23.195 RSD5 Amity RHS Media Center Interior Alt - Addendum 2 05.19.26.pdf
PDF 1 MB Posted
- Solicitation number
- 2026-LMC-HS-1
- Issued by
- New Haven County, Waterbury City, Connecticut
About this file
This Addendum #2 modifies the contract documents for the Media Center Interior Alterations project at Amity Regional High School, a project administered by Regional School District 5 in Woodbridge, Connecticut under State Project #205-0046 A and Bid #2026-LMC-HS-1. The addendum updates project specifications and mechanical drawings issued as part of the original bid package dated May 1, 2026. Key modifications include revising the final completion date from December 31, 2026 to March 1, 2027 per RFI #016, and replacing two mechanical drawings (M001 Mechanical General Notes, Abbreviations & Legends and M021 Mechanical First Floor Piping Demo Part Plan) with revised versions attached to this addendum. The pre-bid walkthrough sign-in sheet and RFI log documenting 21 requests for information through the May 18, 2026 deadline are included for reference. The bid submission deadline remains unchanged at 2:00 p.m. EST on May 27, 2026. Electrical panels were not accessible during the walkthrough, and photographs pertaining to the project have been provided as attachments.
The addendum addresses significant clarifications through the RFI process regarding project scope, insurance requirements, and construction procedures. Owner responsibilities confirmed in the RFIs include retention and payment for third-party special inspections testing, provision of exterior storage areas designated by the Owner for contractor equipment and materials, relocation of existing furniture and equipment prior to construction commencement, and completion of hazardous materials testing prior to work initiation. Contractor responsibilities include providing all temporary utilities, equipment, and portable restroom facilities, coordinating work with security sign-in requirements, managing material storage containers, and completing all mechanical and electrical system work including HVAC, plumbing, fire protection, and associated controls. Builder's Risk and OCP insurance are not contractor responsibilities, and no Clerk of the Works, snow plowing, or allowances and alternates are required. The project involves phased construction with maintenance of existing services to occupied areas and coordination with the Owner's construction sequencing plan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #2
Amity Regional High School Media Center Interior Alterations – Regional School District 5 State Project #205-0046 A Addendum #2-1
MEDIA CENTER INTERIOR ALTERATIONS
AMITY REGIONAL HIGH SCHOOL
25 NEWTON ROAD
WOODBRIDGE, CT 06525
STATE PROJECT #205-0046 A
BID #2026-LMC-HS-1
S/P+A PROJECT #23.195
DATE: May 19, 2026
The following changes to the Drawings and Project Specifications shall become a part of the Drawings and Project Specifications; superseding previously issued Drawings and Project Specifications to the extent modified by Addendum #2.
General Information:
• The pre-bid sign-in sheet is attached for reference. (2)
• The deadline for RFIs was Monday, May 18, 2026, 10:00am.
• See attached RFI log. (1)
• Electrical panels were not accessible during the walkthrough, therefore photos of those that pertain to the project have been attached to this addendum. (2)
Changes to the Specifications:
• INSTRUCTIONS TO BIDDERS, Page 1, Article 3, Final Complete, revise “December 31, 2026” to read “March 1, 2027”. (Per RFI #016)
Changes to the Drawings:
• The following drawings have been deleted in their entirety. New drawings have been added and are attached as part of this addendum*:
o M001 MECH GENERAL NOTES, ABBREVIATIONS & LEGENDS (Per RFI #002) o M021 MECH FIRST FLOOR PIPING DEMO PART PLAN (Per RFI #002)
The bid date remains unchanged by this addendum.
The addendum consists of six (6) pages of 8½” x 11” text and two (2) 30” x 42” drawings*.
End of Addendum #2
BID RFI LOG
Project: Amity Regional High School Media Center Interior Alterations State Project/Bid #: 205-0046 A/2026-LMC-HS-1 RFI Deadline: 05/18/26, 10a
S/P+A Project #: 23.195 Bids Due: 05/27/26, 2p
RFI # QUESTION DATE RESPONSE ADDENDUM #
RECEIVED ISSUED
Documents list both June 5 and May 27th as the bid due date.
Please confirm correct bid due date.
05/13/26 May 27 is correct. Refer to Addendum #1. 2
Some notes on drawings say to refer to abatement plans, or as required by abatement, etc. Is there any hazardous materials that need to be abated as part of this project. If so please provide testing report.
05/13/26 No abatement, additional testing to be completed by Owner prior to work. Refer to Addendum #2 for revised Drawings.
Based on the review of the documents it does not appear that Builders Risk or OCP insurance is required. Please confirm
05/13/26 Builder's Risk is not the responsibility of the Contractor.
OCP is not required.
Are there any requirements for the contractor to provide for any clerk of the works.
05/13/26 Project will not have a Clerk of the Works. 2
It does not appear that any allowances or alternates are required. Please confirm.
05/13/26 Confirmed. 2
The specification calls for special inspections for the steel work. Please confirm the costs/fees for the testing agency for these third party tests are to be paid for by owner per IBC
1704.2 and 1703.1.1.
05/13/26 Confirmed. 2
Will there be a specified staging area for materials/tools that will need to be stored on site? Or shall the contractor provide exterior storage containers.
05/13/26 Contractor to provide storage containers in area designated by the Owner.
Will the General Contractor be required to provide snow plowing during the course of the construction
05/13/26 No. 2
Is there any specific security requirements for contractors/GC working on site? As in Daily sign in, background checks, badging, etc.
05/13/26 All Contractors will be required to sign-in Security. Refer to Section 011000, 1.5.G. for additional requirements.
Confirm Builders Risk insurance is to be carried by the General Contractor.
05/13/26 Refer to RFI #003. 2
Confirm OCP insurance is required to be carried by the general contractor
05/13/26 Refer to RFI #003. 2
Confirm the GC owns the cost of all temporary equipment, electric, water, heat etc. Will the GC be allowed to hook up to the existing services for construction purposes?
05/13/26 Refer to Section 015000. 2
Confirm the GC will be able to use the existing bathroom facilities during the construction phase
05/13/26 No, refer to Section 015000, 3.2. 2
Confirm who will be paying for third party testing, we note that IBC 2021 Section 1704.2 requires special inspections to be performed by an approved agency retained by the Owner or Owner's agent, "other than contractor", in accordance with the independence requirements of IBC 2021 Section 1703.1.1.
Given that these services typically are to be performed by the Owner's retained agency, and that the scope and frequency of required testing are not fully defined, please confirm whether the Owner will retain and pay for these services directly, or if the Contractor is to carry an allowance or other defined value for include in the proposal.
05/13/26 Unless otherwise indicated in the project manual, Owner is responsible to retain and pay for third-party testing.
Will existing FF/E be moved by the owner prior to the start of construction, or will the GC need to assist in the process?
05/13/26 Yes. 2
The dates in the RFP contain conflicting language. Section 2 states substantial completion by December 31, 2026, and final completion by March 1, 2027. However, the "Important Dates" table later lists "Final Completion: By December 31, 2026".
05/13/26 Dates in Article 2 of the Instructions to Bidders are correct. Refer to Addendum #2 for revisions to Article 3.
Will a field office be required? Or can the contractor utilize space in the existing building?
05/15/26 Refer to Section 015000, 2.1. No space available aside from the media center.
Will we be able to use toilets in the building or we will need to provide portalets?
05/15/26 Refer to RFI #013. 2
Is there a laydown area available for dumpster, storage, portalet?
05/15/26 Yes. 2
Rooms 125, 125B, and others are missing wall tags. Please provide.
05/15/26 Refer to Drawing A705 for Enlarged Plans. 2
021 Please confirm that all FFE is by owner. 05/15/26 Refer to RFI #015. 2
SILVER PETRUCELLI + ASSOCIATES
3190 Whitney Avenue | Hamden CT 06518 311 State Street | New London CT 06320
EMP-2
LP-23
LP-2
GLOBE VALE
BUTTERFLY VALVE
PRESSURE GAUGE
SHUT-OFF VALVE
STRAINER, BLOW OFF
AV
OR
STRAINER
PUMP OR FAN
AIR VENT, MANUAL
AIR VENT, AUTOMATIC
MECHANICAL DEMOLITION NOTE,
NUMBER INDICATES NOTEPIPE UNIONPRESSURE/TEMPERATURE
PORT
TEMPERATURE GAUGE/
TEMPERATURE INDICATOR
T
ABBREVIATIONS (NOT ALL ARE USED)
(###) CFM
ABV ABOVE
AC AIR COMPRESSOR
AD ACCESS DOOR
AF AIRFOIL
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU-# AIR HANDLING UNIT
AL ACOUSTIC LINING
ALD AUTOMATIC LOUVER DAMPER
APD AIR PRESSURE DROP
AUTO AUTOMATIC
AWT AVERAGE WATER TEMPERATURE
B-# BOILER
BC BACKWARD CURVED
BD BELT DRIVE
BMCS BUILDING MANAGEMENT & CONTROL SYSTEM
BTU BRITISH THERMAL UNIT
CAP CAPACITY
CB-# CONTROL BOX
CC-# COOLING COIL
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CH-# CHILLER
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
CLG CEILING
CONV-# HOT WATER CONVECTOR
CP CONDENSATE RECEIVER/PUMPING SYSTEM
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
CT-# COOLING TOWER
CUH-# CABINET UNIT HEATER
CV CONTROL VALVE
dB DECIBELS
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DIA. or ∅ DIAMETER
DIFF DIFFUSER
DL DOOR LOUVER
DN DOWN
DOAS DEDICATED OUTDOOR AIR SYSTEM
DP DEWPOINT TEMPERATURE
DR DROP
DTR DUAL TEMPERATURE WATER RETURN
DTS DUAL TEMPERATURE WATER SUPPLY
DX DIRECT EXPANSION
EAT ENTERING AIR TEMPERATURE
ECM ELECTRONICALLY COMMUTATED MOTOR
EER ENERGY EFFICIENCY RATIO
EF-# EXHAUST FAN
EG EXHAUST GRILLE
EHC-# ELECTRIC HEATING COIL
ER EXHAUST REGISTER
ES END SUCTION
ESP EXTERNAL STATIC PRESSURE
ET-# EXPANSION TANK
EUH-# ELECTRIC UNIT HEATER
EWH-# ELECTRIC WALL HEATER
EWT ENTERING WATER TEMPERATURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
EXT EXTERNAL
F DEGREES FAHRENHEIT
FA FACE AREA
FAI FRESH AIR INTAKE
F&B FACE & BYPASS DAMPER
FBO FURNISHED BY OTHERS (INSTALLED BY HVAC SUBCONTRACTOR)
FC FORWARD CURVE
FCU FAN COIL UNIT
FD/AD FIRE DAMPER WITH ACCESS DOOR
FF FINAL FILTER
FIBO FURNISHED AND INSTALLED BY OTHERS
FIN FL FINISH FLOOR
FL FLOOR
FLA FULL LOAD AMPERES
FLEX FLEXIBLE
FPF FINS PER FOOT
FS FLOW SWITCH
FT FEET
F.T. FLOAT & THERMOSTATIC TRAP
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GWLR GEOTHERMAL WATER LOOP RETURN
GWLS GEOTHERMAL WATER LOOP SUPPLY
H-# HUMIDIFIER
H/C HEATING/COOLING
HEPA HIGH EFFICIENCY PARTICULATE ARRESTANCE
HC-# HEATING COIL
HD FEET OF HEAD
HGBP HOT GAS BYPASS
HGRH HOT GAS REHEAT
H-O-A HAND-OFF-AUTOMATIC
HP-# HEAT PUMP
HP HORSEPOWER
HTG HEATING
HV-# HEATING AND VENTILATING UNIT
HVAC HEATING, VENTILATING & AIR CONDITIONING
HX-# HEAT EXCHANGER CONVERTOR
IBT INVERTED BUCKET TRAP
ID INSIDE DIMENSION
IL INLINE
IN INCHES
IV INLET GUIDE VANES
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LD LINEAR DIFFUSER
LIN LINEAR
LRA LOCKED ROTOR AMPERES
LPR LOW PRESSURE STREAM RETURN
LPS LOW PRESSURE STEAM SUPPLY
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MAT MIXED AIR TEMPERATURE
MAX MAXIMUM
MBH 1000 BTU'S
MCA MINIMUM CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICENCY RESISTANCE VALUE
MEZZ MEZZANINE
MFS MAXIMUM FUSE SIZE
MIN MINIMUM
MOCP MINIMUM OVERCURRENT PROTECTION
MOT MOTOR
MUA MAKE-UP AIR
MV MOTORIZED VALVE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTDOOR AIR INTAKE
OAT OUTDOOR AIR TEMPERATURE
OBD OPPOSED BLADE DAMPER
OD OUTSIDE DIMENSION
O.E. T.D. OPEN END TRANSFER DUCT
P-# PUMP
PB PUSH BUTTON
PBD PARALLEL BLADE DAMPER
PD PRESSURE DROP
PF PREFILTER
PH PHASE
PHC PREHEAT COIL
PRV PRESSURE REDUCING VALVE
PSI POUND PER SQUARE INCH
RA RETURN AIR
RAF-# RETURN AIR FAN
RAT RETURN AIR TEMPERATURE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RATED LOAD AMPS
RM ROOM
RP RADIANT PANEL
RPM REVOLUTIONS PER MINUTE
RTU-# ROOFTOP AIR CONDITIONING UNIT
SA SUPPLY AIR
SAF-# SUPPLY AIR FAN
SAT SUPPLY AIR TEMPERATURE
SB SECURITY BARS
SD SMOKE DAMPER
SEER SEASONAL ENERGY EFFICIENCY RATIO
SG SUPPLY GRILLE
SP STATIC PRESSURE
SQ FT SQUARE FOOT (AREA)
ST SINGLE POLE SWITCH W/ THERMAL OVERLOAD
SWR SIDE WALL REGISTER
TD TEMPERATURE DIFFERENCE
TDV TRIPLE DUTY VALVE
TEMP TEMPERATURE
TG AIR TRANSFER GRILLE
TN-HR TON HOUR REFRIGERATION
TOT TOTAL
TRD TRANSFER DUCT
T'STAT THERMOSTAT
TT THERMOSTATIC TRAP
TYP TYPICAL
UC UNDERCUT DOOR
UH-# UNIT HEATER
UV-# UNIT VENTILATOR
VAV-# VARIABLE AIR VOLUME
VD VOLUME DAMPER
VE VOLUME EXTRACTOR
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
W/ WITH
WB WET BULB
WFM WATER FLOW MEASURING STATION
WMS WIRE MESH SCREEN
WPD WATER PRESSURE DROP
WSHP WATER SOURCE HEAT PUMP
WT WEIGHT (LBS)
ZD ZONE DAMPER
SYMBOL LEGEND (NOT ALL SYMBOLS ARE USED) PROJECT GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
THE INTENT OF THESE CONTRACT DOCUMENTS IS FOR THE CONTRACTOR TO FURNISH AND INSTALL COMPLETE MECHANICAL AND ELECTRICAL SYSTEMS. THESE MECHANICAL AND ELECTRICAL SYSTEMS INCLUDE PLUMBING, FIRE PROTECTION, HVAC, ELECTRICAL AND ALL ASSOCIATED SPECIAL SYSTEMS. ALL SYSTEMS SHALL BE COORDINATED AND COMPLETE IN ALL RESPECTS. OPERATING, TESTED, ADJUSTED, APPROVED BY THE AUTHORITIES HAVING JURISDICTION AND READY FOR BENEFICIAL USE TO THE OWNER'S SATISFACTION.
THE CONTRACTOR SHALL OBTAIN AND REVIEW ALL CONTRACT DOCUMENTS, INCLUDING PROJECT MANUAL, PLANS AND SPECIFICATIONS OF ALL TRADES BEFORE SUBMITTING BID.
REFER TO SPECIFICATIONS, PROJECT MANUAL AND PLANS, INCLUDING ALL EQUIPMENT SCHEDULES FOR MECHANICAL AND ELECTRICAL INFORMATION. CONTRACTOR SHALL WALK
THROUGH BUILDING TO BECOME FULLY FAMILIAR WITH IT PRIOR TO SUBMITTING BID.
ALL OF THE CONTRACT DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY TO FORM A TOTAL DESIGN PACKAGE. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR/CONSTRUCTION MANAGER TO DETERMINE WHICH TRADE CONTRACTOR IS RESPONSIBLE FOR VARIOUS PORTIONS OF THE WORK.
ALL WORK AND ACTION DEPICTED AND DESCRIBED SHALL BE PERFORMED BY THE CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE.
PROVIDE SUPPORT/BRACING OF EQUIPMENT AND BUILDING SERVICES FOR SEISMIC RESTRAINT AS REQUIRED BY CODE.
OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND INSPECTIONS.
ALL EQUIPMENT, MATERIALS AND RELATED SYSTEM COMPONENTS SHALL BE NEW UNLESS SPECIFICALLY NOTED OTHERWISE.
REPAIR AND/OR REPLACE AT NO COST TO OWNER ALL EQUIPMENT AND MATERIALS DAMAGED DURING CONSTRUCTION.
THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. THE CONTRACTOR SHALL COORDINATE LOCATIONS OF EQUIPMENT WITH ALL TRADES BEFORE STARTING CONSTRUCTION. ANY MODIFICATIONS TO THE EQUIPMENT LAYOUT REQUIRED FOR INSTALLATION ARE TO BE
PERFORMED AT NO ADDITIONAL COST TO THE OWNER.
REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EXACT LOCATION OF LIGHT FIXTURES AND MOUNTING HEIGHTS OF EQUIPMENT. INCLUSIVE OF RECEPTACLES, SWITCHES, THERMOSTATS, ETC. ALL SUCH EQUIPMENT AND COLORS SHALL BE COORDINATED WITH THE ARCHITECT. CONTACT ARCHITECT FOR CLARIFICATION OF MOUNTING REQUIREMENTS, IF
INFORMATION IS NOT CONTAINED IN THE DRAWINGS.
ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE APPLICABLE CODES, ORDINANCES AND THE REGULATORY AGENCIES HAVING JURISDICTION.
ALL EQUIPMENT, DAMPERS, VALVES, SMOKE DETECTORS, FIRE DAMPERS SHALL BE LOCATED IN ACCESSIBLE LOCATIONS. WHEN EQUIPMENT, DAMPERS, VALVES, SMOKE DETECTORS, FIRE DAMPERS MUST BE LOCATED ABOVE AN INACCESSIBLE CEILING OR WALL THEN AN APPROPRIATE ACCESS DOOR / PANEL SHALL BE PROVIDED. THESE SHALL BE COORDINATED
WITH THE ARCHITECT AND SUITABLE FOR THE ASSEMBLY RATING BEING PENETRATED.
WHEN CONFLICTS OCCUR BETWEEN THE DRAWINGS AND/OR SPECIFICATIONS IT SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. THE CONTRACTOR SHALL CARRY AS PART OF
THE BID THE LARGER QUANTITY AND/OR MORE EXPENSIVE ITEM(S).
CONTRACTORS SHALL COORDINATE THEIR WORK WITH ALL OWNER-FURNISHED EQUIPMENT, INCLUDING REQUIRED SERVICE CONNECTIONS, RECEPTACLES, ETC. BEFORE INSTALLATION.
CONTRACTORS SHALL PROVIDE ALL REQUIRED SLEEVES AND SEALS FOR PIPES OR CONDUIT PENETRATING WALLS OR SLABS WITH FIRE STOPPING SEALANT WHERE REQUIRED.
ELECTRICAL CONDUITS & BOXES TO BE CONCEALED IN WALLS OR ABOVE CEILING WHEREVER POSSIBLE.
COORDINATE ALL PIPING AND CONDUITS LEAVING THE BUILDING WITH THE SITE CONTRACTOR(S) BEFORE INSTALLATION.
PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT.
PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50 FEET OF ISOLATED EQUIPMENT THROUGHOUT MECHANICAL EQUIPMENT ROOMS.
LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN VISIBLE AND ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP/DOWN STREAM AS
RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.
ALL EQUIPMENT, PIPING, AND DUCT WORK SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
LOCATION AND SIZES OF ALL FLOOR, WALL AND ROOF PENETRATIONS SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED.
INSTALL COMPLETE OPERATING SYSTEMS. PROVIDE ALL COMPONENTS, DEVICES, CONTROLS, RELAYS, TRANSFORMERS, ETC., WHETHER INDICATED OR NOT, FOR COMPLETE SYSTEMS
AS INTENDED BY THE CONSTRUCTION DOCUMENTS.
ALL NEW EQUIPMENT SPECIFIED IN THE SCHEDULES SHALL BE CONNECTED TO THE BMCS.
SOME PART OF THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. REFER TO PHASING PLAN FOR MORE INFORMATION. MAINTAIN EXISTING SERVICES TO OCCUPIED AREAS. SEAL ALL DUCTWORK AND VENTILATION OPENINGS COMMUNICATING CONSTRUCTION AREAS WITH OCCUPIED AREAS TO PREVENT THE TRANSFER OF AIR CONTAMINATED BY CONSTRUCTION
ACTIVITIES.
ALL PENETRATIONS THRU RATED WALLS, FLOORS & CEILINGS SHALL BE SEALED USING U.L. LISTED METHODS APPROPRIATE FOR INDICATED RATING.
HVAC NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
PIPING AND DUCT WORK LAYOUTS AS INDICATED ON THE DRAWINGS ARE DIAGRAMMATIC; PROVIDE ADDITIONAL TRANSITIONS AND OFFSETS AS REQUIRED FOR COORDINATION WITH BUILDING CONSTRUCTION AND THE WORK OF OTHER TRADES AT NO ADDITIONAL COST TO THE OWNER.
PROVIDE VOLUME DAMPERS, THROTTLING VALVES AND ISOLATION VALVES AS SPECIFIED AND/OR AS INDICATED ON THE DRAWINGS.
PROVIDE FIRE DAMPERS AT DUCT PENETRATIONS OF FIRE RATED PARTITIONS.
PROVIDE SMOKE DETECTORS ON THE SUPPLY AND RETURN DUCTWORK OF ALL AIR HANDLING EQUIPMENT 2000 CFM AND OVER.
ALL MOTORS AND EQUIPMENT SHALL BE OF EFFICIENCIES THAT ARE ELIGIBLE FOR UTILITY COMPANY ENERGY INCENTIVE PROGRAMS. THE BMCS SHALL BE COMPLETE IN ALL REGARDS, TESTED AND CAPABLE OF ACHIEVING THE SEQUENCES OF OPERATION. ALL DEVICES SHALL BE UNDER SYSTEM CONTROL. ALL ZONES SHALL BE THERMOSTATICALLY CONTROLLED WHETHER OR NOT A THERMOSTAT, SENSOR OR CONTROLLER IS INDICATED.
THE ABUILDING MANAGEMENT AND CONTROL SYSTEM SHALL BE COMPLETE IN ALL REGARDS, TESTED AND CAPABLE OF ACHIEVING THE SEQUENCES OF OPERATION. ALL DEVICES SHALL BE UNDER SYSTEM CONTROL. ALL ZONES SHALL BE THERMOSTATICALLY CONTROLLED WHETHER OR NOT A
THERMOSTAT, SENSOR OR CONTROLLER IS INDICATED.
MAINTAIN MANUFACTURER'S RECOMMENDED MINIMUM CLEARANCES FOR INSTALLATION OF EQUIPMENT.
INSULATED FLEXIBLE DUCT RUNS SHALL NOT BE LONGER THAN 5 FT AND SHALL TERMINATE AT A 90 DEGREE ELBOW MATCHING THE NECK SIZE OF THE DIFFUSER IT SERVES.
PROVIDE VANDAL RESISTANT COVERS ON THERMOSTATS, AS NOTED.
ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING THICKNESS.
PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE WALL TURNING VANES UNLESS OTHERWISE INDICATED. UNVANED ELBOWS SHALL BE SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL TO 1-1/2 TIMES THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL
ELBOWS WITH TURNING VANES.
COORDINATE DIFFUSER, REGISTER AND GRILLE LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS, LIGHTING AND OTHER CEILING ITEMS.
PROVIDE INSULATED FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO AIR HANDLING UNITS,FANS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE AT THE POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE
INDICATED.
PROVIDE INSULATED FLEXIBLE CONNECTIONS IN ALL DUCTWORK PASSING THROUGH BUILDING SEISMIC EXPANSION JOINTS.
ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, COILS AND OTHER ITEMS LOCATED IN DUCTWORK WHICH REQUIRE SERVICE OR INSPECTION.
DUCTWORK SHALL BE PRESSURE TESTED AND SEALED FOR LEAKAGE IN ACCORDANCE WITH THE CODE.
THE SUPPLY AIR SYSTEM SHALL BE PURGED TO ENSURE ALL FOREIGN PARTICLES ARE REMOVED PRIOR TO FINAL CONNECTION OF SUPPLY AIR DIFFUSERS.
ALL ELBOWS AND TEES FROM DOWNFLOW ROOF MOUNTED UNITS SHALL BE WRAPPED WITH A SOUND LAGGING MATERIAL.
ALL SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK AND PLENUMS SHALL BE PROVIDED WITH INSULATION.
PIPING NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.
INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN BYPASSES AND IN LONG PIPING RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR ALTERATION
AND REPAIRS.
ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION, EXCEPT WATER COILS. FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE.
ALL PENETRATIONS THROUGH RATED WALLS, FLOORS & CEILINGS SHALL BE SEALED USING U.L. LISTED METHODS APPROPRIATE FOR INDICATED ASSEMBLY RATING.
PROVIDE SWING JOINTS AT ALL BRANCH CONNECTIONS TO WATER SUPPLY AND RETURN. PROVIDE ISOLATION VALVES AT ALL BRANCH CONNECTIONS.
PROVIDE AIR VENTS AT ALL HIGH POINTS.
INSTALL DRAIN VALVES WITH HOSE CONNECTION AT ALL LOW POINTS.
PROVIDE HOSE END CAPS WITH CHAIN ON ALL DRAIN VALVES.
ALL PIPING PASSING THROUGH BUILDING EXPANSION JOINTS SHALL BE PROVIDED WITH PIPING EXPANSION LOOPS.
ALL PIPING, VALVES AND FITTINGS SHALL BE PROVIDED WITH INSULATION FOR SERVICES REQUIRING INSULATION.
ALL EXISTING PIPING AND ASSOCIATED FITTINGS THAT ARE TO REMAIN TEMPORARILY AS PART OF THE CONSTRUCTION MANAGER'S STAGING PLAN AND THAT ARE AFFECTED BY ABATEMENT WORK SHALL BE PROVIDED WITH NEW INSULATION. REFER TO ABATEMENT DRAWINGS AND PROJECT MANUAL.
ADDITION AND RENOVATION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
THIS PROJECT IS AN EXISTING FACILITY ADDITION AND RENOVATION.
BEFORE SUBMITTING BIDS, THE CONTRACTOR SHALL VISIT THE SITE AND BECOME THOROUGHLY FAMILIAR WITH THE EXISTING CONDITIONS UNDER WHICH THE PROJECT IS TO BE
COMPLETED.
THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS OR ERRORS MADE AS A RESULT ON OF THEIR FAILURE TO BECOME FULLY FAMILIAR WITH THE
EXISTING CONDITIONS.
IT IS NOT THE INTENT OF THESE DRAWINGS TO SHOW EVERY PIECE OF EQUIPMENT, PIPING OR CONDUIT TO BE REMOVED. EQUIPMENT NOT BEING USED SHALL BE REMOVED INCLUDING ALL ASSOCIATED HANGERS, SUPPORTS, PIPES, DUCTS, CONDUITS, WIRES AND CONTROLS BACK TO THE POINT OF ORIGIN.
NO EQUIPMENT, PIPING OR CONDUIT SHALL BE ABANDONED IN PLACE UNLESS SPECIFICALLY NOTED.
PROPERLY DISPOSE OF ALL DEMOLISHED EQUIPMENT AND MATERIALS IN COMPLIANCE WITH CODES AND REGULATIONS.
RELOCATE EXISTING EQUIPMENT, PIPING, WIRING AND RELATED SYSTEMS TO REMAIN AS REQUIRED FOR CONSTRUCTION. EXTEND FEEDER/CONDUIT AND PROVIDE RECONNECTIONS FOR SYSTEM TO BE FULLY OPERATIONAL. ALL RELOCATED EQUIPMENT SHALL BE PROTECTED DURING CONSTRUCTION.
PROVIDE TEMPORARY CONNECTIONS AND SYSTEM MODIFICATIONS AS REQUIRED FOR PHASED CONSTRUCTION.
INCLUDE ALL WORK REQUIRED TO ALLOW STAGED CONSTRUCTION . COORDINATE WITH GENERAL CONTRACTOR/CONSTRUCTION MANAGER FOR SEQUENCE OF CONSTRUCTION
REQUIREMENTS.
GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING, REPAIRING, CAPPING, ETC. PER DEMOLITION AND CONSTRUCTION REQUIREMENTS.
FS FLOW SWITCH
MECHANICAL CONSTRUCTION NOTE,
NUMBER INDICATED NOTEC##
D##
SUPPLY OR OUTSIDE AIR DUCT OR
DIFFUSER / REGISTER
SUPPLY OR OUTSIDE AIR DUCT DOWN
RETURN DUCT OR GRILLE
RETURN DUCT DOWN
MOTORIZED DAMPER
BACKDRAFT DAMPER
DUCT STATIC PRESSURE SENSOR
SPS
MD
BD
VOLUME DAMPERVD
EXHAUST AIR DUCT OR EXHAUST GRILLE
EXHAUST AIR DUCT DOWN
BALL VALVE
ELBOW, 90°
CAP
PIPE CONNECTION BOTTOM
PIPE CONNECTION TOP
PIPE COUPLING (JOINT)
OS & Y
SAFETY RELIEF VALVE
(PRESS. & TEMP.)
HOSE END DRAIN
TWO WAY MOTORIZED
CONTROL VALVE
THREE WAY MOTORIZED
CONTROL VALVE
CHECK VALVE
PIPE TEE
DRAIN VALVE W/
HOSE COUPLING W/CAP
PIPE ELBOW, TURNED DOWN
CALIBRATED
BALANCING VALVE
DUCT MOUNTED
HUMIDITY SENSOR
DUCT MOUNTED
CARBON DIOXIDE SENSOR
FLOW METER
HUMIDISTAT/ HUMIDITY
SENSORH
H
CO2
FM
CHANGE OF ELEVATION,
RISE (R) DROP (D) R
LINED DUCT WORK
DUCT WORK, DIRECTION OF FLOW
RECTANGULAR TO ROUND TRANSITION
FLEXIBLE CONNECTION
FC
TRANSITION
DIRECTION OF SUPPLY OR OUTSIDE AIR
DIRECTION OF RETURN OR EXHAUST AIR
S SMOKE DETECTOR IN DUCT (FIBO)
FD/AD FIRE DAMPER W/ ACCESS DOOR
DUCT ACCESS DOOR
RETURN GRILLE
DIA. OR
PIPE TEE, OUTLET UP
M
OR THERMOMETER
DIAMETER
P
METER
DIRECTION OF FLOW
PRESSURE SENSOR
SPACE TEMPERATURE SENSORT
HWS
HWR HOT WATER RETURN
HOT WATER SUPPLY
POINT OF CONNECTION
CHWS
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
PIPE ELBOW, TURNED DOWN
PIPE TEE, OUTLET DOWN
PIPE ELBOW, TURNED UP
SMD
SMOKE DAMPER
FSD
COMBINATION FIRE
AND SMOKE DAMPER
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
CO
CO2
NO2
REFERENCE AS-BUILT DRAWING LIST
SM-A-1.1 PART A FIRST FLOOR HVAC PLAN
SM-A-1.2 PART A FIRST FLOOR HVAC PLAN
SM-A-2.1 PART A SECOND FLOOR HVAC PLAN
SM-A-2.2 PART A SECOND FLOOR HVAC PLAN
SM-B-1.1 PART B FIRST FLOOR HVAC PLAN
SM-B-1.2 PART B FIRST FLOOR HVAC PLAN
SM-B-2.2 PART B SECOND FLOOR HVAC PLAN
POINT OF DISCONNECTION
AS BUILT DRAWINGS ARE FOR REFERENCE ONLY
OMIT
RFI 002
DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:
SCALE:
DRAWN BY:
PROJECT NUMBER:
DRAWING NUMBER:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
PROJECT SUBMISSION:
STATE PROJECT NUMBER:
INTERIOR RENOVATION AT
AMITY REGIONAL HIGH SCHOOL MEDIA CENTER
25 NEWTON ROAD
WOODBRIDGE, CT 065525 205-0046 A
ISSUED FOR BID: 05/01/26
23.195
11/07/2025
1/8" = 1'-0"
5/1 9/2
6 1
:59 :01
P
MM001
MECH GENERAL NOTES,
ABBREVIATIONS, AND LEGENDS
M.Burwell/ W. Yaremich
MECHANICAL DRAWING LIST
M001 MECH GENERAL NOTES, ABBREVIATIONS, AND LEGENDS
M011 MECH FIRST FLOOR DUCT DEMO PART PLAN
M021 MECH FIRST FLOOR PIPING DEMO PART PLAN
M111 MECH FIRST FLOOR DUCT PART PLAN
M112 MECH ROOF DUCT PART PLAN
M211 MECH FIRST FLOOR PIPING PART PLAN
M212 MECH ROOF PIPING PLAN
M500 MECH SCHEDULES
M501 MECH SCHEDULES
M600 MECH DETAILS
M601 MECH DETAILS
M602 MECH DETAILS
1 ADDENDUM #2 5/19/20261 ADDENDUM #2 5/19/2026 M.BURWELL
POINT OF DISCONNECT
POINT OF DISCONNECT
SFB4
SFB1
SFB4
REFRIGERANT LINESET (TYP FOR 3 INDOOR UNITS)
DEMO INDOOR UNIT INCLUDING BUT
NOT LIMITED TO UNITS, PIPING,CONTROLS,
INSULATION AND FITTINGS
DEMO CONDENSING UNITS (X3) INCLUDING BUT
NOT LIMITED TO UNITS, PIPING, CONTROLS,
INSULATION AND FITTINGS
SYMBOL
DEMOLITION LEGEND
DESCRIPTION
EXISTING PIPING, DUCTWORK, OR EQUIPMENT TO
BE REMOVED
EXISTING GRILLE TO BE REMOVED
EXISTING REGISTER/DIFFUSER TO BE REMOVED
EXISTING EQUIPMENT/PIPE/DUCT TO REMAIN
DEMOLITION KEYNOTE TAG
DEMOLITION GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
THE INTENT OF THIS DOCUMENT IS FOR THE CONTRACTOR TO
REMOVE ALL EXISTING MECHANICAL EQUIPMENT, HOT WATER
SUPPLY AND RETURN PIPING, SPECIALTIES AND ALL ASSOCIATED
INSULATION AND HANGERS, DUCTWORK AND ASSOCIATED
ACCESSORIES AND CONTROLS EXCEPT WHERE NOTED TO
REMAIN.
THE DEMOLITION NOTES ARE FOR DESCRIPTIVE GUIDE ONLY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL
OF ALL ITEMS WHETHER OR NOT INDICATED AND/ OR NOTED ON
THE DRAWINGS. LOCATIONS AND QUANTITIES SHOWN ON THE
DEMOLITION DRAWINGS ARE APPROXIMATE. CONTRACTOR
SHALL VERIFY THE FULL EXTENT OF WORK.
CONSTRUCTION WILL BE COMPLETED IN PHASES. ALL EXISTING
PIPING WILL BE REUSED UNTIL THEY ARE READY TO BE
DEMOLISHED. REFER TO CONSTRUCTION MANAGER'S PHASING
PLAN.
NO WORK SHALL BE LEFT INCOMPLETE NOR ANY HAZARDOUS
SITUATIONS CREATED WHICH WILL AFFECT THE LIFE OR SAFETY
OF THE PUBLIC AND/OR BUILDING OCCUPANTS. AT NO TIME
SHALL THE WORK INTERFERE WITH OR CUTOFF ANY OF THE
EXISTING SERVICES WITHOUR THE OWNER'S WRITTEN
PERMISSION.
WHEN NECESSARY TO TEMPORARILY DISCONNECT ANY EXISTING
BUILDING UTILITIES AND PIPING SYSTEM, CONFER WITH THE
OWNER AND ARRANGE THE PERIOD OF INTERRUPTION FOR A
TIME MUTUALLY AGREED UPON.
COORDINATE SHUTDOWN OF EXISTING SERVICES AND TAPPING
OF EXISTING PIPING WITH OWNER'S MAINTENANCE PERSONNEL.
NO WORK SHALL TAKE PLACE UNTIL DOING SO.
THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THEIR
WORK WITH ALL TRADES.
ALL DUCTWORK AND PIPING INSULATION REMOVAL SHALL BE
PART OF ABATEMENT WORK. REFER TO ABATEMENT DRAWINGS,
PROJECT MANUAL FOR ALL EXISTING PIPING AND MECHANICAL
SERVICES NOTE SHOWN HEREIN, OR CONCEALED IN THE
EXISTING CONSTRUCTION. INSTALLATION OF NEW TEMPORARY
INSULATION FOR ALL PIPING AFTER ABATEMENT SHALL BE THE
RESPONSIBILITY OF THE MECHANICAL CONTRACTOR.
FOR MORE INFORMATION ON HANDLING HAZARDOUS MATERIALS,
REFER TO THE ABATEMENT DRAWINGS AND PROJECT MANUAL.
INFILL ALL EXISTING FLOOR AND WALL PENETRATIONS THAT ARE
NOT GOING TO BE REUSED WITH A MATERIAL WITH THE SAME
WALL RATING AS THE EXISTING WALL. REFER TO THE
ARCHITECTURAL DRAWINGS.
D##
DEMOLITION KEY NOTES
1.
2.
3.
EXISTING VAV TERMINAL UNIT, ASSOCIATED PIPING, CONTROLS,
SUPPORTS, HANGERS, ETC. TO BE REMOVED BACK TO MAIN AS
INDICATED. PIPING TO BE CAPPED AND SEALED WATER TIGHTAT
PIPE MAIN.
EXISTING INDOOR FAN COIL UNIT, ASSOCIATED OUTDOOR
CONDENSING UNIT, CONDENSATE PUMP, CONTROL,
REFRIGERANT PIPING, CONDENSATE PIPING, ETC. TO BE
REMOVED COMPLETELY.
EXISTING HOT WATER PIPING TO BE REMOVED BACK TO MAIN.
EXISTING PIPE MAIN TO BE CAPPED AND SEALED WATER TIGHT.
OMIT
RFI 002
DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:
SCALE:
DRAWN BY:
PROJECT NUMBER:
DRAWING NUMBER:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
PROJECT SUBMISSION:
STATE PROJECT NUMBER:
PROJECT
NORTH
INTERIOR RENOVATION AT
AMITY REGIONAL HIGH SCHOOL MEDIA CENTER
25 NEWTON ROAD
WOODBRIDGE, CT 065525 205-0046 A
ISSUED FOR BID: 05/01/26
23.195
11/07/2025
As indicated
5/1 9/2
6 1
0:2 8:2
3 A
MM021
MECH FIRST FLOOR PIPING DEMO PART
PLAN
M. Burwell/ W. Yaremich
1/8" = 1'-0"1 FIRST FLOOR PIPING DEMO PART PLAN
1 3
1 ADDENDUM #2 05/19/2026 M. BURWELL
File details come from the government source that posted it. Updated .