23-3001 Repair Roof - BLDG 563.pdf
PDF 6 MB Posted
- Attached to
- Roof & Gutter Repair Installation Fitness Center
- Solicitation number
- F5D3124026A001
About this file
This document is a sources sought notice for a roof and gutter repair and installation project at an Air Force installation fitness center. The project scope includes demolishing the existing built-up roofing and insulation, protecting metal roofs from damage, removing abandoned electric penetrations, hauling all materials off-site, and repairing or replacing the roofing and guttering. Interested parties are requested to provide organization details, SAM UEI number, federal supply schedule number if applicable, business size, website, and capabilities narrative by March 13, 2024. The applicable NAICS code is 238160 for roofing contractors with a small business size standard of $19 million. The agency will evaluate responses to determine the procurement method as either a small business set-aside, sole source, or full and open competition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A - Roof and Gutter Repair.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SU
BM
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
W
AI
TEJA
W
OR
SK
I
RE
PA
IR
R
OO
F
1DEC 2023
CTGB23-3001
G001
TI
TL
E
SH
EE
T
GR
EE
N
JO
HN
SO
N
LEGEND:
LAYDOWN YARD, COORDINATE ACCESS WITH
CONSTRUCTION MANAGEMENT
GRISSOM AIR RESERVE BASE
PROJECT TITLE: PROJECT NUMBER:
REPAIR ROOFS AND GUTTERS CTGB23-3001
FAC 563
DETAIL REFERENCE
SHEET REFERENCE
1 - G001 - TITLE SHEET
2 - G002 - GENERAL SPECIFICATIONS
3 - G003 - GENERAL SPECIFICATIONS
4 - A001 - ARCHITECTURAL SPECIFICATIONS
5 - A002 - ARCHITECTURAL SPECIFICATIONS
6 - A003 - ARCHITECTURAL SPECIFICATIONS
7 - A101 - FAC 563 ROOF DEMO
8 - A102 - FAC 563 ROOF NEW
CIVIL ENGINEERING
FACILITY 641
BASE CONTRACTING
FACILITY 448
MAIN GATE VISITORS
CENTER HOURS
7:30A - 3:30P
CONTRACTOR OFF-SITE
DISPOSAL ROUTE
TRUCK INSPECTION
HOURS 7:30A - 3:30P
ROUTE 218
US 31
HOOSIER AVE.
FOREMAN DRIVE
800 S.
HAUL ROUTE
N
SCALE:SCALE:SCALE: DETAIL SCALE
DETAIL NAME
XX###
BLDG
CONTRACTOR LAYDOWN AREA
FAC 563
SCALE:SCALE:SCALE: NTS
563 LAYDOWN
G001
G001
ALTERNATE CONTRACTOR
LAYDOWN AREA
DO NOT BLOCK FIRE
ACCESS ON ROAD
R:
\4
A
RW
\E
RM
\M
SG
\C
ES
\C
E\
CE
C\
AC
TI
VE
F
IL
ES
1, 7, 0, 3A \4
Pr oj ec t D es ig n
Fi le s\
-3
Re pa ir
Ro of
; 5
\2 0-
G
EN
ER
AL
G
1- 4.
dw g, /4
/2
:5 5:
A
M , A
N
SI
fu ll bl ee d D
(3 4.
x
2.
In ch es
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
W
AI
TEJA
W
OR
SK
I
RE
PA
IR
R
OO
F
1DEC 2023
CTGB23-3001
G002
GE
NE
RA
L
GR
EE
N
JO
HN
SO
N
SP
EC
IF
IC
AT
IO
NS
SECTION 1 - GENERAL SPECIFICATIONS
1.0 PROJECT DESCRIPTION
THE WORK INCLUDES PROJECT DESCRIPTION OF MAJOR WORK ITEMS AND
FEATURES INCLUDE ALL APPLICABLE TRADES AND WORK CONDITIONS AS
PART OF CONTRACT AND ALL INCIDENTAL RELATED WORK AS INDICATED ON
THE DRAWINGS AND THESE SPECIFICATIONS.
1.1 WORK SCHEDULING
CONTRACTOR SHALL ALLOW FOR A MAXIMUM OF 5 CALENDAR DAYS WHERE
CONSTRUCTION ACTIVITY IS PROHIBITIVE. NORMAL DUTY HOURS FOR
WORK SHALL BE FROM 7:30 A.M. TO 4:30 P.M., MONDAY THROUGH FRIDAY,
NOT INCLUDING FEDERAL HOLIDAYS. REQUESTS FOR ADDITIONAL WORK
HOURS SHALL REQUIRE WRITTEN APPROVAL FROM THE CONTRACTING
OFFICER (CO) 7 DAYS IN ADVANCE OF THE PROPOSED WORK PERIOD.
1.2 OCCUPANCY OF PREMISES
THE PROJECT SITE WILL REMAIN OPERATIONAL FOR THE DURATION OF THIS
CONTRACT. WHILE WORKING, THE CONTRACTOR MAY BE REQUIRED TO
VACATE THE WORK AREA TO ALLOW UNSCHEDULED AIRCRAFT MOVEMENTS.
THE CONTRACTOR SHALL NOTIFY THE AIRFIELD MANAGER OF WORK
ACTIVITIES ON A DAILY BASIS AND FOLLOW THE POLICIES FOR ACCESS TO
THE WORK SITE AND STORAGE AS LISTED IN THIS SPECIFICATION.
1.3 UTILITIES
THE GOVERNMENT WILL FURNISH ELECTRIC UTILITIES FREE OF CHARGE
FOR THE CONTRACTOR'S USE DURING CONSTRUCTION. THE CONTRACTOR
IS RESPONSIBLE FOR MAINTAINING ALL EXISTING SERVICES AND ENSURING
CAPACITY OF THE SERVICE TO SAFELY PROVIDE THE CONTRACTOR'S
ADDITIONAL LOADS. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL
UTILITY CONNECTIONS, INCLUDING BUT NOT LIMITED TO PROVIDING
OVERHEAD OR UNDERGROUND EXTENSIONS, TRANSFORMERS,
SWITCHGEAR, OVERCURRENT PROTECTION, ANCHORS, MAKING ALL
CONNECTIONS AND DISCONNECTIONS, AND PROVIDING ALL
APPURTENANCES NECESSARY FOR OPERATION. DURING FURNITURE AND
IT/TELECOM EQUIPMENT INSTALLATION AND UNTIL THE FACILITY IS TURNED
OVER TO THE GOVERNMENT, THE CONTRACTOR SHALL MAINTAIN ELECTRIC
SERVICE TO THE CONSTRUCTION SITE FOR THE OPERATION OF HVAC,
LIGHTING, AND ELECTRICAL POWER.
1.3.1 ADDITIONAL REQUIREMENTS
A. DRINKING WATER MAY BE OBTAINED FROM APPROVED FIXTURES AT
NO COST TO THE CONTRACTOR.
B. EXISTING WASHING FACILITIES IN THE BUILDING MAY BE USED BY
CONTRACTOR EMPLOYEES DURING NORMAL WORKING HOURS,
PROVIDED THE CONTRACTOR FURNISHES DAILY CLEANING SERVICE.
1.3.2 ALTERATIONS TO UTILITIES
WHERE CHANGES AND RELOCATIONS OF UTILITY LINES ARE NOTED TO BE
PERFORMED BY OTHERS, THE CONTRACTOR SHALL GIVE THE CO AT LEAST
THIRTY (30) CALENDAR DAYS WRITTEN NOTICE IN ADVANCE OF THE TIME
THAT THE CHANGE OR RELOCATION IS REQUIRED. IN THE EVENT THAT,
AFTER THE EXPIRATION OF THIRTY (30) CALENDAR DAYS AFTER THE
RECEIPT OF SUCH NOTICE BY THE CO, SUCH UTILITY LINES HAVE NOT BEEN
CHANGED OR RELOCATED AND DELAY IS OCCASIONED TO THE COMPLETION
OF THE WORK UNDER CONTRACT, THE CONTRACTOR WILL BE ENTITLED TO
A TIME EXTENSION EQUAL TO THE PERIOD OF TIME LOST BY THE
CONTRACTOR AFTER THE EXPIRATION OF SAID THIRTY (30) CALENDAR DAY
PERIOD. ANY MODIFICATION TO EXISTING OR RELOCATED LINES REQUIRED
AS A RESULT OF THE CONTRACTOR'S METHOD OF OPERATION SHALL BE
MADE WHOLLY AT THE CONTRACTOR'S EXPENSE AND NO ADDITIONAL TIME
WILL BE ALLOWED FOR DELAYS INCURRED BY SUCH MODIFICATIONS.
1.3.3 TEMPORARY UTILITIES
PROVIDE TEMPORARY UTILITIES REQUIRED FOR CONSTRUCTION.
MATERIALS MAY BE NEW OR USED, MUST BE ADEQUATE FOR THE REQUIRED
USAGE, NOT CREATE UNSAFE CONDITIONS, AND NOT VIOLATE APPLICABLE
CODES AND STANDARDS.
1.3.4 SANITATION
PROVIDE AND MAINTAIN WITHIN THE CONSTRUCTION AREA MINIMUM
FIELD-TYPE SANITARY FACILITIES APPROVED BY THE CO AND PERIODICALLY
REMOVE WASTE TO A COMMERCIAL FACILITY. ANY PENALTIES OR FINES
ASSOCIATED WITH IMPROPER DISCHARGE WILL BE THE RESPONSIBILITY OF
THE CONTRACTOR. MAINTAIN THESE CONVENIENCES AT ALL TIMES.
INCLUDE PROVISIONS FOR PEST CONTROL AND ELIMINATION OF ODORS.
GOVERNMENT TOILET FACILITIES WILL NOT BE AVAILABLE TO
CONTRACTOR'S PERSONNEL.
1.3.5 TELEPHONE
MAKE ARRANGEMENTS AND PAY ALL COSTS FOR TELEPHONE FACILITIES
DESIRED.
1.3.7 WATER
NON-POTABLE WATER IS AVAILABLE FREE OF CHARGE FROM A HYDRANT
DESIGNATED BY THE CO. NOTIFICATION REQUESTS FOR NON-POTABLE
WATER SHALL BE MADE AT LEAST 30 DAYS PRIOR TO USE. PERU UTILIITES
WILL DESIGNATE THE LOCATION OF THE HYDRANT AND INSTALL A METER. IF
CONTRACTOR OFFICER DEEMS USE EXCEEDS CONTRACT OR CONTRACTOR
IS NEGLIGENT WITH HYDRANT THE METER WILL BE REMOVED AND
CONTRACTOR WILL BE RESPONSIBLE TO PROVIDE NON-POTABLE WATER
FROM OUTSIDE SOURCE.
1.3.8 FIRE PROTECTION
PROVIDE TEMPORARY FIRE PROTECTION EQUIPMENT FOR THE PROTECTION
OF PERSONNEL AND PROPERTY DURING CONSTRUCTION. REMOVE DEBRIS
AND FLAMMABLE MATERIALS DAILY TO MINIMIZE POTENTIAL HAZARDS.
1.4 EXISTING WORK
IN ADDITION TO FAR 52.236-9 PROTECTION OF EXISTING VEGETATION,
STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS:
A. REMOVE OR ALTER EXISTING WORK IN SUCH A MANNER AS TO
PREVENT INJURY OR DAMAGE TO ANY PORTIONS OF THE EXISTING
WORK WHICH REMAIN.
B. REPAIR OR REPLACE PORTIONS OF EXISTING WORK WHICH HAVE
BEEN ALTERED DURING CONSTRUCTION OPERATIONS TO MATCH
EXISTING OR ADJOINING WORK. AT THE COMPLETION OF
OPERATIONS, EXISTING WORK MUST BE IN A CONDITION EQUAL TO
OR BETTER THAN THAT WHICH EXISTED BEFORE NEW WORK
STARTED.
1.6 SUPERVISION
IN ACCORDANCE WITH FAR 52.236-6, SUPERINTENDENCE BY THE
CONTRACTOR, THE CONTRACTOR SHALL HAVE A SITE SUPERINTENDENT AT
THE SITE AT ALL TIMES WHEN THERE ARE WORKERS ON SITE OR WHEN
DELIVERIES ARE TO BE RECEIVED. UNDER NO CIRCUMSTANCES SHALL A
SUBCONTRACTOR BE AUTHORIZED TO BE SITE SUPERINTENDENT FOR THE
PRIME CONTRACTOR. THE SUPERINTENDENT SHALL BE DESIGNATED AS
SUCH TO THE CO IN WRITING WITH THE SIGNATURES OF THE CONTRACTOR
AND THE DESIGNATED SUPERINTENDENT. THE CONTRACTOR SHALL
OUTLINE IN THE DESIGNATION LETTER THE EXTENT OF THE
SUPERINTENDENT'S AUTHORITY.
1.7 COMPLIANCE WITH BASE REGULATIONS
THE SITE OF WORK IS ON A MILITARY BASE AND ALL RULES AND
REGULATIONS ISSUED BY THE COMMANDING OFFICER COVERING GENERAL
SAFETY, SECURITY, SANITARY REQUIREMENTS, POLLUTION CONTROL AND
TRAFFIC REGULATIONS, SHALL BE OBSERVED BY THE CONTRACTOR.
INFORMATION REGARDING THESE REQUIREMENTS MAY BE OBTAINED BY
CONTACTING THE CO, WHO WILL PROVIDE SUCH INFORMATION OR ASSIST IN
OBTAINING FROM APPROPRIATE AUTHORITIES. CONTRACTOR PERSONNEL
SHALL PARK ONLY IN AREAS AUTHORIZED BY THE CO.
1.7.2 BURN PERMITS
OBTAIN AND COORDINATE BURN (WELDING) PERMIT BEFORE USE. CONTACT
FIRE DEPARTMENT 688-3353.
1.7.4 SECURITY FREE ZONES
AUTHORIZATIONS ARE REQUIRED FOR THE CONTRACTOR TO WORK IN
RESTRICTED AREAS. FOLLOW CONSTRUCTION PHASING HAUL ROUTES AND
REQUIREMENTS AS INDENTIFIED ON THE DRAWINGS. PAY ATTENTION TO
ANY RED LINES AND RESTRICTED AREA SIGNAGE.
1.8 CONTRACTOR'S TEMPORARY FACILITIES
CONTRACTOR-OWNED OR LEASED TRAILERS MUST BE APPROVED BY THE
GOVERNMENT AS IDENTIFIED IN THE CONSTRUCTION SITE PLAN PRIOR TO
MOBILIZING TO THE SITE. TEMPORARY FACILITIES WILL MEET
REQUIREMENTS AS IDENTIFIED IN EM 385-1-1 SECTION 04.
1.9 AIRFIELD DRIVING
WORK WILL BE PERFORMED IN THE CONTROLLED ZONES OF THE BASE OR
THE AIRFIELD. ALL ACCESS TO OR THROUGH THE BASE SHALL BE
COORDINATED WITH THE CO OR AUTHORIZED REPRESENTATIVE. ALL
ACCESS TO OR THROUGH THE AIRFIELD SHALL BE COORDINATED WITH THE
CHIEF OF AIRFIELD MANAGEMENT. THE CONTRACTOR WILL BE REQUIRED
TO OBTAIN AN AIRFIELD DRIVERS LICENSE TO ACCESS THE WORK SITE.
1.10 SITE PICTURES
PHOTOGRAPHS SHALL NOT BE TAKEN ON THE JOBSITE WITHOUT PRIOR
WRITTEN APPROVAL FROM THE CO.
1.11 FINAL CLEANING
CLEAN THE PREMISES IN ACCORDANCE WITH FAR 52.236-12 "CLEANING UP"
AND ADDITIONAL REQUIREMENTS STATE HERE. REMOVE STAINS, FOREIGN
SUBSTANCES, AND TEMPORARY LABELS FROM SURFACES. VACUUM CARPET
AND SOFT SURFACES. CLEAN EQUIPMENT AND FIXTURES TO A SANITARY
CONDITION. CLEAN OR REPLACE FILTERS OF OPERATING EQUIPMENT IF
CLEANING IS NOT POSSIBLE OR PRACTICABLE. REMOVE DEBRIS FROM
ROOFS, DRAINAGE SYSTEMS, GUTTERS, AND DOWNSPOUTS. SWEEP PAVED
AREAS AND RAKE CLEAN LANDSCAPED AREAS. REMOVE WASTE, SURPLUS
MATERIALS, AND RUBBISH FROM THE SITE. REMOVE ALL TEMPORARY
STRUCTURES, BARRICADES, PROJECT SIGNS, FENCES AND CONSTRUCTION
FACILITIES. A LIST OF COMPLETED CLEAN-UP ITEMS SHALL BE SUBMITTED
ON THE DAY OF FINAL INSPECTION.
1.12 END OF SECTION 1
SECTION 2 - QUALITY CONTROL
2.0 QUALITY CONTROL (QC)
IN ACORDANCE WITH FAR 52.246-12, THE CONTRACTOR IS REQUIRED TO
PROVIDE QC FOR THE WORK PERFORMED ON THIS CONTRACT. THE
GOVERNMENT WILL PERFORM QUALITY ASSURANCE (QA) TO REVIEW
SUBMITTALS, REPORTS, AND INSPECTIONS PERFORMED BY THE QC
MANAGER. THE CONTRACTOR SHALL IDENTIFY THE QC MANAGER AT THE
PRE-CONSTRUCTION MEETING. CONTRACTOR SHALL SUBMIT A QUALITY
CONTROL PLAN (QCP) PRIOR TO CONSTRUCTION INDICATING THE QCM,
CHECKLISTS USED FOR CONTRACT COMPLIANCE, METHODS TO ENSURE
COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS AND PROCEDURES
FOR CORRECTING ANY DEFICIENCIES FOUND BY THE QCM OR GOVERNMENT
QA.
2.1 DAILY INSPECTION REPORTS
CONTRACTOR SHALL PROVIDE DAILY QC REPORTS WITH DAILY ACTIVIES
AND CONSTRUCTION PROGRESS. REPORTS SHALL BE SUBMITTED TO THE
GOVERNMENT QA AND CO ELECTRONICALLY AT LEAST 5 CALENDAR DAYS
AFTER EVENT.
2.2 DELIVERY, STORAGE, AND HANDLING
INSPECT MATERIALS DELIVERED TO THE SITE FOR VISIBLE DAMAGE, AND
UNLOAD AND STORE WITH A MINIMUM OF HANDLING. DELIVER MATERIALS IN
ORIGINAL SEALED CONTAINERS AND PROTECT FROM FREEZING OR
OVERHEATING. PROVIDE JOBSITE STORAGE FACILITIES CAPABLE OF
MAINTAINING TEMPERATURE RANGES WITHIN MANUFACTURERS
RECOMMENDATIONS.
2.3 MEETINGS
2.3.1 PRE-CONSTRUCTION
CONTRACTOR TO HOLD A PRE-CONSTRUCTION MEETING PRIOR TO
STARTING WORK TO IDENTIFY THE WORK LOCATIONS, HOURS OF
OPERATION, SCHEDULE, QC PROCEDURES AND ANY PERTINENT DETAILS TO
COMPLETING THE WORK ON THIS PROJECT. ALL PRE-CONSTRUCTION
SUBMITTALS, PLANNING DOCUMENTS AND SCHEDULES MUST BE APPROVED
BY THE GOVERNMENT PRIOR TO SCHEDULING THE MEETING DATE. THE
CONTRACTOR SHALL NOTIFY THE CO AT LEAST 14 CALENDAR DAYS PRIOR
TO THE MEETING DATE.
2.3.2 PROGRESS MEETINGS
CONTRACTOR SHALL SCHEDULE BIWEEKLY PROGRESS MEETINGS TO
PROVIDE A PROJECT STATUS UPDATE AND REPORT NEW OR ON-GOING
ISSUES. CONTRACTOR SHALL RECORD AND PROVIDE MEETING MINUTES TO
THE CO WITHIN 4 DAYS OF THE MEETING. THE MINUTES SHALL RECORD ANY
DECISIONS MADE OUTSIDE OF RFI'S OR SUBMITTALS. IF THE MEETING IS
CANCELED A STATUS REPORT IS STILL REQUIRED TO BE DELIVERED ON
CONSTRUCTION PROGRESS. TOPICS FOR STATUS AND DISCUSSION SHALL
INCLUDE AT A MINIMUM ALL OF THE FOLLOWING:
A. PREVIOUS MEETING - TASKS, OPEN ITEMS, ACTION ITEMS,
OWNERSHIP OF ITEMS.
B. PROJECT STATUS - COMPLETION DATE, PROJECTED PERCENT
COMPLETION, ACTUAL PERCENT COMPLETION.
C. PROJECT SCHEDULE - 3 WEEK PROJECTED WORK ITEMS.
D. PROJECT SAFETY - ANY REPORTABLE INCIDENTS, SAFETY TOPICS OF
EMPHASIS
E. WORK PROGRESS - CURRENT WORK PLANNED
F. REQUEST FOR INFORMATION (RFI'S) - RFI LIST, COMPLETED, OPEN,
OVERDUE, CRITICAL, SHOW SUSPENSE DATES
G. SUBMITTALS - SUBMITTAL LIST, OPEN, OVERDUE, CRITICAL,
SUSPENSE DATES
H. REQUEST FOR PROPOSAL/MODIFICATIONS - COMPLETED, OPEN,
OVERDUE, SUSPENSE DATES
I. PAYMENT STATUS - SHOW PERCENTAGE PAID TO DATE
J. OPEN FORUM - NEW ISSUES TO BE IDENTIFIED BY ANYONE
2.5 PRE-FINAL INSPECTION
THE GOVERNMENT AND QC MANAGER WILL PERFORM THIS INSPECTION TO
VERIFY THAT THE FACILITY IS COMPLETE AND READY TO BE OCCUPIED. A
GOVERNMENT PRE-FINAL PUNCH LIST MAY BE DEVELOPED AS A RESULT OF
THIS INSPECTION. THE QC MANAGER SHALL ENSURE THAT ALL ITEMS ON
THIS LIST ARE CORRECTED PRIOR TO NOTIFYING THE GOVERNMENT THAT A
"FINAL" INSPECTION WITH THE CUSTOMER CAN BE SCHEDULED. ANY ITEMS
NOTED ON THE "PRE-FINAL" INSPECTION SHALL BE CORRECTED IN A TIMELY
MANNER AND SHALL BE ACCOMPLISHED BEFORE THE CONTRACT
COMPLETION DATE FOR THE WORK OR ANY PARTICULAR INCREMENT
THEREOF IF THE PROJECT IS DIVIDED INTO INCREMENTS BY SEPARATE
COMPLETION DATES.
2.6 FINAL ACCEPTANCE INSPECTION
THE QC MANAGER, THE SUPERINTENDENT, OR OTHER CONTRACTOR
MANAGEMENT PERSONNEL AND THE KO WILL BE IN ATTENDANCE AT THIS
INSPECTION. ADDITIONAL GOVERNMENT PERSONNEL MAY BE IN
ATTENDANCE. THE FINAL ACCEPTANCE INSPECTION WILL BE FORMALLY
SCHEDULED BY THE KO BASED UPON RESULTS OF THE "PRE-FINAL
INSPECTION". NOTICE SHALL BE GIVEN TO THE KO AT LEAST 14 DAYS PRIOR
TO THE FINAL INSPECTION. THE NOTICE SHALL STATE THAT ALL SPECIFIC
ITEMS PREVIOUSLY IDENTIFIED TO THE CONTRACTOR AS BEING
UNACCEPTABLE WILL BE COMPLETE BY THE DATE SCHEDULED FOR THE
FINAL ACCEPTANCE INSPECTION. FAILURE OF THE CONTRACTOR TO HAVE
ALL CONTRACT WORK ACCEPTABLY COMPLETE FOR THIS INSPECTION WILL
BE CAUSE FOR THE CO TO BILL THE CONTRACTOR FOR THE GOVERNMENT'S
ADDITIONAL INSPECTION COST IN ACCORDANCE WITH THE CONTRACT
CLAUSE "INSPECTION OF CONSTRUCTION".
2.7 END OF SECTION 2
SECTION 3 - SUBMITTALS
3.0 SUBMITTALS
PROVIDE SUBMITTALS FOR PRODUCT DATA AND PLANS IDENTIFIED IN THESE
SPECIFICATIONS. ALL SUBMITTALS, REQUESTS FOR INFORMATION AND
TRANSMITTALS SHALL BE ELECTRONICALLY SENT TO THE CO, AN AF FORM
3000 SHALL BE USED AS THE COVER SHEET.
3.0.1 ELECTRONIC FILE FORMAT
PROVIDE SUBMITTALS IN ELECTRONIC FORMAT, WITH THE EXCEPTION OF
MATERIAL SAMPLES. COMPILE THE SUBMITTAL FILE AS A SINGLE, COMPLETE
DOCUMENT, TO INCLUDE THE TRANSMITTAL FORM DESCRIBED WITHIN.
NAME THE ELECTRONIC SUBMITTAL FILE SPECIFICALLY ACCORDING TO ITS
CONTENTS, AND COORDINATE THE FILE NAMING CONVENTION WITH THE CO.
ELECTRONIC FILES MUST BE OF SUFFICIENT QUALITY THAT ALL
INFORMATION IS LEGIBLE. USE PDF AS THE ELECTRONIC FORMAT, UNLESS
OTHERWISE SPECIFIED OR DIRECTED BY THE CO. GENERATE PDF FILES
FROM ORIGINAL DOCUMENTS WITH BOOKMARKS SO THAT THE TEXT
INCLUDED IN THE PDF FILE IS SEARCHABLE AND CAN BE COPIED. IF
DOCUMENTS ARE SCANNED, OPTICAL CHARACTER RESOLUTION (OCR)
ROUTINES ARE REQUIRED. INDEX AND BOOKMARK FILES EXCEEDING 30
PAGES TO ALLOW EFFICIENT NAVIGATION OF THE FILE. WHEN REQUIRED,
THE ELECTRONIC FILE MUST INCLUDE A VALID ELECTRONIC SIGNATURE OR
A SCAN OF A SIGNATURE.
3.0.2 INFORMATION ONLY SUBMITTALS
SUBMITTALS FOR INFORMATION ONLY MUST BE CERTIFIED BY THE QC
MANAGER AND SUBMITTED TO THE CO AS INFORMATION ONLY. APPROVAL
OF THE CO IS NOT REQUIRED ON INFORMATION ONLY SUBMITTALS. THE CO
WILL MARK "RECEIPT ACKNOWLEDGED" ON SUBMITTALS FOR INFORMATION
AND WILL RETURN ONLY THE TRANSMITTAL COVER SHEET TO THE
CONTRACTOR. NORMALLY, SUBMITTALS FOR INFORMATION ONLY WILL NOT
BE RETURNED. HOWEVER, THE GOVERNMENT RESERVES THE RIGHT TO
RETURN UNSATISFACTORY SUBMITTALS AND REQUIRE THE CONTRACTOR
TO RESUBMIT ANY ITEM FOUND NOT TO COMPLY WITH THE CONTRACT. THIS
DOES NOT RELIEVE THE CONTRACTOR FROM THE OBLIGATION TO FURNISH
MATERIAL CONFORMING TO THE PLANS AND SPECIFICATIONS; WILL NOT
PREVENT THE CO FROM REQUIRING REMOVAL AND REPLACEMENT OF
NONCONFORMING MATERIAL INCORPORATED IN THE WORK; AND DOES NOT
RELIEVE THE CONTRACTOR OF THE REQUIREMENT TO FURNISH SAMPLES
FOR TESTING BY THE GOVERNMENT LABORATORY OR FOR CHECK TESTING
BY THE GOVERNMENT IN THOSE INSTANCES WHERE THE TECHNICAL
SPECIFICATIONS SO PRESCRIBE.
3.0.3 APPROVED SUBMITTALS
THE CO'S APPROVAL OF SUBMITTALS IS NOT TO BE CONSTRUED AS A
COMPLETE CHECK, AND INDICATES ONLY THAT THE GENERAL METHOD OF
CONSTRUCTION, MATERIALS, DETAILING, AND OTHER INFORMATION ARE
SATISFACTORY. APPROVAL OR ACCEPTANCE BY THE GOVERNMENT FOR A
SUBMITTAL DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY
FOR MEETING THE CONTRACT REQUIREMENTS OR FOR ANY ERROR THAT
MAY EXIST, BECAUSE UNDER THE QC REQUIREMENTS OF THIS CONTRACT,
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING INFORMATION
CONTAINED WITH IN EACH SUBMITTAL ACCURATELY CONFORMS WITH THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS. AFTER SUBMITTALS HAVE
BEEN APPROVED OR ACCEPTED BY THE CO, NO RESUBMITTAL FOR THE
PURPOSE OF SUBSTITUTING MATERIALS OR EQUIPMENT WILL BE
CONSIDERED UNLESS ACCOMPANIED BY AN EXPLANATION OF WHY A
SUBSTITUTION IS NECESSARY.
3.0.4 DISAPPROVED SUBMITTALS
MAKE CORRECTIONS REQUIRED BY THE CO. IF THE CONTRACTOR
CONSIDERS ANY CORRECTION OR NOTATION ON THE RETURNED
SUBMITTALS TO CONSTITUTE A CHANGE TO THE CONTRACT DRAWINGS OR
SPECIFICATIONS, GIVE NOTICE TO THE CO AS REQUIRED UNDER THE FAR
CLAUSE TITLED CHANGES. THE CONTRACTOR IS RESPONSIBLE FOR THE
DIMENSIONS AND DESIGN OF CONNECTION DETAILS AND THE
CONSTRUCTION OF WORK. FAILURE TO POINT OUT VARIATIONS MAY CAUSE
THE GOVERNMENT TO REQUIRE REJECTION AND REMOVAL OF SUCH WORK
AT THE CONTRACTOR'S EXPENSE. IF CHANGES ARE NECESSARY TO
SUBMITTALS, MAKE SUCH REVISIONS AND RESUBMIT IN ACCORDANCE WITH
THE PROCEDURES ABOVE. NO ITEM OF WORK REQUIRING A SUBMITTAL
CHANGE IS TO BE ACCOMPLISHED UNTIL THE CHANGED SUBMITTALS ARE
APPROVED.
3.1 PRECONSTRUCTION SUBMITTALS
3.1.1 CONSTRUCTION SITE PLAN
PRIOR TO THE START OF WORK, SUBMIT A SITE PLAN SHOWING THE
LOCATIONS AND DIMENSIONS OF TEMPORARY FACILITIES (INCLUDING
LAYOUTS AND DETAILS, EQUIPMENT AND MATERIAL STORAGE AREA (ONSITE
AND OFFSITE), AND ACCESS AND HAUL ROUTES, AVENUES OF
INGRESS/EGRESS TO THE FENCED AREA AND DETAILS OF THE FENCE
INSTALLATION. IDENTIFY ANY AREAS WHICH MAY HAVE TO BE GRAVELED TO
PREVENT THE TRACKING OF MUD. INDICATE IF THE USE OF A
SUPPLEMENTAL OR OTHER STAGING AREA IS DESIRED. SHOW LOCATIONS
OF SAFETY AND CONSTRUCTION FENCES, SITE TRAILERS, CONSTRUCTION
ENTRANCES, TRASH DUMPSTERS, TEMPORARY SANITARY FACILITIES, AND
WORKER PARKING AREAS.
3.1.2 QUALITY CONTROL PLAN (QCP)
SUBMIT NO LATER THAN 15 DAYS AFTER RECEIPT OF NOTICE TO PROCEED,
THE CONTRACTOR QCP PROPOSED TO IMPLEMENT THE REQUIREMENTS
FAR 52.246-12 INSPECTION OF CONSTRUCTION. CONSTRUCTION WILL BE
PERMITTED TO BEGIN ONLY AFTER ACCEPTANCE OF THE CQC PLAN.
3.1.2.1 CONTENT OF QCP
INCLUDE, AS A MINIMUM, THE FOLLOWING TO COVER ALL
CONSTRUCTION-OPERATIONS, BOTH ONSITE AND OFFSITE, INCLUDING
WORK BY SUBCONTRACTORS, FABRICATORS, SUPPLIERS AND PURCHASING
AGENTS:
A. A DESCRIPTION OF THE QC ORGANIZATION, INCLUDING A CHART
SHOWING LINES OF AUTHORITY AND ACKNOWLEDGMENT THAT THE
QC STAFF WILL IMPLEMENT THE CONTROL SYSTEM FOR ALL ASPECTS
OF THE WORK SPECIFIED. INCLUDE A QC MANAGER.
B. THE NAME, QUALIFICATIONS (IN RESUME FORMAT), DUTIES,
RESPONSIBILITIES, AND AUTHORITIES OF EACH PERSON ASSIGNED A
QC FUNCTION.
C. A COPY OF THE LETTER TO THE QC SYSTEM MANAGER SIGNED BY AN
AUTHORIZED OFFICIAL OF THE FIRM WHICH DESCRIBES THE
RESPONSIBILITIES AND DELEGATES SUFFICIENT AUTHORITIES TO
ADEQUATELY PERFORM THE FUNCTIONS OF THE QC SYSTEM
MANAGER, INCLUDING AUTHORITY TO STOP WORK WHICH IS NOT IN
COMPLIANCE WITH THE CONTRACT. LETTERS OF DIRECTION TO ALL
OTHER VARIOUS QC REPRESENTATIVES OUTLINING DUTIES,
AUTHORITIES, AND RESPONSIBILITIES WILL BE ISSUED BY THE QC
MANAGER.
D. PROCEDURES FOR SCHEDULING, REVIEWING, CERTIFYING, AND
MANAGING SUBMITTALS, INCLUDING THOSE OF SUBCONTRACTORS,
OFFSITE FABRICATORS, SUPPLIERS, AND PURCHASING AGENTS.
THESE PROCEDURES MUST BE IN ACCORDANCE WITH SECTION 3 -
SUBMITTALS.
E. CONTROL, VERIFICATION, AND ACCEPTANCE TESTING PROCEDURES
FOR EACH SPECIFIC TEST TO INCLUDE THE TEST NAME,
SPECIFICATION PARAGRAPH REQUIRING TEST, FEATURE OF WORK TO
BE TESTED, TEST FREQUENCY, AND PERSON RESPONSIBLE FOR EACH
TEST.
F. PROCEDURES FOR TRACKING PREPARATORY, INITIAL, AND
FOLLOW-UP CONTROL PHASES AND CONTROL, VERIFICATION, AND
ACCEPTANCE TESTS INCLUDING DOCUMENTATION.
G. PROCEDURES FOR TRACKING CONSTRUCTION DEFICIENCIES FROM
IDENTIFICATION THROUGH ACCEPTABLE CORRECTIVE ACTION.
ESTABLISH VERIFICATION PROCEDURES THAT IDENTIFIED
DEFICIENCIES HAVE BEEN CORRECTED.
H. REPORTING PROCEDURES, INCLUDING PROPOSED REPORTING
FORMATS.
I. A LIST OF THE DEFINABLE FEATURES OF WORK. A DEFINABLE
FEATURE OF WORK IS A TASK WHICH IS SEPARATE AND DISTINCT
FROM OTHER TASKS, HAS SEPARATE CONTROL REQUIREMENTS, AND
IS IDENTIFIED BY DIFFERENT TRADES OR DISCIPLINES, OR IT IS WORK
BY THE SAME TRADE IN A DIFFERENT ENVIRONMENT. ALTHOUGH
EACH SECTION OF THE SPECIFICATIONS CAN GENERALLY BE
CONSIDERED AS A DEFINABLE FEATURE OF WORK, THERE ARE
FREQUENTLY MORE THAN ONE DEFINABLE FEATURES UNDER A
PARTICULAR SECTION. THIS LIST WILL BE AGREED UPON DURING THE
COORDINATION MEETING.
J. COORDINATE SCHEDULED WORK WITH SPECIAL INSPECTIONS
REQUIRED, THE CONTRACTOR MUST INCLUDE THE INSPECTIONS IN
THE. THE CONTRACTOR MUST PERFORM THESE INSPECTIONS USING
INDEPENDENT QUALIFIED INSPECTORS. INCLUDE THE SPECIAL
INSPECTION PLAN REQUIREMENTS IN THE QC PLAN.
3.1.2.2 ACCEPTANCE
ACCEPTANCE OF THE CONTRACTOR'S PLAN IS REQUIRED PRIOR TO THE
START OF CONSTRUCTION. ACCEPTANCE IS CONDITIONAL AND WILL BE
PREDICATED ON SATISFACTORY PERFORMANCE DURING CONSTRUCTION.
THE GOVERNMENT RESERVES THE RIGHT TO REQUIRE THE CONTRACTOR
TO MAKE CHANGES IN THE CONTRACTOR QCP AND OPERATIONS INCLUDING
REMOVAL OF PERSONNEL, AS NECESSARY, TO OBTAIN THE QUALITY
SPECIFIED.
3.1.3 SAFETY PLAN
SUBMIT SAFETY PLAN MEETING OSHA REQUIREMENTS TO COMPLETE THE
WORK ITEMS NEEDED FOR SUCCESSFUL EXECUTION OF THE PROJECT. THE
SITE SAFETY OFFICER MUST BE IDENTIFIED IN WRITING TO THE CO AND
SHALL BE RESPONSIBLE AS THE POINT OF CONTRACT FOR ALL SAFETY
ISSUES AS PART OF THE PROJECT. AT A MINIMUM THE PLAN SHALL PROVIDE
SAFETY OFFICER, CONTACT NUMBER, NARRATIVE FOR EXECUTION OF PLAN,
EMERGENCY CONTACTS AND PROCEDURES.
3.1.4 ENVIRONMENTAL PROTECTION PLAN
SUBMIT ENVIRONMENTAL PROTECTION PLAN INDICATING BEST
MANAGEMENT PRACTICES FOR STORM WATER PROTECTION, AIR
POLLUTION, NOISE PREVENTION, AND WILDLIFE PROTECTION AS IT
PERTAINS TO THE EQUIPMENT IN MAINTAINING COMPLIANCE WITH INDIANA
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT.
3.1.4.1 WASTE MANAGEMENT PLAN
SUBMIT CONSTRUCTION WASTE MANAGEMENT PLAN WITHIN 15 DAYS AFTER
NOTICE TO PROCEED. THE PLAN SHALL DEMONSTRATE HOW THE
CONTRACTOR WILL MEET THE AIR FORCE CUMULATIVE WASTE DIVERSION
REQUIREMENT OF 60% DIVERSION. CONTRACTORS WILL MAXIMIZE THE
DIVERSION OF CONSTRUCTION MATERIALS DISPOSAL IN THE LANDFILL
(METALS, CARDBOARD, PLASTICS, ETC.). CONSTRUCTION & DEMOLITION
(C&D) DEBRIS GENERATED FROM CONSTRUCTION IS THE RESPONSIBILITY
OF THE CONTRACTOR. CONTRACTOR IS RESPONSIBLE FOR PROPER
DISPOSAL OF ALL ITEMSAND FOR ANY PERMITS AND FEES REQUIRED FOR
SOLID WASTE DISPOSAL/RECYCLING. THE PLAN MUST INCLUDE THE
FOLLOWING ITEMS:
A. IDENTIFY THE NAMES OF INDIVIDUALS RESPONSIBLE FOR WASTE
MANAGEMENT AND WASTE MANAGEMENT TRACKING, ALONG WITH
ROLES AND RESPONSIBILITIES ON THE PROJECT.
B. DESCRIPTION OF THE SPECIFIC APPROACHES TO BE USED IN
RECYCLING/REUSE OF THE VARIOUS MATERIALS GENERATED,
INCLUDING THE AREAS ON SITE AND EQUIPMENT TO BE USED FOR
PROCESSING, SORTING, AND TEMPORARY STORAGE OF
MATERIALS.
C. NAME OF LANDFILL AND/OR INCINERATOR TO BE USED.
D. IDENTIFICATION OF LOCAL AND REGIONAL RE-USE PROGRAMS,
INCLUDING NON-PROFIT ORGANIZATIONS SUCH AS SCHOOLS, LOCAL
HOUSING AGENCIES, AND ORGANIZATION THAT ACCEPT USED
MATERIALS SUCH AS MATERIAL EXCHANGE NETWORKS AND RESALE
STORES. INCLUDE THE NAME, LOCATION, PHONE NUMBER FOR EACH
RE-USE FACILITY IDENTIFIED, AND PROVIDE A COPY OF THE PERMIT
OR LICENSE FOR EACH FACILITY.
E. LIST OF SPECIFIC MATERIALS, BY TYPE AND QUANTITY, THAT WILL BE
SALVAGED FOR RESALE, SALVAGED AND REUSED ON THE CURRENT
PROJECT, SALVAGED AND STORED FOR REUSE ON A FUTURE
PROJECT, OR RECYCLED. IDENTIFY THE RECYCLING FACILITIES BY
NAME, ADDRESS, AND PHONE NUMBER.
F. IDENTIFICATION OF MATERIALS THAT CANNOT BE RECYCLED OR
REUSED WITH AN EXPLANATION OR JUSTIFICATION, TO BE APPROVED
BY THE CO.
G. DESCRIPTION OF THE MEANS BY WHICH ANY MATERIALS IDENTIFIED
IN ITEM (G) ABOVE WILL BE PROTECTED FROM CONTAMINATION.
H. DESCRIPTION OF THE MEANS OF TRANSPORTATION OF THE
RECYCLABLE MATERIALS (WHETHER MATERIALS WILL BE
SITE-SEPARATED AND SELF-HAULED TO DESIGNATED CENTERS, OR
WHETHER MIXED MATERIALS WILL BE COLLECTED BY A
WASTE HAULER AND REMOVED FROM THE SITE).
I. COPY OF TRAINING PLAN FOR SUBCONTRACTORS AND OTHER
SERVICES TO PREVENT CONTAMINATION BY CO-MINGLING MATERIALS
IDENTIFIED FOR DIVERSION AND WASTE MATERIALS.
J. IDENTIFICATION OF AT LEAST 5 CONSTRUCTION OR DEMOLITION
MATERIAL STREAMS FOR DIVERSION.
K. LIST EACH SUPPLIER WHO DELIVER CONSTRUCTION MATERIALS, IN
BULK, OR PACKAGE PRODUCTS IN RETURNABLE CONTAINERS OR
RETURNABLE PACKAGING, OR HAVE TAKE-BACK PROGRAMS. LIST
EACH PROGRAM AND THE APPLICABLE MATERIAL TO ACTIVELY
MONITOR AND TRACK TO ASSIST IN MEETING WASTE DIVERSION
REQUIREMENTS ON THE PROJECT.
L. IDENTIFY ANY LOCAL JURISDICTION REQUIREMENTS FOR WASTE
MANAGEMENT. INCLUDE THOSE REQUIREMENTS, POINTS OF
CONTACT, ETC. DISTRIBUTE COPIES OF THE WASTE MANAGEMENT
PLAN TO EACH SUBCONTRACTOR, QC MANAGER, AND THE CO.
R:
\4
A
RW
\E
RM
\M
SG
\C
ES
\C
E\
CE
C\
AC
TI
VE
F
IL
ES
1, 7, 0, 3A \4
Pr oj ec t D es ig n
Fi le s\
-3
Re pa ir
Ro of
; 5
\2 0-
G
EN
ER
AL
G
1- 4.
dw g, /4
/2
:5 5:
A
M , A
N
SI
fu ll bl ee d D
(3 4.
x
2.
In ch
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
W
AI
TEJA
W
OR
SK
I
RE
PA
IR
R
OO
F
1DEC 2023
CTGB23-3001
G003
GE
NE
RA
L
GR
EE
N
JO
HN
SO
N
SP
EC
IF
IC
AT
IO
NS
3.1.4 ENVIRONMENTAL PROTECTION PLAN CONT.
3.1.4.2 SAFETY DATA SHEET (SDS) SUBMITTALS
SUBMIT ALL SDS FOR PRODUCTS AND MATERIALS USED ON THIS PROJECT.
THESE INCLUDE TEMPORARY AND PERMANENT MATERIALS USED AND
STORED IN THE LAYDOWN YARD OR APPLIED TO THE PROJECT SITE
LOCATIONS.
3.1.4.2.1 HAZARDOUS MATERIALS
SUBMIT ALL HAZARDOUS MATERIALS PROPOSED FOR USE ON THE PROJECT.
THIS LIST IS REQUIRED TO BE APPROVED PRIOR TO BEING BROUGHT ONTO
THE INSTALLATION BY CEV. A SDS FOR EACH HAZARDOUS CHEMICAL AND
AN ESTIMATED USAGE AMOUNT MUST BE INCLUDED IN THE SUBMITTAL.
3.1.5 PROJECT SCHEDULE
PREPARE FOR APPROVAL A PROJECT SCHEDULE, AS SPECIFIED HEREIN,
PURSUANT TO THE FAR 52.236-15 “SCHEDULES FOR CONSTRUCTION
CONTRACTS”. SHOW IN THE SCHEDULE THE SEQUENCE IN WHICH THE
CONTRACTOR PROPOSES TO PERFORM THE WORK AND DATES ON WHICH
THE CONTRACTOR CONTEMPLATES STARTING AND COMPLETING ALL
SCHEDULE ACTIVITIES. THE SCHEDULING OF CONSTRUCTION IS THE
RESPONSIBILITY OF THE CONTRACTOR. PROVIDE A SCHEDULE THAT IS A
FORWARD PLANNING AS WELL AS A PROJECT MONITORING TOOL.
3.1.5.1 CRITICAL PATH METHOD
THE CRITICAL PATH METHOD OF NETWORK CALCULATION SHALL BE USED
TO GENERATE THE PROJECT SCHEDULE.
3.1.5.2MANDATORY TASKS/MILESTONES
THE FOLLOWING TASKS MUST BE INCLUDED AND LISTED AS SEPARATE LINE
ACTIVTIES. EACH SHALL HAVE SEPARATE MILESTONE FOR SUBMITAL AND
APPROVAL/ACCEPTANCE:
A. PROCUREMENT ITEMS (LONG LEAD ITEMS > 90 DAYS)
B. REQUIRED PERMITS (SEPERATELY LISTED)
C. CONSTRUCTION SITE PLAN
D. ACCIDENT PREVENTION PLAN
E. QUALITY CONTROL PLAN
F. GOVERNMENT ACTITIVIES (E.G. APPROVALS, NTP, UTILITIES,
INSPECTIONS)
G. PRE-FINAL INSPECTION
H. FINAL INSPECTION
I. CLOSEOUT DOCUMENTATION
3.2 CLOSEOUT SUBMITTALS
3.2.1 OPERATIONS AND MAINTENANCE DATA
SUBMIT ALL OPERATIONS AND MAINTENANCE DATA SHEETS FOR ALL
PRODUCTS PROVIDED DURING CONSTRUCTION. ORGANIZE DATA SHEETS
PER WORK DISCIPLINE IN LOGICAL MANNER WITH HEADERS AND TABS FOR
QUICK REFERENCE. DATA SHEETS SHALL INCLUDE ALL SAFETY,
PREVENTATIVE MAINTENANCE, WARRANTIES, PARTS IDENTIFICATIONS, TEST
AND PERFORMANCE DATA AND CONTRACTOR/MANUFACTURER CONTACT
INFORMATION.
3.2.1.1 WARRANTY MANAGEMENT PLAN
THE CONTRACTOR SHALL DEVELOP A WARRANTY MANAGEMENT PLAN
WHICH SHALL CONTAIN INFORMATION RELEVANT TO THE CLAUSE
"WARRANTY OF CONSTRUCTION" IN FAR 52.246-21. AT LEAST THIRTY (30)
CALENDAR DAYS BEFORE THE PLANNED PRE-WARRANTY CONFERENCE, THE
CONTRACTOR SHALL SUBMIT THE WARRANTY MANAGEMENT PLAN FOR
GOVERNMENT APPROVAL. THE WARRANTY MANAGEMENT PLAN SHALL
INCLUDE ALL REQUIRED ACTIONS AND DOCUMENTS TO ASSURE THAT THE
GOVERNMENT RECEIVES ALL WARRANTIES TO WHICH IT IS ENTITLED. THE
PLAN SHALL BE IN NARRATIVE FORM AND CONTAIN SUFFICIENT DETAIL TO
RENDER IT SUITABLE FOR USE BY FUTURE MAINTENANCE AND REPAIR
PERSONNEL, WHETHER TRADESMEN, OR OF ENGINEERING BACKGROUND,
NOT NECESSARILY FAMILIAR WITH THIS CONTRACT. THE TERM "STATUS" AS
INDICATED BELOW SHALL INCLUDE DUE DATE AND WHETHER ITEM HAS
BEEN SUBMITTED OR WAS ACCOMPLISHED. WARRANTY INFORMATION MADE
AVAILABLE DURING THE CONSTRUCTION PHASE SHALL BE SUBMITTED TO
THE CO FOR APPROVAL PRIOR TO EACH MONTHLY PAY ESTIMATE.
APPROVED INFORMATION SHALL BE ASSEMBLED IN A BINDER AND SHALL BE
TURNED OVER TO THE GOVERNMENT UPON ACCEPTANCE OF THE WORK.
THE CONSTRUCTION WARRANTY PERIOD SHALL BEGIN ON THE DATE OF
PROJECT ACCEPTANCE AND SHALL CONTINUE FOR THE FULL PRODUCT
WARRANTY PERIOD. A JOINT 4 MONTH AND 9 MONTH WARRANTY
INSPECTION SHALL BE CONDUCTED, MEASURED FROM TIME OF
ACCEPTANCE, BY THE CONTRACTOR, CO AND THE CUSTOMER
REPRESENTATIVE. INFORMATION CONTAINED IN THE WARRANTY
MANAGEMENT PLAN SHALL INCLUDE, BUT SHALL NOT BE LIMITED TO, THE
FOLLOWING:
(A) ROLES AND RESPONSIBILITIES OF ALL PERSONNEL ASSOCIATED
WITH THE WARRANTY PROCESS, INCLUDING POINTS OF CONTACT AND
TELEPHONE NUMBERS WITHIN THE ORGANIZATIONS OF THE CONTRACTORS,
SUBCONTRACTORS, MANUFACTURERS OR SUPPLIERS INVOLVED.
(B) LISTING AND STATUS OF DELIVERY OF ALL CERTIFICATES OF
WARRANTY FOR EXTENDED WARRANTY ITEMS, TO INCLUDE ROOFS, HVAC
BALANCING, PUMPS, MOTORS, TRANSFORMERS, AND FOR ALL
COMMISSIONED SYSTEMS SUCH AS FIRE PROTECTION AND ALARM
SYSTEMS, SPRINKLER SYSTEMS, LIGHTNING PROTECTION SYSTEMS, ETC.
(C) A LIST FOR EACH WARRANTED EQUIPMENT, ITEM, AND FEATURE OF
CONSTRUCTION OR SYSTEM INDICATING:
1. NAME OF ITEM.
2. MODEL AND SERIAL NUMBERS.
3. LOCATION WHERE INSTALLED.
4. NAME AND PHONE NUMBERS OF MANUFACTURERS OR SUPPLIERS.
5. NAMES, ADDRESSES AND TELEPHONE NUMBERS OF SOURCES OF
SPARE PARTS.
6. WARRANTIES AND TERMS OF WARRANTY. THIS SHALL INCLUDE
ONE-YEAR OVERALL WARRANTY OF CONSTRUCTION. ITEMS WHICH HAVE
EXTENDED WARRANTIES SHALL BE INDICATED WITH SEPARATE WARRANTY
EXPIRATION DATES.
7. CROSS-REFERENCE TO WARRANTY CERTIFICATES AS APPLICABLE.
8. STARTING POINT AND DURATION OF WARRANTY PERIOD.
9. SUMMARY OF MAINTENANCE PROCEDURES REQUIRED TO
CONTINUE THE WARRANTY IN FORCE.
10. CROSS-REFERENCE TO SPECIFIC PERTINENT OPERATION AND
MAINTENANCE MANUALS.
11. ORGANIZATION, NAMES AND PHONE NUMBERS OF PERSONS TO
CALL FOR WARRANTY SERVICE.
12. TYPICAL RESPONSE TIME AND REPAIR TIME EXPECTED FOR
VARIOUS WARRANTED EQUIPMENT.
(A) THE CONTRACTOR'S PLANS FOR ATTENDANCE AT THE 4 AND 9
MONTH POST-CONSTRUCTION WARRANTY INSPECTIONS CONDUCTED BY
THE GOVERNMENT.
(B) PROCEDURE AND STATUS OF TAGGING OF ALL EQUIPMENT
COVERED BY EXTENDED WARRANTIES.
(C) COPIES OF INSTRUCTIONS TO BE POSTED NEAR SELECTED PIECES
OF EQUIPMENT WHERE OPERATION IS CRITICAL FOR WARRANTY AND/OR
SAFETY REASONS.
3.2.2 ASBUILT DRAWINGS
SUBMIT FINAL AS-BUILT DRAWINGS MARKED UP FROM ANY CHANGES
DURING FIELD WORK AS PART OF THE CLOSEOUT DOCUMENTS. THESE
DRAWINGS SHALL PROVIDE FACTUAL INFORMATION INCLUDING ALL
DEVIATIONS AND AMENDMENTS FROM THE CONTRACT DRAWINGS.
3.2.3 HAZARADOUS WASTE RECORDS
SUBMIT ALL WASTE RECORDS FOR MATERIAL REMOVED OFF-SITE AS PART
OF THE FINAL INSPECTION RECORDS.
3.3 END OF SECTION 3
SECTION 4 - ENVIRONMENTAL REQUIREMENTS
4.0 RECORDS DOCUMENTATION
MAINTAIN RECORDS TO DOCUMENT THE INSPECTIONS, REPORTS,
COMPLIANCE WITH REGULATIONS/ LAWS, AND DIVERSION OF WASTE AS
DESCRIBED BY REPORTABLE ITEMS LISTED IN SECTION 4.4. MAKE RECORDS
AVAILABLE TO THE CO DURING CONSTRUCTION OR INCIDENTAL DEMOLITION
ACTIVITIES. PROVIDE A COPY OF THE REPORTS TO THE CO AT TIME
INTERVALS LISTED IN SECTION 4.4. EACH REPORT SHALL INCLUDE
SUPPORTING DOCUMENTATION SUCH AS MANIFESTS, WEIGH TICKETS,
RECEIPTS, AND INVOICES SPECIFICALLY IDENTIFYING THE PROJECT AND
RESULT.
4.1 QUARTERLY REPORTING
PROVIDE CUMULATIVE REPORTS AT THE END OF EACH QUARTER
(DECEMBER, MARCH, JUNE, AND SEPTEMBER, CORRESPONDING WITH THE
FEDERAL FISCAL YEAR FOR REPORTING PURPOSES). SUBMIT QUARTERLY
REPORTS NOT LATER THAN 15 CALENDAR DAYS AFTER THE PRECEDING
QUARTER HAS ENDED. SUBMIT QUARTERLY REPORTS TO THE APPROPRIATE
OFFICE OR IDENTIFIED POINT OF CONTACT.
4.2 ANNUAL REPORTING
PROVIDE A CUMULATIVE CONSTRUCTION WASTE DIVERSION REPORT
ANNUALLY. SUBMIT ANNUAL REPORT NOT LATER THAN 30 CALENDAR DAYS
AFTER THE PRECEDING FOURTH QUARTER HAS ENDED. PROVIDE COPY OF
ANNUAL CONSTRUCTION WASTE DIVERSION REPORT TO THE INSTALLATION
POC.
4.3 CONSTRUCTION CLOSEOUT FINAL REPORT
A FINAL CONSTRUCTION WASTE DIVERSION REPORT IS REQUIRED AT THE
END OF THE PROJECT. PROVIDE FINAL CONSTRUCTION WASTE DIVERSION
REPORT 60 DAYS PRIOR TO THE BENEFICIAL OCCUPANCY DATE (BOD).
4.4 REPORTABLE ITEMS
ALL ITEMS LISTED BELOW SHALL BE PROVIDED PER TABLE 4.1.
4.4.3 HAZARDOUS MATERIAL
A USAGE REPORT WILL BE PROVIDED TO CEV QUARTERLY, ANNUALLY,
BASED ON THE FISCAL YEAR CALENDAR. A TOTAL PROJECT USAGE REPORT
WILL BE PROVIDED AT THE COMPLETION OF THE PROJECT. USAGE REPORT
WILL PROVIDE CHEMICAL NAME, ACTUAL CHEMICAL USAGE, PROJECT,
LOCATION USED ON PROJECT AND INDIVIDUAL/COMPANY WHO USED THE
CHEMICAL.
4.4.4 HAZARDOUS WASTE
ANY WASTE BEING DISPOSED OF ON A MANIFEST
(HAZARDOUS/NONHAZARDOUS) IS REQUIRED TO HAVE SUPPORTING DATA
(SDSS, SAMPLE RESULTS, ETC.) TO VALIDATE HAZARDOUS/NONHAZARDOUS
DETERMINATION. WASTE SUPPORTING DATA WILL BE PROVIDED TO CEV
PRIOR TO THE WASTE BEING LISTED ON A MANIFEST AND REMOVED FROM
THE PROJECT SITE. ANY MANIFEST (HAZARDOUS OR NONHAZARDOUS)
UTILIZING GRISSOM'S EPA ID IS REQUIRED TO BE SIGNED BY A MEMBER OF
THE CEV OFFICE. RETURN MANIFEST IS REQUIRED TO BE RECEIVED BY THE
CEV OFFICE WITHIN 35 DAYS OF SHIPMENT DATE.
4.4.8 SPILLS
ALL PERSONNEL (GOVERNMENT AND CONTRACTOR) ARE REQUIRED TO
FOLLOW THE FACILITY RESPONSE PLAN (FRP) & THE SPILL PREVENTION,
CONTROL, AND COUNTERMEASURES (SPCC) PLAN. ANY RELEASE A
CONTRACTOR OR SUB-CONTRACTOR IS INVOLVED IN (FUEL, OIL, HAZMAT)
THE CONTRACTOR IS RESPONSIBLE FOR REPORTING AND CLEAN-UP,
DISPOSAL OF SPILT MATERIAL, RESPONSE ITEMS USED, AND SOIL OR OTHER
CONTAMINATED ITEMS. CONTRACTOR IS TO REPORT THE SPILL (PER
SPCC/FRP), SAME DAY, TO CEV AND ANY OTHER PERTINENT PARTY.
TRANSMIT REPORTS AT INTERVALS INDENTIFIED IN TABLE 4.1.
4.4.11 SOLID WASTE/RECYCLING
CONTRACTORS WILL PROVIDE QUARTERLY AND ANNUAL (FY CALENDAR),
AND PROJECT COMPLETION REPORTS TO CEV FOR MATERIALS DISPOSED
AND DIVERTED. REPORTS WILL CONTAIN, AT A MINIMUM, MATERIAL
DISPOSED/RECYCLED, POUNDS/TONS OF MATERIAL RECYCLED/DISPOSED,
LOCATION MATERIAL IS RECYCLED/DISPOSED (LANDFILL OR COMPANY),
DATE MATERIAL LEFT THE SITE, AND ANY OTHER PERTINENT INFORMATION.
CONTRACTOR SHALL PROVIDE, WITH REPORTS, WEIGHT TICKETS FOR
MATERIAL RECYCLED/DISPOSED.
4.5 END OF SECTION 4
TABLE 4.1
TABLE 3.1
TABLE 2.1
R:
\4
A
RW
\E
RM
\M
SG
\C
ES
\C
E\
CE
C\
AC
TI
VE
F
IL
ES
1, 7, 0, 3A \4
Pr oj ec t D es ig n
Fi le s\
-3
Re pa ir
Ro of
; 5
\2 0-
G
EN
ER
AL
G
1- 4.
dw g, /4
/2
:5 6:
A
M , A
N
SI
fu ll bl ee d D
(3 4.
x
2.
In ch
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
W
AI
TEJA
W
OR
SK
I
RE
PA
IR
R
OO
F
1DEC 2023
CTGB23-3001
A001
AR
CH
IT
EC
TU
RA
L
GR
EE
N
JO
HN
SO
N
SP
EC
IF
IC
AT
IO
NS
END OF SECTION 011000
SECTION 070103 - AIR BARRIER REHABILITATION
PART 1 - GENERAL
1.1 SUMMARY
A. SECTION INCLUDES: BUILDING ENVELOPE WEATHERIZATION WORK.
B. RELATED SECTIONS: DIVISION 07 SECTION, PREPARATION FOR
ROOFING SYSTEM REHABILITATION OR REPLACEMENT.
1.2 ACTION SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED.
1.3 INFORMATIONAL SUBMITTALS
A. INSTALLER QUALIFICATIONS: FOR FIRM AND INSTALLERS.
B. PRODUCT TEST REPORTS: WHEN REQUIRED BY AUTHORITIES
HAVING JURISDICTION, FURNISH PRODUCT TEST REPORTS BASED ON
EVALUATION OF TESTS PERFORMED BY A QUALIFIED TESTING AGENCY
OR BY MANUFACTURER AND WITNESSED BY A QUALIFIED TESTING
AGENCY.
1.4 QUALITY ASSURANCE
A. INSTALLER QUALIFICATIONS: A QUALIFIED INSTALLER FIRM WHO
EMPLOYS EXPERIENCED WEATHERIZATION PRODUCT INSTALLERS FOR
THIS PROJECT WHO ARE TRAINED BY MANUFACTURER FOR
INSTALLATION OF SPECIFIED PRODUCTS.
1.5 DELIVERY, STORAGE, AND HANDLING
A. PROTECT THERMAL AND MOISTURE PROTECTION MATERIALS FROM
PHYSICAL DAMAGE AND FROM DETERIORATION DUE TO MOISTURE,
SOILING, AND OTHER SOURCES. STORE INSIDE AND IN A DRY LOCATION.
COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS FOR
HANDLING, STORING, AND PROTECTING DURING INSTALLATION.
PART 2 - PRODUCTS
2.1 MATERIALS, GENERAL
A. SUSTAINABILITY REQUIREMENTS: PROVIDE THERMAL AND
MOISTURE PROTECTION MATERIALS AS FOLLOWS:
1. INSULATION, ADHESIVES, AND SEALANTS SHALL COMPLY WITH
THE REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF PUBLIC
HEALTH'S "STANDARD METHOD FOR THE TESTING AND EVALUATION
OF VOLATILE ORGANIC CHEMICAL EMISSIONS FROM INDOOR
SOURCES USING ENVIRONMENTAL CHAMBERS."
2. PROVIDE ADHESIVES AND SEALANTS WITH VOC CONTENT NOT
MORE THAN THAT ALLOWED UNDER SOUTH COAST AIR QUALITY
MANAGEMENT DISTRICT (SCAQMD) RULE NO. 1168.
B. SURFACE-BURNING CHARACTERISTICS: AS DETERMINED BY
TESTING IDENTICAL PRODUCTS ACCORDING TO ASTM E84 BY A
QUALIFIED TESTING AGENCY. IDENTIFY PRODUCTS WITH APPROPRIATE
MARKINGS OF APPLICABLE TESTING AGENCY.
C. COMBUSTION CHARACTERISTICS WITH APPLIED THERMAL BARRIER:
COMPLY WITH REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION
WHEN TESTED ACCORDING TO NFPA 286.
2.2 INSULATION AND AIR BARRIER REHABILITATION MATERIALS
A. CLOSED-CELL SPRAY POLYURETHANE FOAM INSULATION: ASTM
C1029, TYPE II, WITH MAXIMUM FLAME-SPREAD AND SMOKE-DEVELOPED
INDEXES OF 25 AND 50, RESPECTIVELY, PER ASTM E84 AND THE
FOLLOWING:
1. MINIMUM DENSITY: 1.5 LB/CU. FT (24 KG/CU. M).
2. THERMAL RESISTIVITY: 6.5 DEG F X H X SQ. FT./BTU X IN. AT 75
DEG F (54 K X M/W AT 24 DEG C).
3. CLOSED CELL CONTENT: GREATER THAN 90 PERCENT PER ASTM
D2856.
4. BASIS OF DESIGN PRODUCTS: PROVIDE DAP, TOUCH 'N FOAM
PROFESSIONAL, TWO-COMPONENT SPRAY FOAM.
B. LOW-EXPANSION DETAILING FOAM: SINGLE-COMPONENT
URETHANE FOAM WITH LOW-EXPANSION PRESSURE, AND 10 PERCENT
FLEXIBILITY, SUITABLE FOR INSTALLATION ADJACENT TO
FENESTRATION. PROVIDE PRODUCT COMPLYING WITH AAMA 812.
1. BASIS OF DESIGN PRODUCT: DAP, TOUCH 'N FOAM
PROFESSIONAL, TWO-COMPONENT SPRAY FOAM.
C. AIR BARRIER ACCESSORY MATERIALS:
1. PRIMER: MATERIAL RECOMMENDED BY INSULATION
MANUFACTURER WHERE REQUIRED FOR ADHESION OF INSULATION
TO SUBSTRATES.
2. THERMAL PROTECTION BARRIER: NON-FLAMMABLE,
INTUMESCENT COATING APPROVED FOR USE AS A THERMAL
PROTECTION COATING OVER PLASTIC INSULATION MATERIALS
WHEN TESTED IN ACCORDANCE WITH NFPA 286 AND MEETING
LOW-EMITTING PRODUCTS REQUIREMENT.
3. JOINT SEALANT: ASTM C920; CLASS 100/50 (LOW MODULUS),
GRADE NS, USE NT RELATED TO EXPOSURE, AND, AS APPLICABLE
TO JOINT SUBSTRATES INDICATED, USE O. PROVIDE JOINT SEALANT
CHEMICALLY COMPATIBLE WITH SUBSTRATE MATERIALS.
4. MODIFIED BITUMINOUS TRANSITION STRIP: VAPOR RETARDING,
40 MILS (1.0 MM) THICK, SMOOTH SURFACED, SELF-ADHERING;
CONSISTING OF 36 MILS (0.9 MM) OF RUBBERIZED ASPHALT
LAMINATED TO A 4-MIL- (0.1-MM-) THICK POLYETHYLENE FILM WITH
RELEASE LINER BACKING.
5. PREFORMED SILICONE-SEALANT EXTRUSION: MANUFACTURER'S
STANDARD SYSTEM CONSISTING OF CURED LOW-MODULUS
SILICONE EXTRUSION, SIZED TO FIT OPENING WIDTHS, WITH A
SINGLE-COMPONENT, NEUTRAL-CURING, CLASS 100/50
(LOW-MODULUS) SILICONE SEALANT FOR BONDING EXTRUSIONS TO
SUBSTRATES.
PART 3 - EXECUTION
3.1 PREPARATION
A. CUTTING AND PATCHING: REMOVE EXISTING MATERIALS AS
REQUIRED TO ACCESS SUBSTRATES RECEIVING WORK AND REPLACE
UPON APPROVAL OF WORK.
B. CLEANING AND PREPARATION: CLEAN SUBSTRATES OF
SUBSTANCES THAT ARE HARMFUL TO INSULATION OR VAPOR
RETARDERS, INCLUDING REMOVING PROJECTIONS CAPABLE OF
PUNCTURING VAPOR RETARDERS, OR THAT INTERFERE WITH
INSULATION ATTACHMENT OR ADHESION.
C. PRIMING: PRIME SUBSTRATES WHERE RECOMMENDED BY
INSULATION MANUFACTURER. APPLY PRIMER TO COMPLY WITH
INSULATION MANUFACTURER'S WRITTEN INSTRUCTIONS. CONFINE
PRIMERS TO AREAS TO BE INSULATED; DO NOT ALLOW SPILLAGE OR
MIGRATION ONTO ADJOINING SURFACES.
3.2 AIR BARRIER REHABILITATION
A. INSULATION INSTALLATION, GENERAL: COMPLY WITH INSULATION
MANUFACTURER'S WRITTEN INSTRUCTIONS APPLICABLE TO PRODUCTS
AND APPLICATIONS INDICATED.
1. INSTALL INSULATION THAT IS UNDAMAGED, DRY, AND UNSOILED
AND THAT HAS NOT BEEN LEFT EXPOSED TO ICE, RAIN, OR SNOW AT
ANY TIME.
2. EXTEND INSULATION TO ENVELOP ENTIRE AREA TO BE
INSULATED. CUT AND FIT TIGHTLY AROUND OBSTRUCTIONS AND
FILL VOIDS WITH INSULATION. REMOVE PROJECTIONS THAT
INTERFERE WITH PLACEMENT.
B. SPRAY-APPLIED INSULATION: APPLY SPRAY-APPLIED INSULATION
ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. DO NOT
APPLY INSULATION UNTIL INSTALLATION OF PIPES, DUCTS, CONDUITS,
WIRING, AND ELECTRICAL OUTLETS IN WALLS IS COMPLETED AND
WINDOWS, ELECTRICAL BOXES, AND OTHER ITEMS NOT INDICATED TO
RECEIVE INSULATION ARE MASKED.
1. PLASTIC FOAM THERMAL BARRIER: APPLY APPROVED THERMAL
BARRIER MATERIAL OVER SPRAY-APPLIED PLASTIC FOAM
INSULATION WHERE REQUIRED TO MEET REQUIREMENTS OF
AUTHORITIES HAVING JURISDICTION.
C. INSTALLATION OF AIR BARRIER/INSULATION AT ROOF AND WALL
PERIMETER AND PENETRATIONS: APPLY SPRAY-APPLIED INSULATION
AND LOW-EXPANSION DETAILING FOAM TO ROOF SYSTEM PERIMETER
AND WALL PERIMETERS AT INTERFACE WITH OTHER CONSTRUCTION
TO RESULT IN CONTINUITY OF BUILDING AIR AND MOISTURE BARRIER.
APPLY INSULATION AT EDGE OF ROOF DECK, AT ACCESSIBLE POINTS
BEHIND OR ALONGSIDE STRUCTURAL MEMBERS, AND AT OTHER
MATERIAL TRANSITIONS WHERE AIR LEAKAGE WOULD BE DETECTABLE
FROM LOCAL OR WHOLE BUILDING AIR TIGHTNESS TESTING. WHERE
DIFFERENTIAL MOVEMENT MAY OCCUR BETWEEN CONSTRUCTION
ELEMENTS, UTILIZE COMPATIBLE FLEXIBLE SHEET TRANSITION
MATERIALS. COMPLETELY SEAL ACCESSIBLE JOINTS INCLUDING THE
FOLLOWING:
1. WALL TO ROOF DECK JOINT.
2. ROOF DECK TO STRUCTURAL MEMBER JOINTS AND VOIDS.
3. ROOF CURB TO ROOF DECK AND CURB TO EQUIPMENT JOINTS.
4. ROOF HATCH TO ROOF DECK JOINT.
5. ROOF DECK TO EXPANSION JOINTS.
6. ROOF DRAIN PENETRATIONS.
7. PLUMBING VENT, PIPING, AND CONDUIT PENETRATIONS OF
ROOF DECK.
8. DISCONTINUITIES BETWEEN OTHER INSULATION MATERIALS.
D. THERMAL PROTECTION COATING: APPLY IN ACCORDANCE WITH
MANUFACTURER'S WRITTEN REQUIREMENTS AND REQUIREMENTS OF
AUTHORITIES HAVING JURISDICTION.
E. INSTALLATION OF INTERIOR JOINT SEALANTS/CAULKING: APPLY
JOINT SEALANTS TO WALL PERIMETERS AND OPENINGS AT INTERFACE
WITH OTHER CONSTRUCTION TO RESULT IN CONTINUITY OF BUILDING
AIR AND MOISTURE BARRIER. APPLY AT ACCESSIBLE POINTS AT
PERIMETER OF ROOF SYSTEM AND WITHIN ROOF SYSTEM WHERE AIR
LEAKAGE WOULD BE DETECTABLE FROM LOCAL OR WHOLE BUILDING
AIR TIGHTNESS TESTING. WHERE DIFFERENTIAL MOVEMENT MAY
OCCUR BETWEEN CONSTRUCTION ELEMENTS. COMPLETELY SEAL
ACCESSIBLE JOINTS.
F. AIR BARRIER ACCESSORY REHABILITATION
1. SURFACE PREPARATION: CLEAN, PREPARE, TREAT, AND SEAL
SUBSTRATE ACCORDING TO MANUFACTURER'S WRITTEN
INSTRUCTIONS. PROVIDE CLEAN, DUST-FREE, AND DRY SUBSTRATE
FOR AIR-BARRIER APPLICATION.
a. REMOVE GREASE, OIL, BITUMEN, FORM-RELEASE AGENTS, PAINTS, CURING COMPOUNDS, AND OTHER PENETRATING
CONTAMINANTS OR FILM-FORMING COATINGS FROM CONCRETE.
b. AT CHANGES IN SUBSTRATE PLANE, APPLY SEALANT OR
TERMINATION MASTIC BEADS AT SHARP CORNERS AND EDGES
TO FORM A SMOOTH TRANSITION FROM ONE PLANE TO
ANOTHER.
c. COVER GAPS IN SUBSTRATE PLANE AND FORM A SMOOTH
TRANSITION FROM ONE SUBSTRATE PLANE TO ANOTHER WITH
STAINLESS-STEEL SHEET MECHANICALLY FASTENED TO
STRUCTURAL FRAMING TO PROVIDE CONTINUOUS SUPPORT
FOR AIR BARRIER.
2. TRANSITION STRIP INSTALLATION: INSTALL STRIPS, TRANSITION
STRIPS, AND ACCESSORY MATERIALS ACCORDING TO AIR-BARRIER
MANUFACTURER'S WRITTEN INSTRUCTIONS TO FORM A SEAL WITH
ADJACENT CONSTRUCTION AND MAINTAIN A CONTINUOUS AIR
BARRIER.
a. CONNECT AND SEAL EXTERIOR WALL AIR-BARRIER MATERIAL
CONTINUOUSLY TO ROOFING-MEMBRANE AIR BARRIER, AND
OTHER CONSTRUCTION USED IN EXTERIOR WALL OPENINGS,
USING ACCESSORY MATERIALS.
3. TREATMENT OF GAPS: FILL GAPS IN PERIMETER FRAME
SURFACES OF WINDOWS, CURTAIN WALLS, STOREFRONTS, AND
DOORS, AND MISCELLANEOUS PENETRATIONS OF AIR-BARRIER
MATERIAL WITH FOAM SEALANT.
a. SEAL TRANSITION STRIPS AROUND TIES AND PENETRATIONS
WITH TERMINATION MASTIC.
END OF SECTION 070103
SECTION 070150.19 - PREPARATION FOR RE-ROOFING
PART 1 - GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
1. ROOF REPLACEMENT PREPARATION CONSISTING OF FULL ROOF
TEAR-OFF OF ROOF SYSTEM AT DESIGNATED ROOF AREAS.
2. TEMPORARY ROOFING.
3. TEMPORARY ROOF DRAINAGE.
4. REMOVAL AND REINSTALLATION OF INDICATED COMPONENTS,
ACCESSORIES, AND EQUIPMENT.
B. RELATED INFORMATION:
1. DIVISION 00 DOCUMENT "EXISTING CONDITION INFORMATION"
FOR RELATED PROJECT INFORMATION NOT PART OF THE
CONTRACT DOCUMENTS.
2. DIVISION 01 SECTION "SUMMARY" FOR USE OF THE PREMISES
AND PHASING REQUIREMENTS, AND FOR RESTRICTIONS ON USE OF
THE PREMISES DUE TO OWNER OR TENANT OCCUPANCY.
1.2 DESCRIPTION OF WORK
A. RE-ROOFING PREPARATION WORK CONSISTS OF THE FOLLOWING:
1. PREPARATION FOR ROOF AREA #1:
a. PREPARATION FOR: ROOF REPLACEMENT.
b. EXISTING ROOF TYPE: SMOOTH SURFACED MODIFIED
BITUMINOUS.
c. EXISTING DECK TYPE: METAL DECK.
d. ROOF TEAR-OFF.
e. REMOVAL AND REINSTALLATION OF INDICATED
COMPONENTS, ACCESSORIES, AND EQUIPMENT.
f. UPLIFT SECUREMENT.
g. TEMPORARY ROOF MEMBRANE.
2. PREPARATION FOR ROOF AREA #2:
a. PREPARATION FOR: ROOF REPLACEMENT.
b. EXISTING ROOF TYPE: SMOOTH SURFACED MODIFIED
BITUMINOUS.
c. EXISTING DECK TYPE: METAL DECK.
d. ROOF TEAR-OFF.
e. REMOVAL AND REINSTALLATION OF INDICATED
COMPONENTS, ACCESSORIES, AND EQUIPMENT.
f. TEMPORARY ROOF MEMBRANE.
1.3 MATERIALS OWNERSHIP
A. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED,
REINSTALLED, OR OTHERWISE INDICATED TO REMAIN OWNER'S
PROPERTY, DEMOLISHED MATERIALS SHALL BECOME CONTRACTOR'S
PROPERTY AND SHALL BE REMOVED FROM PROJECT SITE.
1.4 DEFINITIONS
A. ROOFING TERMINOLOGY: REFER TO ASTM D1079 "STANDARD
TERMINOLOGY RELATING TO ROOFING AND WATERPROOFING" AND
GLOSSARY IN APPLICABLE EDITION OF NRCA'S "THE NRCA ROOFING
MANUAL: MEMBRANE ROOF SYSTEMS" FOR DEFINITION OF TERMS
RELATED TO ROOFING WORK IN THIS SECTION.
B. EXISTING ROOFING SYSTEM: ROOFING SYSTEM IDENTIFIED
ABOVE, INCLUDING ROOF COVERING/MEMBRANE, ROOF INSULATION,
SURFACING, AND COMPONENTS AND ACCESSORIES BETWEEN DECK
AND ROOF COVERING/MEMBRANE.
C. FULL ROOF TEAR-OFF: REMOVAL OF EXISTING MEMBRANE ROOFING
SYSTEM FROM DECK.
D. PARTIAL ROOF TEAR-OFF: REMOVAL OF A PORTION OF EXISTING
MEMBRANE ROOFING SYSTEM FROM DECK OR REMOVAL OF SELECTED
COMPONENTS AND ACCESSORIES FROM EXISTING MEMBRANE
ROOFING SYSTEM.
E. ROOF RE-COVER PREPARATION: EXISTING ROOFING THAT IS TO
REMAIN AND BE PREPARED FOR INSTALLATION OF NEW ROOFING
SYSTEM OVER EXISTING SYSTEM.
F. ROOF REHABILITATION PREPARATION: EXISTING ROOFING
MEMBRANE THAT IS TO REMAIN AND BE PREPARED FOR
REHABILITATION.
G. REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND
LEGALLY DISPOSE OF THEM OFF-SITE UNLESS INDICATED TO BE
REMOVED AND REINSTALLED.
H. EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT
ARE NOT INDICATED TO BE REMOVED.
I. CONSTRUCTION WASTE: BUILDING AND SITE IMPROVEMENT
MATERIALS AND OTHER SOLID WASTE RESULTING FROM
CONSTRUCTION, REMODELING, RENOVATION, OR REPAIR OPERATIONS.
CONSTRUCTION WASTE INCLUDES PACKAGING.
J. DEMOLITION WASTE: BUILDING AND SITE IMPROVEMENT MATERIALS
RESULTING FROM DEMOLITION OR SELECTIVE DEMOLITION
OPERATIONS.
K. DISPOSAL: REMOVAL OFF-SITE OF DEMOLITION AND
CONSTRUCTION WASTE AND SUBSEQUENT SALE, RECYCLING, REUSE,
OR DEPOSIT IN LANDFILL OR INCINERATOR ACCEPTABLE TO
AUTHORITIES HAVING JURISDICTION.
L. RECYCLE: RECOVERY OF DEMOLITION OR CONSTRUCTION WASTE
FOR SUBSEQUENT PROCESSING IN PREPARATION FOR REUSE.
M. SALVAGE: RECOVERY OF DEMOLITION OR CONSTRUCTION WASTE
AND SUBSEQUENT SALE OR REUSE IN ANOTHER FACILITY.
N. SALVAGE AND REUSE: RECOVERY OF DEMOLITION OR
CONSTRUCTION WASTE AND SUBSEQUENT INCORPORATION INTO THE
WORK.
1.5 PREINSTALLATION MEETINGS
A. PRELIMINARY ROOFING CONFERENCE: BEFORE STARTING REMOVAL
WORK, CONDUCT CONFERENCE AT PROJECT SITE.
1. COORDINATE WITH ROOFING PREINSTALLATION MEETINGS
SPECIFIED IN DIVISION 07 ROOFING SECTION(S).
2. REVIEW METHODS AND PROCEDURES RELATED TO ROOFING
TEAR-OFF, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
a. REROOFING PREPARATION, INCLUDING ROOFING SYSTEM
MANUFACTURER'S WRITTEN INSTRUCTIONS.
b. TEMPORARY PROTECTION REQUIREMENTS FOR EXISTING
ROOFING SYSTEM COMPONENTS THAT ARE TO REMAIN.
c. EXISTING ROOF DRAINS AND ROOF DRAINAGE DURING EACH
STAGE OF REROOFING, AND ROOF-DRAIN PLUGGING AND PLUG
REMOVAL.
d. CONSTRUCTION SCHEDULE AND AVAILABILITY OF
MATERIALS, INSTALLER'S PERSONNEL, EQUIPMENT, AND
FACILITIES NEEDED TO AVOID DELAYS.
e. EXISTING ROOF DECK CONDITIONS REQUIRING OWNER
NOTIFICATION.
f. EXISTING ROOF DECK REMOVAL PROCEDURES AND OWNER
NOTIFICATIONS.
g. CONDITION AND ACCEPTANCE OF EXISTING ROOF DECK AND
BASE FLASHING SUBSTRATE FOR REUSE.
h. STRUCTURAL LOADING LIMITATIONS OF ROOF DECK DURING
REROOFING.
i. BASE FLASHINGS, SPECIAL ROOFING DETAILS, DRAINAGE, PENETRATIONS, EQUIPMENT CURBS, AND CONDITION OF OTHER
CONSTRUCTION THAT AFFECT REROOFING.
j. HVAC SHUTDOWN AND SEALING OF AIR INTAKES.
k. SHUTDOWN OF FIRE-SUPPRESSION, -PROTECTION, AND
-ALARM AND -DETECTION SYSTEMS.
l. ASBESTOS REMOVAL AND DISCOVERY OF
ASBESTOS-CONTAINING MATERIALS.
m. GOVERNING REGULATIONS AND REQUIREMENTS FOR
INSURANCE AND CERTIFICATES IF APPLICABLE.
1.6 ACTION SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT INDICATED.
B. TEMPORARY ROOFING: INCLUDE PRODUCT DATA AND
DESCRIPTION OF TEMPORARY ROOFING SYSTEM. IF TEMPORARY ROOF
WILL REMAIN IN PLACE, SUBMIT SURFACE PREPARATION
REQUIREMENTS NEEDED TO RECEIVE PERMANENT ROOF, AND SUBMIT
A LETTER FROM ROOFING MEMBRANE MANUFACTURER STATING
ACCEPTANCE OF THE TEMPORARY MEMBRANE AND THAT ITS
INCLUSION WILL NOT ADVERSELY AFFECT THE ROOFING SYSTEM'S
RESISTANCE TO FIRE AND WIND.
1.7 INFORMATIONAL SUBMITTALS
A. QUALIFICATION DATA: FOR INSTALLER FOR REFRIGERANT
RECOVERY TECHNICIAN.
B. DIGITAL IMAGES OR VIDEOS: SHOW EXISTING CONDITIONS OF
ADJOINING CONSTRUCTION AND SITE IMPROVEMENTS, INCLUDING
EXTERIOR AND INTERIOR FINISH SURFACES, WHICH MIGHT BE
MISCONSTRUED AS HAVING BEEN DAMAGED BY REROOFING
OPERATIONS. SUBMIT BEFORE WORK BEGINS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .