231210_UPES Roof Replacement _ Proposal Set 1.pdf
PDF 2 MB Posted
- Attached to
- New roof at Greene County Primary
- Solicitation number
- PE-66610-NONST-2024-000000001
- Issued by
- Gordon County, Georgia
About this file
This document is a Proposal Set for the roof replacement project at the Greene County Union Point Elementary School in Union Point, Georgia. The project involves the removal of the existing roofing membrane, flashings, and accessories, installation of new rigid roof insulation, and installation of a new 60-mil thermoplastic polyolefin (TPO) membrane roofing system. The work also includes the installation of new perimeter metals, scuppers, and gutters using pre-finished metal, as well as painting of existing painted CMU and/or stucco. The bid due date is not specified, but the document provides general notes, a roof plan, and detailed roof construction drawings.
The pricing and funding details are not included in this document. However, it specifies that the minimum thickness of the new rigid roof insulation is assumed to be 3-1/2 inches, unless otherwise indicated, and that the roof insulation slope must be at least 1/4 inch per foot to prevent water ponding. The coordination between trades is the responsibility of the general contractor, and the contractor shall follow the provided architectural details unless the existing conditions differ or the details do not comply with the manufacturer's recommendations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEP
REVISION TAG
ELEVATION
DETAIL/SECTION
WINDOW TAG
WALL TAG
ROOM TAG
DOOR TAG
A
A101
W1
A
ROOM
101B
COLUMN GRID
CL
SINGLE STEP
WINDOW
SWINGING DOOR SCREEN DOOR
A101
INTERIOR ELEVATION 2
+2'-0"
AX.X
X
R @ ±7 1/2"20STAIRS
TOILET 2D P1
UP
SPIRAL STAIR (WITH TREAD SHADING)
DRAFTING GUIDE
POCKET DOOR
FLR GRILLE
USE "PLAN OPENING" INSTANCE
PARAMETER TO SHOW DOOR IN
OPEN OR CLOSED POSITION
Tower Place Building, 3340 Peachtree Road, N.E.
Suite 1800 Atlanta, Georgia 30326 404.522.8805
404.521.2118 (F)
T
H
ES
E D
O C
U M
EN
TS
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
TH
E
AR
C
H
IT
EC
T
AN
D
M
AY
N O
T
BE
U
SE
D O
R R
EP
R
O D
U C
ED
W
IT
H
O U
T W
R
IT
TE
N
P
ER
M
IS
SI
O
N
PROJECT
NO.
SHEET
TITLE
SHEET
NO.
RELEASED FOR CONSTRUCTION
PROJECT TEAM GENERAL NOTES SHEET INDEX
PROJ. NOTES / APP. CODES SYMBOLS LEGEND
GREENE COUNTY UNION POINT ES ROOF
REPLACEMENT
1401 GA-77, Union Point, GA 30669
PROPOSAL SET
OWNER
GREENE COUNTY SCHOOL
ARCHITECT
GARDNER, SPENCER, SMITH, TENCH & JARBEAU, P.C.
TOWER PLACE BUILDING
3340 PEACHTREE ROAD NE
SUITE 1800
ATLANTA, GA 30326
CONTACT: DAVID W. TENCH AIA
TELEPHONE: (404) 522-8805 x03 EMAIL: dtench@gsstj.com
1.
2.
3.
4.
5.
DO NOT SCALE DRAWINGS. USE WRITTEN DIMENSIONS ONLY. SUBMIT ANY DISCREPANCIES TO THE ARCHITECT FOR CLARIFICATION PRIOR TO EXECUTION OF THE WORK IN QUESTION.
ALL DIMENSIONS ARE TO FACE OF FINISH MATERIAL OR CENTERLINE OF FIXTURE UNLESS CLEARLY SHOWN OR NOTED OTHERWISE.
THE LOCATION OF THE EXISTING UTILITIES AND STRUCTURES SHOWN IN THE DOCUMENTS ARE APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND ACTUAL LOCATION OF SUCH, WHETHER SHOWN HEREON OR NOT, PRIOR TO ANY EXCAVATION.
IMMEDIATELY NOTIFY ARCHITECT IN WRITING IF ANY OMISSION, DISCREPANCY, AMBIGUITY OR ERROR IN THE CONTRACT DOCUMENTS BE DISCOVERED OR IF ANY DOUBT AS TO THE MEANING OR INTENT THEREOF SHOULD ARISE. CLARIFICATION WILL BE MADE BY REVISION TO THE CONTRACT DOCUMENTS.
ALL ATTACHMENTS, SCREWS & BOLTS BETWEEN STRUCTURAL STEEL AND TREATED WOOD, BLOCKING AND NAILERS SHALL BE GALVANIZED.
BUILDING: INTERNATIONAL BUILDING CODE 2018 (W/ GEORGIA AMENDMENTS)
FIRE: INTERNATIONAL FIRE CODE 2018 (NO GEORGIA AMENDMENTS)
LIFE SAFETY: NFPA 101 2018 (W/ GEORGIA AMENDMENTS)
MECHANICAL: INTERNATIONAL MECHANICAL CODE 2018 (W/ GEORGIA AMENDMENTS)
ELECTRICAL: NATIONAL ELECTRICAL CODE 2020 (W/ GEORGIA AMENDMENTS)
PLUMBING: INTERNTAIONAL PLUMBING CODE 2018 (W/ GEORGIA AMENDMENTS)
ENERGY: INTERNATIONAL ENERGY CONSERVATION CODE 2015 (W/ GEORGIA
SUPPLEMENTS AND AMENDMENTS)
ACCESSIBILITY: GEORGIA ACCESSIBILTY CODE (ADA ACCESSIBILITY GUIDELINES 2010 W/
GEORGIA AMENDMENTS)
ARCHITECTURAL
22111
COVER SHEET
G0.01
Union Point Elementary
School 1401 Highway
77N Union Point, GA
30669
Sheet Number Sheet Name Sheet Issue Date Current Revision Date
A1.81 ROOF PLAN 12/11/23
A1.82 ROOF DETAILS 12/11/23
A1.83 ROOF DETAILS 12/11/23
101 EAST THIRD STREET
GREENSBORO, GA 30642
CONTACT: RALPH BOSWELL
TELEPHONE: (706) 454-1029
EMAIL: RALPH.BOSWELL@GREENE.K12.GA.US
REEVES CONSULTING, INC
3195 ABBOTTS POINTE DRIVE
DULUTH, GA 30097
CONTACT: JERRY REEVES
TELEPHONE: (404) 285-0848
EMAIL: JERRY@REEVESCONSULTINGINC.COM
ROOFING CONSULTANT
Revisions
No. Date Description
10/31/23 PERMIT SET
12/11/23 PROPOSAL SET
5' 0"
7' 0"
7' 0"
10' - 11" 83' - 8"
407' - 7"
78' - 8" 79' - 0" 7' - 0" 31' - 8" 52' - 0" 12' - 7 3/4"
243' - 6"
10' - 11" 12' - 6"78' - 8"
300' - 11"
1"
28' - 0"
106' - 8"
12' - 6"
77' - 4" 93' - 6"
7' - 0" 59' - 4"
9' 5"
1/ 4"
1'
-0
1/ 4"
1'
-0
1/ 4"
1'
-0
1/4" / 1'-0"1/4" / 1'-0"
1/ 4"
1'
-0
1/ 4"
1'
-0
1/ 4"
1'
-0
1/4" / 1'-0"
1/ 4"
1'
-0
1/ 4"
1'
-0
1/4" / 1'-0"
1/4" / 1'-0"
1/4" / 1'-0"
1/ 4"
1'
-0
1/4" / 1'-0"
1/ 4"
1'
-0
1/ 4"
1'
-0
1/4" / 1'-0"
1/ 4"
1'
-0
L.R.
L.R.
S.R.
S.R.
S.R.
S.V.
S.R.
L.R.
S.R.
S.V.
L.R.
S.R.
S.R.
S.R.
S.V.
S.V.
S.V.
S.V.
L.R.
R.D.
L.R.
1/4" / 1'-0"1/4" / 1'-0" 1/ 4"
1'
-0
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
1/ 4"
1'
-0
1/4" / 1'-0"
1/4" / 1'-0"
1/ 4"
1'
-0
1/4" / 1'-0"
1/4" / 1'-0"
L.R.
L.R. L.R.
S.R.
S.R.
S.R.
NEW ALUMINUM
GUTTERS AND
DOWNSPOUTS TO
MATCH EXISTING (TYP.)
ALTERNATE NO. 1
NEW ALUMINUM GUTTERS AND
DOWNSPOUTS TO MATCH
EXISTING (TYP.) NEW ALUMINUM GUTTERS AND
DOWNSPOUTS TO MATCH EXISTING
(TYP.)
NEW THERMOPLASTIC MEMBRANE
ROOFING AND INSULATION (TYP.)
NEW ALUMINUM GUTTERS AND
DOWNSPOUTS TO MATCH EXISTING
(TYP.)
NEW ALUMINUM GUTTERS AND
DOWNSPOUTS TO MATCH
EXISTING (TYP.)
L.R.
S.R.
S.V.
S.V.
S.V.
S.V.
R.D.
1/4" / 1'-0"
1/4" / 1'-0"
1/ 4"
1'
-0
1/ 4"
1'
-0
1/4" / 1'-0"
1/4" / 1'-0"
1/4" / 1'-0"
1/ 4"
1'
-0
1/ 4"
1'
-0
1/4" / 1'-0"
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
A1.83
TYP
SIM
SIM
SIM
SIM
SIM
SIM
SIM
SIM
Tower Place Building, 3340 Peachtree Road, N.E.
Suite 1800 Atlanta, Georgia 30326 404.522.8805
404.521.2118 (F)
ES
E D
O C
U M
EN
TS
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
TH
E
AR
C
H
IT
EC
T
AN
D
M
AY
N O
T
BE
U
SE
D O
R R
EP
R
O D
U C
ED
W
IT
H
O U
T W
R
IT
TE
N
P
ER
M
IS
SI
O
N
PROJECT
NO.
SHEET
TITLE
SHEET
NO.
RELEASED FOR CONSTRUCTION
22111
ROOF PLAN
A1.81
Union Point Elementary
School 1401 Highway
77N Union Point, GA
30669
1/16" = 1'-0"1 Roof Plan
1.
2.
3.
4.
5.5.
ROOFING NOTESROOFING NOTES
REMOVE THE EXISTING ROOFING MEMBRANE, FLASHINGS AND ACCESSORIES AS
REQUIRED TO REPLACE DAMAGED INSULATION (IF ANY). INSTALL ½” HD ISO BD OVER
THE EXISTING INSULATION & MEMBRANE AND MECHANICALLY FASTEN BOTH LAYERS
OF INSULATION TO THE DECK PER LOCAL CODE. MECHANICALLY FASTEN NEW 60-MIL
TPO MEMBRANE, FLASHINGS AND ACCESSORIES PER MANUFACTURER
SPECIFICATIONS. INSTALL NEW PERIMETER METALS, SCUPPERS AND GUTTERS USING
PRE-FINISHED METAL. INSTALL TPO COATED METAL AT GUTTERS AND INSTALL HEAT
WELDED MEMBRANE STRIPPING PLIES. POWER WASH AND REPAINT PAINTED CMU
AND/OR STUCCO.
THE MINIMUM THICKNESS OF THE NEW RIGID ROOF INSULATION IS ASSUMED TO BE 3-
1/2'' UNLESS OTHERWISE INDICATED ON THE DRAWINGS. THE INTENT OF THIS
STATEMENT IS TO ESTABLISH AN ABSOLUTE MINIMUM THICKNESS. DUE TO FIELD
CONDITIONS, THE ACTUAL MINIMUM THICKNESS MAY NEED TO BE ADJUSTED TO MORE
THAN 3 1/2'' TO INSURE A FLUSH AND LEVEL TRANSITION BETWEEN THE RIGID ROOF
INSULATION AND ABUTTING WOOD NAILERS. IN NO CASE SHALL THE ROOF INSULATION
SLOPE BE LESS THAN 1/4''/ FOOT. THE PONDING OF WATER ALONG THE ROOF EDGE
OR AT ANY POINT ON THE ROOF SHALL NOT BE ACCEPTABLE. THE COORDINATION
BETWEEN TRADES SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
THE CONTRACTOR SHALL NOTE THAT MINIMUM THICKNESS OF INSULATION VARIES
FOR VARIOUS CONDITIONS THROUGHOUT THE PROJECT. REFER TO APPLICABLE
DETAILS.
THE CONTRACTOR SHALL PROVIDE A NEW PRECAST CONCRETE SPLASHBLOCK AT
EACH NEW DOWNSPOUT LOCATION, UNLESS DOWNSPOUT IS CONNECTED TO
UNDERGROUND DRAINAGE SYSTEM OR SPILLS OUT ON CONCRETE SLAB.
THE CONTRACTOR SHALL PROVIDE A NEW ALUMINUM SPLASH PAN AT EACH NEW
DOWNSPOUT LOCATION WHICH SPILLS OUT ONTO AN EXISTING OR NEW ROOF. THE
ALUMINUM SPLASH PAN SHALL BE SET IN A FULL BED OF MASTIC.
ALL GUTTERS AT EXPANSION JOINTS SHALL BE DISCONTINUED AND SHALL HAVE END
CLOSURES.
6.
A.
B.
7.
8.
9.
10.
THE GENERAL CONTRACTOR SHALL FOLLOW THE ARCHITECTURAL DETAILS PROVIDED
IN THESE DRAWINGS UNLESS ONE OR BOTH OF THE FOLLOWING OCCUR:
EXISTING CONDITIONS DIFFER FROM THOSE DETAILED.
DETAILS DO NOT COMPLY WITH THE MANUFACTURER'S CONDITION'S OR
RECOMMENDATIONS.
IF EITHER CASE OCCURS, THE CONTRACTOR SHALL MODIFY DETAILS AND SUBMIT NEW
DETAILS FOR THE ARCHITECT'S APPROVAL.
ALL FLASHING IS TO BE OVERLAPPED AT JOINTS A MINIMUM OF 4'' AND SEALED
WATERTIGHT.
ADDITIONAL DETAILS TYPICAL FOR ELASTIC SHEET ROOFING ARE TO BE FOUND IN THE
SPECIFICATIONS.
THE LOCATION AND QUANTITY OF ROOF PENETRATIONS SHOWN ON THE ROOF PLAN
ARE APPROXIMATE. CONTRACTORS SHALL VERIFY TYPE AND QUANTITY OF ROOF
OPENINGS AND PENETRATIONS.
ROOF LEGEND & ABBREVIATIONSROOF LEGEND & ABBREVIATIONS
S.B NEW SPLASH BLOCK
D.S. NEW DOWNSPOUT
R.V. ROOF VENTILATOR - EXISTING OR NEW
S.R. SLOPIING RIDGE
S.V. SLOPING VALLEY
L.R. LEVEL RIDGE
V.P. VENT PIPE - EXISTING OR NEW
S.L. SKYLIGHT - EXISTING OR NEW
E.F. EXHAUST FAN - EXISTING OR NEW
E.J. EXPANSION JOINT - EXISTING OR NEW
R.D. ROOF DRAIN
B.D. BOARD
ETR EXISTING TO REMAIN
DIRECTION OF ROOF SLOPE 1/4'' / FT. MIN. (TYP)
APPROXIMATE DOFFERENCE IN ADJACENT ROOF-ELEVATIONS
LINE OF EXTERIOR WALL BELOW ROOF
ROOF DETAIL
ROOF FLASHING DETAIL
ALUMINUM CANOPY
NEW SINGLE PLY MEMBRANE ROOFING SYSTEM
ROOF SLOPE OBTAINED BY SLOPING ROOF STRUCTURE
NEW SINGLE PLY MEMBRANE ROOFING SYSTEM
ROOF SLOPE OBTAINED BY TAPERED RIGID INSULATION
Revisions
No. Date Description
10/31/23 PERMIT SET
12/11/23 PROPOSAL SET
NEW THERMOPLASTIC MEMBRANE
ROOFING SYSTEM OVER EXISTING
ROOFING MEMBRANE & INSULATION.
EXISTING FINISH TO REMAIN
1-1/4" HOT DIPPED GALVANIZED
ROOF NAILS @ 4" (102mm) O.C.
MAX.
9.5" TPO QUICKSEAM FLASHING
(SEE NOTE #5 AND #6)
5.5" TPO QUICKSEAM
FLASHING (SEE NOTE #6)
20 GA. CONTINUOUS CLEAT
DRIP/GRAVEL STOP EDGE
METAL (SEE NOTE #1)
PRESSURE TREATED WOOD
NAILER (SEE NOTE #4)
1-1/4" HOT DIPPED GALVANIZED
ROOF NAILS @ 6" (152 mm) O.C.
MAX.
ACCEPTABLE MEMBRANE ADHESIVE
(ADHERED SYSTEMS ONLY)
ULTRAPLY TPO
MEMBRANE
22 GA. METAL OUTLET
TUBE - 4'' LONG (TYP.)
22 GA. MET. D.S. (4''x4'') -
PROVIDE MIN. OF 3
DOWNSPOUT ANCHOR STRAPS
PER D.S., MAX. 6' - 0'' O.C.
EXISTING ROOFING MEMBRANE
1/2" HD ISO BD
1 1/2"
DOWNSPOUT WIDTH
1 1/2"
PLAN VIEW
ELEVATION
FASTEN TO WALL W/ EXPANSION TYPE
ANCHORS, MIN. 2 PER ANCHOR STRAP
METAL DOWNSPROUT REFER TO
ROOF PLAN FOR LOCATIONS
22 GA. x 1 1/2'' WIDE x 1' - 2'' METAL
DOWNSPROUT ANCHOR STRAP-MIN. 3
PER DOWNSPROUT (MAX. 6' - 0'' O.C.)
NOTE:
FASCIA TRIM DEPTH TO MATCH GUTTER & GRAVEL STOP TRIM DEPTH - ADJUST
FASCIA DEPTH AS REQUIRED
EXISTING FINISH TO REMAIN
1-1/4" HOT DIPPED GALVANIZED ROOF
NAILS @ 4" (102mm) O.C. MAX.
9.5" TPO QUICKSEAM FLASHING (SEE
NOTE #5 AND #6)
20 GA. CONTINUOUS CLEAT
DRIP/GRAVEL STOP EDGE
METAL (SEE NOTE #1)
PRESSURE TREATED WOOD
NAILER (SEE NOTE #4)
1-1/4" HOT DIPPED GALVANIZED
ROOF NAILS @ 6" (152 mm) O.C. MAX.
MIN. 4'' TURN DOWN
CONT. TPO COATED VERT.
FLASHING (TYP.)
SINGLE PLY ELASTIC SHEET
CONT. P.T. 2 x 4 WD BLOCKING
TAPERED RIGID ROOF DECK INSUL.
CONT. P.T. 2 BY WD HEADER
PAINT
ETR MULTIPLE LAYERS OF ROOF
INSULATION
REINFORCED MEMBRANE
EXISTING ROOF DECK/SUBSTRATE
PLATES AND FASTENERS PER
MANUFACTURER'S RECOMMENDATIONS
PREMOLDED VENT BOOT
VENT STACK
STAINLESS STEEL CLAMP
WATER BLOCK CAULK GRADE SEALANT
2"
2"
ROOF'S MANUFACTURER'S PREMOLDED VENT
BOOT
TARGET MADE FROM REINFORCED MEMBRANE
PLAN
SECTION
NOTE:
1. DO NOT CUT SIDE OF PREMOLDED BOOT. IT MUST BE PULLED OVER VENT PIPE.
2. IF THE PLATES AND FASTENERS INTRUDE INTO BOOT FLANGE AREA, THEN A TARGET MUST FIRST BE INSTALLED OVER PLATES AND FASTENERS BEFORE BOOT INSTALLATION.
3. FOR INSULATION THICKNESS GREATER THAN 8'' (203mm), A COVER BOARD IS REQUIRED ON MECHANICALLY ATTACHED SYSTEMS.
EXISTING ROOFING MEMBRANE
1/2" HD ISO BD
CAST ALUMINUM
ALLOY STRAINER
DOME
FASTENERS MIN. 4
PER DRAIN
1/2" HD ISO BD
4'' (102mm) TPO COATED
METAL WELDABLE FLANGE
EXISTING ROOF DECK/SUBSTRATE
ETR MULTIPLE LAYERS
OF ROOF INSULATION
EXISTING DRAIN PIPE
U-FLOW SEAL BODY
NOTE:
1. EXISTING DRAIN PIPE SHALL BE CLEAN OF ALL DEBRIS THROUGH THE LENGTH OF THE TUBE TO ENSURE PROPER SEAL.
2. RETRODRAIN ONLY TO BE USED AS A RETROFIT DRAIN.
3. REFER TO PRODUCT APPLICATION INSTRUCTIONS FOR DRAIN PIPE SECUREMENT.
EXISTING ROOFING
MEMBRANE
REINFORCED MEMBRANE
HEAT WELDED MEMBRANE
REINFORCED MEMBRANE (PERIMETER
SHEET IF REQUIRED)
ETR MULTIPLE LAYERS OF ROOF INSULATION
EXISTING ROOF DECK/SUBSTRATE
NOTE:
1. DO NOT CROSS SEAMS WITH WALKWAY PADS 6" (152mm) OFF EACH SEAM.
2. HEAT-WELD EDGE OF WALKWAY PADS CONTINOUSLY.
3. REQUIRED AT ALL ROOF ACCESS POINTS.
EXISTING ROOFING MEMBRANE
1/2" HD ISO BD
Tower Place Building, 3340 Peachtree Road, N.E.
Suite 1800 Atlanta, Georgia 30326 404.522.8805
404.521.2118 (F)
ES
E D
O C
U M
EN
TS
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
TH
E
AR
C
H
IT
EC
T
AN
D
M
AY
N O
T
BE
U
SE
D O
R R
EP
R
O D
U C
ED
W
IT
H
O U
T W
R
IT
TE
N
P
ER
M
IS
SI
O
N
PROJECT
NO.
SHEET
TITLE
SHEET
NO.
RELEASED FOR CONSTRUCTION
22111
ROOF DETAILS
A1.82
Union Point Elementary
School 1401 Highway
77N Union Point, GA
30669
Revisions
No. Date Description
10/31/23 PERMIT SET
12/11/23 PROPOSAL SET
3" = 1'-0"1 GUTTER DETAIL
3" = 1'-0"2 DOWNSPOUT ANCHOR STRAP 3" = 1'-0"3 FASCIA DETAIL
1 1/2" = 1'-0"4 ROOF HATCH & LADDER
1" = 1'-0"6 PREMOLDED VENT BOOT FLASHING DETAIL 1 1/2" = 1'-0"7 COATED METAL DRAIN DETAIL
1 1/2" = 1'-0"5 ROOF INSULATION DETAIL
PACK SPACE BETWEEN
MET. DECK AND CONC.
BLOCK WITH BATT
INSUL.
MITER & SEAL JOINT
WATERTIGHT (TYPICAL)
.090 ALUM ANCHOR STRAP 6' - 0''
MAXIMUM O.C. (MIN. 3 PER D.S.)
22 GA. METAL FASCIA TRIM W/
CONT. CONCEALED CLEATS
FASTENED AT 24'' O.C.
EXISTING 8'' CMU
1-1/4" HOT DIPPED GALVANIZED
ROOF NAILS @ 4" (102mm) O.C. MAX.
9.5" TPO QUICKSEAM FLASHING
(SEE NOTE #5 AND #6)
5.5" TPO QUICKSEAM
FLASHING (SEE NOTE #6)
20 GA. CONTINUOUS CLEAT
DRIP/GRAVEL STOP EDGE
METAL (SEE NOTE #1)
WOOD NAILER (SEE NOTE #4)
1-1/4" HOT DIPPED GALVANIZED
ROOF NAILS @ 6" (152 mm) O.C. MAX.
ACCEPTABLE MEMBRANE ADHESIVE
(ADHERED SYSTEMS ONLY)
ULTRAPLY TPO
MEMBRANE
APPROPRIATE FASTENER
GUTTER (SEE NOTE #9 AND #10)
PRESSURE TREATED WOOD
NAILER (SEE NOTE #3)
ULTRAPLY TPO MEMBRANE
ACCEPTABLE PRIMER
1-1/4" HOT DIPPED GALVANIZED ROOF
NAILS @ 4" (102mm) O.C. MAX.
ACCEPTABLE MEMBRANE
ADHESIVE
(ADHERED SYSTEMS ONLY)
9.5" TPO QUICKSEAM FLASHING
(SEE NOTE #10 AND #6)
5.5" TPO QUICKSEAM
FLASHING (SEE NOTE #6)
EXISTING 8'' CMU
NEW THERMOPLASTIC MEMBRANE
ROOFING OVER EXISTING ROOFING
MEMBRANE & INSULATION
NEW 2-1/2" Z-CLIPS
16" OC VERTICALLY
NEW 2-1/2" RIGID INSULATION
NEW 5/8" DENSGLASS
SHEATHING W/ FLUID-
APPLIED
MEMBRANE AIR & VAPOR
BARRIER
NEW PT 2X
FRAMING
ANCHORED TO
THE WALL
NEW CUSTOM COLOR
VERTICAL APPLIED
MEMBRANE ROOFING
MEMBRANE ROOFING
NEW 2-1/2" RIGID INSULATION
1/2" HD ISO BD
EXISTING ROOFING MEMBRANE
EXISTING ROOFING MEMBRANE
1/2" HD ISO BD
NEW THERMOPLASTIC MEMBRANE
ROOFING SYSTEM OVER EXISTING
ROOFING MEMBRANE & INSULATION.
EXISTING FINISH TO REMAIN
1-1/4" HOT DIPPED GALVANIZED ROOF
NAILS @ 4" (102mm) O.C. MAX.
9.5" TPO QUICKSEAM FLASHING (SEE
NOTE #5 AND #6)
5.5" TPO QUICKSEAM
FLASHING (SEE NOTE #6)
20 GA. CONTINUOUS CLEAT
DRIP/GRAVEL STOP EDGE
METAL (SEE NOTE #1)
PRESSURE TREATED WOOD
NAILER (SEE NOTE #4)
1-1/4" HOT DIPPED GALVANIZED
ROOF NAILS @ 6" (152 mm) O.C. MAX.
ACCEPTABLE MEMBRANE ADHESIVE
(ADHERED SYSTEMS ONLY)
ULTRAPLY TPO
MEMBRANE
EXISTING ROOFING MEMBRANE
1/2" HD ISO BD
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
NOTES:
INSTALL TPO COATED METALWORK AND HEAT WELDED MEMBRANE AT GUTTERS TO MANUFACTURES REQUIREMENTS OR SMACNA RECOMMENDATIONS. IF SHOP FABRICATED METAL EDGE IS USED IT MUST MEET ANSI/SPRI ES-1 OR AN FM STANDARD.
ULTRAPLY TPO GP SEALANT IS REQUIRED ALONG ENTIRE UPSLOPE EDGE OF QUICKSEAM FLASHING WHEN ROOF SLOPE IS 1" (25 mm) PER FOOT OR GREATER.
WOOD NAILER MUST BE INSTALLED TO MEET APPLICABLE BUILDING CODES.
FLANGE OF METAL MUST BE FULLY SUPPORTED BY WOOD AND TERMINATED AT LEAST 1/2" (13 mm) FROM EDGE OF WOOD.
9.5" TPO FLASHING MUST EXTEND TO WITHIN 1/4" (6 mm) OF THE FLANGE EDGE.
TO ENSURE FORMABILITY, SLIGHTLY HEAT-FORM THE SURFACE OF TPO QUICKSEAM PRODUCTS AT STEP-OFFS AND ANGLE CHANGES.
ROUND ALL METAL CORNERS AND PLACE BACK OF GUTTER STRAP 1/4" (6 mm) BELOW TOP OF WOOD NAILER.
DO NOT PRE-NAIL MEMBRANE TO THE FACE OF THE WOOD NAILER.
CONSTRUCT AND ANCHOR GUTTER IN ACCORDANCE WITH SMACNA RECOMMENDATIONS.
FLANGE OF METAL GUTTER MUST BE FULLY SUPPORTED BY WOOD AND TERMINATED AT LEAST 1/2" (13mm) FROM EDGE WOOD.
IF THE THE FLANGE OF THE METAL GUTTER IS NOT COMPLETELY COVERED WITH QUICKSEAM FLASHING, THEN AND ADDITIONAL PIECE OF QUICKSEAM FLASHING SHALL BE INSTALLED AT ALL METAL SPLICES.
NEW THERMOPLASTIC MEMBRANE
ROOFING SYSTEM OVER EXISTING
ROOFING MEMBRANE & INSULATION.
EXISTING FINISH TO REMAIN
1-1/4" HOT DIPPED GALVANIZED ROOF
NAILS @ 4" (102mm) O.C. MAX.
9.5" TPO QUICKSEAM FLASHING (SEE
NOTE #5 AND #6)
5.5" TPO QUICKSEAM
FLASHING (SEE NOTE #6)
20 GA. CONTINUOUS CLEAT
DRIP/GRAVEL STOP EDGE
METAL (SEE NOTE #1)
PRESSURE TREATED WOOD
NAILER (SEE NOTE #4)
1-1/4" HOT DIPPED GALVANIZED
ROOF NAILS @ 6" (152 mm) O.C. MAX.
ACCEPTABLE MEMBRANE ADHESIVE
(ADHERED SYSTEMS ONLY)
ULTRAPLY TPO
MEMBRANE
EXISTING ROOFING MEMBRANE
1/2" HD ISO BD
Tower Place Building, 3340 Peachtree Road, N.E.
Suite 1800 Atlanta, Georgia 30326 404.522.8805
404.521.2118 (F)
ES
E D
O C
U M
EN
TS
R
EM
AI
N
T H
E
PR
O
PE
R
TY
O F
TH
E
AR
C
H
IT
EC
T
AN
D
M
AY
N O
T
BE
U
SE
D O
R R
EP
R
O D
U C
ED
W
IT
H
O U
T W
R
IT
TE
N
P
ER
M
IS
SI
O
N
PROJECT
NO.
SHEET
TITLE
SHEET
NO.
RELEASED FOR CONSTRUCTION
22111
ROOF DETAILS
A1.83
Union Point Elementary
School 1401 Highway
77N Union Point, GA
30669
Revisions
No. Date Description
10/31/23 PERMIT SET
12/11/23 PROPOSAL SET
3" = 1'-0"1 ROOF DETAIL 01 3" = 1'-0"3 ROOF DETAIL 03
3" = 1'-0"2 ROOF DETAIL 02
| G0.01 - COVER SHEET |
| A1.81 - ROOF PLAN |
| A1.82 - ROOF DETAILS |
| A1.83 - ROOF DETAILS |