Signs issued by Intercity Transit in Olympia, Washington. The addendum addresses questions about API and GTFS integration requirements, delivery schedules for displays at various transit facilities, solar kit specifications, enclosure requirements, and clarifications regarding line items in the Cost Proposal attachment. The document includes updated specifications for 32" outdoor e-paper enclosures and mounting requirements, along with detailed technical drawings.
The addendum clarifies that all prices in the Cost Proposal should be pre-tax values and includes modifications to Attachments A and B. Key equipment specifications include various sizes of e-paper signs (13", 23", 28", 32", and 42"), solar panel kits (20W-25W and 40W-50W), and associated enclosures and mounting hardware. The document notes that funding has not yet been secured for displays and enclosures at several locations including Lacey Transit Center, Martin Way Park and Ride, Amtrak Centennial Station, and various bus stops, making delivery schedules currently unavailable for these locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Digital_E-Paper_Realtime_Info_Signs.docx | DOCX document | |
| RFP_Digital_E-Paper_Realtime_Info_Signs.docx.crdownload | CRDOWNLOAD file | |
| 2339_Addendum 3.docx | DOCX document | |
| 2339_Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OLYMPIA, WASHINGTON
Request for Proposals (RFP) Digital E-Paper Real-Time Information Signs #2339
Addendum No. 2
This Addendum takes precedence in resolving inconsistencies in any parts of the RFP contract documents. Proposers are to acknowledge receipt of this Addendum in their submittal. Proposers are hereby notified that the documents have been amended as follows:
Questions and Responses:
The following questions from Proposers have been received and are answered as follows:
| Question 1: |
| To ensure proposers fully understand the setup requirements, please provide documentation regarding API and GTFS integration for the following agencies: UniteGPS API for Mason Transit and Lewis County Transit, FlixBus API for FlixBus, and Greyhound API for Greyhound. |
| Response 1: |
| Refer to Addendum 1 for a list of data feeds. |
| Question 2: |
| To assist proposers in their planning, could you provide a projected delivery schedule (month and year) for the displays and enclosures needed at the Lacey Transit Center, Martin Way Park and Ride, Amtrak Centennial Station, and various bus stops? |
| Response 2: |
| Funding has not yet been secured for the displays and enclosures needed at the Lacey Transit Center, Martin Way Park and Ride, Amtrak Centennial Station and various bus stops; therefore, a project delivery schedule is not available. |
| Question 3: |
| Please specify the number of solar kits required for each display model at the following transit facilities: Lacey Transit Center, Martin Way Park and Ride, Amtrak Centennial Station, and bus stops. Additionally, please update Attachment A to reflect any necessary changes. |
| Response 3: |
| The table included in Section 4.8 Performance Period of the proposal includes quantities of solar kits for the 13” RTIS, 23”RTIS and triple 13” RTIS for the Lacey Transit Center, Martin Way Park and Ride, Amtrak Centennial Station and bus stops. Solar kits are not anticipated at this time for the larger display models (28”, 32” or 42” RTIS). |
The Attachment A: Cost Proposal includes line items1.10 and 1.11 for solar kits, but only includes quantities for the initial purchase at the Olympia Transit Center. No changes were made to Attachment A with respect to this question.
| Question 4: |
| Attachment B includes a draft drawing for the 32" outdoor ePaper totem enclosure. Should proposers reference line item 1.54: 32" E-paper Sign Wall Mount Overhead Enclosure in Attachment A: Cost Proposal for pricing related to the 32" outdoor ePaper totem enclosure? |
| Response 4: |
| Proposers should refer to line item 1.7: 32” E-Paper Totem Enclosure in Attachment A: Cost Proposal for the 32” Outdoor E-Paper Totem Enclosure concept drawing included in Attachment B. |
| Question 5: |
| If line item 1.54: 32" E-paper Sign Wall Mount Overhead Enclosure differs from the 32" outdoor ePaper totem enclosure, could you provide a technical drawing for clarification? |
| Response 5: |
| A separate drawing has been added to Attachment B for the 32” E-Paper Sign Wall Mount Overhead Enclosure. |
| Question 6: |
| Please include a 50W Solar Panel and Rechargeable Battery Kit as an optional line item for a quantity of 2 in Attachment A: Cost Proposal. |
| Response 6: |
| Line Item 1.11 of Attachment A: Cost Proposal description has been updated to 40W-50W Solar Panel and Rechargeable Battery Kit. The quantity for the kit remains as 1. |
| Question7: |
| Line item 1.51 in Attachment A: Cost Proposal currently states "23" E-paper Sign." Should this be revised to "13" E-paper Sign Enclosure with vandal guard and mounting kit"? |
| Response 7: |
| No. Line item 1.51 in Attachment A: Cost Proposal remains “23” E-Paper Sign” and line item 1.52 remains “23” E-Paper Sign Enclosure with vandal guard and mounting kit”. Refer to Attachment A: Cost Proposal line item 1.1 for 13” E-Paper Sign and line item 1.5 for 13” E-Paper Sign Enclosure with vandal guard and mounting kit. |
| Question 8: |
| Could you clarify which line items in Attachment A: Cost Proposal should include taxes? |
| Response 8: |
| All prices included in the Cost Proposal should be pre-tax values. |
| Question 9: |
| If the display itself complies with NEMA and UL requirements stated in the RFP, would Intercity Transit consider the fabricated enclosures as protective coverings or mounting hardware that do not require separate NEMA 3R and UL listings? |
| Response 9: |
| If the display itself complies with NEMA and UL requirements as stated in the RFP, the fabricated enclosures could be considered as protective covering or mounting hardware provided that all electrical and communication components external to the display are housed within a NEMA 3R enclosure located within the protective covering and the entire fabricated enclosure with displays and ancillary equipment is UL listed as a whole. |
SECTION 8 – ATTACHMENTS—CHANGED.
Attachment A: Cost Proposal – CHANGED.
Replace Attachment A: Cost Proposal with the revised Attachment A: Cost Proposal embedded in this Addendum.
Attachment B: Enclosure Drawings – CHANGED.
Attachment B: Enclosure drawings is supplemented by adding the embedded enclosure drawing included in this Addendum.
RFP #2339 – Addendum No. 2 Page 1 of 4
RFP No. 2339 – Addendum No. 2 Page 3 of 4 image2.emf
Att_B_Enclosure_Drawing_v2.pdf
32" OUTDOOR E-PAPER ENCLOSURE -
WALL MOUNT
GENERAL NOTES:
1. ENCLOSURE SHALL BE CAPABLE OF HOLDING A 32" E-PAPER DISPLAY BEING
MOUNTED TO AN OVERHEAD BEAM OR WALL (PROVIDED BY INTERCITY) AT A HEIGHT
BETWEEN 70" AND 10-FT ABOVE GROUND LEVEL WHILE MEETING ADA CLEARANCE
AND VISIBILITY REQUIREMENTS.
2. INTERNAL RACEWAYS SHALL BE PROVIDED WITHIN THE ENCLOSURE BEHIND THE
DISPLAY FOR PROTECTING AND ROUTING POWER AND/OR COMMUNICATION CABLES
TO THE DISPLAY. SEPARATE RACEWAYS SHALL BE PROVIDED FOR LOW VOLTAGE
AND LINE VOLTAGE.
3. ENCLOSURE SHALL INCLUDE ENVIRONMENTALLY ENCLOSED DISCONNECT SWITCH
TO TURN ON/OFF POWER TO THE DISPLAY.
4. THE ENCLOSURE AND ALL ASSOCIATED HARDWARE/FASTENERS SHALL BE MADE OF
CORROSION RESISTANT MATERIAL.
5. THE ENCLOSURE AND FASTENERS SHALL BE DESIGNED TO PREVENT UNAUTHORIZED
ACCESS TO DISPLAY AND ASSOCIATED CABLING.
PROVISION FOR CABLE
ENTRY POINTS WITH
GASKET AND BUSHING
FOR INSTALLATION OF
WIRING - LOCATION FOR
OPENING FOR CABLING
CONNECTION TBD
INTERNAL BRACKET
FOR DISPLAY
32" E-PAPER DISPLAY
INTERNAL REMOVABLE DISPLAY
SUPPORTS TO ALLOW FOR
REMOVAL OF SINGLE DISPLAY
REMOVABLE END PANEL WITH
TAMPER RESISTANT
HARDWARE FOR AUTHORIZED
MAINTENANCE ACCESS
OPENING FOR 32" E-PAPER DISPLAY WITH
REPLACEABLE LAYER OF VANDAL
RESISTANT ANTI-GLARE TEMPERED GLASS
Sheets and Views
Column Mount image1.emf
Att_A_Cost_Proposal_v2.xlsx Price Proposal
Proposer: _____________________________________________________________
Price Proposal Form
CORE EQUIPMENT, MATERIALS, AND SERVICES
LS = Lump Sum; EA = Each
All unit prices should be pre-tax.
Item/Description Quantity Unit Unit Price (USD) Extended Price (USD)
PART 1: Real-Time Information Signs and Associated Equipment (including equipment, accessories, cabling, and related materials and services required for a complete installation by others)
RTIS Equipment for OTC
1.1 13" E-paper Sign 2 EA $0
1.2 28" E-paper Sign 28 EA $0
1.3 32" E-paper Sign 3 EA $0
1.4 42" E-paper Sign 2 EA $0
1.5 13" E-paper Enclosure with vandal guard and mounting kit 2 EA $0
1.6 28" E-paper Double-Sided Overheard Enclosure 14 EA $0
1.7 32" E-Paper Totem Enclosure 3 EA $0
1.8 42" E-Paper Wall Mount Overhead Enclosure 2 EA $0
1.9 Text to Speech Button with Braile Signage, Integrated speaker and mounting kit 16 EA $0
1.10 20W-25W Solar Panel and Rechargeable Battery Kit 1 EA $0
1.11 40W-50W Solar Panel and Rechargeable Battery Kit 1 EA $0
1.12 Power adapter for 110-240V AC 26 EA $0
1.13 Long-life battery kit 2 EA $0
1.14 Cellular data plan - 500MB (1 Year) per display 2 EA $0
SUBTOTAL RTIS EQUIPMENT $0
RTIS Equipment - Future Locations
1.51 23" E-paper Sign 0 EA $0
1.52 23" E-paper Sign Enclosure with vandal guard and mounting kit 0 EA $0
1.53 Triple 13" E-paper Sign Enclosure with vandal guard and mounting kit 0 EA $0
1.54 32" E-paper Sign Wall Mount Overhead Enclosure 0 EA $0
Item/Description Quantity Unit Unit Price (USD) Extended Price (USD)
PART 2: Content Management System and Integration with External Data feeds
CMS
2.1 CMS Set up and Integration Fee (one-time) - including integration with GTFS-RT, GTFS, UniteGPS API, FlixBus API, Greyhound API 1 LS $0
2.2 CMS Software License and Support Fee (1 Year) per display 1 EA $0
SUBTOTAL CMS $0
Item/Description Quantity Unit Unit Price (USD) Extended Price (USD)
PART 3: Testing
Testing
3.1 Installation Acceptance Testing (IAT) - Successful Completion & Sign-Off 35 EA $0
SUBTOTAL TESTING $0
Item/Description Quantity Unit Unit Price (USD) Extended Price (USD)
PART 4: Training
Training Courses
4.1 System Administration/Applications Training - including training materials and documentation 1 EA $0
4.2 Installation/Maintenance Training - including training materials and documentation 1 EA $0
SUBTOTAL TRAINING $0
Item/Description Quantity Unit Unit Price (USD) Extended Price (USD)
PART 5: Warranty and Maintenance
Warranty and Maintenance (Optional)
5.1 Extended Warranty (+3years) per 13" display 0 EA $0
5.2 Extended Warranty (+3years) per 28" display 0 EA $0
5.3 Extended Warranty (+3years) per 32"display 0 EA $0
5.4 Extended Warranty (+3years) per 42" display 0 EA $0
SUBTOTAL WARRANTY AND MAINTENANCE $0
*NOTE: Contractor to review existing, proposed environment and specify and cost any additions, if required.
GRAND TOTAL (Required Parts 1 to 5) $0
Note: Contractor is responsible for reviewing technical and contractual requirements and ensuring that the total priced cost includes fulfilling all requirements as indicated in the compliance matrix and contract.
Signature of Authorized Representative Date
Printed Name
Title
RFP - Procurement of Digital E-Paper Real-Time Information Signs