2312 ADDENDUM NO 1 _ GRIGGS POOL _ PACKAGE NO.pdf

PDF 59 KB Posted

Attached to
Pool & Pool Pavilion At William J Griggs Center
Solicitation number
PE-77030-NONST-2024-000000001
Issued by
Terrell County, Georgia

About this file

This document is an addendum issued by Smith Design Group, Inc. on behalf of the Griggs Pool & Pool Pavilion, Package No. 2 project. The addendum modifies the original bidding documents, primarily due to review comments received from the Georgia Department of Health regarding the pool turnover rate. As a result, the bid date has been extended to December 12, 2023 at 2 p.m.

The base bid for the project includes a pool design with a 6-hour turnover rate, without the slide or "mushroom" features. There are several additive alternates included, such as increasing the turnover rate to 4 hours, adding the "mushroom" feature, adding a slide, adding a fin wall, and providing a decorative black metal fence and gates instead of a black coated vinyl chain link fence. Revised bid documents for the 4-hour turnover rate will be issued on or about November 22, 2023.

View the file

Other files

File Type Posted
2312 GRIGGS POOL AND PAVILION 09 OCT 2023_pdf.html HTML file
Griggs Project Manual.htm HTM file
Griggs Pool Construction 09 OCT 2023_pdf.html HTML file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 06 NOV 2023 SDG Project No.: 2312 Project Name: Griggs Pool & Pool Pavilion, Package No. 2

The Bidding Documents are modified as follows:

PART 1.00 DRAWINGS

NO ITEMS INCLUDED

PART 2.00 PROJECT MANUAL

NO ITEMS INCLUDED

PART 3.00 ADDENDA

NO ITEMS INCLUDED

PART 4.00 APPROVED MANUFACTURERS

NO ITEMS INCLUDED

PART 5.00 ATTACHMENTS

NO ITEMS INCLUDED

PART 6.00 GENERAL CLARIFICATIONS

6.01: Bid Date Extension

A. The Bid Date is extended due to review comments from the GA Dept. of Health on the pool turnover rate. This will affect pump sizes, piping sizes, electrical & mechanical associated with the pool pumping system. Therefore, the Bid Date is extended to 12 DEC 2023 at 2 p.m.. After review comments from the Georgia Department of Health and consultation with the Owner & Design Team, the following Base Bid & Additive Alternate Pricing will be included in the Bid Package:

Base Bid: Base Bid pool to be be bid with 6-hour turnover rate as designed without the slide or the ‘mushroom’ features and their associated piping, pumps, and electrical components.

Additive Alternate No. 1: Increase the turnover rate of the pool to a 4-hour turnover. Revised Bid Documents for the 4-hour turnover rate to be issued on or about 22 NOV 2023.

Additive Alternate No. 2: Add the ‘mushroom’ features and its associated piping, pumps, and electrical components to the 4-hour turnover rated pool.

Smith Design Group, Inc. P | 706.882.5511 - www.sdgarch.net of 1 2

ADDENDUM NO. 1

Additive Alternate No. 3: Add the slide and its associated piping, pumps, and electrical components to the 4-hour turnover rated pool.

Additive Alternate No. 4: Add fin wall as designed on the drawings. (Base Bid: No fin wall.)

Additive Alternate No. 5: Provide 7’-0” high decorative black metal fence & gates around the entire pool & pavilion as shown on the drawings. (Base Bid: Provide 7’-0” high black coated vinyl chain link fence & gates around the entire pool & pavilion.)

END OF ADDENDUM NO. 1

Smith Design Group, Inc. P | 706.882.5511 - www.sdgarch.net of 2 2

File details come from the government source that posted it. Updated .