23-3052 TCAPS STEM BP2 Front End.pdf
PDF 5 MB Posted
- Attached to
- LEGAL AD FOR BID STEM ADDITION-BID PACK II
- Solicitation number
- RFP - TRAV - 240000000529
- Issued by
- Grand Traverse County, Tower CDP, Michigan
About this file
This document is a legal advertisement for bids related to the STEM Lab Additions Bid Pack No. 2: Building Addition project for Traverse City Area Public Schools in Grand Traverse County, Michigan. The project consists of existing building renovations and building additions for future STEM laboratories at Traverse City Central High School and Traverse City West Senior High School. The work includes finishes, flooring, plumbing, mechanical, electrical, exterior storefront and brick, structural steel, and exterior improvements.
Bids are due on December 19, 2023 at 10:00 AM local time, and will be publicly opened and read aloud the same day at 10:15 AM. A pre-bid meeting will be held on December 5, 2023 at 11:00 AM local time. The owner, Traverse City Area Public Schools, intends to award contracts on or about January 15, 2024. Bid security of 5% of the base bid is required, and contractors bidding over $50,000 must be bondable.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
Traverse City Area Public Schools STEM Lab Additions
Bid Pack No. 2: Building Addition
November 28, 2023
OWNER
Traverse City Area Public Schools
412 Webster Street Traverse City, MI 49686
ARCHITECT/ENGINEER
Diekema Hamann Architecture & Engineering 15 Ionia SW - Suite 330 Grand Rapids, MI 49503
CONSTRUCTION MANAGER
Miller-Davis Company 1029 Portage Street
Kalamazoo, MI 49001
VOLUME 1
Traverse City Area Public Schools – STEM Lab Additions
- Bid Pack No. 2 – Building Addition
AE PROJECT NO. 22010.00
CM PROJECT NO. 23-3052
PAGE 2 OF 169 TABLE OF CONTENTS
TABLE OF CONTENTS
DIVISION 0 – BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
00 1113 Advertisement for Bids 00 2113 Instructions to Bidders 00 3113 Preliminary Schedules 00 3126 Existing Hazardous Material Information 00 3132 Geotechnical Data 00 4100 Bid Proposal Signature Attachment 00 4200 Bid Category Descriptions 00 4300 Bid Request for Information 00 4313 Bid Security 00 4318 Familial Statement of Disclosure 00 4320 Iran Economic Sanctions Act Certification 00 4513 Contractor Qualification Statement 00 5000 Agreement and Notice to Proceed 00 6100 Performance and Payment Bonds 00 6216 Certificates of Insurance and Insurance Policies 00 6290 Subcontractor/Supplier/Material/Equipment Listing 00 7200 General Conditions 00 7300 Supplementary Conditions 00 7343 Wage Rate Requirements 00 9113 Addenda
DIVISION 1 - GENERAL REQUIREMENTS
01 2100 Allowances 01 2200 Unit Prices 01 2300 Alternates 01 2500 Substitutions 01 2600 Changes in The Work 01 2900 Payment Procedures 01 2973 Schedule of Values 01 3000 Project Administration 01 3119 Project Meetings 01 3300 Submittals 01 3500 Safety 01 3553 Security 01 4000 Quality Assurance & Quality Control Procedures 01 5000 Temporary Facilities and Controls 01 5510 Access and Deliveries 01 5526 Parking and Traffic Controls 01 6000 Product Requirements 01 7123 Field Engineering 01 7329 Cutting and Patching 01 7400 Cleaning 01 7419 Sustainable Practices and Waste Management 01 7700 Project Closeout 01 7823 Operation and Maintenance Data 01 7836 Warranties 01 7839 Project Record Documents 01 7850 Asbestos Certification
AE PROJECT NO. 22010.00
PAGE 3 OF 169 ADVERTISEMENT FOR BIDS SECTION 00 1113
SECTION 00 1113
ADVERTISEMENT FOR BIDS
PROJECT: Traverse City Area Public Schools STEM Lab Additions
• Traverse City Central High STEM Lab Addition 1150 Milliken Drive Traverse City, Michigan 49686
• Bid Pack No. 2 – Building Addition
• Traverse City West Senior High STEM Lab Addition 5376 N. Long Lake Road Traverse City, Michigan 49685
• Bid Pack No. 2 – Building Addition
Owner: Traverse City Area Public Schools 412 Webster Street Traverse City, MI 49685
Architect/Engineer: Diekema Hamann Architecture & Engineering 15 Ionia SW - Suite 330 Grand Rapids, Michigan 49503
Phone: (269) 373-1108 Fax: (269) 373-1186
Construction Manager: Miller-Davis Company 1029 Portage Street Kalamazoo, MI 49001 Phone: (269) 345-3561 Fax: (269) 345-1372
BIDS DUE: Traverse City Area Public Schools and Miller-Davis Company will receive Electronic Bids for the Bid Categories described in the Project Manual for the above referenced Project until 10:00 AM, local time, December 19, 2023. Bids received late will not be considered.
The Owner intends to award Contracts on or about January 15, 2024.
Bids are to be submitted virtually through Building Connected. Bids submitted virtually cannot be opened prior to the bid due date and time. Use the Bid Documents link located at www.miller-davis.com/Bids under the project tile to access Building Connected. Any firm that cannot comply with electronic bid submission requirements must contact Mike Farese at (973) 738-0823 / mfarese@miller-davis.com at least 48 hours before bids are due to make alternative arrangements.
BID OPENING: Bids will be opened publicly and read aloud via Microsoft Teams Live Event at 10:15 AM, local time, December 19, 2023. All Bids will be evaluated at a later date. A link to join the live bid opening can be found at www.miller-davis.com/Bids under the project tile.
PROJECT DESCRIPTION: This Bid Package No. 2 consists of existing building renovations and building additions for future STEM laboratories at Central High School and West Senior High School. Work includes, but is not limited to, finishes, flooring, plumbing, mechanical, electrical, exterior storefront and brick, structural steel, and exterior improvements. Bid Package No. 1 has addressed the footings and foundations for the building additions.
mailto:mfarese@miller-davis.com http://www.miller-davis.com/Bids
AE PROJECT NO. 22010.00
PAGE 4 OF 169 ADVERTISEMENT FOR BIDS SECTION 00 1113
PRE-BID MEETING: A Pre-Bid Meeting will take place on site at the Traverse City Area Public School STEM additions on December 5, 2023, at 11:00 AM local time. The meeting will begin at West Senior High School, and will conclude at Central High School. All prospective Bidders are strongly encouraged to attend.
BID SECURITY: Bid Security in the amount of five percent (5%) of Base Bid(s) shall accompany each Proposal (refer to Section 00 4313)
PERFORMANCE BOND AND PAYMENT BOND: All Contractors bidding on Work in excess of $50,000.00 must be bondable and must include in their Proposal the cost for furnishing a Performance Bond and Payment Bond listing Traverse City Area Public Schools as Obligee (refer to Section 00 6100).
CONTRACTOR QUALIFICATION STATEMENT: A current Contractor Qualification Statement must be on file with Miller-Davis Company to be Awarded a Contract.
Follow any of the options below to start your prequalification process:
• Via Miller-Davis website:
o Visit our website at www.miller-davis.com o Navigate to the “Bids” tab o Click on “Start Prequalification”
• Alternatively, you can directly access the prequalification through this link:
https://bit.ly/mdprequal
As part of the prequalification process, you may be required but not limited to provide the following information:
• OSHA 300/300A Logs from the past three years
• EMR letters
• Bonding information
• Insurance documents
Please gather these materials ahead of time to ensure a smooth and efficient prequalification process.
BIDDERS REQUEST FOR INFORMATION: Submission cut off is December 11, 2023, at 12:00 PM (refer to Section 00 4300).
BIDDING DOCUMENTS: A link to the Bidding Documents may be obtained at www.miller-davis.com under the Bids tab.
OTHER: All Bids submitted shall remain valid for a period of sixty (60) consecutive calendar days after the Bid Date.
The Owner and Miller-Davis Company reserve the right to waive any irregularities, reject any or all Bids, or accept any Bid which, in its opinion, will best serve its interests.
http://www.miller-davis.com/ https://bit.ly/mdprequal
AE PROJECT NO. 22010.00
CM PROJECT NO. 23-3052
PAGE 5 OF 169 ADVERTISEMENT FOR BIDS SECTION 00 1113
It is the policy of the Owner and Miller-Davis Company that minority and women’s business enterprises shall have an equal opportunity to participate as Contractors for this project.
Miller-Davis Company is an Equal Opportunity Employer and we fully and actively support equal opportunities for everyone. All qualified bidders are encouraged to submit a Proposal for this project regardless of race, color, religion, gender, sexual orientation, age, national origin, disability or veteran status.
END OF ADVERTISEMENT FOR BIDS
AE PROJECT NO. 22010.00
PAGE 6 OF 169 INSTRUCTIONS TO BIDDERS SECTION 00 2113
SECTION 00 2113
INSTRUCTIONS TO BIDDERS
ARTICLE 1 - BIDDING PROCEDURE
1.1 Form and Style of Bids:
1.1.1 Bids shall be submitted utilizing the electronic form provided for each Bid Category through Building Connected. Access Building Connected via the Bid Documents link on the project tile at www.miller-davis.com/Bids.
1.1.2 All requested Alternates, affecting the work covered by a Bid Category, shall be Bid. If a Bid is not submitted for an Alternate, it is understood and agreed to by the Bidder that its Proposal is unaffected by the acceptance of the particular Alternate.
1.2 Submission of Bids:
1.2.1 The Bid, Bid Security, and any other documents required to be submitted with the Bid shall be submitted as noted below.
1.2.2 Submit Bid electronically through Building Connected. Before submitting the proposal, check to be sure that:
a. The Base Bid amount is filled in
b. All Addenda are acknowledged
c. All applicable Alternate amounts are filled in
d. All required responses are filled in
e. Cost of Payment and Performance Bonds are included, if applicable
f. The following attachments have been uploaded:
i. Bid Proposal Signature Attachment, refer to Section 00 4100
ii. Signature Authorization
iii. Familial Statement of Disclosure, refer to Section 00 4318
iv. Iran Economic Sanctions Act Certification, refer to Section 00 4320
v. Bid Security, refer to Specification Section 00 4313
1.2.3 Any firm that cannot comply with electronic bid submission requirements must contact Mike Farese at (973) 738-0823 / mfarese@miller-davis.com at least 48 hours before bids are due, to make alternative arrangements.
1.3 Modification or Withdrawal of Bid:
1.3.1 A Bid may not be modified, withdrawn, or cancelled by the Bidder for a period of sixty (60) calendar days after the Date of the Bid opening.
1.3.2 Prior to the time and date designated for receipt of Bids, Bids submitted early may be modified or withdrawn only by notice to the party receiving Bids at the place and prior to the time designated for receipt of Bids.
Such notice shall be in writing over the signature of the Bidder. Written confirmation over the signature of Bidder must have been mailed and postmarked on or before the date and time set for receipt of Bids; it shall be worded as not to reveal the amount of the original Bid.
mailto:mfarese@miller-davis.com
AE PROJECT NO. 22010.00
CM PROJECT NO. 23-3052
PAGE 7 OF 169 INSTRUCTIONS TO BIDDERS SECTION 00 2113
1.3.3 Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids, provided they are then fully in conformance with these Instructions to Bidders. The Bid Security shall be in an amount sufficient for the Bid as resubmitted.
1.4 Post Bid Information: Each bidder, by submitting a Bid Proposal, agrees to meet with the Construction Manager, Owner and/or Architect/Engineer, if so requested, prior to an award.
ARTICLE 2 - DEFINITIONS
1.1 Bidding Documents include all the Proposed Contract Documents as listed in the
Table of Contents of the Project Manual, all drawings as listed in the Project Manual or on a Title Sheet on the drawings, and all Addenda issued prior to receipt of bids.
1.2 Addenda are written and graphic instruments issued by the Architect prior to the execution of the Contract, which modify or interpret the Bidding Documents by addition, deletions, clarifications or corrections.
1.3 A Bid is a complete and properly signed proposal to do the Work or designated portion thereof for the sums stipulated therein supported by data called for by the Bidding Documents.
1.4 Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described as the base, to which work may be added or deducted for sums stated in Alternate Bids.
1.5 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from the amount of the Base Bid if the corresponding change in project scope or materials or methods of construction described in the Bidding Documents is accepted.
1.6 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials or services as described in the Contract Documents.
1.7 A Bidder is one who submits a Bid for a Prime Contract with the Construction Manager for the Work described in the proposed Contract Documents.
1.8 A Sub-Bidder is one who submits a Bid to a Bidder for materials or labor for a portion of the Work.
1.9 A BID CATEGORY DESCRIPTION OUTLINES THE SCOPE OF WORK TO BE
INCLUDED IN THE BIDDER’S PROPOSAL.
ARTICLE 3 - BIDDERS REPRESENTATION
2.1 Each Bidder by making a Bid represents that:
2.1.1 They have read and understand the Bidding Documents and the Bid is made in accordance therewith.
2.1.2 They have visited the site and familiarized themselves with the local conditions under which the Work is to be performed.
AE PROJECT NO. 22010.00
PAGE 8 OF 169 INSTRUCTIONS TO BIDDERS SECTION 00 2113
2.1.3 The Bid is based upon the materials, systems and equipment described in the Bidding
Documents without exceptions.
ARTICLE 4 - BIDDING DOCUMENTS
4.1 Interpretation or Correction of Bidding Documents:
4.1.1 Complete sets of Bidding Documents shall be used in preparing Bids. Neither the Owner, Construction Manager, nor the Architect assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
4.1.2 Bidders shall promptly notify the Construction Manager and Architect of any ambiguity, inconsistency or error, which they may discover upon examination of the Bidding Documents or of the site and local conditions.
4.1.3 Bidders requiring clarification or interpretation of the Bidding Documents shall make such requests to the Construction Manager at least seven (7) days prior to the date for receipt of Bids. A Pre-Bid Conference will be scheduled by the Construction Manager at the time and location as designated in the Advertisement for Bids (refer to Section 00 1113). Bidders are to bring questions for clarification and/or interpretations, corrections and changes.
4.1.4 Any interpretation, correction or change of the Bidding Documents will be made by
Addendum. Corrections or changes of the Bidding Documents made in any other manner will not be binding, and Bidders shall not rely upon such interpretations, corrections and changes.
4.1.5 In case of a conflict in the Contract Documents regarding Scope of Work, they shall govern in the following order:
a. The Contract Agreement; Bid Category Descriptions; General Conditions;
Instructions to Bidders; Advertisement for Bids; Technical Specifications and Drawings. Drawings of larger scale shall have precedence over small scale; calculated dimensions over scaled dimensions; noted materials over graphic indications.
4.1.6 In case of an inconsistency between Drawings and Specifications or within either document, which is not clarified by Addendum, the better quality or greater quantity of Work shall be provided that is most favorable to the Owner.
4.1.7 Bidders may submit proposals for one or more Bid Categories and/or separate combination proposals for a multiple of Bid Categories.
ARTICLE 5 – CONSIDERATION OF BIDS
5.1 Bids will be opened publicly and read aloud via Microsoft Teams Live Event. A link to join the live bid opening can be found at www.miller-davis.com/Bids under the project tile.
5.2 The Owner expressly reserves the right, within the Owner's sole discretion and in compliance with applicable laws, to reject any or all Bids, to accept any Bid, to waive any http://www.miller-davis.com/Bids
AE PROJECT NO. 22010.00
CM PROJECT NO. 23-3052
PAGE 9 OF 169 INSTRUCTIONS TO BIDDERS SECTION 00 2113
irregularities or informalities, to withhold the award for any reason the Owner determines, and/or to take any other appropriate action.
5.3 The Owner shall have the right to reject any Bid not accompanied by any data required by the Bidding Documents or a Bid that is in any way incomplete or irregular.
5.4 The Owner shall have the right to accept Alternates in any order or combination and to determine the successful Bidder on the basis of the sum of the Base Bid and the Alternates accepted.
END OF INSTRUCTIONS TO BIDDERS
AE PROJECT NO. 22010.00
PAGE 10 OF 169 PRELIMINARY CONSTRUCTION SCHEDULE SECTION 00 3113
SECTION 00 3113
PRELIMINARY SCHEDULES
ARTICLE 1 – DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
1.1 Work shall commence on or about January of 2024. Submittals and Shop Drawings shall be submitted immediately upon notification of award.
1.2 Contractor shall achieve Substantial Completion for the Work of each phase, and the entirety of Work, as shown in the Preliminary Schedule. Refer to schedule and phasing plans for areas that must be completed prior to Substantial Completion.
ARTICLE 2 – PRELIMINARY CONSTRUCTION SCHEDULE
2.1 A Preliminary Construction Schedule is bound herein. Each Bidder is required to review these dates and to endorse them within the context of the Bid Category(s) being bid.
The Preliminary Construction Schedule, and the information it provides, is not a part of the Contract Documents.
2.2 Each Bidder acknowledges that all shift and overtime premium required to meet the completion dates is included in the base bid.
2.3 Each Bidder is obligated to comment on the Preliminary Construction Schedule if, in their opinion, the dates do not depict realistic time interval(s) for performance of the Work of the Bid Category(s).
ARTICLE 3 – PROJECT SCHEUDLE
3.1 The Preliminary Construction Schedule as endorsed and/or amended by successful
Bidders and accepted by the Owner will be used in the development of a Project Schedule to be used as a guide during the construction of the Project.
3.2 All Contractors shall provide input to the Project Schedule by which the Project will be built. Consequently, it is the responsibility and obligation of each Contractor to utilize its manpower and resources according to the commitments made under the scheduling process.
3.3 The Contractor shall cooperate with the Construction Manager in scheduling and performing the Contractor’s Work to avoid conflict with, and as to cause no delay in, the work or activities of other Contractors or the construction or operations of the Owner’s own forces.
3.4 The Contractor shall participate with other Contractors, the Construction Manager and
Owner in reviewing and coordinating all schedules for incorporation into the Project Schedule that is prepared by the Construction Manager. The Contractor shall make revisions to the Construction Schedule and Submittal Schedule as deemed necessary by the Construction Manager to conform to the Project Schedule.
AE PROJECT NO. 22010.00
CM PROJECT NO. 23-3052
PAGE 11 OF 169 PRELIMINARY CONSTRUCTION SCHEDULE SECTION 00 3113
3.5 The Contractor shall cooperate with the Construction Manager in scheduling and performing its Work to avoid conflict or interference with the Work of others, and the Contractor shall be responsible for any conflict or interferences that it causes.
3.6 The Construction Manager and Contractor acknowledge and understand that the Project Schedule will be modified from time-to-time with the Owner’s approval to coordinate with the work of others and that such schedule changes to not give rise to claim for damages or additional compensation by the Contractor for delay or otherwise. The Contractor shall be required to conform to the most recent Owner-approved schedule and acknowledges that fact was taken into account when it entered into the Contract.
3.7 The Contractor shall cooperate with the Construction Manager in working out and following the proper sequence of operations between the Work of the Contractors and that of other trades on the site.
3.8 Prior to proceeding with any portion of the Work, Contractor shall give the Construction Manager written notice of any discrepancies or deficiencies determinable by reasonable due diligence regarding construction activities. Failure to give such notice shall constitute Contractor’s acceptance of construction activities and a waiver of any claims by Contractor regarding the same. Contractor shall provide Construction Manager access to the Work and Subcontractor’s activities onsite and offsite regarding the Work, and cooperate with Construction Manager permitting observation, inspection, testing, providing reports, and attending meetings, all in furtherance of the Work and assurance of Contractor’s compliance with the terms of the Contract Documents.
ARTICLE 4 - PROMPTNESS OF EXECUTION
4.1 It is the intention of the Owner and the Construction Manager to complete the Project in the fastest practical time frame. Whereas varying conditions inherent in the construction process will affect the progress of the Work, it is the intent of the Contract Agreement that the Contractor maintain the progress pace set forth in the Project Schedule.
4.2 If the Contractor shall, through its action or inactions, including the actions or inactions of its’ subcontractors or suppliers, fall behind in furnishing necessary labor and/or materials to meet the construction needs in accordance with the established schedule, then it shall increase its forces or work such overtime as may be required, at its own expense, to bring its part of the work up to the proper schedule. Costs that the Contactor may be responsible shall include, but not be limited to, the Construction Manager’s time and efforts; other contractors increase in forces or overtime to meet the established schedule.
4.3 If at any time the Contractor refuses or fails to supply enough properly skilled workers or proper materials, or for any reason fails to take the necessary actions to maintain the Project Schedule, the Construction Manager retains the right, after giving the Contractor forty-eight (48) hours written notice and without prejudice to any other right or remedy they may have, to assure the timely completion of the Work by whatever method they may deem expedient. In such case, the Contractor will be responsible for all costs incurred in this venture by the Construction Manager and shall not be entitled to receive any further payment until the Work is finished.
ID Task Name Start Finish
1 TCAPS STEM Additions Thu 9/21/23 Thu 12/19/24
2 Preconstruction - Phase No. 2 - Building Addition Tue 9/26/23 Wed 11/22/23
7 Bid and Award Thu 9/21/23 Mon 1/8/24
8 Bid Pack No. 1 - Footings and Foundations Thu 9/21/23 Thu 10/26/23
21 Bid Pack No. 2 - Building Addition Wed 11/22/23 Mon 1/8/24
22 Receive Completed CD's Wed 11/22/23 Wed 11/22/23
23 Finalize-Front End & Scopes Mon 11/27/23 Mon 11/27/23
24 Issue Cd's For Bidding Tue 11/28/23 Tue 11/28/23
25 Pre-Bid Meeting Tue 12/5/23 Tue 12/5/23
26 Last Day for Bid RFI's Mon 12/11/23 Mon 12/11/23
27 Issue Last Addendum Tue 12/12/23 Wed 12/13/23
28 Bids Due 10:00am Tue 12/19/23 Tue 12/19/23
29 Post Bid Interviews Tue 12/19/23 Thu 12/21/23
30 Finalize Award Recommendations Thu 12/21/23 Thu 12/21/23
31 Send Board Award Recommendations Thu 12/21/23 Thu 12/21/23
32 Board Finance Committee Wed 1/3/24 Wed 1/3/24
33 Full Board Meeting Mon 1/8/24 Mon 1/8/24
34 Finalize Rec's and send out sub contracts Fri 12/22/23 Thu 12/28/23
35 Permits Fri 9/29/23 Thu 1/11/24
36 State Plan Review Fri 9/29/23 Fri 10/27/23
37 City Erosion Permit Mon 10/30/23 Fri 11/10/23
38 Utilities Permit Mon 10/30/23 Fri 11/10/23
39 Foundation Permit Mon 10/30/23 Fri 11/10/23
40 Building Permit Fri 12/29/23 Thu 1/4/24
41 Plumbing Permit Fri 1/5/24 Thu 1/11/24
42 Electrical Permit Fri 1/5/24 Thu 1/11/24
43 Mech. Permit Fri 1/5/24 Thu 1/11/24
44 Fire Protection Permit Fri 1/5/24 Thu 1/11/24
45 Fire Alarm Permit Fri 1/5/24 Thu 1/11/24
46 Expediting Submittals Mon 10/9/23 Fri 1/12/24
63 Construction Mon 10/30/23 Thu 12/19/24
64 West Senior High School Mon 10/30/23 Thu 12/19/24
65 Bid Pack No. 1 - Footings and Foundations Mon 10/30/23 Mon 1/8/24
86 Bid Pack No. 2 - Building Addition Fri 12/29/23 Thu 12/19/24
87 Steel Shop Drawings and Fabrication Fri 12/29/23 Wed 1/31/24
88 Mobilize Thu 1/4/24 Wed 1/10/24
89 Structural Steel Thu 2/1/24 Wed 2/28/24
90 Second Floor In Deck MEP Rough-in Thu 2/29/24 Wed 3/13/24
91 Masonry Walls and Brick Thu 2/29/24 Wed 5/1/24
92 Slab on Deck Thu 3/14/24 Wed 3/27/24
93 Roofing Thu 5/2/24 Wed 5/15/24
94 Underground Plumbing Thu 5/2/24 Wed 5/15/24
95 Underground Electrical Thu 5/16/24 Wed 5/29/24
96 Architectural Demo Mon 6/10/24 Fri 6/14/24
97 MEP Demo & Rough-in Existing Building Mon 6/10/24 Fri 7/5/24
11/22
11/27 11/27
11/28
12/5
12/11
12/12 12/13
12/19
12/19 12/21
12/21 12/21
12/21
1/3
1/8
12/22 12/28
9/29 10/27
10/30 11/10
10/30 11/10
10/30 11/10
12/29 1/4
1/5 1/11
1/5 1/11
1/5 1/11
1/5 1/11
1/5 1/11
12/29 1/31
1/4 1/10
2/1 2/28
2/29 3/13
2/29
3/14 3/27
Jul Aug Sep Oct Nov Dec Jan Feb Mar
Miller-Davis Company TCAPS - STEM Lab Additions
Construction Schedule
Tue 11/28/23
ID Task Name Start Finish
98 Slab on Grade Thu 5/30/24 Wed 6/12/24
99 Interior Partitions Thu 6/13/24 Wed 7/3/24
100 Storefronts, Windows and Curtain Wall Assemblies Thu 7/4/24 Wed 7/31/24
101 MEP rough-ins Thu 7/4/24 Wed 7/31/24
102 Sitework Thu 7/4/24 Tue 9/10/24
103 Drywall Hang & Finish Thu 8/1/24 Wed 8/21/24
104 Paint Thu 8/22/24 Wed 9/4/24
105 Ceilings Thu 9/5/24 Wed 9/18/24
106 MEP Finishes Thu 9/19/24 Wed 10/16/24
107 Casework Thu 10/17/24 Wed 10/30/24
108 Flooring Thu 10/31/24 Wed 11/20/24
109 Doors and Hardware Thu 11/21/24 Wed 12/4/24
110 Punch List Thu 12/5/24 Wed 12/18/24
111 Turnover Thu 12/19/24 Thu 12/19/24
112 Central High School Mon 10/30/23 Thu 11/14/24
113 Bid Pack No. 1 - Footings and Foundations Mon 10/30/23 Fri 11/3/23
116 Site Work and Foundations Mon 11/13/23 Tue 2/13/24
136 Bid Pack No. 2 - Building Addition Fri 12/29/23 Thu 11/14/24
137 Steel Shop Drawings and Fabrication Fri 12/29/23 Wed 1/31/24
138 Mobilize & Temp Walls Thu 1/4/24 Wed 1/10/24
139 Architectural and Concrete Demo Mon 1/29/24 Fri 2/9/24
140 MEP Demo Mon 1/29/24 Fri 2/23/24
141 Structural Steel Thu 2/1/24 Wed 2/28/24
142 Exterior Metal Studs and Sheathing Thu 2/29/24 Wed 3/13/24
143 Second Floor In-Deck MEP Roughin Thu 2/29/24 Wed 3/13/24
144 Roofing Thu 3/14/24 Wed 3/27/24
145 Slab on Deck Thu 3/14/24 Wed 3/20/24
146 Underground Plumbing Thu 3/14/24 Wed 4/3/24
147 Underground Electrical Thu 4/4/24 Wed 4/17/24
148 Slab on Grade Thu 4/18/24 Wed 5/1/24
149 Interior Block Partitions Thu 5/2/24 Wed 5/15/24
150 Brick Veneer Thu 5/16/24 Wed 6/12/24
151 Interior Metal Stud Partitions Thu 5/16/24 Wed 6/5/24
152 MEP rough-ins Thu 6/6/24 Wed 7/3/24
153 Storefronts, Windows and Curtain Wall Assembies Thu 6/13/24 Wed 7/10/24
154 Drywall Thu 7/4/24 Wed 7/17/24
155 Sitework Thu 7/4/24 Tue 9/10/24
156 Paint Thu 7/18/24 Wed 7/31/24
157 Ceilings Thu 8/1/24 Wed 8/14/24
158 Casework Thu 8/15/24 Wed 8/28/24
159 MEP Finishes Thu 8/29/24 Wed 9/25/24
160 Flooring Thu 9/26/24 Wed 10/16/24
161 Doors and Hardware Thu 10/17/24 Wed 10/30/24
162 Punch List Thu 10/31/24 Wed 11/13/24
163 Turnover Thu 11/14/24 Thu 11/14/24
12/29 1/31
1/4 1/10
1/29 2/9
1/29 2/23
2/1 2/28
2/29 3/13
2/29 3/13
3/14 3/27
3/14 3/20
3/14
4/4
Jul Aug Sep Oct Nov Dec Jan Feb Mar
Miller-Davis Company TCAPS - STEM Lab Additions
Construction Schedule
Tue 11/28/23
AE PROJECT NO. 22010.00
PAGE 12 OF 169 PRELIMINARY CONSTRUCTION SCHEDULE SECTION 00 3113
END OF PRELIMINARY CONSTRUCTION SCHEDULE
AE PROJECT NO. 22010.00
PAGE 13 OF 169 EXISTING HAZARDOUS MATERIAL INFORMATION SECTION 00 3126
SECTION 00 3126
HAZARDOUS MATERIAL INFORMATION
To be issued in Addendum.
END OF HAZARDOUS MATERIAL INFORMATION
AE PROJECT NO. 22010.00
PAGE 14 OF 169 GEOTECHNICAL DATA SECTION 00 3132
SECTION 00 3132
GEOTECHNICAL DATA
Geotechnical Investigations were performed on the sites. A copy of the full Geotechnical Investigation Reports are bound herein.
The reports were prepared for use by the Architect/Engineer in designing the Project and are not a part of the Contract Documents. These are made available for information only and are not a warrant of subsurface conditions.
The date on indicated subsurface conditions are not intended as representation or warranties of accuracy of continuity between soil borings. It is expressly understood that Construction Manager and/or Architect/Engineer will not be responsible for interpretations or conclusions drawn therefrom by the Contractor.
Additional test borings and other exploratory operations may be made by Contractors, at no expense to Construction Manager or Owner. Please contact Construction Manager, however, before so doing.
END OF GEOTECHNICAL DATA
12330 James Street, Suite H80 Holland, Michigan 49424 Ph. (616) 396-0255 Fax (616) 396-0100 www.driesenga.com
Holland Grand Rapids Kalamazoo Lansing Ypsilanti
September 8, 2023 via electronic mail
Mr. Paul Thwing
TRAVERSE CITY AREA PUBLIC SCHOOLS (TCAPS)
1212 Cass Road Traverse City, Michigan 49685
Re: Geotechnical Report Central High School – STEM Addition 1150 Milliken Drive, Traverse City, Michigan Driesenga & Associates, Inc. Project No. 2310706.3A
Dear Mr. Thwing:
Driesenga & Associates, Inc. is pleased to submit the attached report of subsurface exploration performed for the above-referenced project. The report presents the exploration procedures, subsurface conditions encountered, and our recommendations for development of the site with respect to proposed earthwork and foundation construction. As the project nears construction you can contact Jake Stocking at 616-396-0255 in our local office to provide a quote for construction materials testing and survey needs.
Proper execution of our recommendations will affect the design, construction and performance of the structure and related facilities, and the potential associated risks involved. Therefore, the issues and recommendations presented in this report should be discussed with the project team, including Driesenga & Associates, Inc. This will increase the likelihood that the issues are understood and our recommendations are applied in a manner consistent with the project budget, tolerance of risk, and expectations for performance and maintenance.
We appreciate the opportunity to be of service to you. If you have any questions concerning this report, or if we can be of further service as design and construction progresses, please contact our office.
Sincerely, DRIESENGA & ASSOCIATES, INC.
Michael Stork Musana Nabil Senior Project Geologist Senior Project Engineer
Randy Pail, P.E Director of Geotechnical Engineering
GEOTECHNICAL REPORT
SITE:
CENTRAL HIGH SCHOOL – STEM ADDITION
1150 MILLIKEN DRIVE
TRAVERSE CITY, MICHIGAN
SEPTEMBER 8, 2023
PROJECT NO. 2310706.3A
PREPARED FOR:
TRAVERSE CITY AREA PUBLIC SCHOOLS
1212 CASS ROAD
TRAVERSE CITY, MICHIGAN 49685
Prepared by:
Driesenga & Associates, Inc.
1.0 INTRODUCTION
1.1 LOCATION
1.2 PURPOSE
1.3 SCOPE
1.4 DESIGN INFORMATION
2.0 SITE CONDITIONS
2.1 GENERAL
2.2 SURFACE CONDITIONS
2.3 DESCRIPTION OF SUBSURFACE SOILS
2.4 GROUNDWATER OBSERVATIONS
2.5 SEISMIC SITE CLASS
2.6 LIMITATIONS
3.0 RECOMMENDATIONS
3.1 SITE PREPARATION
3.2 FOUNDATIONS
3.3 FLOORS
3.4 GROUNDWATER CONTROL
3.5 TEMPORARY EXCAVATION STABILITY
4.0 GENERAL COMMENTS
APPENDICES
APPENDIX A Figure 1 – Site Location Figure 2 – Boring Locations APPENDIX B Soil Boring Logs APPENDIX C Field and Laboratory Procedures
1.0 INTRODUCTION
1.1 LOCATION
This report presents the results of the geotechnical investigation completed for the proposed STEM addition to Central High School. The site is located at 1150 Milliken Drive in Traverse City, Michigan as shown on Figure 1 – Site Location (Appendix A). The property is situated on the east side of Milliken Drive in an area of primarily residential development.
1.2 PURPOSE
The purpose of this investigation was to determine the subsurface profile, the engineering characteristics of the subsurface soils, and to provide recommendations in regard to the proposed design and construction based on our interpretation of the test results. This report was prepared in general accordance with our proposal dated August 17, 2023, as authorized by Mr. Paul D.
Thwing, R.A. of TCAPS on August 24, 2023.
1.3 SCOPE
The field exploration to estimate engineering characteristics of the site soils included performing a site reconnaissance, advancing the soil borings, performing standard penetration tests, and recovering split-spoon samples. Soil boring locations were determined in the field by measuring from existing site features. Existing ground surface elevations were not provided and obtaining them was beyond the scope of this investigation.
Three (3) soil borings, designated SB-1 to SB-3, were advanced in the vicinity of the proposed building addition on August 31, 2023, at the approximate locations shown on Figure 2 - Boring
Locations (Appendix A). The soil borings were advanced with hollow-stem augers to a depth of twenty (20) feet below the ground surface. During drilling, soil samples were collected from split-spoon sampling via standard penetration testing (ASTM method D 1586) at intervals of 2.5 feet to a depth of 10 feet, and intervals of 5 feet from a depth of 10 feet to the end of each boring. The soil boring logs are contained in Appendix B. The field and laboratory procedures are described in
Appendix C.
1.4 DESIGN INFORMATION
It is understood the proposed building addition is to be a two-story steel framed structure with masonry veneer supported on poured concrete foundations, with an approximate footprint of 9,500 square feet. The addition will extend approximately 70 feet west of the existing building.
Structural load information was provided by Mr. Tom Palarz, PE of Nehil Sivak Structural
Engineers. Maximum loads of 2,000 pounds per lineal foot of wall and 92 kips per column were provided. Understanding that the new construction will not include any basement areas, exterior footing depths are assumed to be a minimum of 3.5 feet below the final ground surface elevation.
We have assumed maximum tolerable settlements of 1 inch total and ½ inch differential. We do not anticipate any significant cuts or fills will be required to establish site grades. Any significant deviation from these assumptions should be brought to the attention of Driesenga & Associates, Inc. as soon as possible.
2.0 SITE CONDITIONS
2.1 GENERAL
The stratification of the soils, as shown on the soil boring logs in Appendix B, represents the soil conditions at the actual soil boring locations. Variations may occur away from or between the soil borings. Stratigraphic lines shown on the soil boring logs represent the approximate boundary between the soil types, but the transition may be gradual. They are not intended to show exact depths of change from one soil type to another. In addition, changes in soil type may occur between the sample intervals that are consequently not observed by the driller.
The soil boring logs in Appendix B include the drilling method, materials encountered, penetration resistances, and pertinent field observations made during the drilling operations along with the results of the laboratory testing.
2.2 SURFACE CONDITIONS
The area of the new addition is currently maintained lawn and concrete/asphalt pavement with a few mature trees and underground utility pipes. This area is relatively flat. The existing building is surrounded by maintained lawn, asphalt parking, and driveway areas associated with residential uses.
2.3 DESCRIPTION OF SUBSURFACE SOILS
Surface materials encountered at the site generally consist of either 3 inches of asphalt underlain by
7 inches of aggregate base material or 2 to 4 inches of topsoil. Underlying the surface materials, loose to medium dense, brown, fine to medium grained sand was encountered to a depth of at least
20 feet below grade.
The estimated group symbol, according to the USCS, is shown in the USCS column just before the textural description of the various strata on the soil boring logs in Appendix B.
2.4 GROUNDWATER OBSERVATIONS
Groundwater was not encountered in any of the soil borings during or after completion of drilling operations. Hydrostatic groundwater levels and the elevations and volumes of groundwater should be expected to fluctuate throughout the year, based on variations in precipitation, evaporation, run-off, and other factors. The groundwater levels (or lack thereof) indicated by the soil borings and presented in this section represent conditions at the time the readings were taken. The actual groundwater levels at the time of construction may vary.
Groundwater measurements were attempted during drilling and again shortly after completion of the drilling operations. After drilling and collection of groundwater readings, the boreholes were backfilled with auger cuttings and the surface was repaired approximating previous conditions.
Since the boreholes were backfilled shortly after drilling, long-term groundwater level information is not available from the soil borings. To obtain long-term groundwater levels, groundwater observation wells would be required.
2.5 SEISMIC SITE CLASS
The proposed building’s seismic class was determined for use in the structural design of the proposed project. Soils information was obtained from the soil borings completed on-site, as well as information obtained from the “Soil Survey of Grand Traverse County” by the United States
Department of Agriculture, the “Quaternary Geology of Michigan” completed by W.R. Farrand, the USGS Topographic Quadrangle and the Hydrogeologic Atlas of Michigan. It is assumed that the proposed structure falls under Building Class III according to the 2015 Michigan Building
Code (MBC) Table 1604.5. Based on this information it is our determination that seismic site class
D be used according to the ASCE 7 – Table 20.3-1 for structural calculations.
2.6 LIMITATIONS
Soil and groundwater conditions have been observed and interpreted at the soil boring locations only. This information has been used as the basis for our analyses and the recommendations that follow. Although we have allowed for minor variations in subsurface conditions in the development of our recommendations, conditions can vary away from and between soil boring locations. Should this become evident during construction, we should be contacted to review our recommendations. This geotechnical evaluation and report were prepared for geotechnical purposes only. We did not perform environmental related borings or analytical tests.
3.0 RECOMMENDATIONS
3.1 SITE PREPARATION
To increase the likelihood that the recommended allowable soil bearing capacities are achieved and tolerable settlements are not exceeded, the recommendations contained herein should be followed.
Within the building footprint and any areas to receive fill, all existing building material, topsoil, old fill, organic-containing material, frozen soil and other unsuitable material should be removed. The clearing should extend a minimum of 5 feet beyond the limits of proposed building and areas to receive structural fill.
It is strongly recommended that the building pad areas be evaluated by Driesenga & Associates, Inc. after the area has been cleared and stripped. This evaluation may be performed by proofrolling with a loaded tandem axle dump truck or another method selected by the geotechnical engineer.
To identify any areas of soft subgrade soil. Where soft subgrade soils are encountered, remedial actions as recommended by the geotechnical engineer will be required.
We understand portions of the existing building will be demolished to create a connection point between the existing building and new addition. Any existing foundations, floor slabs, utilities, and other below-grade structures from previous construction should be completely removed from the footprint of the proposed building. Depressions or excavations from the demolition and removal operations should be backfilled with granular structural fill meeting the requirements of
MDOT Class II sand compacted in accordance with the recommendations below.
Trees were located within the project area when this investigation was conducted. Large trees may have relatively widespread root structures and related organic veins. The earthwork activities within the building and pavement areas should include complete removal of the tree roots and organic veins.
Care should be exercised when excavating for the building addition. Excavations should not extend below existing footings, floor slabs, utilities or other structures without first properly underpinning, or supporting the structures with properly designed and installed sheeting.
In all general fill areas, the exposed soil surface should be scarified to a depth of 12 inches and recompacted to a minimum of 95% of Modified Proctor maximum dry density (MDD) per ASTM
D 1557 method, or 98% of MDD as determined by the Michigan Cone Method. Sand soils were encountered at or near the final subgrade level in some of the soil borings in the proposed building area. Within the proposed building area the native sand should be proof-compacted by at least six
(6) passes of a 10-ton vibratory roller.
The contractor should remove standing water from the subgrade and prevent surface water from reaching the footing excavations and the prepared subgrade. In addition, construction traffic should use haul roads and should not haphazardly traffic the site. Subgrade soils that become disturbed should be removed and replaced with structural fill or crushed aggregate. Under wet weather conditions, the subgrade may be protected by placing crushed aggregate on the exposed subgrade.
It is recommended that any fill materials be placed in or near horizontal maximum 8-inch-thick loose lifts and compacted to a minimum of 95% of Modified Proctor MDD, or 98% of Michigan
Cone MDD. If a vibratory roller is used for compaction, the loose lift thickness may be increased to 12 inches. Soils used for structural fill should consist of clean sand meeting SW or SP classification in accordance with USCS criteria. Care should be taken not to disturb or undermine the existing foundations.
3.2 FOUNDATIONS
Considering the subsurface conditions on this site and the assumed proposed construction, it is acceptable for the proposed building addition to be supported on conventional spread footings.
Footings bearing on newly placed structural fill placed over suitable native soils or directly on the native sand may be designed for a maximum net allowable soil bearing pressure of 3,000 psf.
At some locations, the native sand soils may be in relatively loose condition and not suitable for support of foundations at the recommended design soil bearing pressure. In addition, these soils may become loosened below the bottom of footing level from the excavation activities or from construction traffic, especially if allowed to dry out. Therefore, the excavated footing bearing surfaces should be compacted to a minimum of 95% of Modified Proctor MDD, or 98% of MDD as determined by the Michigan Cone Method, just prior to concrete placement. A hand-operated plate compactor may be used for loose or disturbed soil that is less than 6 inches in thickness. For deeper compaction, we recommend using a hoe-pac mounted on a backhoe. Water may need to be added to achieve the desired compaction for the allowable bearing capacity.
All perimeter footings and footings in unheated areas should bear at least 42 inches below finished grade for protection from frost action. To reduce the likelihood of frost heave, trench footings should be formed vertically and should not be allowed to widen near the top. If interior footings are to bear on compacted fill, the fill should be placed in accordance with the recommendations of
Section 3.1. Interior foundations can be constructed on suitable natural soils or on structural fill overlying suitable natural subgrade just below the floor slab. However, the footings and proposed bearing soils should be protected from freezing during construction if work is conducted in the cold winter months. Due to the sands encountered at the site, construction of trench footings is probably not feasible. Therefore, we anticipate footing excavations will need to be sloped back and the foundations formed. The placement of footing concrete should be done as soon as footing excavations have been completed and approved to reduce the potential for disturbance or freezing of the footing subgrade.
New foundations adjacent to existing foundations should be constructed at the same level as the existing foundations. New foundation bearing levels can be stepped up or down to match existing foundation bearing levels as needed. We recommend limiting vertical steps to 2 foot every 4 horizontal feet. Excavation for new foundations should not extend below existing foundations without first properly underpinning or shoring the existing foundations.
Prior to concrete placement, the bearing surface should be free of loose soil and standing water.
The contractor should avoid stockpiling excavated materials immediately adjacent to the excavation walls. It is recommended that stockpiled materials be kept back from the excavation a minimum distance equal to half the excavation depth to prevent surcharging the excavation walls.
Total and differential settlement of foundations properly designed and constructed based on our recommendations are not expected to exceed 1 inch and ½ inch, respectively.
3.3 FLOORS
The soil below the floor slab should be prepared in accordance with the recommendations in
Section 3.1. A noncohesive soils mat such as MDOT Class II sand should be provided directly below the floor slabs. The mat should be a minimum of 8 inches in thickness and compacted to a minimum of 95% of Modified Proctor MDD.
The floor slab should be suitably reinforced and proper joints should be provided at the junctions of the slab and foundation system so that a small amount of independent movement can occur without causing damage. A minimum of 6 inches of structural fill should be provided between the bottom of the slab and the top of the shallow spread footing below. Otherwise, other arrangements should be made to allow for potential relative settlements, such as grade beams, thickened slabs with appropriate reinforcing steel or other appropriate details. A modulus of subgrade reaction of 200 pci should be used in the design of slabs-on-grade.
3.4 GROUNDWATER CONTROL
Groundwater was not encountered to a depth of 20 feet in the vicinity of the soil borings. As such, groundwater problems are not expected to be a significant issue with respect to building construction. Any water which enters the footing excavation can likely be controlled by a gravity drain system, sump pump, or other minor dewatering procedure. Concrete should not be poured in footing excavations containing water. Upon removal of any trapped water, the soils should be reviewed by a geotechnical engineer and any soft areas replaced with structural fill per Section 3.1, as necessary.
Perimeter foundation drains should be installed along foundations where interior finished floor elevations are lower than perimeter grades, or where exterior grades slope toward the building. In addition, all roof drains should be diverted to downspouts which carry water away from foundations and supporting walls.
3.5 TEMPORARY EXCAVATION STABILITY
If excavations are anticipated for the proposed structure and/or utilities, shoring and bracing or flattening (laying back) of the slopes may be required to obtain a safe working environment.
Excavations should be sloped or shored in accordance with local, state and federal regulations, including OSHA (CFR Part 1926) excavation trench safety standards. We recommend that all excavated soils be placed away from the edges of the excavation at a distance equaling or exceeding the depth of the excavation. In addition, surface runoff water should be diverted away from the crest of the excavated slopes to prevent erosion and sloughing.
Localized areas of soft or unsuitable soils not detected by our borings or in unexplored areas may be encountered once construction begins. Vertical cuts in these soils may be unstable and may present a significant hazard because they can fail without warning. Therefore, temporary construction slopes greater than 5 feet high should not be steeper than one horizontal to one vertical
(1H: 1V) and excavated material should not be placed within 10 feet of the crest of any excavated slope.
Unbraced excavations may experience some minor localized instability (i.e., sloughing). To reduce potential sloughing, excavated slopes should be covered with plastic for protection from rainfall and moisture changes. It should be emphasized that continuous observations by personnel from our office are important during trenching or excavation operations at the site.
4.0 GENERAL COMMENTS
If significant changes are made in the plans and specifications or location of the proposed structure, a consultation should be arranged to review such changes with respect to the prevailing soil conditions. It may then be necessary to submit supplementary recommendations. If deviations from the noted subsurface conditions are encountered during construction, they should also be brought to the attention of Driesenga & Associates, Inc.
Driesenga & Associates, Inc. should be afforded the opportunity to review the project design drawings and specifications to verify the factors affecting subgrade and foundation performance comply with our recommendations.
It is recommended that the services of Driesenga & Associates, Inc. be engaged to observe excavation for the footings and to test and evaluate the soils in the footing excavations prior to placement of foundations in order to determine that the soils have the required bearing capacities.
Monitoring and testing should also be performed to verify that suitable materials are used for controlled fills and that they are properly placed and compacted.
This report and any future reports or addenda performed for this site should be supplied to potential bidders prior to them submitting their proposals. We also recommend the construction contract include provisions for dealing with differing conditions. Contingency funds should be reserved for potential problems during earthwork and foundation construction.
This report was for geotechnical purposes only. We did not sample for environmental purposes or perform any analytical testing. However, the contractor should be prepared to handle environmental conditions encountered at this site that may affect the excavation, removal, or disposal of soil; dewatering of excavations; and health and safety of workers. Any Environmental
Assessment reports prepared for this property should be made available for review by bidders and the successful contractor.
This report has been prepared solely for the use of the client for the project specifically described in this report.