About this file

This document is an Invitation to Bid (ITB) issued by the Florida Department of Financial Services, Division of Investigative and Forensics Services, for the purchase and installation of equipment to convert explosive ordinance disposal law enforcement vans. The ITB details the required components and installation, including items such as electric awnings, doors, insulation, shelving, storage cabinets, lighting, electrical systems, and other specialized equipment. The ITB includes a price response sheet with a list of over 50 line items, detailing the quantities and requesting unit costs for the initial 5-year term and potential 5-year renewal term. There is a mandatory pre-response conference scheduled for February 13, 2024.

The price response sheet outlines two tables – Table A for component installation and Table B for additional services hourly rates. Respondents must provide pricing for all line items, and failure to do so will result in the response being deemed non-responsive. The ITB will be administered through the Vendor Information Portal, and the contract will be awarded to the lowest responsive and responsible bidder. The jurisdiction for this opportunity includes Leon County and the City of Tallahassee in the state of Florida.

View the file

Other files

File Type Posted
2324-02 ITB IF App B-Questions Template.xlsx XLSX spreadsheet
2324-02 ITB IF App D-Award Preferences.docx DOCX document
2324-02 ITB IF - Complete ITB.pdf PDF
2324-02 ITB IF App C-Mandatory Criteria Cert.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

DEPARTMENT OF FINANCIAL SERVICES

DFS 2324-02 ITB IF

ATTACHMENT 3

PRICE RESPONSE

Instructions to Respondents:

Attachment 3, Price Response has been formatted to calculate annual totals for Table A and to provide the calculated average totals for the Initial Term (Years 1 through 5) as described herein. Fields provided for Respondent population are unlocked. Fields provided for Department Use Only are locked.

Table A - Component Installation: Respondents must complete each unit cost field for Years 1 thru 5 and Renewal Years 1 thru 5, for each line item rows a. thru xx., as provided in the shaded cells contained within Table A. Unit costs proposed must be inclusive of time and materials for the component installation. The Respondent shall consider the identified quantity with each line item. The Respondent must include the unit cost for the quantity identified for each line item (i.e. total quantity multipled by the single unit cost = total unit cost entered per field).

Table B - Additional Services: Respondents must complete each hourly rate unit cost field for Years 1 thru 5 and Renewal Years 1 thru 5, as provided in the shaded cells contained within Table B. Unit costs proposed are exclusive of the hourly rate contemplated in the Table A proposed unit costs.

Failure to provide pricing for any unit cost field as identified in either Table A or Table B will result in the Respondent being deemed non-responsive.

TABLE A - COMPONENT INSTALLATION
Components
(See Section 6, Component Specifications, of Attachment 2, Statement of Work, for further information)Qty*Component and Installation Price
Initial Term - Year 1Initial Term - Year 2Initial Term - Year 3Initial Term - Year 4Initial Term - Year 5Renewal Year 1Renewal Year 2Renewal Year 3Renewal Year 4Renewal Year 5
a.Roof mount 12-volt electric awning with LED lights and wind sensor such as or equivalent to Carefree of Colorado Freedom1
b.One (1) stainless steel door with pass-thru such as or equivalent to Cast products #fg4205-21-2631
c.Van body insulation1
d.Van body interior sub-floor1
e.Van body finish floor – such as or equivalent to Lonseal vinyl floor-Coin design1
f.Van body sub-walls - 1/4”1
g.Van body finish walls - magnetic dry/erase material + FRP material1
h.Van body sub-ceiling1
i.Van body finish ceiling - aluminum composite finish-Changed to FRP material1
j.Heavy duty interior cabinet shelf tracks3
k.3/16" (.188") adjustable shelves for interior cabinet(s)9
l.3/16" (.188") permanent shelves for interior cabinet(s)1
m.Overhead storage cabinets - aluminum - up to 48” wide2
n.Overhead storage cabinets - aluminum - up to 60” wide2
o.Approx 104”W x 16”H x10”D x 52inches each storage cabinet - aluminum1
p.Approx 20’W x 30”H x 18”D storage cabinet - aluminum1
q.Approx 29”W x 64”H x 16”D storage cabinets - aluminum2
r.Heavy duty locking interior drawers - aluminum (up to 24”)5
s.Hinged solid locking doors for cabinets/closets - Approx 23” W x 14”H x 18”D2
t.Hinged solid locking doors for cabinets/closets - Approx: 60”L x 10”D X 16”H6
u.Hinged solid locking door for cabinets/closets - Approx: 29”W x 64”H x 18”D2
v.Stainless steel "d" door latches such as or equivalent to Southco #m1-42-87
w.Stainless steel locking paddle handles9
x.Custom slide-out platforms for day boxes2
y.Approx 36.5’H x 20” D x 64.5”L(Street Side) 30.5”H x 20.5”D x 112.”L(Drivers Side) work benches - covered with pebble gray material such as or equivalent to Wilsonart Gibraltar2
z.Install customer-supplied 24" and 42" HDTV monitors + wall mount brackets2
aa.Wall mounted rear switch panel1
bb.Switch label package1
cc.White LED under cabinet lights such as or equivalent to Whelen #60C0EHCR.5
dd.White LED under cabinet lights with switch such as or equivalent to Whelen #60C0EHCR.3
ee.Wiring access cove package1
ff.HDMI audio/video cable & outlet2
gg.12-volt #091-85-12 low voltage alarm & light (NFPA)1
hh.12 vdc battery/charging system - single1
ii.Magnum inverter / charger1
jj.Household 15-amp interior receptacles - duplex4
kk.Household 120v/15-amp quad interior receptacles1
ll.Auto-eject such as or equivalent to Kussmaul #091-55-15-120 15a super l/l inlet.1
mm.Power strip with USB outlets1
nn.On-Scene Solutions quick release cargo strap1
oo.Heavy duty hook for bomb suit1
pp.Aluminum pocket for ramps1
qq.Small aluminum tray/platform for legs of bomb suit1
rr.Porcelain steel/magnetic dry/erase board-medium (Approx 60x24)1
ss.Porcelain steel/magnetic dty/erase board-large (Approx 110x30)1
tt.Bulkhead divider (No Opening)- carpeted on both sides1
uu.Ignition controlled 200-amp continuous duty solenoid1
vv.Electronic throttle device (hi idle) - Mercedes Sprinter1
ww.Body manufacturers manual1
xx.Wiring Manual1
Yearly Totals$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
*IMPORTANT NOTE: Respondent is responsible for considering quantity with each line item above. The Respondent must include the unit cost for the quantity identified for each line item (i.e. total quantity multipled by the single unit cost = total unit cost entered). The Department will not update and/or correct unit costs provided in the fields.

DEPARTMENT USE ONLY - Table A Average Cost (Sum of Initial Term -Years 1 through 5 divided by 5) = $0.00

TABLE B - ADDITIONAL SERVICES
Hourly Rate for Additional Services
(See Section 8, Additional Services, of Attachment 2, Statement of Work, for further information)Year 1Year 2Year 3Year 4Year 5Renewal Year 1Renewal Year 2Renewal Year 3Renewal Year 4Renewal Year 5