2300227_002_DRC_02_DRWGS_2024_06_14.pdf
PDF 5 MB Posted
- Attached to
- Hwashin Plant 5 Fire Pump Building
- Solicitation number
- PE-77567-NONST-2025-000000001
- Issued by
- Laurens County, Georgia
About this file
This document contains information related to a state and local contract opportunity for the construction of a fire pump house building at the Hwashin Plant 5 facility in Dublin, Georgia.
The project scope includes the construction of a pump house to house the fire protection pumps and associated electrical and mechanical equipment. The pump will tie into a new fire protection line being provided as part of the overall Plant 5 project. The bidding documents provide details on the required fire pump assembly and emergency generator. The project is located in Laurens County, Georgia. No specific bid due date is provided, but the document indicates the project is being issued for bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| POSTED_ Invitation to Bid_ Hwashin Plant 5 Fi.pdf | ||
| 2300227_002 DRC02_SPECS_2024_06_14.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G A H
W Y
G A H
W Y 2
GA HWY 360
G A H
W Y 357
G A H
W Y 3
PROJECT
ADDRESS TBD
ELEVATION INDICATION - (FLOORS, ETC...)
DOOR NUMBER INDICATION
TITLE IDENTIFICATION
SECTION LOCATION IDENTIFICATION
PLAN IDENTIFICATION
ELEVATION LOCATION IDENTIFICATION
ROOM NAME AND NUMBER INDICATION
COLUMN INDICATION
ROOF OR RAMP PITCH INDICATION
ROOF OR RAMP SLOPE INDICATION
REVISION INDICATION
REFERENCE SYMBOLS
ELEVATION IDENTIFICATION
NUMBER(S) INDICATES
DIRECTION OF VIEW OR VIEWS
(SAME NUMBER ON SHEET
WHERE DRAWN)
SHEET IDENTIFICATION NUMBER
(INDICATES SHEET NUMBER
WHERE ELEVATION IS DRAWN)
BUILDING SECTION
WALL SECTION
DETAIL SECTION
WALL TAG
PARTITION TYPE INDICATION
0'-0"
GRAPHIC SCALE
(0000)
ROOM IDENTIFICATION NUMBER
COLUMN IDENTIFICATION LETTER OR
NUMBER FOR NEW CONSTRUCTION
PLAN OR SECTION DETAIL
IDENTIFICATION NUMBER
(SAME NUMBER ON SHEET
WHERE DRAWN)
SHEET IDENTIFICATION
NUMBER (INDICATES SHEET
NUMBER WHERE PLAN OR
SECTION DETAIL IS DRAWN)
SHEET IDENTIFICATION NUMBER
(INDICATES SHEET NUMBER WHERE
DETAIL IS TYPICALLY
REFERENCED - NOT ALL INCLUSIVE)
SECTION IDENTIFICATION NUMBER
(SAME NUMBER ON SHEET WHERE
REFERENCED)
SECTION IDENTIFICATION NUMBER
(SAME NUMBER ON SHEET WHERE
DRAWN)
SHEET IDENTIFICATION NUMBER
(INDICATES SHEET NUMBER
WHERE SECTION IS DRAWN)
LOUVER NUMBER INDICATION
SCALE:
NORTH
1/8" = 1'-0"
PLAN TITLE
SCALE:
AE1-01-01 1/8" = 1'-0"
VIEW TITLE
AE1-01-01
AE1-01-01
AE1-01-01
SIM
AE1-01-01
SIM
AE1-01-01
SIM
AE1-01-01
SIM
FINISH FLOOR
0' 0" (0000)
AE1-01-01
SIM
0 1' 2' 1"=1'-0"
GD-1A
A
ROOM NAME
1000 1000
L101A L101A
SLOPE
BUILDING CODE REVIEW SUMMARY (BASED ON 2018 INTERNATIONAL CODES)
2020 NATIONAL ELECTRICAL CODE (NEC 70) WITH GEORGIA
AMENDMENTS (2021)
2018 INTERNATIONAL FIRE CODE (IFC)
2018 INTERNATIONAL PLUMBING CODE (IPC) WITH GEORGIA
AMENDMENTS (2020), (2022), (2023)
2018 INTERNATIONAL MECHANICAL CODE (IMC) WITH
GEORGIA AMENDMENTS (2020)
2015 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
WITH GEORGIA AMENDMENTS (2020), (2022), (2023)
ADOPTED LOCAL AMENDMENTS:
GOVERNING CODES:
2018 INTERNATIONAL BUILDING CODE (IBC) WITH GEORGIA
AMENDMENTS (2020), (2022)
REFERENCED STANDARDS:
NFPA 13 (2019) STANDARD FOR INSTALLATION OF
SPRINKLER SYSTEMS
NFPA 14 (2016) STANDARD FOR THE INSTALLATION OF
STANDPIPE AND HOSE SYSTEM
NFPA 20 (2016) STANDARD FOR THE INSTALLATION OF
STATIONARY PUMPS FOR FIRE PROTECTION
NFPA 70 (2020) NATIONAL ELECTRIC CODE
NFPA 72 (2019) NATIONAL FIRE ALARM AND SIGNALING CODE
NFPA 101 (2018) LIFE SAFETY CODE
GEORGIA ACCESSIBILITY CODE (120-3-20) BASED ON 2010
ADA STANDARDS FOR ACCESSIBLE DESIGN
2018 INTERNATIONAL FUEL GAS CODE (IFGC) WITH GEORGIA
AMENDMENTS (2020), (2022)
FLOOD HAZARD AREA
NEW CONSTRUCTION NEW BUILD ADDITION
YES NO
FIRE DISTRICT YES NO
FLOOR
FIRST FLOOR
GROSS BUILDING
AREAS
PROPOSED AREAEXISTING AREA
N/A 166 SF
OCCUPANCYOCCUPANCY AND
USE GROUPS
SECTIONGROUPBUILDING
PUMP HOUSE SINGLE USE F-2 LOW HAZARD 306
STRUCTURAL FRAME
BEARING WALLS - EXTERIOR
BEARING WALLS - INTERIOR
NON BEARING WALLS - INTERIOR
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
0 HOUR
0 HR NORTH
0 HOUR
0 HOUR
0 HOUR
0 HOUR
FIRE RESISTANCE
RATINGS FOR
BUILDING ELEMENTS
T601
CONSTRUCTION
CLASSIFICATION
X < 5 II-B
FIRE RESISTANCE
RATING
REQUIREMENTS
FOR EXTERIOR
WALLS BASED ON
FIRE SEPARATION
DISTANCE
T602
FIRE SEPARATION DISTANCE = X (FT) CONSTRUCTION TYPE
5 < X < 10
10 < X < 30
X > 30
1 HOUR
OCCUPANCY GROUP F2
1 HOUR
0 HOUR
0 HOUR
TYPE II-B
0 HR SOUTH 0 HR EAST 0 HR WEST
TABLE 601NONCOMBUSTIBLE
NON BEARING WALLS - EXTERIOR REFER TO T602
II-B
II-B
II-B
FIRE PROTECTION
SYSTEMS
CHAPTER 9
PROTECTION
AUTOMATIC SPRINKLER SYSTEMS (903)
STANDPIPE SYSTEMS (905)
PORTABLE FIRE EXTINGUISHERS (906)
STANDARD
FIRE ALARM & DETECTION SYSTEMS (907)
EMERGENCY ALARM SYSTEMS (908)
SMOKE CONTROL SYSTEMS (909)
SMOKE & HEAT REMOVAL (910)
FIRE DEPARTMENT CONNECTIONS (912)
EMERGENCY RESPONDER RADIO
COVERAGE (916)
SYSTEM TYPE
WET
CLASS 1
CLASS A & B
NFPA 13
NFPA 14
NFPA 10
NFPA 72
IBC 415.5
NFPA
IFC 510
NUMBER OF EXITS
NFPA 101:
7.4.1; 7.5.1
OCCUPANT LOAD PER STORY STORY #
PUMP HOUSE = 2 1
OCCUPANT LOAD
NFPA 101:
7.3.1 (T 7.3.1.2)
OCCUPANCY FLOOR AREA PER OCCUPANT GROSS OR NET
MINIMUM NUMBER OF REQUIRED EXITS
BUILDING
PUMP
HOUSE
GROSS166 SF / 100 OCC. = 2
CLIMATE ZONE: 3AENERGY
CONSERVATION
PRESCRIPTIVE TRADE-OFF ENERGY MODELCOMPLIANCE PATH:
MANDATORY REQUIREMENTS: IECC 2015, CHAPTER 3
INDUSTRIAL
GENERAL
NFPA 1225; CH. 18
PROJECT TEAM
LOCATION MAP
N.T.S.
PROJECT DESCRIPTION LOCATION MAPPROJECT NAME AND ADDRESS
CONSTRUCTION OF NEW FIRE PUMP HOUSE FOR GREENFIELD
MANUFACTURING PLANT
CITY SUBMITTALS
LIST OF CITY SUBMITTALS
1. DOC REL 02 – IFB 06/14/24
2.
3.
4.
LIST OF DEFERRED CITY SUBMITTALS
1.
2.
3.
4.
PROJECT INFORMATION
G H
A F
A R
I A
S S
O C
IA
T
E S www.ghafari.com
BIRMINGHAM, AL 35205-4024 USA
TEL +1.205.203.4611
2170 HIGHLAND AVENUE SOUTH
SUITE 220
/1
/2
:1
:2
A
M
PROJECT NUMBER:2300227.002
ISSUED FOR:BID
ISSUE DATE:06/14/24
HWASHIN GEORGIA
DUBLIN, GEORGIA
00-0-0
DRAWING INDEX - PROJECT
D
O C
R E
L
I F
B
SHEET # SHEET TITLE
00 GENERAL INFORMATION
● GO0-00-00 COVER SHEET
40 CIVIL GENERAL INFORMATION
● CO5-00-01 DETAILS
42 CIVIL SITE
● CS1-00-01 SITE LAYOUT PLAN
43 CIVIL UTILITIES
● CU1-00-01 SITE UTILITY PLAN
44 CIVIL GRADING
● CG1-00-01 OVERALL GRADING PLAN
60 STRUCTURAL
● S00-00-01 STRUCTURAL ABBREVIATIONS AND SYMBOLS
● S00-00-02 STRUCTURAL GENERAL NOTES
63 STRUCTURAL SUPERSTRUCTURE
● SF1-00-01 STRUCTURAL FRAMING AND FOUNDATION PLAN
● SF5-00-01 STRUCTURAL SECTIONS AND DETAILS
71 ARCHITECTURAL SITE
● AS1-00-00 ARCHITECTURAL SITE PLAN
73 ARCHITECTURAL ELEMENTS
● AE1-01-01 ARCHITECTURAL FLOOR PLAN
● AE2-00-01 ARCHITECTURAL BUILDING ELEVATIONS, SECTIONS AND DETAILS
104 FIRE SUPPRESSION
● FX0-00-01 FIRE SUPPRESSION GENERAL INFORMATION
● FX5-00-01 FIRE SUPPRESSION DETAILS
110 PLUMBING GENERAL INFORMATION
● PO0-00-01 PLUMBING GENERAL INFORMATION
160 MECHANICAL GENERAL INFORMATION
● MO0-00-01 MECHANICAL GENERAL INFORMATION
170 ELECTRICAL
● EO0-00-01 ELECTRICAL GENERAL INFORMATION
172 ELECTRICAL SITE
● ES1-00-01 ELECTRICAL SITE PLAN
177 ELECTRICAL POWER
● EP1-01-00 ELECTRICAL POWER PLAN
OWNER
HWASHIN AMERICA CORPORATION
661 MONTGOMERY HWY
GREENVILLE, AL 36037
CIVIL ENGINEER
KADRE ENGINEERING
P.O. BOX 101205
IRONDALE, AL 35210
CONTACT: BRIAN HATCHER
PHONE: 205.305-4079
EMAIL: bhatcher@kadre-eng.com
STRUCTURAL ENGINEER
ARCHITECT
GHAFARI ASSOCIATES, INC.
2170 HIGHLAND AVE S, #220
BIRMINGHAM, AL 35205
CONTACT: SCOTT HEYWOOD
PHONE: 205.585-5535
EMAIL: sheywood@ghafari.com
ELECTRICAL ENGINEER
MECHANICAL ENGINEER
GHAFARI ASSOCIATES, INC.
2170 HIGHLAND AVE S, #220
BIRMINGHAM, AL 35205
CONTACT: SETH MICHAEL
PHONE: 205.613.0889
EMAIL: smichael@ghafari.com
GHAFARI ASSOCIATES, INC.
2170 HIGHLAND AVE S, #220
BIRMINGHAM, AL 35205
CONTACT: GREGORY ENOS
PHONE: 205.662.2147
EMAIL: genos@ghafari.com
GHAFARI ASSOCIATES, INC.
2170 HIGHLAND AVE S, #220
BIRMINGHAM, AL 35205
CONTACT: STEVEN BOWKER
PHONE: (734) 718-0502
EMAIL: sbowker@ghafari.com
CONCRETE PAVING
PORTLAND CEMENT CONCRETE PAVEMENT (4,000 PSI/650 FLEXURAL)
CRUSHED AGGREGATE BASE COURSE, COMPACTED TO 98% (ASTM D 1557)
9.0"
4.0"
CONTROL JOINT CONSTRUCTION JOINT
AT POUR BREAKS AND
PAVEMENT TIE POINTS
EXPANSION JOINT
LEGEND:
W = WIDTH OF SAWCUT
D = DEPTH OF SEALANT (1.0 TO 1.5 x W) FOR POURED SEALANT; 0.5 W FOR SILICONE
SEALANT; A MINIMUM OF 38" REQUIRED
T = DEPTH OF INITIAL SAWCUT TYPE JOINT FORMER (CONTRACTION JOINT)
a. 1/4" SLAB THICKNESS ±1/2" FOR PAVEMENTS LESS THAN 12 INCHES
b. DIAMETER OF BACKER MATERIAL = W + 1/8"
NOTES:
1. TOP OF SEALANT MUST BE 116" TO 14" BELOW TOP OF PAVEMENT.
2. PLACE EXPANSION JOINTS AT POUR BREAKS (80' MAX SPACING FOR CONCRETE
PAVING AND 50' MAX SPACING FOR CONCRETE SIDEWALKS) OR WHERE
PAVEMENT ABUTS PERMANENT STRUCTURES (BUILDING, POLES, INLETS, ETC.)
JOINT
BOTTOM
PAVEMENT
SURFACE
PAVEMENT
SURFACE
BACKER
MATERIAL
BACKER
MATERIAL
JOINT
FILLER
POUR BREAK/
BUTT JOINT
POURED
JOINT
SEALER
CONCRETE JOINT DETAIL
CONCRETE PAVING REINFORCEMENT MUST BE 4X4 W2.9/W2.9 WELDED WIRE FABRIC PLACED AT MID-DEPTH. 34" DOWELS AT 12"O.C. (ONE END GREASED) LOCATED AT EXPANSION JOINTS AND POUR BREAKS WITH 6" EMBED LENGTH. SEE CONCRETE JOINT DETAIL FOR ADDITIONAL JOINTING INFORMATION. FIBER REINFORCEMENT MAY BE ALLOWED AS AN ALTERNATE. CONTRACTOR
SHALL PROVIDE DESIGN FROM FIBER MANUFACTURER TO KADRE PRIOR TO INSTALLATION.
W
T
D D
PAVEMENT
SURFACE
W1/8" 1/2"
W 1/2"
JOINT SPACING
PAVING
TYPE
SIDEWALK
CURB & GUTTER
VALLEY GUTTER
80' MAX
EXPANSION
50' MAX
30' MIN / 100' MAX
12' MAX
CONTROL
5'
5' MIN / 15' MAX
30' MIN / 100' MAX 5' MIN / 15' MAX
SCARIFY AND RECOMPACT THE UPPER 12" IN CUT AREAS TO 95% MODIFIED PROCTOR (ASTM D-1557)
OR PER ON-SITE GEOTECHNICAL RECOMMENDATIONS
PVC D.I.
BENEATH EXISTING IMPROVED SURFACES
UNSTABLE
PVC D.I.
HDPE
UNSTABLE
HDPE
APPROVED
BACKFILL TO BE
COMPACTED IN
12" TO 18" LIFTS
APPROVED
BACKFILL TO BE
COMPACTED IN
12" TO 18" LIFTS
APPROVED
BACKFILL TO BE
COMPACTED IN
12" TO 18" LIFTS
I.D. + 24" I.D. + 24" I.D. + 24"
6" BEDDING
6"
EXISTING UNIMPROVED SURFACES
EXISTING ROADWAY
APPROVED
BACKFILL
6"- 8" LAYERS
95% STANDARD
PROCTOR
APPROVED
BACKFILL
6" - 8" LAYERS
95% STANDARD
PROCTOR
TRACER WIRE
(FORCE MAIN)
6" BEDDING
6"
I.D. + 24" I.D. + 24" I.D. + 24"
SUBGRADE
EXISTING ROADWAY
SUBGRADE
EXISTING ROADWAY
SUBGRADE
APPROVED
BACKFILL
6" - 8" LAYERS
95% STANDARD
PROCTOR
UNDISTURBED
SOIL OR ROCK
UNDISTURBED
SOIL OR ROCK
UNDISTURBED
SOIL OR ROCK
UNDISTURBED
SOIL OR ROCK
UNDISTURBED
SOIL OR ROCK
UNDISTURBED
SOIL OR ROCK
PIPE BEDDING DETAIL
NO. 57 CRUSHED
STONE NO. 57 CRUSHED
STONE
NO. 57 CRUSHED
STONE OR SANDNO. 57 CRUSHED
STONE OR SAND
6" BEDDING6" BEDDING
6" BEDDING6" BEDDING
NOTES:
1. BEDDING MATERIALS FOR PVC AND HDPE PIPE SHALL BE 1/4" TO 1 1/2" GRADED CRUSHED STONE SUCH AS: 56,57,6,67,68,7,OR 78, STONE PER ALDOT STANDARD SPECS. SAND OR GRAVEL MAY BE
USED AS BEDDING MATERIAL FOR D.I. PIPE.
2. WIDTH VARIES BASED ON WALL STABILITY. STABLE WALLS WIDTH AS NEEDED TO JOIN PIPE AND
COMPACT HAUNCHING AND INITIAL BACKFILL. UNSTABLE WALLS: WIDTH TO BE A MINIMUM OF
FIVE TIMES PIPE DIAMETER.
3. FLOWABLE FILL CAN BE USED AS BACKFILL, BUT MUST HAVE PRIOR APPROVAL AND MUST BE
ALLOWED TO SETUP FOR 24 HOURS PRIOR TO TOPPING.
4. APPROVED BACKFILL MATERIAL INCLUDES 825 B, FLOWABLE FILL AND APPROVED DIRT.
ALTERNATIVE MATERIAL MUST BE APPROVED BY PROJECT MANAGER PRIOR TO USE.
TOP 6"-8" TO
98% STANDARD
COMPACTION
TOP 6"-8" TO
98% STANDARD
COMPACTION
TOP 6"-8" TO
98% STANDARD
COMPACTION
CO5-00-01
DETAILS
24"
IMPROVED
SUBGRADE
CONCRETE SHALL
BE KEPT CLEAR OF
PIPE JOINTS(TYP.)
CONCRETE
BLOCK(TYP.)
CROSSTEE
ALL BEARING SURFACES SHALL
BE AGAINST UNDISTURBED
GROUND (TYP.)
C.I. CAP
CONCRETE BLOCK
(TYP.)
ELBOW
CONCRETE
BLOCK(TYP.)
DEAD END
BEARING AREAS EACH DIRECTION
OF THRUST IN SQUARE FEET
PIPE
SIZE
TEES &
DEADENDS
90°
ELBOWS
45° ELBOW CROSSES IN
DIRECTION OF FLOW
22-1/2°
ELBOWS
6" 8"
10" 12" 14" 16"
4.0 7.0 9.5
13.5 18.0 23.0
5.5 9.5
13.5 19.0 23.5 33.0
3.0 5.0 7.0
10.0 14.0 18.0
2.0 3.0 4.0 5.0 7.0 9.0
SIDE EXCAVATIONS(TYP.)
THRUST BLOCK
ALL BEARING SURFACES SHALL
BE AGAINST UNDISTURBED
GROUND (TYP.)
FLOW
HEAVY DUTY TRAFFIC RATED
CLEANOUT HANDHOLE RING
AND COVER (H-20 LOADING)
FINISHED
GRADE
REQUIRED CONCRETE COLLAR
12"X12" SQUARE CAST IN PLACE
OR 18" DIA. ROUND PRECAST
CLEANOUT IN PAVED AREAS
BRASS, METAL, OR PVC CAP
4" MIN.
TO BE FLUSH
WITH GROUND
8"
18"
ANNULAR SPACE SHALL BE GROUTED
IN IF PRECAST COLLARS ARE USED
FINISHED
GRADE
TO BE FLUSH
WITH GROUND
4" MIN.
BRASS, METAL, OR PVC CAP
FLOW
*MIN.1% SLOPE FOR 6" PIPE
*MIN. 2% SLOPE FOR 4" PIPE CLEANOUT IN NON-PAVED AREAS
SANITARY SEWER CLEANOUT
*MIN. 1% SLOPE FOR 6" PIPE
*MIN. 2% SLOPE FOR 4" PIPE
DRAWN BY
SHEET TITLE
PROJECT MANAGER
QUALCHECK
DESIGNED BY
PROJECT #
SHEET NUMBER
G H
AF
AR
I A
SS
O C
IA
TE
S
REGISTRATION SEAL
2170 HIGHLAND AVENUE SOUTH
SUITE 220
BIRMINGHAM, AL 35205-4024 USA
TEL +1.205.203.4611
www.ghafari.com
PO BOX 101205
IRONDALE, ALABAMA 35210
Contact: Brian Hatcher, PE Tel +1.205.795.3434 bhatcher@kadre-eng.com
KE# 24001
CONSULTANT INFORMATION
B. HATCHER
C. WALKER
C. WALKER
C. EATMAN
FPH
REV DATE DOC REL ## - DESCRIPTION
06/14/
HWASHIN
GEORGIA
2300227.002
DOC REL 02 - IFB06/14/24
FIRE PUMP HOUSE
GE
N
T
SCALE: 1"=10'
10 20
CS1-00-01
SITE LAYOUT
PLAN
N
FIRE PUMP
BUILDING
FFE=292.50
GENERAL NOTES:
1. BOUNDARY AND TOPOGRAPHIC SURVEY WAS PROVIDED BY THE OWNER AND PREPARED BY CHRISTIAN &
ELLINGTON ENGINEERING. TOPOGRAPHIC INFORMATION WAS PERFORMED VIA GROUND RUN FORMAT.
CONTRACTOR SHALL VISIT THE SITE AS NECESSARY TO VERIFY SITE BOUNDARY AND EXISTING TOPOGRAPHY PRIOR TO BIDDING OR CONSTRUCTION. NOTIFY KADRE ENGINEERING OF ANY DISCREPANCIES PRIOR TO
SUBMITTING BIDS OR ORDERING OF MATERIALS.
2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION SITE LAYOUT. IN THE EVENT THE CONTRACTOR WILL PERFORM THEIR OWN LAYOUT AND/OR UTILIZE GPS GRADING CONTROLS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIRING A LICENSED SURVEYOR TO PROVIDE THE NECESSARY CONTROL POINTS AND PROVIDE 3RD/ PARTY VERIFICATION OF LAYOUT AND GRADE CONTROL WORK
PERFORMED BY THE CONTRACTOR.
3. ALL NECESSARY PERMITS AND APPROVALS FROM AGENCIES GOVERNING THE CONSTRUCTION OF THIS WORK SHALL BE SECURED PRIOR TO BEGINNING CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALL FEES ARE PAID PRIOR TO COMMENCING CONSTRUCTION AND THE CONSTRUCTION INSPECTION
SCHEDULED IS ADHERED TO PER AGENCY REQUIREMENTS.
4. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE VARIOUS
GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK, INCLUDING LANDSCAPING.
5. THE CONTRACTOR SHALL USE EACH PLAN IN CONJUNCTION WITH THE ENTIRE SET OF DRAWINGS AND JOB SPECIFICATIONS. DO NOT REMOVE OR DEMOLISH ANYTHING WITHOUT VERIFYING AND COORDINATION WITH ALL ELECTRICAL, PLUMBING, MECHANICAL, GENERAL TRADES, AND UTILITY COMPANIES AS THEY EFFECT THE
OVERALL PROJECT.
6. PRIOR TO ANY WORK ON-SITE, THE CONTRACTOR SHALL CONTACT THE ONE CALL SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY REMOVALS WHETHER LOCATED BY THE ONE CALL SYSTEM OR NOT.
7. CONTRACTOR IS RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO ANY EXISTING IMPROVEMENTS DURING CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC.ALL REPAIRS SHALL BE MADE IN A MANNER THAT ENSURES THE REPAIRED ITEM TO BE BE EQUAL TO OR BETTER
THAN THE ORIGINAL CONDITION.
8. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND SHALL COMPLY WITH
ALL REGULATORY AGENCY'S REGULATIONS AND CODES AND O.S.H.A. STANDARDS.
9. CONTRACTOR SHALL REVIEW SOIL REPORTS AND BORINGS PRIOR TO BIDDING THE PROJECT AND COMMENCING
CONSTRUCTION.
10. EXISTING UTILITIES SHOWN ON THESE DRAWINGS ARE APPROXIMATE AND ADDITIONAL UTILITIES MAY EXIST WITHIN OR ADJACENT TO THE LIMITS OF CONSTRUCTION. ALL UTILITIES MUST BE LOCATED BY UNDERGROUND LINE LOCATORS AS WELL AS FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT.
REPORT DISCREPANCIES IMMEDIATELY.
11. WORK PERFORMED UNDER THIS CONTRACT SHALL COORDINATE WITH OTHER WORK BEING PERFORMED OR SCHEDULED ON SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. IT IS NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE ACTIVITIES, WHERE NECESSARY, WITH OTHER CONTRACTOR'S
AND UTILITY COMPANIES.
SITE DEMOLITION NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR ALL REGISTRATIONS, NOTIFICATIONS, PERMITS, FEES, DUMP FEES AND
CHAIN OF CUSTODY TRACKING REQUIRED TO REMOVE AND LEGALLY DISPOSE OF ALL DEMOLITION MATERIALS
OFF OF THE OWNER'S PROPERTY.
2. THE CONTRACTOR IS RESPONSIBLE TO OBTAINING PERMITS AND COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS IN THE REMOVAL/DEMOLITION/DISPOSAL OF ALL DEMOLITION MATERIALS.
3. CONTRACTOR IS RESPONSIBLE FOR VISITING THE PROJECT SITE AND VERIFYING EXTENTS AND ASSOCIATED
QUANTITIES OF REQUIRED DEMOLITION WORK AND UTILITY REMOVAL PRIOR TO BID DATE.
4. SALVAGE RIGHTS FOR ALL DEMOLISHED MATERIALS SHALL BE FIRST GIVEN TO THE OWNER. ANY MATERIALS NOT RETAINED BY THE OWNER SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED OF BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
5. ALL EXISTING PAVING, CURBS, HARDSCAPE, ETC. SHALL BE SAW CUT AT THE LIMITS OF REMOVAL IN ORDER TO PROVIDE A CLEAN EDGE. EXISTING PAVING AT EDGE SHALL BE MILLED BACK A MINIMUM OF 1.5' TO ENSURE SMOOTH TRANSITION. LIMITS OF REMOVALS SHOWN ARE APPROXIMATE AND CONTRACTOR SHALL REMOVE
PAVING AS REQUIRED TO INSTALL PROPOSED IMPROVEMENTS.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISCONNECTION OF UTILITY SERVICES TO THE EXISTING STRUCTURES PRIOR TO DEMOLITION OF ANY BUILDINGS. THE CONTRACTOR SHALL COORDINATE WITH OWNER, KADRE ENGINEERING, AND RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF
UTILITIES.
7. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL STRUCTURES, UTILITIES AND OTHER EXISTING ITEMS AS REQUIRED TO INSTALL IMPROVEMENTS SHOWN IN THE CONSTRUCTION DOCUMENTS. IF REMOVAL OF EXISTING IMPROVEMENTS RESULTS IN AN LOOSE, SOFT OR OTHERWISE UNSTABLE SUBGRADE CONDITION, UNSUITABLE MATERIALS SHALL BE REMOVED SHALL BE UNDERCUT TO FIRM
AND STABLE SUBGRADE AND BROUGHT TO GRADE WITH COMPACTED STRUCTURAL FILL PER THE
GEOTECHNICAL ENGINEER, GRADING NOTES AND/OR SPECIFICATIONS.
8. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS INVOLVED IN THE REMOVAL OR RELOCATION OF ANY UTILITY.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH APPLICABLE UTILITY COMPANIES.
9. THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO THE EXISTING ADJACENT PROPERTIES OR TENANTS AT ALL TIMES. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, TENANT AND UTILITY COMPANY FOR THE RELOCATION AND/OR REMOVAL OF UTILITIES IF NECESSARY. SERVICES SHALL NOT BE
INTERRUPTED WITHOUT APPROVAL.
10. PROMPTLY DISPOSE OF DEMOLISHED MATERIALS. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE. ALL DEMOLITION AND CONSTRUCTION DEBRIS SHALL BE TRANSPORTED AND DISPOSED OF AT LEAST
WEEKLY IN A LEGAL AND APPROVED MANNER.
11. IT IS UNDERSTOOD THAT ALL ABOVE GROUND ITEMS TO BE REMOVED INCLUDE THEIR ASSOCIATED BELOW
GROUND COMPONENTS (I.E. FOUNDATIONS, UTILITY CONNECTIONS, ETC.).
12. ALL TREES INSIDE THE LIMITS OF DISTURBANCE ARE TO BE REMOVED UNLESS NOTED OTHERWISE.
13. THE CONTRACTOR MUST PROTECT ALL AREAS INDICATED TO REMAIN UNDISTURBED OR TO REMAIN AS
BUFFERS, ALL PROPERTY CORNERS, AND ANY REQUIRED COORDINATION OF REGISTERED LAND SURVEYOR TO
REPLACE ALL PINS ELIMINATED OR DAMAGED DURING CONSTRUCTION.
SITE LAYOUT NOTES:
1. CONSTRUCTION MUST COMPLY WITH AND BE CONSTRUCTED IN ACCORDANCE WITH ALL REQUIRED AND
GOVERNING CODES.
2. ALL ADA AREAS, ROUTES, AND PARKING INCLUDING RAMPS, SIGNS, SYMBOLS, AND PAINTED ISLANDS MUST
CONFORM TO THE LATEST ADA REQUIREMENTS.
3. ADA PARKING AREAS MUST NOT EXCEED 2.0% GRADE IN ANY DIRECTION. ADA ACCESS ROUTES MUST NOT
EXCEED 5.0% RUNNING SLOPE AND 2.0% CROSS SLOPE.
4. DIMENSIONS SHOWN WITHIN THESE DOCUMENTS ARE TO THE BACK OF CURB OR EDGE OF HARDSCAPE UNLESS
NOTED OTHERWISE.
5. DIMENSIONS TO BUILDINGS ARE TO THE OUTSIDE FACE OF BUILDING OR COLUMN LINES AS NOTED. THE
CONTRACTOR SHALL VERIFY EXTERIOR BUILDING FACING THICKNESSES PRIOR TO LAYOUT. REFER TO
ARCHITECTURAL PLANS FOR SPECIFIC BUILDING INFORMATION.
6. ALL PAVEMENT STRIPING AND ROADWAY SIGNAGE MUST BE PER THE LATEST EDITION OF THE MUTCD UNLESS
SPECIFICALLY NOTED.
7. CONTRACTOR MUST REPAIR ANY DAMAGE TO ANY EXISTING IMPROVEMENTS DURING CONSTRUCTION, NOT LIMITED TO DRAINAGE CONVEYANCE OR STRUCTURES, UTILITIES, HARDSCAPE, PAVING, STRIPING, LANDSCAPE, ETC. ALL REPAIRS MUST RETURN THE DAMAGED AREA TO BETTER THAN EXISTING CONDITIONS.
8. CONTRACTOR MUST COORDINATE THE INSTALLATION OF UNDERGROUND WORK WITH ALL FINISHED GRADE.
ALL UNDERGROUND INFRASTRUCTURE MUST BE IN PLACE PRIOR TO THE PLACEMENT OF BASE COURSE
MATERIALS.
9. CONTRACTOR IS RESPONSIBLE FOR PREPARING ANY REQUIRED CONSTRUCTION TRAFFIC CONTROL PLANS AND ANY REQUIRED APPROVALS FOR GOVERNING AUTHORITIES. ALL TRAFFIC CONTROL PLANS SHALL BE PER THE
LATEST EDITION OF THE MUTCD.
10. ALL MATERIALS REQUIRED FOR PAVING IMPROVEMENTS MUST BE TESTED BY A 3RD/ PARTY AGENCY, APPROVED OR PROVIDED BY THE OWNER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE WORK CONSTRUCTED MEETS THE REQUIREMENTS OF THE PROJECT ACCORDING TO STANDARD TESTING PROCEDURES
INCLUDING ANY AUTHORITIES HAVING JURISDICTION TESTING REQUIREMENTS.
11. ALL PAVEMENT STRIPING WITHIN RIGHTS-OF-WAY SHALL BE THERMOPLASTIC UNLESS OTHERWISE NOTED.
12. ALL PAINT STRIPING MUST BE APPLIED IN TWO EQUAL COATS WITH A MINIMUM TOTAL THICKNESS OF 15 MILS.
TRAFFIC CONTROL NOTES:
1. THE CONTRACTOR SHALL ESTABLISH AND MAINTAIN TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THE
LATEST EDITION AND REVISION OF PART VI OF THE FEDERAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE APPROVED TRAFFIC CONTROL PLAN FOR ALL CONSTRUCTION WITHIN WORK AREAS SHOWN
AND DESCRIBED IN PART VI OF THE MUTCD.
2. PERMANENT ROADWAY SIGNS OR TEMPORARY CONSTRUCTION SIGNS WHICH ARE NOT APPLICABLE OR
INAPPROPRIATE FOR THE CURRENT CONDITIONS SHALL BE COVERED OR REMOVED.
3. THE DIMENSIONS SHOWN OR DESCRIBED FOR LOCATING CONSTRUCTION SIGNS ARE NOMINAL. THE ACTUAL DIMENSIONS SHALL BE ADJUSTED TO BEST FIT LOCAL CONDITIONS AND PROVIDE MAXIMUM VISIBILITY.
4. IF TRAFFIC CONTROL DEVICES ARE NECESSARY FOR PROPER WARNING AND TRAFFIC CONTROL AFTER SUNSET, THEN AS A MINIMUM, TYPE "B" WARNING LIGHTS SHALL BE PLACED ON THE FIRST WARNING SIGN AND CHANNELIZING DRUM AND TYPE "A" REFLECTIVE SHEETING SHALL BE REQUIRED ON ALL SIGNS.
5. HAZARDOUS CONDITIONS ON OPEN ROADWAYS SUCH AS PAVEMENT DROP-OFFS IN EXCESS OF 2";
CONSTRUCTION MATERIALS, VEHICLES, OR EQUIPMENT STORED OR PLACED WITHIN THE ROADWAY RIGHT-OF-WAY; AND OPEN TRENCHES ACROSS OR NEAR THE ROADWAY SHALL NOT BE ALLOWED UNLESS THE CONTRACTOR IS ON SITE AND WORKING, AND PROPER TRAFFIC CONTROL MEASURES ARE BEING TAKEN.
6. THE CONTRACTOR SHALL KEEP OPEN ROADWAYS CLEAN AND FREE OF CONSTRUCTION DEBRIS, DIRT, LOOSE
GRAVEL OR OTHER MATERIAL THAT MAY CAUSE HAZARDOUS DRIVING CONDITIONS.
7. TRAFFIC CONTROL DEVICES SHALL MEET THE STANDARD MATERIAL AND INSTALLATION REQUIREMENTS SPECIFIED IN THE CURRENT EDITION OF THE AL.D.O.T. STANDARD SPECIFICATIONS FOR HIGHWAY
CONSTRUCTION.
8. ROADWAYS AND DRIVEWAYS SHALL REMAIN OPEN DURING CONSTRUCTION. CHANNELIZING DEVICES SHALL BE PLACED AT 10' ON CENTER ALONG MINIMUM 20' RADII TO CHANNELIZE TRAFFIC INTO AND OUT OF INTERSECTING ROAD AND DRIVES WITHIN AREAS WHERE CHANNELIZING DEVICES ARE REQUIRED. TEMPORARY REGULATORY SIGNS SUCH AS STOP SIGNS AND YIELD SIGNS SHALL BE PLACED AS NECESSARY FOR PROPER
TRAFFIC CONTROL IN ACCORDANCE WITH THE MUTCD.
DRAWN BY
SHEET TITLE
PROJECT MANAGER
QUALCHECK
DESIGNED BY
PROJECT #
SHEET NUMBER
G H
AF
AR
I A
SS
O C
IA
TE
S
REGISTRATION SEAL
2170 HIGHLAND AVENUE SOUTH
SUITE 220
BIRMINGHAM, AL 35205-4024 USA
TEL +1.205.203.4611
www.ghafari.com
PO BOX 101205
IRONDALE, ALABAMA 35210
Contact: Brian Hatcher, PE Tel +1.205.795.3434 bhatcher@kadre-eng.com
KE# 24001
CONSULTANT INFORMATION
B. HATCHER
C. WALKER
C. WALKER
C. EATMAN
FPH
REV DATE DOC REL ## - DESCRIPTION
06/14/
HWASHIN
GEORGIA
2300227.002
DOC REL 02 - IFB06/14/24
FIRE PUMP HOUSE
CONCRETE
PAVING
8' 15 .4
2'
.6
7'
18'
WAREHOUSE BUILDING
FFE=294.00FUTURE WAREHOUSE
BUILDING EXPANSION
20'
20'
.5
.5
GENERATOR PAD (SEE
ELECTRICAL PLANS)
TRANSFORMER PAD (SEE
ELECTRICAL PLANS)
4.
7'
5'
17.5'
S45° 01' 58.01"E 1916.431
D.B. 2881, PG. 97
PLAT: D.B. 414, PG. 94
OPEN OFFICE
RECEPTION /
LOBBY
ENCLOSED
TRANSFER
WAREHOUSE
PRIVATE DINING
WAREHOUSE
OFFICE
6" F
12" F
8" F
12" F 12" F
G
SSSS
SSSS
6" W Co
Co
6" W
Co
Co
Co
Co
2" W2" W 6" W 2" W
Co
8" F
6" F
Co
4"
SS
COMM
COMM
COM
M
GASGE
N
T
GA
S
SCALE: 1"=30'
30 60
CU1-00-01
SITE UTILITY
PLAN
FIRE SERVICE F
DOMESTIC WATER W
SANITARY SEWER SS
FIRE HYDRANT
SANITARY SEWER
MANHOLE
GATE VALVE
THRUST BLOCK
SS
N
UTILITY NOTES:
1. LOCATIONS AND/OR ELEVATIONS OF EXISTING UTILITIES (ABOVE AND BELOW GROUND) SHOWN IN THE PLANS
ARE APPROXIMATE AND BASED UPON AVAILABLE DATA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATION OF EXISTING UTILITIES (ABOVE AND BELOW GROUND) BEFORE BEGINNING ANY CONSTRUCTION. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. CONTRACTOR SHALL UTILIZE GPR, HYDRO VAC AND OR POTHOLING TO VERIFY HORIZONTAL AND VERTICAL LOCATION OF UTILITIES.
ANY AND ALL DAMAGE MADE TO ANY EXISTING UTILITY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE OR REMOVE ANY UTILITIES REQUIRED TO CONSTRUCT PROPOSED IMPROVEMENTS. ANY DEVIATIONS FROM DESIGN PLANS MUST BE REPORTED TO THE
OWNER AND ENGINEER PRIOR TO CONSTRUCTION.
3. REFER TO ARCHITECTURAL AND MEP PLANS AND SPECIFICATIONS FOR ACTUAL LOCATION OF ALL UTILITY ENTRANCES INCLUDING BUT NOT LIMITED TO SANITARY, DOMESTIC AND FIRE WATER, ELECTRICAL, COMMUNICATIONS, ETC. COORDINATE AND SCHEDULE UTILITY INSTALLATION TO ENSURE REQUIRED DEPTHS ARE MET AND TO AVOID CONFLICTS WITH OTHER UTILITIES AND BELOW GRADE CONSTRUCTION.
4. CONTRACTOR MUST COORDINATE INSTALLATION AND FINAL SITE ROUTING WITH AUTHORITIES HAVING JURISDICTION FOR POWER, COMMUNICATIONS, AND GAS SERVICE ROUTINGS PRIOR TO INSTALLATION OF OTHER SUBSURFACE UTILITIES. INFORMATION SHOWN ON THE PLANS IS FOR REFERENCE ONLY.
5. UNDERGROUND ELECTRICAL AND COMMUNICATIONS MUST BE INSTALLED IN PVC SCHD 40 CONDUIT OR DUCT BANK WITH PULL WIRE PER AUTHORITY HAVING JURISDICTION REQUIREMENT. INFORMATION SHOWN ON THE
PLANS IS FOR REFERENCE ONLY.
6. CONTRACTOR SHALL REVIEW AND UNDERSTAND AUTHORITIES HAVING JURISDICTION REQUIREMENTS FOR OBSERVATION AND OVERSIGHT ON ALL UTILITIES. COORDINATE INSPECTION WITH THE APPROPRIATE
AUTHORITIES PRIOR TO COVERING TRENCHES AT INSTALLATION.
7. THE CONTRACTOR IS REQUIRED TO CONDUCT ALL REQUIRED WORK AND TESTING TO THE SATISFACTION OF
THE AUTHORITY HAVING JURISDICTION AT NO ADDITIONAL COST TO THE OWNER.
8. THE MINIMUM SEPARATION BETWEEN WATER AND SEWER LINES MUST BE THEN (10) FEET HORIZONTALLY OR
TWO (2) FEET VERTICALLY.
9. SANITARY SEWER LINES MUST BE DIP CL 52 UNLESS OTHERWISE REQUIRED BY AUTHORITY HAVING
JURISDICTION.
10. GRAVITY SANITARY SEWER SYSTEMS MUST BE CONSTRUCTED FROM DOWNSTREAM TO UPSTREAM AND IN ACCORDANCE WITH ALL UTILITY COMPANY STANDARDS AND REQUIREMENTS. ALL EXCAVATION, SHORING AND
BRACING IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
11. ALL PIPE ENTRANCE CONNECTIONS TO SANITARY SEWER MANHOLES MUST BE MADE WITH NEOPRENE BOOTS INSTALLED PER MANUFACTURER'S RECOMMENDATIONS TO ASSURE CONNECTION IS WATER TIGHT.
12. WATER LINES MUST BE THE FOLLOWING MATERIALS:
a. 4” DIAMETER AND LARGER: DIP (CL 350)
b. LESS THAN 4” DIAMETER: PVC (SCHD 40)
13. WATER LINES MUST BE INSTALLED PER AUTHORITY HAVING JURISDICTION REQUIREMENTS. ALL MAINS AND SERVICES MUST BE MAINTAIN 36” OF MINIMUM COVER UNLESS SPECIFICALLY NOTED OTHERWISE.
14. METERING AND BACKFLOW PREVENTION MUST BE PROVIDED ON ALL WATER SERVICES (DOMESTIC, FIRE, IRRIGATION) PER AUTHORITY HAVING JURISDICTION REQUIREMENTS.
a. DOMESTIC SYSTEM: REDUCED PRESSURE ZONE (RPZ)
b. FIRE SYSTEM: DOUBLE CHECK DETECTOR ASSEMBLY (DCDA)
c. IRRIGATION SYSTEM: REDUCED PRESSURE ZONE (RPZ)
d. DCV AND DDCV DEVICES MUST BE IN BELOW GRADE BOXES PER LOCAL AUTHORITY REQUIREMENTS
e. RPZ DEVICES MUST BE IN ABOVE GRADE HEATED ENCLOSURE PER LOCAL AUTHORITY REQUIREMENTS.
f. CONTRACTOR MUST INCLUDE AND COORDINATE ALL POWER AND COMMUNICATION REQUIREMENTS TO
BOXES INCLUDING BUT NOT LIMITED TO SUMP PUMPS, HEATERS, SCADA, ETC.
15. PROVIDE TAMPER SWITCHES AND ASSOCIATED INFRASTRUCTURE ON FIRE SERVICE POST INDICATOR VALVES
AND VALVES IN PIT PER LOCAL AUTHORITY REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR CONDUIT, WIRING, ETC FROM ANY TAMPER SWITCH LOCATION TO POWER SERVICE AND/OR REPORTING LOCATION.
COORDINATE WITH FIRE PROTECTION AND ELECTRICAL PLANS FOR POWER SERVICE AND/OR REPORTING
LOCATIONS.
16. TRENCHES IN EXISTING UNSURFACED AREAS MUST BE BACKFILLED PER GEOTECHNICAL ENGINEERS RECOMMENDATIONS OR AT A MINIMUM WITH FILL PLACED IN MAX 6” LOOSE LIFTS, COMPACTED TO 98%
STANDARD PROCTOR AT +/- 2.0% OPTIMUM MOISTURE CONTENT.
17. TRENCHES IN EXISTING PAVED AREAS MUST BE NEATLY SAWCUT AND BACKFILLED FULL DEPTH WITH CRUSHED AGGREGATE. REPLACE SURFACING AND PAVEMENT SECTION IN LIKE KIND AND RESTRIPE AS NECESSARY TO
RETURN AREA TO PRE-CONSTRUCTION CONDITION.
18. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS REQUIRED TO ENSURE ALL AT-GRADE EXISTING AND PROPOSED UTILITY STRUCTURES (MANHOLES, VAULTS, VALVE BOXES, ETC.) MATCH FINISHED GRADE UPON
CONSTRUCTION COMPLETION.
19. ALL WATER AND SEWER LINES SHALL BE INSTALLED WITH TRACER WIRE AND IDENTIFICATION TAPE.
DRAWN BY
SHEET TITLE
PROJECT MANAGER
QUALCHECK
DESIGNED BY
PROJECT #
SHEET NUMBER
G H
AF
AR
I A
SS
O C
IA
TE
S
REGISTRATION SEAL
2170 HIGHLAND AVENUE SOUTH
SUITE 220
BIRMINGHAM, AL 35205-4024 USA
TEL +1.205.203.4611
www.ghafari.com
PO BOX 101205
IRONDALE, ALABAMA 35210
Contact: Brian Hatcher, PE Tel +1.205.795.3434 bhatcher@kadre-eng.com
KE# 24001
CONSULTANT INFORMATION
B. HATCHER
C. WALKER
C. WALKER
C. EATMAN
FPH
REV DATE DOC REL ## - DESCRIPTION
06/14/
HWASHIN
GEORGIA
2300227.002
DOC REL 02 - IFB06/14/24
FIRE PUMP HOUSE
WAREHOUSE BUILDING
FFE=294.00FUTURE WAREHOUSE
BUILDING EXPANSION
FIRE PUMP
BUILDING
FFE=293.00
4" DIP (CL 52) SANITARY
SEWER @ 2.0% SLOPE
COMMUNICATIONS LINE
(SEE ELECTRICAL PLANS)
COMMUNICATIONS LINE
(SEE ELECTRICAL PLANS)
COMMUNICATIONS
LINE
COMM
MANUFACTURING BUILDING
FFE=294.00
12" DIP (CL 350)
WATER LINE
SEE PLUMBING PLANS
FOR CONTINUATION
CONNECT TO EXISTING 12"
BACKFLOW PREVENTER
SANITARY SEWER
CLEANOUT
CONNECT TO EXISTING
SANITARY SEWER MANHOLE
DIESEL GENERATOR (BASE BID).
NATURAL GAS GENERATOR (ALTERNATE).
SEE ELECTRICAL PLANS.
12" DIP (CL 350)
WATER LINE
NATURAL GAS SERVICE
(ALTERNATE)
NATURAL GAS SERVICE
(ALTERNATE)
CONNECT TO EXISTING
12" WATER LOOP
TRANSFORMER (SEE
ELECTRICAL PLANS)
290 289
291 GE
N
T
SCALE: 1"=10'
10 20
CG1-00-01
OVERALL
GRADING PLAN
N
GRADING NOTES:
1. CONTRACTOR MUST ADJUST THE FINAL ELEVATIONS OF ALL EXISTING AT-GRADE STRUCTURES AND UTILITIES
TO MATCH PROPOSED FINISHED GRADES.
2. THE CONTRACTOR MUST VISIT THE SITE AND DO ANY REQUIRED SITE RECONNAISSANCE TO VERIFY EXISTING
CONDITIONS PRIOR TO CONSTRUCTION AND OR PREPARING A QUOTE.
3. A GEOTECHNICAL INVESTIGATION REPORT PREPARED BY WHITAKER LAB & ENGINEERING, PROJECT NUMBER 11-10-23-5, DATED NOVEMBER 10, 2023 IS AVAILABLE FOR REFERENCE. THE CONTRACTOR MUST REVIEW THE REPORT, VISIT THE SITE AND COMPLETE ANY ADDITIONAL EXPLORATIONS / INVESTIGATIONS THAT IT DEEMS
NECESSARY IN ORDER TO PROVIDE A COMPLETE BID.
4. CONTRACTOR MUST VERIFY HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING INFRASTRUCTURE
PRIOR TO CONSTRUCTION.
5. CONTRACTOR MUST NOTIFY ENGINEER OF ANY EXISTING CONDITION OR UTILITY CONFLICT WITH PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
6. CLEARING LIMITS ARE DEFINED AS 5' OUTSIDE OF ALL PROPOSED GRADED AREAS OR NOT BEYOND THE
PROPERTY LINES WHICHEVER IS LESS.
7. CLEARING AND GRUBBING LIMITS INCLUDE ALL AREAS DISTURBED BY CONSTRUCTION OPERATIONS.
CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UNDISTURBED AREAS, ALL PROPERTY MONUMENTS, AND RESTORATION OF ANY AREAS CLEARED OR DEMOLISHED WITHOUT AUTHORIZATION.
8. ALL TOPSOIL SHALL BE STRIPPED PER GEOTECHNICAL RECOMMENDATIONS WITHIN THE LIMITS OF GRADING AND STOCKPILED FOR LATER USE WITH ALL EXCESS TO BE DISPOSED OF OFF-SITE UNLESS OTHERWISE
NOTED ON THE PLANS.
9. PRIOR TO EARTHWORK CONSTRUCTION BEGINNING AND DURING THE ENTIRE LENGTH OF THE PROJECT, SURFACE DRAINAGE SHALL BE PERFORMED TO AGGRESSIVELY DRAIN SURFACE WATER AWAY FROM STRUCTURAL AREAS AT ALL TIMES. THIS SHALL INCLUDE THE EXPOSED GROUND SURFACE BEING GRADED AS REQUIRED TO SHED WATER AWAY FROM STRUCTURAL AREAS AND SEALED WITH A SMOOTH DRUM ROLLER
PRIOR TO RAIN EVENTS AND AT THE END OF EACH DAYS WORK.
10. PRIOR TO CUT TO FILL OPERATING BEGINNING, 4 SETTLEMENT MONITORING PLATES SHALL BE INSTALLED WITHIN THE DEEPER FILL AREAS OF THE SITE. SETTLEMENT MONITORING SHALL BE PERFORMED DURING FILL PLACEMENT BY THE ONSITE GEOTECHNICAL ENGINEER. BUILDING CONSTRUCTION MAY NOT COMMENCE
UNTIL THE SITE IS APPROVED BY THE ONSITE GEOTECHNICAL ENGINEER.
11. PROOF ROLL SUBGRADE WITH A LOADED DUMP TRUCK IN A MANNER APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACING FILL. ANY DEFICIENT AREAS, OR ANY UNSUITABLE (ORGANIC, SOFT, LOOSE) MATERIAL FOUND MUST BE UNDERCUT AND REPLACED OR MOISTURE CONDITIONED PER THE GEOTECHNICAL ENGINEER IN 6" LIFTS TO MINIMUM DENSITY OF 95% PER ASTM D-1557. IF A RAIN EVENT OF 0.5 INCHES OR MORE OCCURS AFTER INITIAL PROOF ROLLING AND PRIOR TO SUBSEQUENT PLACEMENT OF BASE OR SURFACE WEARING COURSE, THE PROOF ROLL TESTING MUST BE REPEATED JUST PRIOR TO ADDITIONAL WORK.
12. SCARIFY SUBGRADE TO A MINIMUM DEPTH OF 12”. MOISTURE CONDITION AND RECOMPACT AS REQUIRED TO ACHIEVE REQUIRED DENSITY AND MOISTURE CONTENT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE SUBGRADE BENEATH STRUCTURES IS GRADED AS NECESSARY TO DIRECT DRAINAGE AWAY FROM THE STRUCTURE. CARE MUST BE TAKEN TO SUBGRADE AS CONCRETE MAY NOT BE PLACED ON WET SOILS. IT IS THE SOLE RESPONSIBILITY TO MAINTAIN PROPER SUBGRADE MOISTURE CONTENT. SUB-DRAINS MAY BE REQUIRED OR USED AT THE DISCRETION OF THE CONTRACTOR AND ONSITE GEOTECHNICAL ENGINEER IF
THE CONTRACTOR IS UNABLE TO MAINTAIN MOISTURE CONTENT.
13. DUE TO THE POTENTIAL FOR PLASTIC CLAYEY SOILS RESIDING AT PLANNED SUBGRADE AND BOTTOM OF FOOTINGS WITHIN CUT AREAS, AN AUGER BORING EVALUATION MUST BE PERFORMED WITHIN ALL PAVEMENT AND FOOTING AREAS IN CUT ONCE FINISHED SUBGRADE ELEVATION IS ACHIEVED. THIS AUGER BORING EVALUATION MUST EXTEND TO A DEPTH REACHING 2 FEET BELOW BOTTOM OF FOOTING ELEVATIONS AND 2 FEET BELOW BOTTOM OF PAVEMENT SECTION ELEVATIONS TO DETERMINE IF PLASTIC SOILS RESIDE WITHIN 24" OF PROPOSED SUBGRADE. IF PLASTIC SOILS ARE ENCOUNTERED AND/OR AT THE DIRECTION OF THE ONSITE GEOTECHNICAL ENGINEER, THESE SOILS MUST BE UNDERCUT AND REPLACED WITH NON-PLASTIC SOILS TO A DEPTH REACHING 24 INCHES BELOW BOTTOM OF FOOTING AND PAVEMENT SUBGRADES.
14. CONTRACTOR IS SOLELY RESPONSIBLE TO PROTECT PREPARED SUBGRADES. RESTORE TO PROJECT SPECIFICATIONS IF DAMAGED OR COMPROMISED DUE TO INCLEMENT WEATHER AND/OR CONSTRUCTION
TRAFFIC.
15. DEWATERING IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. PREVENT SURFACE WATER AND GROUND WATER FROM ENTERING EXCAVATIONS AND PONDING ON PREPARED SUBGRADES. PROTECT SUBGRADES FROM DAMAGE BY RAIN OR WATER ACCUMULATION. INSTALL A DEWATERING SYSTEM AS REQUIRED TO KEEP SUBGRADES DRY AND CONVEY GROUND WATER AWAY FROM GRADING OPERATIONS. MAINTAIN UNTIL DEWATERING IS NO LONGER REQUIRED. CONTRACTOR IS RESPONSIBLE FOR TREATING ANY DISCHARGE FROM DEWATERING OPERATIONS TO ENSURE NO SEDIMENT IS DISCHARGED FROM THE PROJECT SITE.
CONTRACTOR IS REQUIRED TO OBTAIN ALL NECESSARY PERMITS FOR THE DISCHARGE OF DEWATERING
EFFLUENT.
16. MIXING OF FILL SOIL FROM CUT SECTIONS OF SITE WILL BE REQUIRED TO ACHIEVE NON-PLASTIC FILL SOILS RESIDING WITHIN THE FILL SECTIONS OF THE SITE. CUT AND FILL OPERATORS MUST ALTERNATE LOADS FROM OPPOSITE SIDES OF CUR AREAS OF THE SITES TO ENCOURAGE MIXING AND SOILS WILL REQUIRE HARROWING/MIXING ONCE PLACED WITHIN THE FILL AREA PRIOR TO COMPACTION EFFORTS. THE ONSITE GEOTECHNICAL ENGINEER MUST BE ONSITE DURING CUT AND FILL OPERATIONS TO VERIFY THE MIXING PROCESS AND THE FILL MATERIAL ACHIEVED UPON MIXING RESULTS IN A NON-PLASTIC SOIL.
17. FILL MATERIAL MUST MAINTAIN THE FOLLOWING PROPERTIES: VIRTUALLY FREE OF ORGANICS, NO ROCK FRAGMENTS GREATER THAN 4" WITHIN 4' OF FINISH GRADE, MAX LIQUID LIMIT OF 50, MAX PLASTICITY INDEX OF 30, MAX DRY DENSITY GREATER THAN 100PCF PER ASTM D-1557, MODIFIED PROCTOR, AND WITHIN
+/- 2.0% OF OPTIMUM MOISTURE CONTENT DURING COMPACTION OPERATIONS.
18. PLACE FILL MATERIAL IN 8"-10" LOOSE LIFTS AND COMPACT TO GEOTECHNICAL ENGINEER REQUIREMENTS.
19. COMPACTION TESTS MUST BE TAKEN AT A MINIMUM EVERY 2,500 SQUARE FEET OF AREA PER 8" LIFT OR AS
DIRECTED BY THE GEOTECHNICAL ENGINEER.
20. MINIMUM COMPACTION REQUIREMENTS OF MAX DRY DENSITY PER ASTM D-1557, MODIFIED PROCTOR
a. STRUCTURAL AREAS 95% a.a. DEFINED AS ZONES OF INFLUENCE AROUND BUILDING, PAVEMENT AREAS, FILL SLOPES, ETC.
b. LANDSCAPE AREAS 85% TOP 2' (95%)
c. LIMITED SPACES 95% c.a. DEFINED AS MANHOLES, INLETS, UTILITY TRENCHES
d. ANY STUMP HOLES OR OTHER DEPRESSIONS SHOULD BE CLEARED OF LOOSE MATERIAL AND DEBRIS, AND SHOULD THEN BE BACK-FILLED WITH APPROVED FILL. THE BACKFILL SHOULD BE PLACED IN 6"
THICK LIFTS AND COMPACTED TO 95% DENSITY IN ACCORDANCE WITH ASTM D-1557.
e. ALL OF THE FILL BACKFILL (INCLUDING UTILITY LINE BACKFILL) FOR THIS PROJECT SHOULD CONSIST OF CLEAN, GRANULAR SOILS . THE FILL SHOULD BE FREE OF OBJECTIONABLE ROOTS, CLAY
LUMPS, ORGANICS AND OTHER DEBRIS. THE FILL SHOULD BE READILY COMPACTABLE DURING
PLACEMENT. NON-PLASTIC SOILS WILL BE ACCEPTABLE. SOILS WITH THE MINUS NO. 40 FRACTION CLASSIFIED AS MH, CH, OR OH, WILL BE REJECTED. SOILS EXHIBITING MOISTURE SENSITIVITY, SOILS WITH EXCESSIVE CLAY CONTENT, OR EXCESSIVE MOISTURE SHOULD NOT BE USED WITHOUT
APPROVAL FROM THE GEOTECHNICAL ENGINEER. APPROVED SOILS WILL NEED TO BE MOISTURE
CONDITIONED AS NECESSARY TO FACILITATE PROPER COMPACTION THROUGHOUT ITS ENTIRE
DEPTH. IF UTILITY TRENCHES CANNOT BE SUFFICIENTLY DEWATERED TO READILY ALLOW
COMPACTION OF THE PIPE BEDDING MATERIAL, THEN A CLASS I (ASTM-D-2331)GRAVEL OR GRAVEL
MIXTURE IS REQUIRED.
21. STONE BACKFILL SHALL BE INSTALLED IN 12” MAX LOOSE LIFTS AND COMPACTED BY VIBRATORY COMPACTOR.
22. ALL UN-SURFACED AREAS DISTURBED BY GRADING OPERATIONS SHALL RECEIVE FOUR INCHES (4") OF TOPSOIL, SEED, MULCH, WATER, ETC. TO ENSURE THE ESTABLISHMENT OF A PERMANENT STAND OF GRASS.
CONTRACTOR SHALL GRASS DISTURBED AREAS IN ACCORDANCE WITH THE LANDSCAPE PLAN AND
CITY/COUNTY SPECIFICATIONS UNTIL HEALTHY STAND OF GRASS IS OBTAINED.
23. PROPOSED ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE GRADE UNLESS OTHERWISE
NOTED ON DRAWINGS.
24. CONTRACTOR SHALL MILL, TACK, AND ENSURE FLUSH CONDITION WITH NO PONDING OF WATER AT
LOCATIONS WHERE NEW PAVEMENT MEETS EXISTING PAVEMENT.
25. EXISTING MANHOLE TOPS, VALVE BOXES, ETC. TO REMAIN ARE TO BE ADJUSTED AS REQUIRED TO MATCH PROPOSED GRADES. IF NECESSARY, RE-ADJUSTMENTS SHALL BE PERFORMED UPON COMPLETION OF PAVING
AND FINE GRADING TO ENSURE A SMOOTH TRANSITION.
26. EXISTING DRAINAGE STRUCTURES TO REMAIN WITHIN THE PROJECT LIMITS ARE TO BE INSPECTED AND
REPAIRED AS NECESSARY. EXISTING PIPES TO BE CLEANED OF ANY SILTS AND DEBRIS.
27. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDING AND FOR ALL NATURAL AND PAVED
AREAS.
28. MAXIMUM FILL AND CUT SLOPE GRADES MUST BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED.
29. FILL SLOPES MUST BE BENCHED INTO EXISTING SLOPES PER THE GEOTECHNICAL ENGINEER.
30. RETAINING WALL GRADES:
a. GTW = FINISHED GRADE AT TOP OF WALL
b. GBW = FINISHED GRADE AT BOTTOM OF WALL
c. ACTUAL WALL HEIGHT MUST BE A MINIMUM OF 6" ABOVE FINISHED GRADE AT TOP OF WALL.
d. SEE STRUCTURAL PLANS FOR WALL DESIGN AND FOOTING ELEVATIONS RELATIVE TO FINISHED
GRADE.
31. ALL RETAINING WALLS TO BE PROTECTED DURING BACKFILL BY CONTRACTOR. THIS INCLUDES BUT IS NOT
LIMITED TO, PROVIDING AND INSTALLING PROPER BRACING DURING BACKFILL BEING PLACED ADJACENT TO
RETAINING WALLS.
32. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING COMPACTION TESTING.
STORM DRAINAGE NOTES:
1. EXISTING STORM INFRASTRUCTURE SHOWN ON PLANS IS APPROXIMATE. CONTRACTOR SHALL VERIFY
EXISTING CONDITIONS AND CONNECTION POINTS PRIOR TO ORDERING OF MATERIALS AND CONSTRUCTION.
2. SUBMIT PROJECT SPECIFIC SHOP DRAWINGS TO THE ENGINEER FOR ALL STORM PIPE MATERIALS AND
STRUCTURES PRIOR TO FABRICATION.
3. STORM DRAINAGE CONVEYANCE SYSTEMS SHALL BE CONSTRUCTED FROM DOWNSTREAM TO UPSTREAM WITH
ALL INLETS BEING LOCATED AT LOWPOINTS.
4. ALL WORK AND MATERIALS SHALL BE IN CONFORMANCE WITH LOCAL AND GDOT STANDARDS AND
REQUIREMENTS.
5. STORM PIPES:
a. ADS HP STORM PIPE WITH WATERTIGHT JOINTS OR AS NOTED.
b. BEDDING:
b.a. 24” AND LESS BEDDED IN 4” OF CRUSHED AGGREGATE OR PER MANUFACTURER'S
RECOMMENDATIONS
b.b. 30” AND GREATER BEDDED IN 6” OF CRUSHED AGGREGATE OR PER MANUFACTURER'S
RECOMMENDATIONS
6. PROVIDE DOWNSPOUT BOOTS, CLEANOUTS AND ROOF DRAIN PIPING FROM DOWNSPOUTS TO CONNECT TO STORM CONVEYANCE SYSTEM. COORDINATE WITH ARCHITECTURAL PLANS FOR DOWNSPOUT LOCATION AND BOOT MODEL. COORDINATE WITH STRUCTURAL PLANS FOR FOOTING ELEVATIONS TO ENSURE A MINIMUM
ROOF DRAIN PIPING COVER OF 18".
7. INSTALL DRAINAGE PIPING (4” MIN PVC) AS REQUIRED FROM BELOW GRADE UTILITY VAULTS TO NEAREST
INLET OR DAYLIGHT.
8. THE CONTRACTOR SHALL INSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT CONSTRUCTION. THIS MAY INCLUDE, BUT NOT LIMITED TO, PHASED
CONSTRUCTION SEQUENCING WITH GRADING AND STORM DRAINAGE WORK.
FIRE PUMP
BUILDING
FFE=293.00
DRAWN BY
SHEET TITLE
PROJECT MANAGER
QUALCHECK
DESIGNED BY
PROJECT #
SHEET NUMBER
G H
AF
AR
I A
SS
O C
IA
TE
S
REGISTRATION SEAL
2170 HIGHLAND AVENUE SOUTH
SUITE 220
BIRMINGHAM, AL 35205-4024 USA
TEL +1.205.203.4611
www.ghafari.com
PO BOX 101205
IRONDALE, ALABAMA 35210
Contact: Brian Hatcher, PE Tel +1.205.795.3434 bhatcher@kadre-eng.com
KE# 24001
CONSULTANT INFORMATION
B. HATCHER
C. WALKER
C. WALKER
C. EATMAN
FPH
REV DATE DOC REL ## - DESCRIPTION
06/14/
HWASHIN
GEORGIA
2300227.002
DOC REL 02 - IFB06/14/24
FIRE PUMP HOUSE
292.98
292.50 292.50
292.95
293.50
293.98
293.89
293.37
293.31
293.50
293.31
292.79
292.91
292.88
292.98
292.50292.50
292.88
WAREHOUSE BUILDING
FFE=294.00FUTURE WAREHOUSE
BUILDING EXPANSION
ENSURE POSITIVE
DRAINAGE
ENSURE POSITIVE
DRAINAGE
GB-# ( )
SLAB ON GRADE MARK (SOG-6)
THICKNESS IN INCHES
SOIL BORING MARK
SB-#
WATERSTOP
(SELF-EXPANDING WATERSTOP)
GRADE BEAM MARK
(TOP OF GRADE BEAM EL)
OR
XW18x35
W18x35 C = #"
W18x35 (+/-#")
W18x35 (#)
SLAB CHANGE IN ELEVATION
(+/- FROM ESTABLISHED ELEVATION)
SPAN DIRECTION
EXISTING BEAM OR COLUMN DESIGNATION
SOG CHANGE IN ELEVATION
(+/- FROM ESTABLISHED ELEVATION)
RW-# RETAINING WALL MARK
WATERSTOP (DUMBBELL, PVC UON)
TOS EL (+/- ESTABLISHED ELEVATION)
BEAM CAMBER
COMPOSITE SLAB MARK
ROOF DECK MARK
ONE-WAY CONCRETE SLAB MARK
SLAB ON FORMED DECK MARK
THICKNESS IN INCHESP-#
F-#
CF-#
TOP OF PIER EL
PIER MARK
TOP OF FOOTING EL
FOOTING MARK
TOP OF COMBINED FOOTING EL
COMBINED FOOTING MARK
STRUCTURAL FRAMING SYMBOL LISTSTRUCTURAL FOUNDATION SYMBOL LIST
WF-# WALL FOOTING MARK
NUMBER OF 3/4" DIA STUDS
TEST BORING MARK
TB-#
-2"
RD-#
SPAN DIRECTION
THICKNESS IN INCHES
CS-#
SPAN DIRECTION
THICKNESS IN INCHES
FS-#
SPAN DIRECTIONS-#
OR
-2"
BEAM NOMENCLATURE
DECK AND SLAB SYMBOLSFOUNDATION NOMENCLATURE AND SYMBOLS
FOUNDATION WALL NOMENCLATURE
MISCELLANEOUS SYMBOLS
SLAB ON GRADE NOMENCLATURE AND SYMBOLS
SOG-#
+1"
+1"
XDP - #
XF - #
EXISTING DRILLED PIER
EXISTING FOOTING
CONT
CT
DH
DJ
EOD
EQ SP
EXP JT
EXIST
FDN
FT
HP
IN
JT
k
K-FT
LLBB
LP
MC
MDO
PL
REBAR
SFRC
SLBB
SOG
TDO
TC
UOD
UON
CONTINUOUS
CARRYING TRUSS
DOOR HEADER
DOOR JAMB
EDGE OF DECK
EQUALLY SPACED
EXPANSION JOINT
EXISTING
FOUNDATION
FEET, FOOT, FLOOR TRUSS
HIGH POINT
INCH
JOINT, JACK TRUSS
KIP (1000 LB)
KIP-FOOT (FEET)
LONG LEG BACK-TO-BACK
LOW POINT
MOMENT CONNECTION
MAN DOOR OPENING
PLATE
REINFORCING STEEL BARS
STEEL FIBER REINFORCED CONCRETE
SHORT LEG BACK-TO-BACK
SLAB ON GRADE
TRUCK DOOR OPENING
TOP CHORD
UNDERSIDE OF DECK
UNLESS OTHERWISE NOTED
STRUCTURAL ABBREVIATIONS
INSPECTION TASK
1. AS MASONRY CONSTRUCTION BEGINS, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:
LEVEL 1
NRa. PROPORTIONS OF SITE-PREPARED MORTAR
MASONRY SPECIAL INSPECTION REQUIREMENTS MINIMUM (TMS 602 TABLE 4)
FREQUENCY (a) REFERENCE FOR CRITERIA
LEVEL 2 LEVEL 3 TMS 402 TMS 602
P P ART. 2.1, 2.6 A, & 2.6 C
NRb. GRADE AND SIZE OF PRESTRESSING TENDONS AND ANCHORAGES P P ART. 2.4, B & 2.4 H
ART. 3.4 & 3.6 A
ART. 3.6 B
ART. 2.1 C.1
ART. 1.6 D
P
P
C
C
P
P
C(b)/P(c)
P
NR
NR
NR
NR
c. GRADE, TYPE AND SIZE OF REINFORCEMENT, CONNECTORS, ANCHOR BOLTS,AND
PRESTRESSING TENDONS AND ANCHORAGES
d. PRESTRESSING TECHNIQUE
e. PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY
f. SAMPLE PANEL CONSTRUCTION
2. PRIOR TO GROUTING, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:
NRa. GROUT SPACE P C ART. 3.2 D & 3.2 F
NRb. PLACEMENT OF PRESTRESSING TENDONS AND ANCHORAGES P P ART. 2.4,& 3.6
ART. 3.2 E & 3.4
ART. 2.6 B & 2.4 G.1.b
C
P
P
P
NR
NR
c. PLACEMENT OF REINFORCEMENT, CONNECTOR, AND ANCHOR BOLTS
d. PROPORTIONS OF SITE-PREPARED GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS
3. VERIFY COMPLIANCE OF THE FOLLOWING DURING CONSTRUCTION:
NRa. MATERIALS AND PROCEDURES WITH THE APPROVED SUBMITTALS P P ART. 1.5
NRb. PLACEMENT OF MASONRY UNITS AND MORTAR JOINT CONSTRUCTION P P ART. 3.3 B
ART. 3.3 FP
C
P
P
NR
NR
c. SIZE AND LOCATION OF STRUCTURAL MEMBERS
d. TYPE, SIZE, AND LOCATION OF ANCHORS, INCLUDING OTHER DETAILS OF ANCHORAGE
OF MASONRY TO STRUCTURAL MEMBERS, FRAMES, OR OTHER CONSTRUCTION
e. WELDING OF REINFORCEMENT
f. PREPARATION, CONSTRUCTION, AND PROTECTION OF MASONRY DURING COLD WEATHER
(TEMPERATURE BELOW 40°F (4.4°C)) OR HOT WEATHER (TEMPERATURE ABOVE 90°F(32.2°C))
g. APPLICATION AND MEASUREMENT OF PRESTRESSING FORCE
I. PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION OF THIN-BED MORTAR JOINTS
h. PLACEMENT OF GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS IS IN COMPLIANCE
NR
NR
NR
NR
NR
NR
C
P
C
C
P
C(b)/P(c)
C
P
C
C
C
C4. OBSERVE PREPARATION OF GROUT SPECIMENS, MORTAR SPECIMENS, AND/OR PRISMS
SEE. 10.8 & 10.9
SEE. 6.1, 6.3.1,
6.3.6, & 6.3.7
SEE. 1.2.1(e), 6.2.1, & 6.3.1
SEE. 6.1.6.1.2
ART. 1.8 C & 1.8 D
ART. 3.6 B
ART. 3.5 & 3.6 C
ART. 3.3 B.9
& 3.3 F.1.b
ART. 1.4 B.2.a.3,
1.4 B.2.b.3,
1.4 B.2.c.3,
1.4 B.3, & 1.4 B.4
(a) FREQUENCY REFERS TO THE FREQUENCY OF INSPECTION, WHICH MAY BE CONTINUOUS DURING THE LISTED TASK OR PERIODICALLY DURING THE LISTED TASK, AS DEFINED IN THE TABLE.
NR=NOT REQUIRED, P=PERIODIC, C=CONTINUOUS
(b) REQUIRED FOR THE FIRST 5000 SQUARE FEET (465 SQUARE METERS) OF AAC MASONRY.
(c) REQUIRED AFTER THE FIRST 5000 SQUARE FEET (465 SQUARE METERS) OF AAC MASONRY.
1'
2 3
0.
6h
0.
6h
0.6h 0.6h
0.
2h
0.
6h
DRAWN BY
SHEET TITLE
PROJECT MANAGER
QUALCHECK
DESIGNED BY
PROJECT #
SHEET NUMBER
1"=1000'-0" 0 1000' 2000'
1"=500'-0" 0 500' 1000'
1"=400'-0" 0 400' 800'
1"=200'-0" 0 200' 400'
1"=100'-0" 0 100' 200'
1"=80'-0" 0 80' 160'
1"=60'-0" 0 60' 120'
1"=50'-0" 0 50' 100'
1"=40'-0" 0 40' 80'
1"=30'-0" 0 30' 60'
1"=20'-0" 0 20' 40'
1"=10'-0" 0 10' 20'
16"=1'-0"
0 16' 32'
32"=1'-0" 0 16' 32'
8"=1'-0"
0 8' 16'
16"=1'-0" 0 8' 16'
4"=1'-0"
0 4' 8'
8"=1'-0" 0 4' 8'
2"=1'-0"
0 2' 4'
4"=1'-0" 0 2' 4'
1"=1'-0" 0 1' 2'0 1' 2'
"=1'-0"1 21 1
32"=1'-0" 0 32' 64'
G H
AF
AR
I A
SS
O C
IA
TE
S
REGISTRATION SEAL
2170 HIGHLAND AVENUE SOUTH
SUITE 220
BIRMINGHAM, AL 35205-4024 USA
TEL +1.205.203.4611
www.ghafari.com
CONSULTANT INFORMATION
HWASHIN
GEORGIA
FIRE PUMP HOUSE
6/
/2
9:
:3
AM
2300227.002
E.MCCRARY
E.MCCRARY
S00-00-01
S. HEYWOOD
C. COSTIS
STRUCTURAL
ABBREVIATIONS
AND SYMBOLS
60-0-1
FPH
REV DATE DOC REL ## - DESCRIPTION
NOT TO SCALE
NORTH
C&C DIAGRAM
06/14/24 DOC REL 02 - IFB
THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE COMPLETED, SELF
SUPPORTING, STABLE STRUCTURE .
THEY DO NOT INDICATE THE MEANS OR METHOD OF CONSTRUCTION.
IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE AND
CONSTRUCTION SEQUENCE AND PROVIDE ALL MEASURES NECESSARY TO ENSURE THE STABILITY AND
SAFETY OF THE STRUCTURE, ITS COMPONENT PARTS,
AND PROTECTION OF SURROUNDING EXISTING PROPERTY AND UTILITIES. THIS SHALL INCLUDE, BUT
NOT BE LIMITED TO: PROTECTION OF SUBGRADE FROM FREEZING CONDITIONS, BRACING,
SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, TEMPORARY STRUCTURES,
AND PARTIALLY COMPLETED WORK, OBSERVATION VISIT TO THE SITE BY THE STRUCTURAL
ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS.
GHAFARI SHALL NOT BE RESPONSIBLE IN ANY WAY FOR CONSTRUCTION MEANS ,
METHODS, SEQUENCES, OR PROCEDURES SINCE THESE ARE THE CONTRACTORS
SOLE RESPONSIBILITY UNDER THE CONTRACT.
THE SPECIFICATIONS ARE INTENDED TO AUGMENT THE STRUCTURAL DRAWINGS AND ARE AN
INTEGRAL PART OF THE CONSTRUCTION DOCUMENTS. SHOULD THE DRAWINGS DIFFER FROM
THE SPECIFICATIONS, NOTIFY THE ENGINEER FOR CLARIFICATION. FOR PRICING PURPOSES,
ASSUME THE DRAWINGS GOVERN.
PROJECT DESIGN BASIS IS IN ACCORDANCE WITH THE LATEST CODES AND
STANDARDS:
BUILDING CODE:
INTERNATIONAL BUILDING CODE
MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES ASCE 7
STRUCTURAL STEEL:
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS (AISC)
SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS (ANSI/AISC 341)
STRUCTURAL CONCRETE:
BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318)
CONCRETE MASONRY:
BUILDING CODE REQUIREMENTS FOR CONCRETE MASONRY STRUCTURES (TMS 402/602)
ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE SECTIONS OF OSHA AND
THE LOCAL GOVERNING SAFETY CODES.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE STRUCTURAL WORK IN
CONJUNCTION WITH THE ARCHITECTURAL, MECHANICAL, SITE, AND ELECTRICAL DRAWINGS.
SOIL DATA IS TAKEN FROM THE GEOTECHNICAL REPORT BY WHITAKER LABORATORY INC.,
TITLED “PROPOSED 604K SF WAREHOUSE HEART OF GEORGIA MEGA SITE, GA HWY 257
DUBLIN, GEORGIA", DATED NOVEMBER 10, 2023.. THIS REPORT IS PROVIDEDIN THE SPECIFICATIONS IN ITS ENTIRETY UNDER DIVISION 1 OF THE PROJECT SPECIFICATIONS. THE CONTRACTOR SHALL
REVIEW THEIR PROPOSED SITE CONSTRUCTION WORK PLAN WITH THE GEOTECHNICAL ENGINEER
TO VERIFY THAT IT IS ACCORDANCE WITH THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS AND
CONSIDERATIONS.
USE OF ENGINEERING DRAWINGS AS ERECTION DRAWINGS BY THE CONTRACTOR WILL NOT BE
PERMITTED.
UNLESS OTHERWISE NOTED, ALL DETAILS, SECTIONS AND NOTES ON THE DRAWINGS ARE
INTENDED TO BE TYPICAL FOR SIMILAR CONDITIONS ELSEWHERE.
SHOP DRAWINGS PREPARED BY SUPPLIERS, SUBCONTRACTORS, ETC. SHALL BE REVIEWED AND
COORDINATED BY THE CONTRACTOR, PRIOR TO SUBMITTING TO THE ENGINEER.
SHOP DRAWINGS PREPARED BY SUPPLIERS, SUBCONTRACTORS, ETC. SHALL BE REVIEWED BY THE
ARCHITECT/ENGINEER FOR CONFORMANCE WITH DESIGN INTENT ONLY.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL RELEVANT DIMENSIONS AND ELEVATIONS
FOR EQUIPMENT INSTALLATIONS AGAINST APPROVED MANUFACTURERS CERTIFIED EQUIPMENT
DRAWINGS. CONTRACTOR SHALL VERIFY EQUIPMENT WEIGHT, OPENING SIZES,AND LOCATIONS
INDICATED ON THE STRUCTURAL DRAWINGS WITH DOCUMENTS FROM OTHER DISCIPLINES AND
NOTIFY ENGINEER OF ANY DISCREPANCIES.
ALL SUBMITTALS REVIEWED BY THE STRUCTURAL ENGINEER ARE REVIEWED FOR
GENERAL CONFORMANCE WITH DESIGN CONCEPT ONLY AND DOES NOT RELIEVE THE
FABRICATOR VENDOR OF RESPONSIBILITY FOR CONFORMANCE WITH DESIGN DRAWINGS
AND SPECIFICATIONS, ALL OR WHICH HAVE PRIORITY OVER SUBMITTALS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
GENERAL STRUCTURAL NOTES:
DESIGN LOADS
ROOF AND SNOW LOADS:
FLAT ROOF SNOW LOAD (Pf) MINIMUM ROOF LIVE LOAD (Lr)
SUPERIMPOSED DEAD LOADS:
ROOFING AND INSULATION
MEP
WIND LOADS:
ULTIMATE DESIGN WIND SPEED (Vult)
RISK CATEGORY
WIND EXPOSURE CATEGORY
TOPOGRAPHIC FACTOR
INTERNAL PRESSURE COEFFICIENT (GCPi)
SEISMIC LOADS:
RISK CATEGORY
SEISMIC DESIGN CATEGORY
MAPPED SPECTRAL RESPONSE ACCELERATION (Ss)
MAPPED SPECTRAL RESPONSE ACCELERATION (S1)
SITE CLASS
DESIGN SPECTRAL RESPONSE ACCELERATION (Sds) DESIGN SPECTRAL RESPONSE ACCELERATION (Sd1) SEISMIC IMPORTANCE FACTOR (Ie)
ANALYSIS PROCEDURE
RESPONSE MODIFICATION FACTORS
SEISMIC FORCE-RESISTING SYSTEM
5 PSF
20 PSF
5 PSF
2.5 PSF
110 MPH
II
C +/- 0.18
II
B 0.184 0.078 D 0.196 0.124 1.0
EQUIVALENT LATERAL FORCE
ORDINARY REINFORCED
MASONRY SHEAR WALLS
ALL FOOTINGS SHALL BE PLACED ON TO UNDISTURBED NATURAL SUBGRADE, AS VERIFIED BY THE
QUALIFIED GEOTECHNICAL ENGINEER RETAINED BY THE OWNER. FOOTING ELEVATIONS SHOWN
DESIGNATE A MINIMUM DEPTH OF FOOTINGS WHERE A SAFE SOIL BEARING PRESSURE OF 3000 PSF FOR COLUMN FOOTINGS IS EXPECTED TO BE OBTAINED.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .