232089 Bid Docs.pdf

PDF 13 MB Posted

Attached to
2023 TDA Sewer Improvements TxCDBG Contract No. CDV23-0099
Solicitation number
232089
Issued by
Mills County, Texas

About this file

Summary

This is a bid document package for construction contract services issued by the City of Garrison, Texas for 2023 TDA Sewer Improvements funded through the Texas Community Development Block Grant (CDBG) program under Contract No. CDV23-0099. The project requires installation of approximately 3,200 linear feet of 8-inch and 10-inch gravity sewer lines using a combination of construction methods including open cut, pipe bursting, slick bore, and directional drilling, along with related work encompassing manholes, service lines, reconnections, pavement repair, and site restoration. The base bid includes 23 line items with quantities ranging from single units to over 2,400 linear feet, and an additive alternate bid consisting of 15 additional line items. Bids were due by 11:00 AM on July 30, 2026, at City Hall in Garrison, Texas, with public opening and reading of bids to follow. The successful bidder must complete all work within 90 consecutive calendar days from the Notice to Proceed, with liquidated damages assessed at $300 per day for delays beyond the contract completion date.

The contract requires a bid bond equal to 5 percent of the bid amount and performance and payment bonds equal to 100 percent of the contract price. Contractors must comply with prevailing wage requirements as determined under Davis-Bacon and Related Acts, equal employment opportunity requirements, and Section 3 of the Housing and Urban Development Act of 1968 regarding hiring and subcontracting objectives. All materials must comply with Build America, Buy America Act (BABA) requirements, ensuring iron, steel, and manufactured products are produced in the United States unless approved waivers are obtained. The project is funded through the Texas Department of Agriculture CDBG program, which provides federal Community Development Block Grant assistance. All contractors and subcontractors must maintain active System for Award Management (SAM.gov) registration and cannot be debarred, suspended, or otherwise excluded from federal assistance programs. The contract documents include comprehensive general conditions, special conditions, technical specifications, and multiple certifications addressing insurance, non-collusion, bidder qualifications, and compliance with federal labor standards and civil rights regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS

AND

TECHNICAL SPECIFICATIONS

FOR

CITY OF GARRISON

ON

2023 TDA SEWER IMPROVEMENTS

TX CDBG CONTRACT NO CDV23-0099

June 2026

GLS NO. 232089

1609 S CHESTNUT • SUITE 202 • LUFKIN, TEXAS • 75901

(936) 637-4900 • FAX (936) 637-6330 • poates@glstexas.com

TBPE FIRM REGISTRATION #413

2023 TDA SEWER IMPROVEMENTS

TxCDBG CONTRACT NO CDV23-0099

TABLE OF CONTENTS

No. Pages TITLE

2 ADVERTISEMENT AND INVITATION FOR BIDS

4 INSTRUCTION TO BIDDERS

1 BID FOR UNIT PRICE/LUMP SUM CONTRACTS

1 BID SUMMARY

4 BID SCHEDULE

2 BID BOND

3 STATEMENT OF BIDDER’S QUALIFICATIONS

2 CONFLICT OF INTEREST QUESTIONNAIRE

1 NON-COLLUSION AFFIDAVIT OF PRIME BIDDER

1 SAMPLE ATTORNEY’S REVIEW CERTIFICATION

2 CONTRACT (TDA)

1 NOTICE OF AWARD

1 NOTICE OF PROCEED

3 SPECIAL CONDITIONS

4 GENERAL SPECIFICATIONS – SPECIAL CONDITIONS – PART III

1 GENERAL SPECIFICATIONS – SCHEDULE OF DRAWINGS

20 GENERAL CONTRACT CONDITIONS

WARRANTY AND INSURANCE

1 PERFORMANCE AND PAYMENT BOND (OR BONDS)

1 PERFORMANCE AND PAYMENT BOND REQUIREMENTS

2 PERFORMANCE BOND

2 PAYMENT BOND

1 CERTIFICATE OF INSURANCE

5 WORKER’S COMPENSATION REQUIREMENTS

GRANT REQUIREMENTS AND CERTIFICATIONS

15 REQUIRED CONTRACT PROVISIONS

6 WAGE RATE REQUIREMENTS

5 FEDERAL LABOR STANDARDS PROVISIONS (HUD 4010)

6 TITLE 29 - LABOR

No. Pages TITLE

1 CERTIFICATION REGARDING LOBBYING

2 INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF

LOBBYING ACTIVIITITES

2 DISCLOSURE OF LOBBYING ACTIVITIES (SF-LLL)

2 CONTRACTOR’S CERTIFICATION CONCERNING LABOR

STANDARDS AND PREVAILING WAGE REQUIREMENTS

1 CONTRACTOR’S CERTIFICATIONS – CERTIFICATION OF BIDDER

REGARDING CIVIL RIGHTS LAWS AND REGULATIONS

2 RESOLUTION REGARDING CIVIL RIGHTS (A1014)

1 SERVICE MAP AREA – PROJECT LOCATION

1 SECTION 3 CLAUSE (24 CFR 135.38)

1 SECTION 3 EMPLOYER CERTIFICATION FORM (A1022)

1 SECTION 3 STATUS SUMMARY (A1022)

1 SECTION 3 CERTIFICATION AS BUSINESS CONCERN (A1023)

3 CONTRACTOR’S LOCAL OPPORTUNITY PLAN

1 INSTRUCTIONS FOR PROPOSED CONTRACTS BREAKDOWN

1 CERTIFICATIONS OF SUBCONTRACTOR REGARDING SECTION 3

AND SEGREGATED FACILITIES

2 MINORITY/FEMALE GOALS AND TIMETABLES (ATTACHMENT 7-K)

3 CONTRACT CHANGE ORDER (A505)

1 CERTIFICATE OF CONSTRUCTION COMPLETION (COCC) (A709)

2 CONTRACTOR’S FINAL PAYMENT AFFIDAVIT

1 EXHIBIT A PROVISIONS

1 PROJECT SIGNAGE

1 CERTIFICATE OF INTERESTED PARTIES

3 A400 – BABA COMPLIANCE FORM

7 A401 – BABA CHECKLIST, INSTRUCTIONS, DEFINITIONS, & FAQS

2 A402 – CONTRACTOR’S BABA COMPLIANCE CERTIFICATION

2 A403 – MANUFACTURER’S BABA COMPLIANCE CERTIFICATION

2 A704 – PRECONSTRUCTION CONFERENCE REPORT

ADVERTISEMENT AND INVITATION FOR BIDS

The CITY OF GARRISON will receive bids for the 2023 TDA Sewer Improvements TxCDBG CONTRACT NO CDV23-0099 until 11:00 AM on July 30, 2026 , at 330 South B Ave, Garrison, TX 75946. At said time, the bids will be publicly opened and read aloud at City Hall.

Bids are invited for several items and quantities of work as follows:

• Approximately 3,200 linear feet of 8” and 10” gravity sewer line, installed by a combination of open cut, pipe bursting, slick bore, and directional drilling

• Related work including manholes, service lines, reconnections, pavement repair, site restoration, and other incidental work.

Bid/Contract Documents, including Drawings and Technical Specifications are on file at GLS, 1609 S.

Chestnut, Suite 202, Lufkin, Texas 75901 (936) 637-4900 (at which specifications can be obtained).

Bid/Contract Documents may be viewed and downloaded free of charge (with the option to purchase hard copies) at www.civcastusa.com.

A Bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid.

Cash currency is not acceptable as bid surety and is not to be submitted in lieu of the Bid Bond.

Attention is called to the fact that not less than the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Texas Department of Agriculture and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, age or national origin.

Funding for this project is covered under Section 3 of the Housing and Urban Development Act of 1968. All eligible bidders must comply with Section 3 requirements in regards to meeting or exceeding the required objectives for both hiring and subcontracting. In accordance with these objectives, contractors are required to direct their newly created employment and/or subcontracting opportunities to Section 3 Residents and Business Concerns.

The City of Garrison reserves the right to reject any or all bids or to waive any informalities in the bidding.

Bids may be held by the City of Garrison for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder’s qualifications prior to the contract award.

All contractors/subcontractors that are debarred, suspended or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part of in full under this project. All contractors/subcontractors must have an active “System for Award Management” (SAM.gov) registration.

This solicitation is for services related to a project that is subject to the Build America, Buy America Act (BABA) requirements under Title IX of the Infrastructure Investment and Jobs Act. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States.

The City of Garrison does not discriminate on the basis of race, color, religion, sex, sexual orientation, gender identity, national origin, or disability. The City of Garrison is an affirmative action/equal opportunity employer and encourages participation by Section 3 residents and businesses, Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, and labor surplus area firms.

City of Garrison Tim Wright, Mayor July 8, 2026 (Locality) (Contracting Officer) (Date) file://luf-server7/WPfiles-Civil/242/242112/CD/www.civcastusa.com

INSTRUCTION TO BIDDERS

FOR CONSTRUCTION

1. Use of Separate Bid Forms

These contract documents include a complete set of bid and contract forms which are for the convenience of the bidders and are not to be detached from the contract document, completed or executed. Separate bid forms are provided for your use.

2. Interpretations or Addenda

No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than ten (10) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than seven (7) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders.

If an addendum to the bid package is necessary, it must be distributed to each potential bidder. The distribution of an addendum shall be verified either by statements of receipt or registered/certified mail receipts, which shall be included in the public works construction file. The addendum shall allow adequate time for consideration in bid preparation (usually at least one week). If adequate time is not available, the bid opening date must be extended and the Grant Recipient must republish the invitation for bids containing the place, time, and date for the new bid opening. Note that any change to the original bid opening date will require republication of the invitation for bids at least once in a locally published newspaper. The republished notice will include the place, time and date for the new bid opening and must be published at least seven days prior to the new bid opening date.

3. Inspection of Site

Each bidder should visit the site of the proposed work and should become acquainted with the existing conditions and facilities, the difficulties and restrictions pertaining to the performance of the contract. The bidder should thoroughly examine and become familiar with the drawings, technical specifications and all other contract documents. The contractor by the execution of the contract shall in no way be relieved of any obligation under it due to failure to receive or examine any form or legal document or to visit the site or the conditions existing at the site. The City will be justified in rejecting any claim based on lack of inspection of the site prior to the bid.

4. Alternate bid items

If alternate bids or bid items are considered, they are included in the Bid Summary and / or the Bid Schedule hereinafter.

5. Bids

a. All bids must be submitted on the forms provided and are subject to all requirements of the Contract Documents, including the Drawings.

b. All bids must be regular in every respect and no interlineation, excisions or special conditions may be made or included by the bidder.

c. Bid documents, including but not limited to the bid, the bid bond(s), the contractor’s certifications, local opportunity plan, and the statement of the bidder’s qualifications, shall be sealed in an envelope and clearly labeled with the words "Bid Documents”, the project number, name of bidder and the date and time of bid opening.

d. The City may consider as irregular any bid on which there is an alteration of or departure from the bid form and, at its option, may reject any irregular bid.

e. If a contract is awarded, it will be awarded to a responsible bidder on the basis of the lowest/best bid and the selected alternate bid items, if any. The contract will require the completion of the work in accordance with the contract documents.

6. Bid Modifications Prior to Bid Opening

a. Any bidder may modify its bid in writing at any time prior to the scheduled closing time for receipt of bids, provided such modification is received by the locality prior to the closing time.

The modification should not reveal the bid price but should provide the addition, subtractions or other modifications so that the final prices or terms will not be known by the locality until the sealed bid is open.

b. Likewise, any bidder may modify a bid by submitting a supplemental bid in person prior to the scheduled closing time for receipt of bids. Such supplemental bid should mention only additions or subtractions to the original bid so as to not reveal the final prices or terms to the locality until the sealed bid is open.

7. Bid Bond

a. A bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid [for contracts greater than $100,000.00]. A certified check or bank draft payable to the locality or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

b. The bid bond or its comparable, will be returned to the bidder as soon as practical after the opening of the bids.

8. Statement of Bidders Qualifications

Each bidder shall submit on the form furnished for that purpose a statement of the bidder's qualifications.

The Grant Recipient shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform its obligations under the contract, and the bidder shall furnish the Grant Recipient all such information and data for this purpose as it may request. The right is reserved to reject any bid where an investigation of the available data does not satisfy the Grant Recipient that the bidder is qualified to carry out properly the terms of the contract.

9. Unit Price

The unit price for each of the several items in the bid shall include its pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the total bid. Any bid not conforming to this requirement may be rejected as informal. Special attention is drawn to this condition, as the unit prices will be used to determine the amount of any change orders resulting from an increase or decrease in quantities.

10. Corrections:

Erasures or other corrections in the bid must be noted over the signature of the bidder.

11. Time for Receiving Bids

Bids received prior to the advertised hour of opening shall be kept securely sealed. The officer appointed to open the bids shall decide when the specified time has arrived and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the Grant Recipient that the late arrival of the bid was solely due to delay in the mail for which the bidder was not responsible, such bid will be received and considered.

12. Opening of Bids

The City shall, at the time and place fixed for the opening of bids, open each bid and publicly read it aloud, irrespective of any irregularities therein. Bidders and other interested individuals may be present.

13. Withdrawal of Bids

Bidder may withdraw the bid before the time fixed for the opening of bids, by communicating its purpose in writing to the Grant Recipient. Upon receipt of such notice, the unopened bid will be returned to the bidder.

The bid guaranty of any bidder withdrawing his bid will be returned promptly.

14. Award of Contract/Rejection of Bids

a. The contract will be awarded to the responsible Bidder whose bid, conforming with all material terms and conditions for the Invitation to Bid, is the lowest in price. The bidder selected will be notified at the earliest possible date. The locality reserves the right to reject any or all bids and to waive any informality in bids received where such rejection or waiver is in its interest.

b. The Grant Recipient reserves the right to consider as unqualified to do the work any bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this contract.

15. Execution of Agreement/Performance and Payment Bonds

a. Performance Bonds - Requires all prime contractors which enter into a formal contract in excess of $100,000 with the State, any department, board, agency, municipality, county, school district or any division or subdivision thereof, to obtain a Performance Bond in the amount of the contract before commencing with work

b. Payment Bonds- Requires all prime contractors which enter into a formal contract with the State, any department, board, agency, municipality, county, school district or any division or subdivision thereof, a payment bond(s) in the amount of the contract. The payment bond must be in the amount of the contract and must be filed within 30 days from the date of the Notice of Award:

o Municipalities: If the contract is in excess of $50,000, a payment bond is required.

o Counties: If the contract is in excess of $25,000, a payment bond is required.

c. The failure of the successful bidder to execute the agreement and supply the required bonds within thirty (30) days from the date of the notice of award-or within such extended period as the locality may grant, shall constitute a default and the locality may, at its option either award the contract to the next lowest responsible bidder, or re-advertise for bids. In either case, the locality may charge against the bidder the difference between the amount of the bid, and the amount for which a contract is subsequently executed irrespective of whether this difference exceeds the amount of the bid bond. If a more favorable bid is received through re-advertisement, the defaulting bidder shall have no claim against the locality for a refund.

16. Wages and Salaries

Attention is particularly called to the requirement of paying not less than the prevailing Davis Bacon Related Acts (DBRA) wage rates specified in the Contract Documents. These rates are minimums to be paid during the life of the contract. It is therefore the responsibility of the Bidder to inform themselves as to local labor conditions.

17. Section 3

Attention is called to the required Section 3 contracting and hiring objectives specified in the Contract Documents. These minimum objectives for hiring and contracting must be enforced. It is therefore the responsibility of the Bidder to inform themselves as to these requirements.

18. Equal Employment Opportunity

Attention is called to the requirements for ensuring that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin, and other civil rights requirements.

19. Restrictions for Lobbying

Contractors who apply or bid for an award of $100,000 or more shall provide the required certification that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer of employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 USC § 1352.

20. BABA Compliance

a. TDA has determined that iron and steel products that provide an EPA certification of BABA compliance are considered “substantially compliant” – TDA will accept these certifications without any additional action, but Grant Recipients are advised that HUD and EPA have implemented the BABA regulations slightly differently. If additional guidance is provided, TDA will notify Grant Recipients.

b. Any non-compliant product installed in a CDBG-funded project, through any funding source or construction contract, will be considered a finding. (This excludes items covered by HUD-approved waivers.)

c. Disallowed costs will be based on the bid item(s) for which the non-compliant product was installed. We will not use the material cost alone to calculate disallowed costs.

d. On a case-by-case basis, TDA may determine that the non-compliance is significant enough to warrant disallowed costs for the construction contract as a whole, or the grant agreement entirely.

e. Any attempt to intentionally circumvent federal BABA regulations will be taken very seriously and additional sanctions will apply.

BID FOR UNIT PRICE OR LUMP SUM CONTRACTS

Place Garrison City Hall Date May 7, 2026 Project No. CDV23-0099

Proposal of (hereinafter called Bidder) a corporation organized and existing under the laws of the State of /a partnership/an individual, doing business as (cross out non-applicable references).

To the City of Garrison, Texas (hereinafter called Owner).

Gentlemen:

The Bidder, in compliance with your invitation for bids for the construction of the 2023 TDA Sewer Improvements TxCDBG Contract No CDV23-0099 , having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the contract documents, within the time set forth therein, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this proposal is a part.

Bidder hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within ninety (90) (for each Base Bid Part) consecutive calendar days thereafter. Bidder further agrees to pay as liquidated damages, the sum of $300 for each consecutive calendar day thereafter as hereinafter provided in the General Conditions.

Bidder acknowledges receipt of the following addenda:

Bidder agrees to perform all the 2023 TDA WATER PLANT IMPROVEMENTS TxCDBG CONTRACT NO CDV23-0099, work described in the specifications and shown on the plans, for the prices as bid in the BID

SCHEDULE/SECTION 00320.

(Amounts are to be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)

The prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.

Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.

The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 days after the scheduled closing time for receiving bids.

Upon receipt of written notice of the acceptance of this bid, Bidder will execute the formal contract attached within 10 days and deliver a Surety Bond or Bonds as required under the GENERAL CONDITIONS. The bid security attached in the sum of ($ ) is to become the property of the Owner in the event the contract and bond are not executed with in the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.

Respectfully submitted, By

(SEAL - if bid is by a corporation) Title Address

232089 00315 - 1 BID SUMMARY

SECTION 00315

BID SUMMARY

OWNER: City of Garrison ENGINEER: GLS

330 South B Ave 1609 S. Chestnut, Suite 202 Garrison, TX 75946 Lufkin, TX 75901

(936) 398-4126 (936) 637-4900

PROJECT: 2023 TDA Sewer Improvements TxCDBG CONTRACT NO. CDV23-0099

BASE BID

I. BASE BID – SEWER IMPROVEMENTS (SUM OF ITEMS 1 THROUGH 23) IN WORDS

DOLLARS ($ )

II. ADDITIVE ALTERNATE BID – SEWER IMPROVEMENTS (SUM OF ITEMS 24

THROUGH 38) IN WORDS

BIDDER: SIGNED:

ADDRESS: BY:

TITLE:

DATE:

TELEPHONE

NO: ( ) - ATTEST:

EMAIL:

NOTE: All bid submissions will be evaluated on a per bid package basis. Owner may review and award Bids with or without Alternatives, at their best interest.

232089 00320 - 1 BID SCHEDULE

SECTION 00320

BID SCHEDULE – BASE BID

2023 TDA Sewer Improvements TxCDBG CONTRACT NO CDV23-0099

BASE BID: Line “A”

ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

1. Mobilization, Bonds and Insurance 1 LS

DOLLARS

2.

10” SDR26 PVC Sewer Line Installed by Open Cut (0’-5’ Depth), Complete in Place

677 LF

DOLLARS

3.

10” DR17 HDPE Sewer Line Installed by Pipe Bursting, Complete in Place

348 LF

DOLLARS

4.

8” SDR26 PVC Sewer Line Installed by Open Cut (0’-5’ Depth), Complete in Place

121 LF

DOLLARS

5.

8” SDR26 PVC Sewer Line Installed by Open Cut (5’-8’ Depth), Complete in Place

516 LF

DOLLARS

6.

8” SDR26 PVC Sewer Line Installed by Open Cut (8’-12’ Depth), Complete in Place

138 LF

DOLLARS

7.

8” SDR26 PVC Sewer Line Installed by Horizontal Directional Bore, Complete in Place

138 LF

DOLLARS

8.

8” DR17 HDPE Sewer Line Installed by Pipe Bursting, Complete in Place

499 LF

DOLLARS

9.

6” SDR26 PVC Sewer Line Installed by Open Cut (0’-5’ Depth), Complete in Place

19 LF

DOLLARS

10.

Provide Trench Excavation Safety System and Plan in Accordance with OSHA Excavation Standards 29 CFR Part 1926 (Latest Revision) for Excavation Depths Greater than Five (5) Feet

654 LF

DOLLARS

232089 00320 - 2 BID SCHEDULE

ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

11.

Standard Sewer Manhole (0’-5’ Depth) with Appurtenances, Complete in Place.

5 EA

DOLLARS

12.

Construct New Sewer Manhole (0’- 5’ Depth) on Existing Sewer Line, with Appurtenances, Complete in Place.

1 EA

DOLLARS

13.

Replace Existing Manhole with Standard Sewer Manhole (0’-5’ Depth) with Appurtenances, Complete in Place.

3 EA

DOLLARS

14. Additional Depth Sewer Manhole, Complete in Place. 14.7 VF

DOLLARS

15.

Rehabilitate Existing Sewer Manhole (0’-5’ Depth), Complete in Place.

3 EA

DOLLARS

16. Additional Depth Manhole Rehabilitation, Complete in Place. 1.0 VF

17.

Connect New Sewer Line to Existing Manhole/Wet Well, Complete in Place

3 EA

DOLLARS

18. Short-Side Sanitary Sewer Service Transfer, Complete in Place 9 EA

19. Long-Side Sanitary Sewer Service Transfer, Complete in Place 3 EA

20. Abandon Existing Manhole, Complete in Place 2 EA

21. Asphaltic Paving Repair, Complete in Place. 1,037 LF

22. Gravel Pavement Repair, Complete in Place 16 LF

232089 00320 - 3 BID SCHEDULE

23. Site / Route Dress-Up, Seeding and Fertilizing, Complete in Place. 2,456 LF

TOTAL AMOUNT OF BASE BID (SUM OF ITEMS 1 THROUGH 23), IN WORDS

SECTION 00320

BID SCHEDULE – ADDITIVE ALTERNATE BID

TxCDBG CONTRACT NO CDV23-0099

ADDITIVE ALTERNATE BID: Line “B”

ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

24.

8” SDR26 PVC Sewer Line Installed by Open Cut (0’-5’ Depth), Complete in Place

146 LF

DOLLARS

25.

8” DR17 HDPE Sewer Line Installed by Pipe Bursting, Complete in Place

574 LF

DOLLARS

26.

Cement Stabilized Sand Bedding and Backfill for Sewer Main, Complete in Place.

30 LF

DOLLARS

27.

14” Standard Weight (3/8” Wall) Steel Casing (Installed by Dry Bore), Complete in Place

DOLLARS

28.

Standard Sewer Manhole (0’-5’ Depth) with Appurtenances, Complete in Place.

1 EA

DOLLARS

29.

Construct New Sewer Manhole (0’- 5’ Depth) on Existing Sewer Line, with Appurtenances, Complete in Place.

1 EA

DOLLARS

30.

Replace Existing Manhole with Standard Sewer Manhole (0’-5’ Depth) with Appurtenances, Complete in Place.

1 EA

DOLLARS

31. Additional Depth Sewer Manhole, Complete in Place. 2.0 VF

32.

Rehabilitate Existing Sewer Manhole (0’-5’ Depth), Complete in Place.

1 EA

DOLLARS

33. Additional Depth Manhole Rehabilitation, Complete in Place. 8.5 VF

232089 00320 - 2 BID SCHEDULE

34.

Connect New Sewer Line to Existing Manhole, Complete in Place

1 EA

DOLLARS

35. Short-Side Sanitary Sewer Service Transfer, Complete in Place 2 EA

36.

Fill Existing Sanitary Sewer Line with Flowable Fill Grout, Complete in Place

142 LF

DOLLARS

37. Asphalt Pavement Repair, Complete in Place 10 LF

38. Site / Route Dress-Up, Seeding and Fertilizing, Complete in Place. 720 LF

TOTAL AMOUNT OF BASE BID (SUM OF ITEMS 24 THROUGH 38), IN WORDS

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we the undersigned, as PRINCIPAL, and , as SURETY are held and firmly bound unto (CITY OF GARRISON) hereinafter called the "Local Public Agency”, in the penal sum of Dollars, ($ ), lawful money of the United

States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the

Accompanying Bid, dated , for

NOW, THEREFORE, the Principal shall not withdraw said Bid within the period specified therein after the opening of the same, or, if no period be specified, within sixty (60) days after the said opening, and shall within the period specified therefor, or if no period be specified, within ten (10) days after the prescribed forms are presented to him for signature, enter into a written contract with the Local Public Agency in accordance with the Bid as accepted, and give bond with good and sufficient surety or sureties, as may be required, for the faithful performance and proper fulfillment of such contract; or in the event of the withdrawal of said Bid within the period specified, or the failure to enter into such Contract and give such bond within the time specified, if the Principal shall pay the Local Public Agency the difference between the amount specified in said Bid and the amount for which the local Public Agency may procure the required work or supplies or both, if the latter be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue.

IN WITNESS THEREOF, the above parties have executed this instrument this day of , the name and corporate seal of each corporate party being hereto affixed and these present signed by its undersigned representative, pursuant to authority of its governing body.

(SEAL)

Attest: By:

Affix Corporate

Seal

Affix

Countersigned

By

* Attorney-in-Fact, State of Texas

CERTIFICATE AS TO CORPORATE PRINCIPAL

I, , certify that I am the Secretary of the Corporation named as Principal in the bid bond; that , who signed the said bond on behalf of the Principal was then of said corporation; that I know his/her signature, and his/her signature thereto is genuine; and that said bond was duly signed, sealed, and attested to, on behalf of said corporation by authority of its governing body.

Title:

* Power-of-attorney for person signing for Surety Company must be attached to bond.

STATEMENT OF BIDDER'S QUALIFICATIONS

All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information it desires.

Date: ________________________________

Bidder (Legal Name of Firm):

Date Organized:

Address :

Date Incorporated

Federal ID Number: ____________________________

Number of Years in contracting business under present name

List all other names under which your business has operated in the last 10 years:

Work Presently Under Contract:

Contract Amount $ Completion Date

Type of work performed by your company:

Total Staff employed by Firm (Break down by Managers and Trades on separate sheet):

Have you ever failed to complete any work awarded to you? Yes No (If yes, please attach summary of details on a separate sheet. Include brief explanation of cause and resolution)

Have you ever defaulted on a contract? Yes No (If yes, please attach summary of details on a separate sheet.)

Has your organization had any disbarments or suspensions that have been imposed in the past five years or that was still in effect during the five year period or is still in effect? Yes No

(If yes, list and explain; such list must include disbarments and suspensions of officers, principals, partners, members, and employees of your organization.)

List the projects most recently completed by your firm (include project of similar importance):

Project Amount $ Mo/Yr Completed

Major equipment available for this contract:

Are you in compliance with all applicable EEO requirements? Yes No (If no, please attach summary of details on a separate sheet.))

Bank References

Address: __________________________________ Contact Name: _______________

City & State: _____________________Zip: ____________________Phone Number: _______________

Credit available: $

Has the firm or predecessor firm been involved in a bankruptcy or reorganization? Yes No (If yes, please attach summary of details on a separate sheet.)

List on a sheet attached hereto all judgements, claims, arbitration proceedings, or suits pending or outstanding against bidder over the last five (5) years with amount of claim and brief description.

List on a sheet attached hereto all lawsuits or requested arbitration with regard to construction contracts which bidder has initiated within the last five (5) years and brief explanation of claim and outcome.

Attach resume(s) for the principal member(s) of your organization, including the officers as well as the proposed superintendent for the project.

Signed this ______ day of _______________________, 20____.

Signature

Printed Name and Title

Company Name

Notary Statement:

______________________________. being duly sworn, says that he/she is the _________Position/Title____________of________________________ (Firm Name), and hereby swears that the answers to the foregoing questions and all statements therein contained are true and correct. He/she hereby authorizes and requests any person, firm, or corporation to furnish any information requested City of _____________________ in verification of the recitals comprising this Statement of Bidder's Qualifications.

Subscribed and sworn before me this _________day of __________, 20____.

Notary Public

Signature

Printed Name

My Commission Expires: _______________, The penalty for making false statements is prescribed in the U. S. Criminal Code, 18 U.S.C. 1001.

NONCOLLUSION AFFIDAVIT OF PRIME BIDDER

State of Texas )

County of )

, being first duly sworn, deposes and says that:

(1) He/She is of , the Bidder that has submitted the attached Bid;

(2) He/She is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;

(3) Such Bid is genuine and is not a collusive or sham Bid;

(4) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly with another Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix an overhead, profit or cost element of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the (Local Public Agency) or any person interested in the proposed Contract; and

(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.

(Signed)

Title

Subscribed and sworn to me this day of .

By:

Notary Public

My commission expires

ATTORNEY'S REVIEW CERTIFICATION

I, the undersigned, , the duly authorized and acting legal representative of the , do hereby certify as follows:

I have examined the attached contract(s) and surety bonds and am of the opinion that each of the agreements may be duly executed by the proper parties, acting through their duly authorized representatives; that said representatives have full power and authority to execute said agreements on behalf of the respective parties; and that the agreements shall constitute valid and legally binding obligations upon the parties executing the same in accordance with terms, conditions and provisions thereof.

Attorney's signature: Date:

Print Attorney's Name:

Texas State Bar Number: _____________________________

232089 1 CONTRACT

CONTRACT (TDA)

THIS AGREEMENT MADE THIS day of , by and between (a corporation organized and existing under the laws of the State of _____________) (a partnership consisting of _______________) (an individual trading as _______________________),, hereinafter called the "Contractor", and the CITY OF GARRISON, hereinafter called the "City".

WITNESSETH, that the Contractor and the City for the considerations stated herein mutually agree as follows:

ARTICLE 1. STATEMENT OF WORK

The Contractor shall furnish all supervision, technical personnel, labor, materials, machinery, tools, equipment and services, including utility and transportation services, and perform and complete all work required for the construction of the Improvements embraced in the Project; namely, 2023 TDA SEWER IMPROVEMENTS – TxCDBG CONTRACT NO. CDV23-0099, and required supplemental work, all in strict accordance with the Contract Documents including all addenda thereto, numbered , dated , all as prepared by GLS acting and in these Contract documents preparation, referred to as the "Engineer".

ARTICLE 2. THE CONTRACT PRICE

The City will pay the Contractor for the performance of the Contract in current funds, for the total quantities of work performed at the unit prices stipulated in the Bid for the several respective items of work completed subject to additions and deductions as approved by the TDA (Grantor Agency) and the City.

Total contract award is ___________________ Dollars ($_________________).

ARTICLE 3. CONTRACT

The executed Contract documents shall consist of the following:

a) This Agreement f) General Conditions, Parts I and II

b) Addenda g) Special Conditions

c) Invitation for Bids h) Technical Specifications

d) Instructions to Bidders i) Drawings (as listed in the

e) Signed copy of Bid j) Schedule of Drawings)

ARTICLE 4. PERFORMANCE

Work, in accordance with the Contract dated , shall commence on or before as specified in the Notice to Proceed, and Contractor shall complete the WORK within consecutive calendar days thereafter as specified in the Notice to Proceed. The date of completion of all WORK is therefore as specified in the Notice to Proceed.

232089 2 CONTRACT

This Agreement, together with other documents enumerated in this ARTICLE 3, which said other documents are as fully a part of the Contract as if hereto attached or herein repeated, forms the Contract between the parties hereto. In the event that any provision in any component part of this Contract conflicts with any provision of any other component part, the provision of the component part first enumerated in this ARTICLE 3 shall govern, except as otherwise specifically stated.

IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be executed in Four (4) original copies on the day and year first above written.

By: Keith Yarbrough By:

Title: Mayor Title:

Signed: Signed:

City of Garrison

101 North Street

Garrison, TX 75946

Attested by: Attested by:

Title: Title:

Signed: Signed:

CERTIFICATIONS

I, , certify that I am the of the corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor, was then of said corporation, that said Agreement was duly signed for and in behalf of said corporation by authority of its governing body, and is within the scope of its corporate powers.

232089 00510-1 NOTICE OF AWARD

SECTION 00510

NOTICE OF AWARD

To: Date:

Project Description: CITY OF GARRISON

TxCDBG CONTRACT NO. CDV23-0099

The OWNER has considered the BID submitted by you for the above-described WORK in response to its Advertisement for Bids dated April 15, 2026 , and Information for Bidders.

You are hereby notified that your BID has been accepted for items in the amount of $ .

You are required by the Information for Bidders to execute the Agreement and furnish the required CONTRACTOR'S Performance BOND, Payment BOND and certificate of insurance within ten (10) calendar days from the date of this Notice to you.

If you fail to execute said Agreement and to furnish said BONDS within ten (10) days from the date of this Notice, said OWNER will be entitled to consider all your rights arising out of the OWNER'S acceptance of your BID as abandoned and as a forfeiture of your BID BOND. The OWNER will be entitled to such other rights as may be granted by law.

You are required to return an acknowledged copy of this NOTICE OF AWARD to the OWNER.

Dated this day of , 2026 .

OWNER: City of Garrison

BY: Keith Yarbrough TITLE: Mayor

SIGNED:

ACCEPTANCE OF NOTICE

Receipt of the above NOTICE OF AWARD is hereby acknowledged by , this the day of , 2026.

BY: TITLE:

232089 00520-1 NOTICE TO PROCEED

SECTION 00520

NOTICE TO PROCEED

To: Date:

Project Description: CITY OF GARRISON

TxCDBG CONTRACT NO. CDV23-0099

You are hereby notified to commence WORK in accordance with the Agreement dated

, on or before , and you are to complete the WORK within ninety (90) consecutive calendar days thereafter.

The date of completion of all WORK is therefore .

OWNER: City of Garrison BY: Keith Yarbrough TITLE: Mayor

ACCEPTANCE OF NOTICE

Receipt of the above NOTICE TO PROCEED is hereby acknowledged by

, this the day of , 2026.

BY: TITLE:

PERFORMANCE AND PAYMENT BOND (OR BONDS)

Following the Contract cover sheets, insert the approved form of the statutory surety bond or bonds to ensure the performance of the Contract and payment of labor and materials. In addition to the corporation signatures of the surety company(ies) on the bond(s), each bond should be countersigned by the surety companys attorney-in-fact, authorized to act within the State in which the Project is situated.

*NOTE: This Document is provided for sample purposes only. Contracts and agreements have important legal consequences. It is imperative that you consult with your City attorney concerning the proper drafting, completion, or modification of such documents

PERFORMANCE AND PAYMENT BONDING REQUIREMENTS

Pursuant to the Texas Uniform Grant and Contract Management Act of 1981, the following minimum requirements apply to all TCDP contract:

a) A performance bond on the part of the contractor for 100 percent of the contract price for contracts in excess of $100,000.00. A performance bond is one executed in connection with a contract to secure fulfillment of all the Contractor’s obligations under the contract. For contracts under $50,000, localities have the option of with- holding payment to construction contractors until completion of construction and acceptance of work by the city or county in lieu of such performance bonds.

b) A payment bond on the part of the contractor for 100 percent of the contract price for contracts in excess of $25,000.00. A payment bond is one executed in connection with a contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the contract.

SECTION 00610

PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS that:

(Name of Contractor or Company)

(Address) a hereinafter called Principal, and

(Name of Surety Company) hereinafter called Surety, are held and firmly bound unto

(Name of Grant Recipient)

(Grant Recipient's Address) hereinafter called OWNER, in the penal sum of $

Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made we bind ourselves, successors, and assigns, jointly and severally, firmly in these presents.

THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER dated the day of , a copy of which is hereto attached and made a part hereof for the construction of:

NOW THEREFORE, if the Principal shall well, truly and faithfully perform its duties in all the undertakings, covenants, terms, conditions, and agreements of said contract during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without notice to the Surety and during the one year guaranty period, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the OWNER from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void, otherwise to remain in full force and effect.

PROVIDED FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any way affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS.

PROVIDED, FURTHER, that no final settlement between the OWNER and the Principal shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

IN WITNESS WHEREOF, this instrument is executed in counterparts, each one of which shall be deemed an original, this the day of

ATTEST:

(Principal)

By (s) (Principal Secretary)

(Witness as to Principal) (Address)

(Surety)

(Witness as to Surety) (Attorney in Fact)

(Address) (Address)

NOTE: Date of BOND must not be prior to date of Contract. If PRINCIPAL/CONTRACTOR is

Partnership, all partners should execute BOND.

SECTION 00620

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS that:

(Name of Contractor or Company) a , hereinafter called Principal, (Corporation / Partnership) and (Name of Surety Company) hereinafter called Surety, are held and firmly bound unto

(Name of Recipient)

(Recipient's Address) hereinafter called OWNER, in the penal sum of $

Dollars, $ in lawful money of the United States, for this payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.

THE CONFIDENTIALITY OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER, dated the day of a copy of which is hereto attached and made a part hereof for the construction of:

(Project Name)

NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, SUB- CONTRACTORS, and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK, and all insurance premiums on said WORK, and for all labor, performed in such WORK whether by SUB-CONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.

PROVIDED, FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any way affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS.

PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

IN WITNESS WHEREOF, this instrument is executed in ______________ counter-parts, each on of (Number) which shall be deemed an original, this the day of .

ATTEST:

(Principal)

By (s) (Principal Secretary)

(Witness as to Principal) (Address)

(Surety)

(Witness as to Surety (Attorney in Fact)

(Address) (Address)

NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND.

SECTION 00650

CERTIFICATE OF INSURANCE

To: CITY OF GARRISON Date:

OWNER

Project No.: 232089

101 North Street

Type of Project:

2023 TDA Sewer Improvements TxCDBG CONTRACT NO

CDV23-0099

Garrison, Texas 75946

ADDRESS

THIS IS TO CERTIFY THAT

(Name and address of insured) is, at the date of this certificate, insured by this Company with respect to the business operations hereinafter described, for the types of Insurance and in accordance with the provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof.

TYPE OF INSURANCE

Policy No.

Effective

Expires

Limits of Liability

Workmen's Compensation

Public Liability

1 Person $ 1 Accident $

Contingent Liability

1 Person $ 1 Accident $

Property Damage

Builder's Risk

Automobile

Other

The foregoing Policies (do) (do not) cover all sub-contractors.

Locations Covered:

Descriptions of Operations Covered:

The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or cancelled by the insurer in less than five days after the insured has received written notice of such change or cancellation.

When applicable local laws or regulations require more than five days actual notice of change or cancellation to the assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached.

Should any of the above described policies be cancelled before the expiration date thereof, the issuing insurer will contact the owner prior to cancellation within no less than 10 business days

(Name of Insurer)

Title

232089 00810-1 SPECIAL CONDITIONS

SECTION 00810

SPECIAL CONDITIONS

1.0 SCHEDULE AND SEQUENCE OF CONSTRUCTION

Submit proposed schedule and sequence of construction to the ENGINEER for his approval prior to beginning work.

2.0 SUBCONTRACTORS

Submit names and addresses of subcontractors for approval.

3.0 EXAMINATION OF PROJECT SITE

Make a careful examination of the project site, the existing conditions around the site, ingress and egress limitations, and traffic considerations prior to bidding.

4.0 CONTENT OF PROJECT

CONTRACTOR is to furnish project complete as required in the Specifications, Drawings, and Contract Documents. Items not specifically covered in these documents which comprise a part of the project shall be considered incidental to the project. CONTRACTORS are to consider all incidental work necessary for a satisfactory and completed project and are to include any related costs in the original prices bid.

5.0 SPECIFICATIONS

Three (3) sets of plans and specifications shall be furnished to the CONTRACTOR or MATERIAL SUPPLIER for construction purposes.

6.0 TESTING

All utility testing will be provided by the Contractor and cost for this work shall be included in bid for the various items of work. Disinfection testing and passing bacteriological reports in accordance with Texas Commission of Environmental Quality (TCEQ) requirements shall be furnished by the Contractor for Water Meter Replacement.

7.0 SHOP DRAWINGS

Submit four (4) copies of all shop drawings to the ENGINEER for approval. Shop drawings are required on all products that are installed on this project.

8.0 UTILITIES FOR CONSTRUCTION

Make arrangements for water, electrical power, and other utilities required during construction operations for construction purposes.

232089 00810-2 SPECIAL CONDITIONS

9.0 FIELD STAKING

CONTRACTOR is responsible for staking and layout during construction in accordance with plans.

10.0 LOCATION AND REPAIR OF EXISTING UTILITIES

It is the CONTRACTOR's responsibility to verify the location of all utilities and service lines before proceeding with the work. If a utility or service line is broken during the course of construction, it shall be the CONTRACTOR's responsibility to repair such breaks at no cost to the OWNER.

11.0 REGULATORY AGENCY

Construction is to be done in accordance with Texas Commission on Environmental Quality (TCEQ)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .